Municipal Authority
Regular MeetingSand Springs, OK · February 26, 2024
Agenda
M3A
City of Sand Springs Agenda Form
Meeting Date:____________
FEB 26 2024 Agenda:_______________
CC & MA Item:____________
Consent
Yes
Signature Items:__________ City Clerk Janice L. Almy
Presented by:____________________________
Minutes of the 01-22-2024
Subject:____________________ City Council and Municipal Authority meetings
____________________________________________________
M3A
Item #:_____________ Cost:_________BBBB
N/A Approval
Recommendation:____________________
)LQDQFH5HYLHZ: Yes Yes
/HJDO5HYLHZ: 'HSDUWPHQW+HDG5HYLHZYes
6\QRSVLV:
Requesting approval, denial, amendment, or revision of the minutes of the January 22, 2024 City Council and Municipal
Authority meetings.
Details:
Council may consider the approval, denial, amendment, or revision of the minutes of the January 22, 2024 City Council
and Municipal Authority meetings.
$WWDFKPHQWV:
CC2024-01-22 Minutes
MA2024-01-22 Minutes
MINUTES
Sand Springs Municipal Authority
January 22, 2024 – Following City Council
Sand Springs Municipal Building
100 East Broadway Street – Council Chambers, First Floor
Sand Springs, Oklahoma 74063
www.sandspringsok.org
MEMBERS PRESENT: Vice Chairman Beau Wilson (8-1)
Trustee Matt Barnett (9-0)
Trustee Mike Burdge (9-0)
Trustee Brian Jackson (8-1)
Trustee Cody Worrell (8-1)
ALSO PRESENT: City Manager Michael S. Carter
Assistant City Manager Jennifer M. Swezey
City Attorney David Weatherford
Secretary Janice L. Almy
ABSENT: Chairman Jim Spoon (7-2)
Trustee Nancy Riley (8-1)
The Sand Springs Municipal Authority met in regular session on January 22, 2024 in the
Council Chambers of the Sand Springs Municipal Building pursuant to the regular
meeting notice and agenda filed with the City Clerk’s office and posted at 2:45 p.m. on
January 18, 2024 on the display board located at the front entrance of the Sand Springs
Municipal Building (City Hall), 100 East Broadway Street, Sand Springs, Oklahoma
74063.
1. Call to Order
Vice Chairman Wilson called the meeting to order at the noted time of 6:25 p.m.
2. Roll Call
Vice Chairman Wilson called for an individual roll call with members replying in the
following manner:
Trustee Jackson, here; Trustee Barnett, here; Trustee Burdge, here; Chairman
Spoon, no response; Vice Chairman Wilson, here; Trustee Riley, no response;
Trustee Worrell, here.
It was noted for the record that Chairman Spoon and Trustee Riley were absent
from said meeting.
MUNICIPAL AUTHORITY MINUTES JANUARY 22, 2024 PAGE 2
3. Consent Agenda (A-B)
Vice Chairman Wilson informed Trustees that all matters listed under Consent
Agenda to be considered by Trustees are to be routine and will be enacted by one
motion. Consent Agenda items are vetted through various committees prior to
consideration by Trustees.
Vice Chairman Wilson noted that questions or clarification on the Consent Agenda
items could be addressed prior to taking action. Vice Chairman Wilson inquired if
Trustees had questions, needed clarification on the Consent Agenda items, or
whether any item needed to be considered separately.
There being none, Vice Chairman Wilson called for a motion regarding Consent
Agenda Items No. 3A-3B.
A motion was made by Trustee Jackson and seconded by Trustee Burdge to
approve Consent Agenda Items No. 3A-3B.
A) The minutes of the December 18, 2023 regular Municipal Authority meeting.
B) 1. Approval, denial, amendment, or revision of the purchase of a 2022
Bomag BW177 self-propelled vibratory compaction roller. (Public Works)
2. Approval, denial, amendment, or revision of a supplemental
appropriation of funds in the Municipal Authority Short Term Capital Fund: An
Increase in the Other Revenues line item in the amount of $123,292, and an
Increase in the Expenditure Utility Projects and Construction Machinery and
Equipment line item in the amount of $123,292 as related to the purchase of a
2022 Bomag BW177 self-propelled vibratory compaction roller.
Vice Chairman Wilson called for the vote recorded as follows:
Trustee Worrell, aye; Vice Chairman Wilson, aye; Trustee Burdge, aye; Trustee
Barnett, aye; Trustee Jackson, aye.
