Board of Public Utilities
Regular MeetingSanta Rosa, CA · June 5, 2025
Minutes
Council Chamber
City of Santa Rosa 100 Santa Rosa Avenue
Board of Public Utilities
Regular Meeting Minutes - Final
Thursday, June 5, 2025 1:30 PM
1. CALL TO ORDER AND ROLL CALL
Chair Galvin called the meeting to order at 1:32 p.m.
Present 7 - Chair Daniel Galvin III, Vice Chair William Arnone Jr., Board Member
Lisa Badenfort, Board Member Robin Bartholow, Board Member
Duane De Witt, Board Member J. Matthew Mullan, and Board Member
Glen Wright
2 REMOTE PARTICIPATION UNDER AB 2449 (IF NEEDED)
None.
3. STATEMENTS OF ABSTENTION BY BOARD MEMBERS
None.
4. STUDY SESSION
None.
5. MINUTES APPROVAL
5.1 May 15, 2025 - Regular Meeting Minutes - DRAFT
The May 15, 2025 Regular Meeting Minutes were approved as
submitted.
6. STAFF BRIEFINGS
6.1 FEMA FLOOD RISK MAPPING PROJECT FOR THE SANTA ROSA
CREEK WATERSHED
Staff will present the latest update on the Federal Emergency
Management Agency (FEMA) Santa Rosa Creek Watershed Flood Risk
Mapping Project. The multi-year FEMA project will map high-risk flood
areas in the Watershed. The Board may discuss this item and give
direction to staff.
Claire Myers, Storm Water and Creeks Manager, and Jimmy Bliss,
Chief Building Official, presented and answered Board Member
City of Santa Rosa
Regular Meeting Minutes
Page 2 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
questions.
Janice Carmen asked questions regarding FEMA taking in the
waterways infrastructure, the flood channels, and easements that
have already been taken care with regards to floods.
6.2 2024 WATER QUALITY REPORT UPDATE
Staff will provide an overview of Santa Rosa’s 2024 water quality report,
including information on Santa Rosa’s water supply, distribution system,
drinking water regulatory requirements, and 2024 water quality results.
The Board may discuss this item and provide direction to staff.
Tony Llamas, Water Quality Manager, presented and answered
Board Member questions.
Janice Carmen spoke regarding how lucky Santa Rosa is to have
high quality water.
6.3 WATER AND RECYCLED WATER SUPPLY UPDATE
Staff will update the Board on water and recycled water supply issues.
The Board may discuss this item and give direction to staff.
Peter Martin, Deputy Director - Water Resources, presented and
answered Board Member questions.
7. CONSENT ITEMS
A motion was made by Vice Chair Arnone, Jr., seconded by Board Member
Mullan, to approve Consent Item 7.1.
The motion carried by the following vote:
Yes: 7 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member Bartholow, Board Member De Witt, Board Member
Mullan and Board Member Wright
7.1 MOTION - APPROVAL OF A FIRST AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT FOR LEGAL SERVICES
WITH MINASIAN LAW
RECOMMENDATION: It is recommended by the City Attorney’s Office
and Santa Rosa Water that the Board of Public Utilities, by motion,1)
City of Santa Rosa
Regular Meeting Minutes
Page 3 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
approve a First Amendment to Professional Services Agreement (PSA)
number F002930 with the law firm of Minasian Law, LLC for outside
legal services for Santa Rosa Water in the amount of one hundred
thousand dollars ($100,000), for a total contract not to exceed amount
of two hundred thousand dollars ($200,000), subject to approval as to
form by the City Attorney, and 2) delegate authority to the City Attorney
to execute the First Amendment.
This Consent - Motion was approved.
8. REPORT ITEMS
8.1 REPORT - RECOMMEND TO CITY COUNCIL APPROVAL OF THE
REVISED PUBLIC STORM DRAIN STANDARDS AND DELEGATE
APPROVAL AUTHORITY FOR FUTURE REVISIONS TO THE BOARD
OF PUBLIC UTILITIES
BACKGROUND: The Public Storm Drain Standards (Standards) set
forth the design policies and construction methods associated with
additions and modifications to the public storm drain infrastructure. The
standards, details, and specifications require routine revisions to ensure
that new installations and modifications are consistent with various
regulations, references, industry best practices, industry needs, and
operational needs to serve the community’s urban environment. The
delegation of approval authority is consistent with the general policy
and management authority over the public storm drain infrastructure
granted to the Board under Section 25 of the Charter of the City of
Santa Rosa (City) and City Council Resolution RES-2017-177, which
delegated approval authority of the Potable Water, Recycled Water,
and Sewer Design Standards, Construction Standards, and
Construction Specifications to the Board of Public Utilities (BPU).
