City Council
Regular MeetingSaratoga Springs, NY · April 13, 2004
Minutes
CITY OF SARATOGA SPRINGS
CITY COUNCIL WORKSHOP
TUESDAY, APRIL 13, 2004
Present: Mayor Michael Lenz
Commissioner of Finance, Matthew McCabe
Commissioner of Public Works, Thomas McTygue
Commissioner of Accounts, Stephen Towne
Staff Present: City Attorney Matthew Dorsey
Absent: Commissioner of Public Safety, Thomas Curley
CALL TO ORDER
Mayor Michael Lenz called the meeting to order at 7 PM. He said that due to the absence of the
regular City Council Secretary, it is necessary for the City Council to approve a contract for Nancy
Wagner to take and transcribe the minutes of tonight’s workshop. Mayor Michael Lenz moved and
Commissioner Matthew McCabe seconded to approve the contract for Nancy Wagner to take and
transcribe the minutes of any City Council meeting or workshop as needed in the amount of one
hundred dollars. Ayes all
Mayor Lenz introduced Mike Van Patten, Director of Marketing and Development of the
Saratoga/Glen Hollow Water Company. He said that Saratoga Glen Hollow Water Supply Company
is committed to serve the rim of Saratoga Lake, which includes residents in the Town of Stillwater,
the Town of Malta and the Town of Saratoga, but they could expand their plans to include the City
of Saratoga Springs to provide them with a supplemental water source.
Mr. Van Patten said that the company’s facility is at the southern end of Saratoga Lake. He said
their plan is to run a water line around Saratoga Lake from their facility on Cold Springs Road to
County Route 423 at Snake Hill, then from that point to the town line between Stillwater and the
Town of Saratoga. He said the third phase would be to run a line from there to the bridge, but that
would only occur if the City signs on. He said that phase three would bring the water line from the
town line that is between Stillwater and the Town of Saratoga to the bridge on Route 9P between
the Town of Saratoga and the City of Saratoga Springs.
.
He said the water is of pristine quality and comes from the Colonie aquifer. He said that since the
water is naturally filtered, it is necessary to add only a small amount of chlorine. He explained that
they were present tonight to provide information on their system and to offer to provide water to the
City of Saratoga Springs as a supplemental source, as needed. He said the system currently uses a
12- inch water line, but if they provided water to the City of Saratoga Springs, the 12-inch pipe
would have to be replaced with a 16” water line.
Commissioner Towne asked about the timing of the phases. Brian Fear, the company’s engineer
said the first phase would be completed this year definitely, the first phase plans have been sent to
and received back from the Department of Health, and revised plans have subsequently been sent to
City Council Workshop minutes
April 13, 2004
the Department of health. He said the Department of Transportation is fine with the project and the
permits have been received. He said that they are permitted to go to County Route 423, and they
are planning the construction because of logistics approved by DEC, DOT, and the DOH, to the
town line.
William McTygue, Director of Public Works said that he questions the lay of the land along the
chosen route for the water line. He said this section of Route 9P would be a formidable challenge to
install this water line because that section is narrow, and the sewer line is there. He said that this
proposal includes a very difficult engineering project. Brian Fear said that the engineering plan for
this project is set, and the plans include not staying on the highway.
Robert Iovinella, President of Saratoga Glen Hollow Water Supply Corp. (SGHWSC) said that the
first phase is the most difficult, but the Department of Transportation has approved it. He said they
have a DEC water supply permit and approval from the Public Service Commission for the
expansion. Bill McTygue asked if they had sought the cooperation of property owners along Route
9P since the line would run through their properties. Robert Iovinella said that they have secured
the proper easements, but they are prepared to conduct a process of eminent domain if necessary.
Commissioner Towne said he understands that people around the lake need water. Brian Fear said
in that area, people have had health problems due to their current water source. He said that the
Saratoga Lake Association and the Saratoga Lake Protection and Improvement district have been
trying to get water over there because the water is bad and it is a health issue.
Commissioner McTygue said the project is moving ahead regardless of the City’s involvement
since the SGHWSC is committed to supplying water to the camps and communities.
Robert Iovinella said they are asking the City to construct a water line from the north end of
Saratoga Lake to the Stillwater/Town of Saratoga line and install a water meter pit. He said the City
would control their pipeline and determine the connection fee that it feels appropriate to charge its
prospective users.
Steve Lafever, the company’s Hydrologist, said that the SGHWSC has two production wells
screened in coarse, sandy deposits, approximately 250 feet deep and tapped into a confined,
extremely productive aquifer system known as the Colonie Channel and as Lake Albany. He said
the pumping capacity is currently 900,000 gallons of water per day, 500,000 of which could be
make immediately available to the City of Saratoga Springs. He explained that the enclosed aquifer
is subject to a natural filtration process of clay and sand that prevents contaminants on the surface
from going down into the water.
Mr. Lafever said the confined aquifer system is recharged from the other units and is not dependent
upon snowmelt and rain. He said that the clay layer is in contact with the bottom of the Saratoga
Lake and the water filters down, eventually getting into the aquifer, giving the water a pristine and
pure quality that exceeds the water purity standards of the Department of Health.
Mr. Lafever described a 72-hour pump test performed in 1997. He said that in this process, the
wells are pumped continuously for 72 hours and the significance of the test is that the water level in
Page 2 of 5
City Council Workshop minutes
April 13, 2004
the production well #1 stabilized only dropping two inches with 167 feet of available draw-down
remaining in that well. He said the water level in production well number 2 stabilized after ten
hours leaving 104 feet of available draw-down after running continuously for 72 hours. He said
they submitted a report to the DEC containing this information and the DEC subsequently
concluded that the average level of production is 900,000 gallons per day.