The motion carried 5-0-0.
4. Financial Report
The regular monthly Financial Report and Sales Tax and Use Tax updates were
provided to Trustees for their review and information.
This item was for informational purposes only.
MUNICIPAL AUTHORITY MINUTES JANUARY 22, 2024 PAGE 3
5. Correspondence (A)
The following correspondence was provided to Trustees for their review and
information.
A) Regular monthly bills.
6. Adjournment
The meeting adjourned at the noted time of 6:26 p.m.
_______________________________
Dawn Gilmartin, Deputy City Clerk
MA3B
City of Sand Springs Agenda Form
Meeting Date:____________
FEB 26 2024 Agenda:_______________
CC & MA Item:____________
Consent
Yes
Signature Items:__________ Ken Madison
Presented by:____________________________
Sand Springs Pogue Airport
Subject:____________________ Construction, Installation of Jet-A Fuel Tank System
____________________________________________________
Item #:_____________ $632,600.00 BBBB
Cost:_________ Approval
Recommendation:____________________
)LQDQFH5HYLHZ: Yes Yes
/HJDO5HYLHZ: 'HSDUWPHQW+HDG5HYLHZYes
6\QRSVLV:
Requesting approval, denial, amendment, or revision of Resolution No. 24-16 and M24-03 related to supplemental
appropriation, design, bidding services, payment authorization, and signature authorization. Proposed Work Order
#2/Master Agreement for Professional Services #2302606, from Garver.
Details:
Some of the projects eligible for Oklahoma Department of Aerospace and Aeronautics (ODAA) funding involve the
construction of a Jet-A fuel system. The project will consist of the upgrade of the fuel containment area and the
installation of a 12,000 gallon Jet-A tank with dispensing and receiving pumps.
The City has received permission to solicit and receive bids for design and construction of this project at the ODAA
Commission scheduled on January 30, 2024.
Staff has requested an engineering agreement with Garver to include design, bidding and constoiction services for this
project.
These items were reviewed by the Airport Advisory Board on January 11, 2024.
These items were reviewed by the Public Works City Council Committees on February 20, 2024.
Budget Impact:
The project will require up to a fifty (50) percent local match from the sponsor. The sponsor's local matching funds in the
amount of $332,600.00 is available in the FY24 Airport Construction Funds
$WWDFKPHQWV:
Resolution 24-16, M24-03 Proposed Work Order #2/Master Agreement for Professional Services #2302606,Garver
CITY OF SAND SPRINGS
SAND SPRINGS, OKLAHOMA
RESOLUTION NO. 24-16 and M24-03
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAND SPRINGS, and
TRUSTEES OF THE SAND SPRINGS MUNICIPAL AUTHORITY DESIGN
SUPPLEMENTAL AGREEMENT, AUTHORIZING CONTRACT PAYMENTS,
AUTHORIZING THE SIGNATURE OF ALL RELATED DOCUMENTS FOR
CONSTRUCTION OF A JET-A FUEL SYSTEM
WHEREAS, the City of Sand Springs has been authorized by the Oklahoma Department of
Aerospace and Aeronautics to solicit and receive bids for a Jet-A Fuel System at Sand Springs – Pogue
Airport;
WHEREAS, the funding for the project will be provided by a combination of a Oklahoma
Department of Aerospace and Aeronautics and local funds;
WHEREAS, award of bid is necessary to construct the project;
WHEREAS, an agreement related to the design and bidding phase services has been requested;
WHEREAS, authorizing payments pursuant to the contract is necessary to construct this project;
WHEREAS, approval of the documents associated with this project are in the best interest of the
citizens of the City of Sand Springs;
THEREFORE, BE IT RESOLVED by the City Council of the City of Sand Springs as follows:
1. Supplemental appropriations in the Municipal Authority Water Utility fund for an increase to
the Transfers Out: Airport Construction Fund line item in the amount of $632,600; In the
Airport Construction Fund, an increase to the Transfers In: MA Water Utility Fund in the
amount of $632,600 and an increase in the expenditure line item for Jet-A Fuel System
(new project) in the amount of $632,600.
2. The appropriation is within the FY 2024 Airport Construction Fund budget for the sponsor
local matching funds of $632,600.00;
2. Supplemental Agreement Work Order No. Two to the Design and Bidding Services
Agreement with Garver, LLC is approved;
3. All payments required pursuant to the contracts are authorized;
4. The Mayor/Chairman and/or City Manager are authorized to sign all documents necessary
to proceed with the work in a timely manner.