RECOMMENDATION: It is recommended by Santa Rosa Water and the
Planning and Economic Development Department that the Board of
Public Utilities, by motion, recommend the Santa Rosa City (City)
Council adopt, by resolution, the revised Public Storm Drain Standards
as presented with an effective date 30 days from the date of adoption
and delegate authority to the Board of Public Utilities to adopt future
revisions to the standards.
Flannery Banks, Supervising Engineer, and Cleve Gurney, Deputy
City of Santa Rosa
Regular Meeting Minutes
Page 4 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
Director - Development Services, presented and answered Board
Member questions.
Board Member Bartholow left Council Chamber at 2:44 p.m.
A motion was made by Vice Chair Arnone, Jr., seconded by Board Member
Wright, to approve the recommendation to the Santa Rosa City (City)
Council to adopt, by resolution, the revised Public Storm Drain Standards
as presented with an effective date 30 days from the date of adoption and
delegate authority to the Board of Public Utilities to adopt future revisions
to the standards.
The motion carried by the following vote:
Yes: 6 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member De Witt, Board Member Mullan and Board Member
Wright
Absent: 1 - Board Member Bartholow
8.2 REPORT - UPDATE TO 2018 WATER AND SEWER STANDARDS
AND SPECIFICATIONS
BACKGROUND: Santa Rosa Water’s Design and Construction
Standards (Standards) provide the specifications for designing and
constructing additions and modifications to the public water and sewer
systems. In October of 2018, the Board, via Resolution No. 1180, last
approved an update to Santa Rosa Water’s current Standards.
Santa Rosa Water was a participant in U.S. et al., ex rel. Hendrix v. J M
Manufacturing Co., Inc., et al., Case No. EDCV 06 0055 GW (C.D. of
CA) (“Action”), and therefore, the current Standards include a restriction
on the use of PVC pipe manufactured by J M Manufacturing and JM
Eagle. In May 2025, the City entered into an agreement settling the
Action, and the settlement requires the City to remove the restrictions
on J M Manufacturing and JM Eagle.
RECOMMENDATION: It is recommended by Santa Rosa Water and the
City Attorney's Office that the Board of Public Utilities, by resolution,
approve updates to the Water Distribution System Design Standards,
the Water Distribution System Construction Standard Specifications,
and the Sanitary Sewer System Construction Standard Specifications,
removing the restricted use of J M Manufacturing or JM Eagle pipe.
City of Santa Rosa
Regular Meeting Minutes
Page 5 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
Andy Allen, Supervising Engineer, presented and answered Board
Member questions.
A motion was made by Board Member Wright, seconded by Board Member
De Witt, to waive reading of the text and adopt RESOLUTION NO.
RES-2025-007 ENTITLED: RESOLUTION OF THE BOARD OF PUBLIC
UTILITIES ADOPTING THE REVISED AND UPDATED WATER AND SEWER
STANDARDS AND SPECIFICATIONS.
The motion carried by the following vote:
Yes: 6 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member De Witt, Board Member Mullan and Board Member
Wright
Absent: 1 - Board Member Bartholow
8.3 REPORT - RECOMMENDATION TO CITY COUNCIL FOR
CONSIDERATION OF COUNCIL’S DIRECTION TO ITS WATER
ADVISORY COMMITTEE REPRESENTATIVE REGARDING THE
PROPOSED WATER SUPPLY AGREEMENT BETWEEN MARIN
MUNICIPAL WATER DISTRICT AND SONOMA WATER
BACKGROUND: The City of Santa Rosa entered into the Restructured
Agreement for Water Supply with the Sonoma County Water Agency
(Sonoma Water) in 2006 (2006 Restructured Agreement). The 2006
Restructured Agreement created the Water Advisory Committee (WAC),
which is an advisory committee to the Sonoma Water Board of Directors
and is comprised of elected officials of each of the eight prime
contractors that are party to the 2006 Restructured Agreement,
including Santa Rosa. Marin Municipal Water District (Marin Water) has
a separate existing water supply agreement with Sonoma Water with a
term expiring June 30, 2025. Sonoma Water and Marin Water have
prepared a draft amended and restated water supply agreement (Draft
Agreement), which proposes changes to several key provisions.