Commissioner Towne asked if the 1997 test is still considered viable even though it is seven years
old. Brian Fear said that he does not know how the DEC would answer that question because it
depends on the level of use in the area and whether the conditions have changed or not. He said the
DEC signed off on the results of that pumping test.
Commissioner Towne said that the two other options, Saratoga County and Saratoga Lake have
issues, PCB elements in the Hudson River, and the concern about possible MTBE elements in
Saratoga Lake. He asked, given the thickness of the sand, gravel and clay that filters the water, and
with the top of the aquifer hitting that buffer on the bottom of Saratoga Lake, if there is any concern
that either of these contaminants, PCB’s of MTBE, could affect the aquifer.
Brian Fear said no, even if recharged by water from the Saratoga Lake, the water in the aquifer has
to filter through clay and silt and sand up to the point where the wells are, which is a significant
distance from the lake.
Rich Straut said there have been water quality tests done on Saratoga Lake for MTBE before and
after the regulations were established by the State, and the analyzed levels never exceeded 10 micro
grams per liter which is the maximum level allowed. He said that MTBE is not a concern in
Saratoga Lake and it is actually a larger concern in ground water than in surface water.
Bill McTygue said that the proposal requires significant expansion in order to supply Stillwater and
the Town of Saratoga. He said it seems that because of their close proximity to the Saratoga Water
Services, Inc. in Malta, it would require a very delicate engineering process to not interfere with
their water lines. Brian Fear said that there might even be a piping network or a possible connection
between the two water services to solve the problem.
Bill McTygue said that Saratoga Water Service, Inc. supplies that section of 9P and SGHWSC is
going to interface water lines with his in certain areas, but you are not allowed to service anyone in
his franchise. Bobby Iovinella said they are in communication with Al Mackey, and it could be a
possibility if they reach their capacity of 900,000 gallons per day.
Brian Fear said regarding an Environmental Impact Study, all proper paperwork has been filed with
the DEC. He said they did a long form at the conception of the project with no significant impacts
and a negative declaration of SEQR was performed. Bill McTygue said that close proximity of
another water service in the area might prompt the necessity of another Environmental Impact
Statement.
Rich Straut of Barton & Loguidice asked if they were proposing to conduct further tests prior to
commitment from the City of Saratoga Springs. Brian Fear said they would initially enter into
contract with the City at 500,000 gallons per day, make the connection and the rest of the capacity
Page 3 of 5
City Council Workshop minutes
April 13, 2004
would only come after further tests showed the water was available. Rich Straut asked if the
Saratoga Glen Hollow water system was capable of delivering half a million gallons of water per
day, and has it been determined if a water pumping station would be required.
Todd Frederick of the company’s water operations said they do not know yet, they would need to
know the pressure rates. Commissioner McTygue said they would need to know the answer before
the City committed. Bill McTygue said that if the City connected, there would have to be a
significant reduction in pressure. He said given the high water pressure, it is an important factor
that they would be pushing against it. Todd Frederick said in that case, SGHWSC would have to
increase their water pressure.
Rich Straut asked if the minimum purchase of 500,000 gallons per day was required to support cash
flow. Steve Lafever said no, it is the minimum amount offered, but not as a minimum requirement.
Rich Straut asked if the money includes expansion of their well section. Steve Lafever said yes,
$1.85 per 1,000 gallons would decrease as more water is sold. He said that the water meter pit
would be installed to ensure that the City price is based on use, that the City pays only for the water
it uses.
Commissioner Towne asked what the price difference would be if SGHWSC built the line across
the bridge to the City. Commissioner McTygue said that he would expect Saratoga Glen Hollow to
bring the water to the City line on this side of the bridge at no cost to the City, with the cost of
construction borne by SGHWSC.
Commissioner Towne said that considering the value of the option, the quality of the water is good
and little needs to be done with it in regards to quality, but he is concerned about the immediacy of
availability.
Brian Fear said by 2005, the lines to the Town of Saratoga would be complete, then in another year
the lines through the Town of Saratoga to the City of Saratoga Springs would be completed. Mayor
Lenz said that brings us to 2006. Commissioner McTygue said that would be contingent upon all
the permits and layers of approvals being obtained quickly.
William McTygue said that attaching to a 12” main in the Crescent Avenue area brings into
question the effect it would have on the City’s ability to supply water to the top of North Broadway,
Skidmore. He said a large amount of water is pumped through our entire system at peak times. He
said there is considerable cost to the kind of connections needed to adequately supply Skidmore and
this area of the City at peak times. He said that consideration must be given to how the systems
interconnect and how our system reacts. He asked what is the advantage of the connections on the
extreme end and how does it relate to the connection with our big lines under Broadway. Todd
Frederick said that velocity and pressure are both contingent elements.
Rich Straut said now all water works off of the Woodlawn Avenue Reservoir. He said that the
pressure would have to be raised to push the water in a different direction, which would have to be
part of the consideration in regards to cost. Robert Iovinello said that engineers would have to talk
to work out the elements of pressure, especially regarding differences in elevation.
Page 4 of 5
City Council Workshop minutes
April 13, 2004
Commissioner McTygue said that this is a supplemental source only, the City is looking to someone
to bring water to Saratoga Springs at no construction costs to the City. He said that the City could
expand its own well fields, drop a few more wells and do the same thing, accomplish the same goal
as this proposal.
Mayor Lenz asked that if the City enters into an agreement with SGHWSC and since they would
have to go from a 12” to a 16” line, would the fact that the City is still deciding put the SGHWSC in
a bad situation. Robert Iovinello said that modifications to 16” pose no problem with them or with
the DEC; if our company can help you we would be happy to.
ADJOURNMENT
Mayor Lenz adjourned the workshop at 7:55 p.m.
Respectfully submitted,
Nancy Wagner
Clerk
Approved:
Page 5 of 5