This Resolution is approved in open meeting of the City of Sand Springs, Oklahoma, on the 26th
day of February, 2024.
Res 24-16 and M24-03__/Pg 2
CITY OF SAND SPRINGS, OKLAHOMA
And
SAND SPRING MUNICIPAL AUTHORITY TRUST
_________________________________
James O. Spoon, Mayor/Chairman
ATTEST:
_____________________________
Janice L. Almy, City Clerk
Approved as to Form:
______________________________
David L. Weatherford, City Attorney
Work Order No. 2
to the
Master Agreement
For
Professional Services
City of Sand Springs, Oklahoma
Project No. 2302606
Version 1
OWP Jet Fuel Storage Tank Garver Project No. 2302606
This WORK ORDER (“Work Order”) is made by and between the City of Sand Springs (hereinafter
referred to as “Sponsor”) and Garver, LLC, (hereinafter referred to as “Garver” or “Engineer”) in
accordance with the provisions of the MASTER AGREEMENT FOR PROFESSIONAL SERVICES
executed on January 13, 2023 (the “Agreement”).
Under this Work Order, the Sponsor intends to make the following improvements at William R. Pogue
Municipal Airport:
1. Install Jet Fuel Storage Tank – (Design Through Bidding Only)
Garver will provide professional services related to these improvements as described herein. Terms
not defined herein shall have the meaning assigned to them in the Agreement.
SECTION 1 - SCOPE OF SERVICES
1.1 Garver shall provide the following Services:
1.1.1 Reference Appendix A.
1.2 In addition to those obligations set forth in the Agreement, Sponsor shall:
1.2.1 Give thorough consideration to all documents and other information presented by Garver
and informing Garver of all decisions within a reasonable time so as not to delay the
Services.
1.2.2 Make provision for the Personnel of Garver to enter public and private lands as required
for Garver to perform necessary preliminary surveys and other investigations required
under the applicable Work Order.
1.2.3 Obtain the necessary lands, easements and right-of-way for the construction of the work.
All costs associated with securing the necessary land interests, including property
acquisition and/or easement document preparation, surveys, appraisals, and abstract
work, shall be borne by the Sponsor outside of this Agreement, except as otherwise
described in the Services under Section 1.1.
1.2.4 Furnish Garver such plans and records of construction and operation of existing facilities,
available aerial photography, reports, surveys, or copies of the same, related to or
bearing on the proposed work as may be in the possession of Sponsor. Such documents
or data will be returned upon completion of the Services or at the request of Sponsor.
1.2.5 Furnish Garver a current boundary survey with easements of record plotted for the
project property.
1.2.6 Pay all plan review and advertising costs in connection with the project.
1.2.7 Provide legal, accounting, and insurance counseling services necessary for the project
and such auditing services as Sponsor may require.
1.2.8 Furnish permits, permit fees, and approvals from all governmental authorities having
jurisdiction over the project and others as may be necessary for completion of the project.
1.2.9 Furnishing Garver a current geotechnical report for the proposed site of construction.
Garver will coordinate with the geotechnical consultant, Sponsor has contracted with, on
Sponsor’s behalf for the project specific requested information.
Version 1
OWP Jet Fuel Storage Tank Garver Project No. 2302606
SECTION 2 – PAYMENT
For the Services set forth above, Sponsor will pay Garver as follows: Lump Sum
The table below presents a summary of the fee amounts and fee types for this Work Order.
WORK DESCRIPTION FEE AMOUNT FEE TYPE
Design Services $42,000 LUMP SUM
Bidding Services $9,000 LUMP SUM
TOTAL FEE $ 51,000
The lump sum amount to be paid under this Work Order is $51,000. For informational purposes, a
breakdown of Garver’s estimated costs is included herein with approximate current hourly rates for
each employee classification.
As directed by the Sponsor, some billable Services may have been performed by Garver prior to execution
of this Work Order. Payment for these Services will be made in accordance with the fee arrangement
established herein, as approved by the Sponsor.
Additional Services (Extra Work). For services not described or included in Section 2, but requested by
the Owner in writing, the Owner will pay Garver as expressly set forth in the applicable Amendment.
SECTION 3 – APPENDICES
3.1 The following Appendices are attached to and made a part of this Work Order:
3.1.1 Appendix A - Scope of Services
3.1.2 Appendix B – Fee Spreadsheet
3.1.3 Exhibit A – Site Plan
This Work Order may be executed in two (2) or more counterparts each of which shall be deemed an
original, but all of which together shall constitute one and the same instrument.