The 2006 Restructured Agreement provides for deliveries to Marin
Water pursuant to their 1996 water supply agreements, or to
amendments to those agreements that have been approved by the
WAC, or to subsequent agreements between Sonoma Water and Marin
Water that have been approved by the WAC. Therefore, the WAC will
be considering approval of the Draft Agreement at a future WAC
City of Santa Rosa
Regular Meeting Minutes
Page 6 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
meeting, currently scheduled for August 4, 2025. Staff are
recommending that the Board of Public Utilities provide a
recommendation to the City Council regarding the Council’s direction to
its WAC representative, Councilmember Natalie Rogers, regarding
support for the Draft Agreement for Water Supply by and between Marin
Water and Sonoma Water.
RECOMMENDATION: It is recommended by Santa Rosa Water that the
Board of Public Utilities consider the proposed water supply agreement
by and between Marin Municipal Water District and Sonoma County
Water Agency and, by motion, make a recommendation to the City
Council regarding Council’s direction to its Water Advisory Committee
(WAC) representative.
Peter Martin, Deputy Director - Water Resources, presented and
answered Board Member questions.
Board Member Badenfort left Council Chambers at 2:56 p.m. and
returned to Council Chambers at 3:00 p.m.
A motion was made by Board Member Wright, seconded by Board Member
Mullan, to approve consideration of the proposed water supply agreement
by and between Marin Municipal Water District and Sonoma County Water
Agency and make a recommendation to the City Council regarding
Council's direction to its Water Advisory Committee (WAC) representative.
The motion carried by the following vote:
Yes: 6 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member De Witt, Board Member Mullan and Board Member
Wright
Absent: 1 - Board Member Bartholow
8.4 REPORT - RECOMMENDATION TO CITY COUNCIL TO APPROVE
GRANT OF EASEMENT TO SONOMA COUNTY WATER AGENCY
OVER PORTIONS OF CITY PROPERTY LOCATED AT 2200 LLANO
ROAD AND 0 SEBASTOPOL ROAD (APNS 060-060-059 AND
060-060-064)
BACKGROUND: Sonoma Water owns and operates ground water wells
within the Santa Rosa plain, one of which is adjacent to the City owned
Property, commonly known as Brown Farm. The wells are intended to
City of Santa Rosa
Regular Meeting Minutes
Page 7 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
augment water supplies during periods of drought. In connection with
Sonoma Water’s Emergency Sebastopol Road Well Activation Project,
which upgraded the Sebastopol Road well (“Well”) during the most
recent drought, Sonoma Water requires a water line and access
easement over a portion of the Property. Staff is seeking a Board
recommendation to Council to approve these actions.
RECOMMENDATION: It is recommended by Santa Rosa Water and
Real Estate Services that the Board of Public Utilities, by resolution,
recommend that City Council: 1) grant a 730 square foot water line
easement and a 3,504 square foot access easement (collectively,
“Easement”) to Sonoma County Water Agency (“Sonoma Water”) over
certain portions of City property located at 2200 Llano Road, APN
060-060-059, and 0 Sebastopol Road, APN 060-060-064, respectively
(collectively, the “Property”) in connection with Sonoma Water’s
Emergency Sebastopol Road Well Activation Project (“Project”); 2)
approve entering into an Easement Agreement in a form to be approved
by the City’s Attorney’s Office; and 3) authorize the Assistant City
Manager to execute necessary documents in connection therewith.
Sean McNeil, Deputy Director - Environmental Services, and
Stephanie Valkovic, Associate Real Property Agent, presented and
answered Board Member questions.
A motion was made by Board Member Mullan, seconded by Board Member
De Witt, to waive reading of the text and adopt RESOLUTION NO.
