Complete Streets Advisory Board
Regular MeetingSaratoga Springs, NY · May 12, 2022
Minutes
SARATOGA SPRINGS COMPLETE STREETS ADVISORY BOARD
MEETING MINUTES
MAY 12, 2022
5:00 P.M.
ZOOM MEETING
MEETING MINUTES ARE NOT A WORD-FOR-WORD TRANSCRIPT.
CALL TO ORDER:
Ken Grey called the meeting to order at 5:01 p.m.
PUBLIC COMMENT-15 MINUTES
None
APPROVAL OF MINUTES- 4/14/2022
No formal minutes from the 4/14/2022 meeting.
DISCUSSION OF UNION AVENUE RFP
Tina Carton discussed the five engineering consultant responses to the Union Avenue RFP. The
following consultants responded: C&S Engineers, $357,791.00; JMT of New York, Inc.,
$91,705.00; Greenman‐ Pedersen, Inc., $148,000.00; Creighton Manning Engineering, LLP,
$49,848.00; and Barton & Loguidice, D. P. C., $91,217.00. The main considerations were cost,
time of completion, understanding of what is needed for completion and capacity to work
interdepartmentally with city staff.
After discussing each proposal, the committee would like to interview Creighton Manning and
JMT of NY. The committee would like the consultant to address a number of questions
including:
How will the project address ADA Compliance?
Describe methods and solutions for separation of bike lanes from traffic.
Will your services include projections for the ongoing maintenance costs and requirements as
well as implementation costs and expected future capital equipment costs?
Can your firm expedite the schedule to be complete the design by February 1, 2023? This will
allow the project implementation to be scheduled for the summer of 2023.
Is the implementation of the project within the existing curb lines or are other modifications
expected?
Can the project be implemented in a phased approach?
What equipment will be necessary to implement and upkeep the project?
1
These questions will be sent to the consultants prior to the in-person meetings in order for them
to prepare. Tina Carton will schedule the meetings and invite Chair of the CSAB, the Mayor and
the Deputy Mayor, as well as staff in the Department of Public Works and Public Safety.
UPDATED ON THE ADA TRANSITION PLAN
The City has an ADA Transition Plan Working Group in place. Membership includes the School
District, Library, Downtown Business Association, Saratoga Housing Authority, Saratoga
Springs Public Library, Saratoga Senior Center, and City staff from various departments.
The City received grant funding through Capital District Transportation Committee (CDTC) to
progress ADA planning in the community. The purpose of the ADA Transition Plan is to ensure
that the City of Saratoga Springs pedestrian infrastructure in the public right-of-way is accessible
for everyone, including people with disabilities. The City has made a significant and long-term
commitment to improving the accessibility of their pedestrian facilities in the public-right-of-
way.
Through the grant, all pedestrian infrastructure in the public right-of-way has been identified and
evaluated including curb ramps, sidewalks, crosswalks, pedestrian signals, pedestrian accessible
transit stops, as well as city-owned multi-use trails that are paved. CDTC created a Heat Map to
show priority areas. They also provided a schedule and cost of fixing problematic areas. The
plan’s goal is improvement of 2 miles of sidewalk compliance each year. It would take
approximately 9.85 years to complete. Total Capital Improvement Estimated to be
$3,396,759.12.
The next step is for the City to provide final review and then move the City Council to approve
the plan at a future City Council meeting.
SARATOGA WILTON CONNECTOR TRAIL
CDTC and CDRPC have provided the City, Saratoga County and the Town of Wilton with the
draft plan. A following up meeting was held to discuss edits to the document. CDTC is updating
the plan based on the feedback.
ZIM SMITH TRAIL
The Zim Smith Trail was recently featured on Parks and Trails website. Saratoga County asked
for funding from the NYSDOT transportation improvement program. It received 500K for
design phase. A Feasibility Study has been completed already by GPI (details potential right of
way) for routes.
SKIDMORE MASTER PLAN
2
Recently, Skidmore hosted a Trail cleanup day. Two pickup trucks worth of garbage were taken
from trail/woods. The committee discussed potential trails on both Glenn Mitchell Road and
Clinton Street. Skidmore recently approved funding to improve the parking area near at the
entrance off of North Broadway. A Skidmore Campus master plan will be distributed soon.
INFRASTRUCTURE MEETING
The Infrastructure Committee ranked rerouting trucks that travel through city and getting them
off of Broadway as the second highest priority. There is also a goal of slowing traffic. Erin
Maciel discussed how through Funding under Safe Streets for All Act the City can request funds
for a comprehensive safety action plan. The goal of a study could be to distinguish trucks with
local connections (deliveries) vs cut through. Other ideas include the use of a patrol officer for
enforcement.
The committee agreed to discuss the downtown extender in detail at the next meeting.
ADJOURN
The meeting was officially adjourned at 6:35 p.m.
NEXT MEETING: THE NEXT MEETING IS SCHEDULED FORJULY 1 4TH AT 5 PM.
3
Agenda
SARATOGA SPRINGS
COMPLETE STREETS ADVISORY BOARD
AGENDA
THURSDAY MAY 12, 2022
5:00 P.M. – 6:00 PM
2ND FLOOR CONFERENCE ROOM CITY HALL AND ZOOM
JOIN ZOOM MEETING
HTTPS://US02WEB.ZOOM.US/J/83327583317
MEETING ID: 833 2758 3317
+16465588656,,83327583317# US (NEW YORK)
1. PUBLIC COMMENT
2. DISCUSSION ON UNION AVENUE RFP
3. UPDATE ON ADA TRANSITION PLAN
4. INFRASTRUCTURE GRANT RECOMMENDATIONS FROM CSAB-FEEDBACK (ERIN MACIEL)
5. UPDATES-SARATOGA WILTON CONNECTOR TRAIL
6. OTHER BUSINESS
a. ZIM SMITH CONNECTION
b. SKIDMORE MASTER PLAN UPDATE
c. BROADWAY- TRUCKS
d. DISCUSSION ON POTENTIAL GRANTS
7. ADJOURN
NEXT MEETING: COMMITTEE MEETING THE SECOND THURSDAY WEEK OF JUNE 9TH AT 5:00 P.M. CITY HALL/ZOOM