Version 1
OWP Jet Fuel Storage Tank Garver Project No. 2302606
The effective date of this Work Order shall be the last date written below.
CITY OF SAND SPRINGS, OKLAHOMA GARVER, LLC
By: By:
Signature Signature
Name: Name: Blake Roberson, PE
Printed Name Printed Name
Title: Title: Vice President
Date: Date: December 21, 2023
Attest: Attest:
Version 1
OWP Jet Fuel Storage Tank Garver Project No. 2302606
APPENDIX A
SCOPE OF SERVICES
Generally, the Scope of Services includes the following professional services for improvements to the
William R Pogue Municipal Airport. Improvements will consist primarily of installation of a 12,000 gallon
Jet-A tank with bulk refill only capabilites in the existing containment area as shown in Exhibit A. The
proposed fueling system will not include self-serve capabilities. This project will include construction of
a segment gravel access roadway for fuel tanker trucks and aircraft refueling trucks.
• Project Administration
• Spill Prevention Control & Countermeasure (SPCC) (Amendment to existing SPCC)
• Design Services
o 90% Final Design
o 100% Issued for Bid
• Bidding Services
1. PROJECT ADMINISTRATION
1.1. Garver will serve as the Owner’s representative for the project and furnish consultation and
advice to the Owner during the performance of this service. Garver will attend conferences
alone or with Owner’s representatives, local officials, state and federal agencies, and others
regarding the scope of the proposed project, its general design, functions, and impacts.
1.2. Garver will assist in development of grant reimbursement packets for review, execution, and
submittal to the ODAA (formerly OAC) by the Owner.
2. SPILL PREVENTION CONTROL & COUNTERMEASURE PLAN (SPCC)
2.1. Garver will provide a recommended amendment to the existing Spill Prevention Control and
Countermeasure Plan (SPCC) on file with the airport to be submitted to the Oklahoma
Department of Environmental Quality for review. Garver will incorporate comments from the
agency.
3. DESIGN SERVICES
3.1. General: Garver will prepare performance-based drawings, performance-based
specifications, instructions to bidders, and general provisions and special provisions, all based
on guides furnished to Garver by the Owner and FAA, or internally developed by Garver.
Contract Documents (Plans, Specifications, and Estimates) will be prepared for award of one
(1) construction contract. These designs shall conform to the standards of practice ordinarily
used by members of Garver’s profession practicing under similar conditions and shall be
submitted to the Oklahoma Department of Aeronautics office from which approval must be
obtained.
3.2. Owner / Agency Coordination:Garver’s project manager and/or design team will coordinate
with the Owner as necessary to coordinate design decisions, site visits, document
procurement, or other design needs. Garver will conduct a pre-design meeting with the Owner
to complete a pre-design checklist to gain information on the Owner’s preferences. Garver will
conduct an initial call with the Authority Having Jurisdiction (AHJ) to provide project
background information and review expectations for the project. Garver will conduct a
conference call with the AHJ following their review of the 90% plans and specifications.
OWP Jet Fuel Storage Tank Garver Project No. 2302606
3.3. Project Management Plan / Quality Control Procedures
5.3.1 Garver will develop a project specific project management plan. The project
management plan will include the project background, scope of work, stakeholder
contact information, project team organization and roles, design criteria, project
schedule, deliverables, and quality control procedures.
5.3.2 Garver will complete quality control reviews for each deliverable prior to any design
submission to Owner. Quality control reviews will be completed by qualified project
managers and project engineers who are experienced in the relevant discipline and
design elements under review. Bi-weekly internal progress meetings will be held during
all design phases to ensure adequate quality control throughout the design phases.
3.4. Airspace Analysis: Garver will prepare and submit the project to the FAA for permanent
airspace clearance on the Obstruction Evaluation and Airport Airspace Analysis (OE/AAA)
website and coordinate with FAA representatives.
3.5. Existing Conditions Review
3.5.1.Record Document Review: Garver will review record document data from the vicinity of
the construction site to evaluate existing conditions. Record document data may include
record drawings, record surveys, utility maps, GIS data, and previous design reports.
3.5.2.Site Visits: Garver’s civil and electrical engineers will perform up to two (2) site visits to
the project site to review existing conditions and evaluate record document data.