RES-2025-008 ENTITLED: RESOLUTION OF THE BOARD OF PUBLIC
UTILITIES RECOMMENDING THAT THE SANTA ROSA CITY COUNCIL
APPROVE A GRANT OF EASEMENT TO SONOMA COUNTY WATER
AGENCY OVER PORTIONS OF CITY PROPERTY LOCATED AT 2200 LLANO
ROAD AND 0 SEBASTOPOL ROAD (APNS 060-060-059 AND 060-060-064).
The motion carried by the following vote:
Yes: 6 - Chair Galvin III, Vice Chair Arnone Jr., Board Member Badenfort,
Board Member De Witt, Board Member Mullan and Board Member
Wright
Absent: 1 - Board Member Bartholow
9. PUBLIC COMMENTS ON NON-AGENDA MATTERS
Janice Carmen spoke regarding Planning Commissioner
appointments including her objection to Council Member
City of Santa Rosa
Regular Meeting Minutes
Page 8 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
MacDonald's appointment, tree cuttings not being picked up, and on
another Planning Commission matter.
10. REFERRALS
None.
11. WRITTEN COMMUNICATION (AND POSSIBLE BOARD DISCUSSION)
None.
12. SUBCOMMITTEE REPORTS
None.
13. BOARD MEMBER REPORTS
Board Member DeWitt expressed his desire to speak to Deputy
Director McNeil regarding McMinn Ave.
14. DIRECTORS REPORTS
Director Burke reported: Santa Rosa Water Staff will host two days
of the Mike Hauser STEM Academy. The Academy is open to all 8th
grade students in partnering school districts and is designed to
motivate students as they enter high school and begin making
important course decisions. The students will attend sessions at
both the Laguna Treatment Plant, and the Utilities Field Office where
they will be introduced to diverse work environments and engage
them in interactive, hands-on learning guided by teachers,
engineers, and technical experts. The Academy is devoted to
strengthening math and science skills, expanding the boundaries of
what these students believe is possible, and inspiring them to
pursue higher education and careers in the fields of STEM.
Reminder that there will be no Board meeting on June 19, as it is a
City holiday. Next meeting on July 3, Peter Martin, Deputy Director -
Water Resources, will be your contact for that meeting.
City of Santa Rosa
Regular Meeting Minutes
Page 9 of 9
Board of Public Utilities Regular Meeting Minutes - Final June 5, 2025
15. ADJOURNMENT OF MEETING
Chair Galvin adjourned the meeting 3:27 p.m. The next Board of
Public Utilities meeting is scheduled for July 3, 2025 at 1:30 p.m.
Approved on: July 17, 2025
/s/ Michelle Montoya, Recording Secretary
Agenda
Council Chamber
City of Santa Rosa 100 Santa Rosa Avenue
BOARD OF PUBLIC UTILITIES
REGULAR MEETING AGENDA AND
SUMMARY REPORT - FINAL
JUNE 5, 2025
MEMBERS OF THE PUBLIC CAN PARTICIPATE IN THE MEETING BY
ATTENDING IN-PERSON AT THE COUNCIL CHAMBER LOCATED AT 100
SANTA ROSA AVENUE.
THE MEETING WILL ALSO BE LIVE STREAMED AT
HTTPS://SANTA-ROSA.LEGISTAR.COM/CALENDAR. CLICK ON THE "IN
PROGRESS" LINK TO VIEW. THE MEETING CAN ALSO BE VIEWED ON
COMCAST CHANNEL 28, AT&T U-VERSE CHANNEL 99, AT
HTTPS://WWW.YOUTUBE.COM/CITYOFSANTAROSA, AND VIA ZOOM BY
VISITING
HTTPS://SRCITY-ORG.ZOOM.US/J/86259959811, OR BY DIALING
877-853-5257 AND ENTERING WEBINAR ID: 862 5995 9811.
IN THE EVENT A BOARD MEMBER PARTICIPATES REMOTELY BASED
ON JUST CAUSE OR EMERGENCY CIRCUMSTANCES PURSUANT TO AB
2449, THE BOARD WILL ALSO ALLOW FOR PUBLIC COMMENT
THROUGH THE ZOOM LINK OR DIAL-IN NUMBER ABOVE.
The public attending in person will be able to provide public comment
on agenda items at the time an agenda item is discussed during the
Board of Public Utilities Meeting. Public Comment may also be
submitted via e-mail at bpu-comment@srcity.org.
