SARATOGA SPRINGS COMPLETE STREETS ADVISORY BOARD
MEETING MINUTES
NOVEMBER 9TH, 2023 - 5:00 P.M.
ATTENDEES: CHAIR KEN GREY, TED OROSZ, MIKE KING, JEN NATYZAK, LYNN KEATING,
LINDLEY HICKOX
STAFF: JEN DUNN, MICHAEL DUTRE
ABSENT: SUZANNE JAGODA
MEETING MINUTES ARE NOT A WORD-FOR-WORD TRANSCRIPT.
CALL TO ORDER: The meeting was called to order at 5:00 p.m.
I. Public Comment
Kerry Mayo of the Planning Board is curious about Complete Streets 25mph speed limit
recommendation to City Council.
Ed Lindner of the Open Space Advisory Committee and Bikeatoga advocates for 25mph
speed limits to promote safety. Additionally, Bikeatoga was recently in the news for their
work displaying the history of cycling in the City.
II. Administration
a. Approval of Minutes
Chair Grey asked if the group had any edits for the minutes. No changes were
made.
III. Updates
a. Oak Ridge Development
Jen Dunn updated that the development put up signs saying the trail was for resident use
only. The city has contacted Saratoga PLAN to investigate.
b. Safe Streets for All
Jen Dunn explained that the Capital Region Transportation Council (CRTC) has
received bids from the RFP that are now being reviewed. The municipal joint
applicants will meet and select the best consultant for their respective Vision Zero
plans.
IV. Action Items
a. 25mph Speed Limit
i. Public Hearing
Jen Dunn said there was one person in favor and one person opposed to
the 25mph speed limit at City Council.
ii. Safe Streets for All – Engineering
CSAB agreed to move forward on the fastest path possible with
engineering to progress 25 mph speed limits in the inner tax district
1
iii. City – Engineering
Ted Orosz mentioned that a certified engineer will have to review and
approve 25mph speed limit.
b. ADA Transition Plan
Jen Dunn outlined that Complete Streets should also prioritize the ADA
Transition Plan as the City only has 10 years to implement. Mike King offered to
review the plan with Jen Dunn.
V. Funding Priorities
a. Congress Park Gateway
Jen Dunn went through power point slides that illustrate the potential project. The
goal is connecting bike and ped paths, expanding open space, historical
preservation and increasing safety.
b. Crescent Avenue
Chair Grey reminded the group that Congressman Tonko allocated $300,000
toward path construction. Engineering and additional funding considerations will
be required.
c. Missing Links Phase II
Jen Dunn highlighted that Missing Sidewalk Links was popular and identifying
funding and sections for a phase II would be pertinent. Chair Grey agreed that
Missing Links is a key part of the kind of walkable community the City should be.
d. Union Avenue
Chair Grey asked what can be done in-house. DPS and DPW should continue bike
lanes (installed by DOT from Henning to East Ave) and continue from East
Avenue to Nelson at a minimum. Ideally, CSAB would like bike lanes continued
to Congress Park, however we are awaiting final JMT report decisions. The City
should match what the state has done at minimum.
e. Henry Street
Jen Dunn will find out what can be done internally to complete Henry Street since
there was already a pilot and it may be an inexpensive multimodal connection
compared to other projects.
f. Ballston Ave
Mike King recommends that the board move forward with Ballston Ave as well.
VI. 2024 Priority Projects in Collaboration with DPW
a. Blodgett
Chair Grey spoke with the DPW Commissioner and he would like two achievable
shovel-ready projects. Jen Dunn clarified that the Blodgett agenda item stems
from a grant awarded to the City from the County. She will coordinate with DPW
to put in parking and a trail so users can access City open space.
b. Railroad Run Lighting Pilot
Jen Dunn and Michael Dutre are working with the City Arborist and Electrician to
select dark-sky compliant motion sensing LED lights to illuminate the darkest
parts of the path. Engineers will determine the ideal locations for lighting.
VII. 2024 Priority Projects in Collaboration with DPS
a. Pitney Crossing
Jen Dunn is working with DPS for a possible safer crossing to Pitney that would
serve the High School, YMCA and surrounding neighborhoods.
2
b. Union Ave Striping – East to Nelson
Ted Orosz recommends bringing DPS and DPW together on Union Ave safety
and accessibility since striping is one department and pavement is the other.
c. Spring Run to Lake on Eureka
CSAB discussed the possibility of striping a bike path from Spring Run up Lake
on Eureka.
d. Circular, Park and Whitney Intersection
Jen Dunn identified that these problem intersections could be baked into the
Congress Park Gateway proposal. Lynn Keating recalled seeing a lot of confused
and dangerous driving in this corridor.
VIII. Communications Coordinator
Chair Grey doesn’t have any stories to feed to the communications coordinator currently
but they will be in touch.
IX. Adjourn
3
Agenda
CITY OF SARATOGA SPRINGS
Complete Streets Advisory Committee
Thursday, November 9th 2023
5 pm
Join Zoom Meeting
https://us02web.zoom.us/j/82417214523?pwd
=MEFDNDY2NWxINVdiVTg0UHgvR3ArZz09
I. Public Comment Meeting ID: 824 1721 4523
II. Administration Passcode: 501913
a. Approval of Minutes
III. Updates
a. Oak Ridge Development
b. Safe Streets for All
IV. Action Items
a. 25mph Speed Limit
i. Public Hearing
ii. Safe Streets for All – Engineering
iii. City - Engineering
b. ADA Transition Plan
V. Funding Priorities
a. Congress Park Gateway
b. Grand Ave
c. Crescent Avenue
d. Missing Links Phase II
e. Union Avenue
f. Henry Street
VI. 2024 Priority Projects in Collaboration with DPW
a. Blodgett
b. Railroad Run Lighting Pilot
VII. 2024 Priority Projects in Collaboration with DPS
a. Pitney Crossing
b. Union Ave Striping – East to Nelson
c. Spring Run to Lake on Eureka
d. Circular, Park and Whitney Intersection
VIII. Communications Coordinator
IX. Adjourn