3.6. Utility Design and Coordination: It is expected that no utilities will require relocation /
modification as part of the project. Any relocation of utilities and/or coordination with utility
owners are excluded and would be considered additional scope of work and added by
amendment, as required.
3.7. Plan Set Development
Garver will develop performance-based plans outlining the Owner’s preference for the fuel
system and general guidance for the fuel system design. Garver will not provide detailed
drawings for the fuel system, structural, electrical, mechanical, or piping elements. The
detailed final design of the fuel system and all its appurtenances and elements will be
delegated to the bidders/contractors proposing the system. The drawings provided by the
contractor during the submittal review process shall be stamped by a licensed engineer in the
state of the project and shall reference the applicable building and fire codes.
OWP Jet Fuel Storage Tank Garver Project No. 2302606
The following matrix details the plan drawings to be included in each design submittal.
Design Phase
Plan Set 90% 100%
Final Issued for Bid
Cover Sheet & Index of Sheets X X
Project Layout & Survey Control Plan X X
General Notes X X
Construction Safety and Phasing Plan X X
Fueling Facility Site Plan X X
Civil Details X X
Electrical Legend & Notes X X
Electrical Details X X
Fuel Farm Rack Details X X
One-Line Diagram X X
Panel Schedule X X
3.8. Specifications and Contract Documents
3.8.1. Technical Specifications: Detailed specifications shall be developed using FAA
"Standards for Specifying Construction for Airports" AC 150/5370-10 (latest edition) or
other appropriate standards approved for use by the FAA. Additional supplementary
specifications will be developed for project requirements not covered by FAA
AC150/5370-10 or when state or local standards are approved by the FAA. The
specifications produced by Garver for the fuel system shall be considered performance
specifications and will not include any mechanical, electrical, or structural design for
the fuel system. The performance specifications are intended to direct final design to
the construction contractor.
3.8.2. Construction Contract Documents: Garver will develop construction contract
documents based on EJCDC standards. A specimen copy of the General Provisions
and applicable prevailing wage rates will be obtained by Garver from the FAA and/or
Department of Labor as appropriate for incorporation into the specifications for the
proposed project. Final construction contract documents will be submitted to the Owner
for final review and approval.
3.9. Quantities and Engineer’s Opinion of Probable Cost: Garver will develop detailed quantities
in PDF format for use in construction cost estimating for each design phase. Quantities will be
completed by pay item. Upon the completion of quantity development, Garver will review
previous cost data and market conditions and complete an Engineer’s Opinion of Probable
Cost.
3.10. Design Services Submission and Meeting Summary: The following design submittal
phases shall be included in the fee summary. A summary of each design phase and the
associated review meetings is included below.
OWP Jet Fuel Storage Tank Garver Project No. 2302606
3.10.1. 90% Final Design
3.10.1.1. Garver will develop 90% final design plans, specifications, and engineer’s
report and submit these to the Owner for review. It is anticipated that the
Owner will review the design submission within two weeks.
3.10.1.2. At the completion of the Owner review period, Garver will meet with the
Owner to review the 90% final design plans, specifications, and engineer’s
report and to receive Owner comments and direction.
3.10.2. 100% Issued for Bid (IFB): Garver will develop 100% IFB plans and specifications
and submit these to the Owner for review. It is anticipated that the Owner will review
the IFB submission within one week.
4. BIDDING SERVICES
4.1. Bidding. Garver will assist the Owner in advertising for and obtaining bids for one prime
contract for construction, materials, equipment and services; and, where applicable, maintain
a record of prospective bidders to whom Bidding Documents have been issued, attend a pre-
bid conference and receive and process deposits for Bidding Documents. The Owner will pay
advertising costs outside of this contract.
4.2. Garver will issue addenda as appropriate to interpret, clarify or expand the Bidding
Documents. Garver will consult with and advise the Owner as to the acceptability of
subcontractors, suppliers and other persons and organizations proposed by the prime
contractor(s) (herein called "Contractor(s)") for those portions of the work as to which such
acceptability is required by the Bidding Documents. Garver will consult with the Owner
concerning the acceptability of substitute materials and equipment proposed by Contractor(s)
when substitution prior to the award of contracts is allowed by the Bidding Documents.
4.3. Garver will attend the bid opening, prepare a bid tabulation, and assist the Owner in evaluating
bids or proposals and in assembling and awarding contracts for construction, materials,
equipment, and services. Garver will assist the Owner in the execution of all contract
documents and furnish a sufficient number of executed documents for the Owner, Contractor
and State.