Deadlines and additional instruction for public comment are set forth
below. If you have any questions regarding this meeting, please contact
Michelle Montoya at mmontoya@srcity.org
1:30 PM - VIA IN-PERSON
1. CALL TO ORDER AND ROLL CALL
2 REMOTE PARTICIPATION UNDER AB 2449 (IF NEEDED)
To consider and take action on any request from a Board Member to
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 2 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
participate in a meeting remotely due to Just Cause or Emergency
Circumstances pursuant to AB 2449 (Government Code Section 54953(f)).
3. STATEMENTS OF ABSTENTION BY BOARD MEMBERS
4. STUDY SESSION
None.
5. MINUTES APPROVAL
5.1 May 15, 2025 - Regular Meeting Minutes - DRAFT
Attachments: May 15, 2025 - Regular Meeting Minutes - DRAFT
6. STAFF BRIEFINGS
6.1 FEMA FLOOD RISK MAPPING PROJECT FOR THE SANTA ROSA
CREEK WATERSHED
Staff will present the latest update on the Federal Emergency
Management Agency (FEMA) Santa Rosa Creek Watershed Flood Risk
Mapping Project. The multi-year FEMA project will map high-risk flood
areas in the Watershed. The Board may discuss this item and give
direction to staff.
Attachments: Presentation (Uploaded 6.3.2025)
6.2 2024 WATER QUALITY REPORT UPDATE
Staff will provide an overview of Santa Rosa’s 2024 water quality
report, including information on Santa Rosa’s water supply, distribution
system, drinking water regulatory requirements, and 2024 water quality
results. The Board may discuss this item and provide direction to staff.
Attachments: Presentation (Uploaded 6.3.2025)
6.3 WATER AND RECYCLED WATER SUPPLY UPDATE
Staff will update the Board on water and recycled water supply issues.
The Board may discuss this item and give direction to staff.
Attachments: Presentation (Uploaded 6.3.2025)
7. CONSENT ITEMS
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 3 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
7.1 MOTION - APPROVAL OF A FIRST AMENDMENT TO
PROFESSIONAL SERVICES AGREEMENT FOR LEGAL SERVICES
WITH MINASIAN LAW
RECOMMENDATION: It is recommended by the City Attorney’s Office
and Santa Rosa Water that the Board of Public Utilities, by motion,1)
approve a First Amendment to Professional Services Agreement (PSA)
number F002930 with the law firm of Minasian Law, LLC for outside
legal services for Santa Rosa Water in the amount of one hundred
thousand dollars ($100,000), for a total contract not to exceed amount
of two hundred thousand dollars ($200,000), subject to approval as to
form by the City Attorney, and 2) delegate authority to the City Attorney
to execute the First Amendment.
Attachments: Staff Report
Attachment 1 – First Amendment to Professional Services Agreement num
Attachment 2 - Professional Services Agreement number F002930 with M
8. REPORT ITEMS
8.1 REPORT - RECOMMEND TO CITY COUNCIL APPROVAL OF THE
REVISED PUBLIC STORM DRAIN STANDARDS AND DELEGATE
APPROVAL AUTHORITY FOR FUTURE REVISIONS TO THE BOARD
OF PUBLIC UTILITIES
BACKGROUND: The Public Storm Drain Standards (Standards) set
forth the design policies and construction methods associated with
additions and modifications to the public storm drain infrastructure. The
standards, details, and specifications require routine revisions to ensure
that new installations and modifications are consistent with various
regulations, references, industry best practices, industry needs, and
operational needs to serve the community’s urban environment. The
delegation of approval authority is consistent with the general policy
and management authority over the public storm drain infrastructure
granted to the Board under Section 25 of the Charter of the City of
Santa Rosa (City) and City Council Resolution RES-2017-177, which
delegated approval authority of the Potable Water, Recycled Water,
and Sewer Design Standards, Construction Standards, and
Construction Specifications to the Board of Public Utilities (BPU).
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 4 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
RECOMMENDATION: It is recommended by Santa Rosa Water and the
Planning and Economic Development Department that the Board of
Public Utilities, by motion, recommend the Santa Rosa City (City)
Council adopt, by resolution, the revised Public Storm Drain Standards
as presented with an effective date 30 days from the date of adoption
and delegate authority to the Board of Public Utilities to adopt future
revisions to the standards.