5. CONSTRUCTION ADMINISTRATION SERVICES – Not Included. To be added by Amendment
6. ON-SITE RESIDENT PROJECT REPRESENTATIVE SERVICES – Not Included. To be added
by Amendment
7. MATERIALS TESTING SERVICES – Not Included. To be added by Amendment
8. PROJECT CLOSEOUT SERVICES – Not Included. To be added by Amendment
9. PROJECT DELIVERABLES
9.1. The following deliverables will be submitted to the parties identified below. Unless otherwise
noted below, all deliverables shall be electronic.
• 90% Final Design Plans and Specifications to the Owner, Oklahoma Department of
Aerospace and Aeronatuics (ODAA), and AHJ.
OWP Jet Fuel Storage Tank Garver Project No. 2302606
• 100% Issued for Bid Plans, Specifications, and Report to the Owner and Oklahoma
Department of Aerospace and Aeronatuics (ODAA).
o Issued for Bidding Plans and Specifications to the Owner
• Spill Prevention Control & Countermeasure Plan (Amendment to current SPCC on file).
10. ADDITIONAL SERVICES
10.1. The following items are not included under this agreement but will be considered as additional
services to be added under Amendment if requested by the Owner.
• Construction Administration Services
• On-Site Resident Project Representative Services
• Project Closeout Services
• Topographical Survey
• Redesign for the Owner’s convenience or due to changed conditions after previous
alternate direction and/or approval.
• Deliverables beyond those listed herein.
• Design of any utility relocation other than electrical service.
• Engineering, architectural, or other professional services beyond those listed herein.
• Mechanical, electrical, and structural design associated with the fuel system.
• Fuel system commission assistance.
• Assistance with procurement of aboveground Storage Tank Installation Permit from State
Fire Marshal or any other Federal, Sate, or local permits. The construction contract
documents will require the Contractor to prepare and obtain any necessary permits.
• Preparation of a Storm Water Pollution Prevention Plan (SWPPP). The construction
contract documents will require the Contractor to prepare, maintain, and submit a SWPPP
to DEQ.
• Environmental Handling and Documentation, including wetlands identification or mitigation
plans or other work related to environmentally or historically (culturally) significant items.
• Coordination with FEMA and preparation/submittal of a CLOMR and/or LOMR.
• Services after construction, such as warranty follow-up and operations support.
11. SCHEDULE
11.1. Garver shall begin work under this Agreement upon execution of this Agreement and shall
complete the work within a mutually agreeable schedule with the Owner.
OWP Jet Fuel Storage Tank Garver Project No. 2302606
Appendix B
William R. Pogue Municipal Airport (OWP)
OWP Jet-A Fueling System Installation
FEE SUMMARY
Title I Service Estimated Fees
Lump Sum Design Services $ 42,000.00
Lump Sum Bidding Services $ 9,000.00
Subtotal for Title I Service $ 51,000.00
Total All Services $ 51,000.00
Fee Type
\\garverinc.local\gdata\Projects\2023\A03-2302606 - OWP Jet Fuel Storage Tank\Contracts\Client\Draft\Appendix B - OWP
Fuel Farm Fee Spreadsheet
Appendix B
William R. Pogue Municipal Airport (OWP)
OWP Jet-A Fueling System Installation
Design Services
WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 AM-3
hr hr hr hr hr
1. Project Administration
Pre-Design Checklist Meeting with Stakeholders (# People, on-site/virtual) 2
Coordination with Client 8 2
Coordination with AHJ 4 4
Internal (Bi-Weekly) Progress Meetings (8) 4 4 4 4
Internal Quality Control (QC) Review 8
Attend AHJ Plan Review Meeting (virtual) 4
Prepare and Distribute Final Review Meeting Minutes and Tasks 4
Environmental Coordination (CATEX/Environmental Assessment) 4
Permanent Development OEAAA Submission 4
Construction Equipment OEAAA Submission 4
Subtotal - Project Administration 20 16 16 4 8
2. Civil Engineering
Existing Conditions Review 2 4
Design Site Visit 8 4
Final Plans
Cover Sheet & Index of Sheets 1 2 4