Attachments: Staff Report
Attachment 1 – Redlined Version – Draft Revised Public Storm Drain Stan
Attachment 2 – Simplified Redlined Version – Draft Revised Public Storm
Attachment 3 - Proposed Storm Drain Standard Details
Attachment 4 - Clean - Draft Revised Public Storm Drain Standards
Presentation (Uploaded 6.3.2025)
8.2 REPORT - UPDATE TO 2018 WATER AND SEWER STANDARDS
AND SPECIFICATIONS
BACKGROUND: Santa Rosa Water’s Design and Construction
Standards (Standards) provide the specifications for designing and
constructing additions and modifications to the public water and sewer
systems. In October of 2018, the Board, via Resolution No. 1180, last
approved an update to Santa Rosa Water’s current Standards.
Santa Rosa Water was a participant in U.S. et al., ex rel. Hendrix v. J M
Manufacturing Co., Inc., et al., Case No. EDCV 06 0055 GW (C.D. of
CA) (“Action”), and therefore, the current Standards include a restriction
on the use of PVC pipe manufactured by J M Manufacturing and JM
Eagle. In May 2025, the City entered into an agreement settling the
Action, and the settlement requires the City to remove the restrictions
on J M Manufacturing and JM Eagle.
RECOMMENDATION: It is recommended by Santa Rosa Water and the
City Attorney's Office that the Board of Public Utilities, by resolution,
approve updates to the Water Distribution System Design Standards,
the Water Distribution System Construction Standard Specifications,
and the Sanitary Sewer System Construction Standard Specifications,
removing the restricted use of J M Manufacturing or JM Eagle pipe.
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 5 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
Attachments: Staff Report
Attachment 1 – Redlined Version – Water Distribution System Design Stan
Attachment 2 – Clean Version – Water Distribution System Design Standa
Attachment 3 – Redlined Version – Water Distribution System Constructio
Attachment 4 – Clean Version – Water Distribution System Construction S
Attachment 5 - Redlined Version - Sanitary Sewer Construction Standard
Attachment 6 - Clean Version - Sanitary Sewer Construction Standard Spe
Resolution
Exhibit A - Water and Sewer Standards and Specifications
Presentation (Uploaded 6.3.2025)
8.3 REPORT - RECOMMENDATION TO CITY COUNCIL FOR
CONSIDERATION OF COUNCIL’S DIRECTION TO ITS WATER
ADVISORY COMMITTEE REPRESENTATIVE REGARDING THE
PROPOSED WATER SUPPLY AGREEMENT BETWEEN MARIN
MUNICIPAL WATER DISTRICT AND SONOMA WATER
BACKGROUND: The City of Santa Rosa entered into the Restructured
Agreement for Water Supply with the Sonoma County Water Agency
(Sonoma Water) in 2006 (2006 Restructured Agreement). The 2006
Restructured Agreement created the Water Advisory Committee (WAC),
which is an advisory committee to the Sonoma Water Board of Directors
and is comprised of elected officials of each of the eight prime
contractors that are party to the 2006 Restructured Agreement,
including Santa Rosa. Marin Municipal Water District (Marin Water) has
a separate existing water supply agreement with Sonoma Water with a
term expiring June 30, 2025. Sonoma Water and Marin Water have
prepared a draft amended and restated water supply agreement (Draft
Agreement), which proposes changes to several key provisions.
The 2006 Restructured Agreement provides for deliveries to Marin
Water pursuant to their 1996 water supply agreements, or to
amendments to those agreements that have been approved by the
WAC, or to subsequent agreements between Sonoma Water and Marin
Water that have been approved by the WAC. Therefore, the WAC will
be considering approval of the Draft Agreement at a future WAC
meeting, currently scheduled for August 4, 2025. Staff are
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 6 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
recommending that the Board of Public Utilities provide a
recommendation to the City Council regarding the Council’s direction to
its WAC representative, Councilmember Natalie Rogers, regarding
support for the Draft Agreement for Water Supply by and between
Marin Water and Sonoma Water.