Project Layout and Survey Control Plan 1 2 8
General Notes 1 2 8
Construction Safety and Phasing Plan 1 2 8
Fueling Facility Site Plan 1 2 8
Civil/Miscellaneous Details 2 4 16
Develop Final Construction Contract Documents 2 4
Develop Final Technical Specifications 4 4 4
Develop Final Supplemental Specifications 2 4 4
Develop Final Quantities 2 4 4
Develop Final Opinions of Probable Construction Costs 4 4
Incorporate QC Review Comments 2 4 4 4
Incorporate Final (Owner/AHJ) Review Comments 2 4 4 4
Subtotal - Civil Engineering 0 23 54 60 28
3. Electrical Engineering
Existing Conditions Review 2
(Develop/Update) One-Line Diagram 2
Design Site Visit 4
Power Utility Coordination 4
Final Plans
Electrical Legend & Notes 2 2
Electrical Details 2 2
Fuel Farm Rack Details 2 2
One-Line Diagram 2 2
Panel Schedule 2 2
Develop Final Supplemental Specifications 4 4
Develop Final Quantities 2
Incorporate QC Review Comments 4
Incorporate Final (Owner/AHJ) Review Comments 4
Subtotal - Electrical Engineering 0 36 0 14 0
Hours 20 75 70 78 36
SUBTOTAL - SALARIES: $41,472.00
DIRECT NON-LABOR EXPENSES
Document Printing/Reproduction/Assembly $100.00
Postage/Freight/Courier $28.00
Travel Costs $400.00
SUBTOTAL - DIRECT NON-LABOR EXPENSES: $528.00
SUBTOTAL: $42,000.00
SUBCONSULTANTS FEE: $0.00
TOTAL FEE: $42,000.00
Appendix B
William R. Pogue Municipal Airport (OWP)
OWP Jet-A Fueling System Installation
Bidding Services
WORK TASK DESCRIPTION E-5 E-3 E-1 T-2 AM-3
hr hr hr hr hr
1. Civil Engineering
Upload Bid Documents to Plan Room 2
Review and Respond to Request for Information (RFI) 4
Draft and Distribute Addendums 4 4
Attend Pre-Bid Meeting (1 Person, On-site) 8 2
Bid Opening (1 Person, On-site) 8
Prepare Bid Tabulation 2
Draft and Submit State Grant Application 2 4
Award 2 2
Prepare Contract Documents 4
Prepare Issued for Construction Plans and
Specifications 4 2
Subtotal - Civil Engineering 4 24 0 8 18
Hours 4 24 0 8 18
SUBTOTAL - SALARIES: $8,712.00
DIRECT NON-LABOR EXPENSES
Document Printing/Reproduction/Assembly $0.00
Postage/Freight/Courier $0.00
Office Supplies/Equipment $0.00
Travel Costs $288.00
SUBTOTAL - DIRECT NON-LABOR EXPENSES: $288.00
SUBTOTAL: $9,000.00
SUBCONSULTANTS FEE: $0.00
TOTAL FEE: $9,000.00
WILLIAM R POGUE MUNICIPAL AIRPORT (OWP)
NEW JET-A FUEL TANK
ENGINEER'S OPINION OF PROBABLE COST
12/21/2023
ENGINEER'S OPINION OF
PROBABLE COST
ITEM SPEC. ESTIMATED UNIT
NO. NO. DESCRIPTION UNIT QUANTITY PRICE AMOUNT
1 C-105 Mobilization (10% Maximum) LS 1 $40,000.00 $40,000.00
2 SS-130 12,000 Gallon UL 2085 Jet-A Tank LS 1 $300,000.00 $300,000.00
3 SS-140 Demolition and Disposal LS 1 $10,000.00 $10,000.00
4 SS-230 Concrete Foundation LS 1 $40,000.00 $40,000.00
5 SS-280 Safety Bollards EA 18 $1,200.00 $21,600.00
6 SS-300 Lockout/Tagout Program LS 1 $3,000.00 $3,000.00
7 SS-300 Electrical Service Connection LS 1 $15,000.00 $15,000.00
8 SS-303 Aggregate Base Course SY 1,600 $30.00 $48,000.00
8 Contingency Contingency / Design Changes LS 1 $50,000.00 $50,000.00
TOTAL CONSTRUCTION COST $527,600.00
SPONSOR ADMINISTRATIVE EXPENSES $4,000.00
ENGINEERING SERVICES
ENGINEERING DESIGN SERVICES $42,000.00
BIDDING SERVICES $9,000.00
TOTAL ENGINEERING SERVICES $51,000.00
CONSTRUCTION SERVICES
CONSTRUCTION ADMINISTRATION SERVICES $17,000.00
CONSTRCUTION OBSERVATION / RPR SERVICES $25,000.00
QUALITY ACCEPTANCE TESTING $5,000.00
CLOSEOUT SERVICES $3,000.00
TOTAL CONSTRUCTION SERVICES $50,000.00
TOTAL PROJECT COST - $632,600.00
PROJECT FUNDING TOTAL
ODAA $300,000.00
LOCAL $332,600.00
TOTAL PROJECTED FUNDING $632,600.00
© 2022 GARVER, LLC
THIS DOCUMENT, ALONG WITH THE
IDEAS AND DESIGNS CONVEYED
HEREIN, SHALL BE CONSIDERED
INSTRUMENTS OF PROFESSIONAL
SERVICE AND ARE PROPERTY OF
GARVER, LLC. ANY USE,
REPRODUCTION, OR DISTRIBUTION
OF THIS DOCUMENT, ALONG WITH
THE IDEAS AND DESIGN CONTAINED
0 10' 20' 40' 60' HEREIN, IS PROHIBITED UNLESS
AUTHORIZED IN WRITING BY
GARVER, LLC OR EXPLICITLY
(IN FEET) ALLOWED IN THE GOVERNING
PROFESSIONAL SERVICES
AGREEMENT FOR THIS WORK.