RECOMMENDATION: It is recommended by Santa Rosa Water that the
Board of Public Utilities consider the proposed water supply agreement
by and between Marin Municipal Water District and Sonoma County
Water Agency and, by motion, make a recommendation to the City
Council regarding Council’s direction to its Water Advisory Committee
(WAC) representative.
Attachments: Staff Report
Attachment 1 – Marin Water Memorandum summarizing changes in Draft
Attachment 2 – Draft Water Supply Agreement by and between Marin Wa
Presentation (Uploaded 6.3.2025)
8.4 REPORT - RECOMMENDATION TO CITY COUNCIL TO APPROVE
GRANT OF EASEMENT TO SONOMA COUNTY WATER AGENCY
OVER PORTIONS OF CITY PROPERTY LOCATED AT 2200 LLANO
ROAD AND 0 SEBASTOPOL ROAD (APNS 060-060-059 AND
060-060-064)
BACKGROUND: Sonoma Water owns and operates ground water wells
within the Santa Rosa plain, one of which is adjacent to the City owned
Property, commonly known as Brown Farm. The wells are intended to
augment water supplies during periods of drought. In connection with
Sonoma Water’s Emergency Sebastopol Road Well Activation Project,
which upgraded the Sebastopol Road well (“Well”) during the most
recent drought, Sonoma Water requires a water line and access
easement over a portion of the Property. Staff is seeking a Board
recommendation to Council to approve these actions.
RECOMMENDATION: It is recommended by Santa Rosa Water and
Real Estate Services that the Board of Public Utilities, by resolution,
recommend that City Council: 1) grant a 730 square foot water line
easement and a 3,504 square foot access easement (collectively,
“Easement”) to Sonoma County Water Agency (“Sonoma Water”) over
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 7 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
certain portions of City property located at 2200 Llano Road, APN
060-060-059, and 0 Sebastopol Road, APN 060-060-064, respectively
(collectively, the “Property”) in connection with Sonoma Water’s
Emergency Sebastopol Road Well Activation Project (“Project”); 2)
approve entering into an Easement Agreement in a form to be approved
by the City’s Attorney’s Office; and 3) authorize the Assistant City
Manager to execute necessary documents in connection therewith.
Attachments: Staff Report
Resolution
Exhibit A
Presentation (Uploaded 6.3.2025)
9. PUBLIC COMMENTS ON NON-AGENDA MATTERS
Live Public Comment: Members of the public can provide comment on an
agenda item in-person from the Council Chamber at the time an agenda item
is discussed during the Board of Public Utilities Meeting.
Advance Public Comment via E-mail Public Comment: To submit an e-mailed
public comment to the Board of Public Utilities, please send to:
bpu-comment@srcity.org by 5:00 p.m., the Wednesday prior to the Board of
Public Utilities meeting. Identify in the subject line of your e-mail the agenda
item number(s) on which you wish to comment, provide your name in the body
of the e-mail and your comment. Comments received by the deadline will be
distributed to all Board Members, will be posted to the agenda documents
on-line, and be made part of the archive packet.
10. REFERRALS
None.
11. WRITTEN COMMUNICATION (AND POSSIBLE BOARD DISCUSSION)
None.
12. SUBCOMMITTEE REPORTS
13. BOARD MEMBER REPORTS
14. DIRECTORS REPORTS
City of Santa Rosa
Regular Meeting Agenda and Summary Report
Page 8 of 8
Board of Public Utilities - FINAL JUNE 5, 2025
15. ADJOURNMENT OF MEETING
The Board of Public Utilities encourages public comments regarding the above items. If you are unable to attend this meeting,
please feel free to call the Water Department at 543-4200 or forward written comments to the City of Santa Rosa, Water
Department, 35 Stony Point Road, Santa Rosa, CA 95401. All comments will be forwarded to the Board at the meeting.
The City of Santa Rosa does not discriminate against individuals with disabilities in its employment, services, benefits,
facilities, programs, or activities. Requests for accommodations, auxiliary aids, or services necessary to participate in a City
program, service, or activity, including printed information in alternate formats, are available by contacting the Secretary at
(707) 543-3901 (TTY Relay at 711) or mmontoya@srcity.org. Requests should be submitted as far in advance as possible, but
no later than two business days before the scheduled meeting. Meeting information can also be accessed via the internet at
http://srcity.org.