BY
N
DESCRIPTION
PRO
EXISTING A
DATE
PROPOSED GRAVEL FUEL
TRUCK TURNAROUND
REV.
File: C:\Users\sketer\OneDrive - Garver\Desktop\OWP_EXH2.dwg Last Save: 12/5/2023 3:49 PM Last saved by: SKeter
PROPOSED 12,000
GALLON JET-A TANK
10.00' MIN
WILLIAM R POGUE
SAND SPRINGS, OKLAHOMA
15.00' MIN
MUNICIPAL AIRPORT
8.00' 32.00'
EXHIBIT C - OPTION 1
Last plotted by: Keter, Shalev Plot Style: AECmono.ctb Plot Scale: 1:1 Plot Date: 12/5/2023 3:49 PM Plotter used: DWG To PDF.pc3
JOB NO.: ########
DATE: NOV. 2023
DESIGNED BY: GJT
32.00'
DRAWN BY: SK
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
IF NOT ONE INCH ON THIS SHEET,
ADJUST SCALES ACCORDINGLY.
DRAWING NUMBER
EXB-C
EXHIBIT -A
SHEET
NUMBER 1
City of Sand Springs Agenda Form
Meeting Date:____________
FEB 26 2024 Agenda:_______________
CC & MA Item:____________
Regular
Pull Down
Signature Items:__________ Kevin West
Presented by:____________________________
New Technically Based Local
Subject:____________________ Wastewater Discharge Limits
____________________________________________________
Item #:_____________ Cost:_________BBBB Approval
Recommendation:____________________
)LQDQFH5HYLHZ: Pull Down Pull Down
/HJDO5HYLHZ: 'HSDUWPHQW+HDG5HYLHZPull Down
6\QRSVLV:
Requesting approval of New Technically Based Local Limits (TBLL)
Details:
The current TBLL were adopted in 1992 to replace the initial wastewater discharge limits for commercial and industrial
industrial facilities adopted when the City of Sand Springs first established a pretreatment program in December of 1983.
The proposed TBLL were compiled to reflect the changed conditions due to construction of the new Sequential Batch
Reactor biological treatment units at the Wastewater Treatment Plant.
Staff issued a contract to S2 Engineering, PLLC to develop updated TBLL in 2019. S2 Engineering completed their
report on August 15, 2019. The resulting document was submitted to the DEQ for preliminary approval and received by
them on August 30, 2019. Our updated TBLL proposal was reviewed for technical compliance and approved by DEQ on
December 20, 2019. The approval letter from DEQ was received by the City on January 7, 2021.
Following the DEQ's procedures, the City Council must now decide whether to adopt or reject the proposed modification
of the City's Pretreatment Program. If approved by the Council, the proposed TBLL will then be forwarded back to the
DEQ. After DEQ's review of our proposal, the modified TBLL will then be published in the Sand Springs Leader to elicit
possible public comments. After reviewing any public comments received, or should no changes be recommended, the
DEQ will grant its final approval. After which, the Council will need to formally adopt the final, modified TBLL in a
subsequent meeting.
$WWDFKPHQWV:
DEQ approval letter dated December 20, 2019. Chart showing current and proposed TBLL.