CALL TO ORDER: Gage Simpson, Chair called the meeting to order at 6:30 P.M.
PRESENT: Gage Simpson, Chair, Brendan Dailey, Vice Chair, Chris LaPointe, Jonah Cohen, Shafer
Gaston, Otis Maxwell & Amanda Demma
ABSENT: Chris Maslak (Alternate)
STAFF: Susan Barden, Senior Planner, Richard Roman, Zoning Administrator, Jackie White,
Counsel, City of Saratoga Springs
ANNOUNCEMENT OF RECORDING OF PROCEEDING:
The proceedings of this meeting are being recorded for the benefit of the secretary. Because the
minutes are not verbatim record of the proceedings, the minutes are not a word-for-word transcript of
the recording.
ZBA APPLICATIONS UNDER CONSIDERATION:
PROCEDURAL BUSINESS:
NEW BUSINESS:
1. #20250163 85 Lincoln Ave. Area Variance for an addition to an existing single-family residence in the Urban
Residential – 2 (UR-2) District.
2. #20250162 125 S. Broadway Area Variance to permit wall sign placement above the second floor in the
Neighborhood Center (T-5) District.
CONTINUED BUSINESS:
3. #20250114 56 Duplainville Road Area Variance to permit construction of a fence using barbed wire in the
Industrial – General (IND-G) District.
4. #20250115 38 Oak St. Area Variance for construction of a detached garage in the Urban Residential – 3
(UR-3) District.
5. #20250104 48 White St. Area Variance to permit a secondary dwelling unit in the Urban Residential – 3
(UR-3) District.
NEW BUSINESS:
1. #20250163 85 Lincoln Ave. Area Variance for an addition to an existing single-family residence in the Urban
Residential – 2 (UR-2) District.
Variances sought for 85 Lincoln Ave.:
TYPE OF REQUIREMENT ZONE REQUIREMENT PROPOSED RELIEF REQUESTED
SIDE 1 8 FT. 2.4 FT. 5.6 FT. (70%)
Bob Flansburg, Dreamscapes Unlimited represented the applicant. Bob said the house is fairly
small compared to other houses along Lincoln Ave. The existing floorplan consists of a one-story
master bedroom wing and kitchen (no second story over these rooms). Continuing on the first floor
there’s a small bathroom, living room and dining room with a short (left and right walls are 4 ft high)
on the second level above where there are two small bedrooms. By removing the roof from the
structure and simplifying it they created more head room and usable space on the second floor. They
will be adding a new master bedroom on the second floor, keeping it a 3-bedroom home. They are
proposing to enlarge the kitchen and remove walls to open things up. They added a mudroom to the
first floor and brought the laundry room up from the basement. Bob showed the location of the
proposed addition where it squares off the house at the top right corner of the plan. Because of how
the house is angled, the corner of the addition will be 2.4 ft. from the side yard property line requiring
a variance. Bob said the property next door to the right was recently rehabbed and they are 2.3 ft.
from the property line in the back. The property to the left is about 3 ft. from the property line. Gage
asked if the lot size was appropriate. Bob said yes, they have a good-sized lot. Bob displayed Google
Maps and photos showing several properties in the area that are very close to the property lines,
within 2 to 3 ft (8 and 10 Clark St., 38, 30, 39 Park Pl. and 79, 89, and 100 Lincoln St.) Bob said
there’s a precedent for this in the neighborhood.
Jonah said he appreciated all the detail and neighborhood context. He noted that he lives fairly close
to the subject property, but it won’t impact his ability to be objective. He said the house is currently 4.1
ft. into the required setback just not as much as what’s being proposed. Bob said no matter what
they did they would need a side yard variance. Otis asked how emergency services would access the
rear of the house. Bob said they have a wide driveway they can use for access. Otis said he was
surprised by the number of houses in the neighborhood that had tight setbacks. He asked if Bob
considered putting the addition on the left side instead of the right and what were the disadvantages
of doing so. Bob said they tried to use as much of the existing foundation as possible that was usable.
There’s barely a crawl space under the kitchen. Shafer added with humor that even the shed in the
rear is not square with the property line. Chris said his only concern is with water runoff from the roof
so close to the neighbor. He asked what the pitch on the roof is and if there’s a stormwater mitigation
plan in place. Bob said they will install a gutter to the ground and tie it in with the City’s storm sewer.
Chris said he would like the mitigation to be a condition of approval. Bob said that’s not a problem, it’s
part of their plan.
Gage Simpson, Chair opened the Public Hearing at 6:52. There were no comments, and the Public Hearing
will remain open.
Gage Simpson, Chair said they have no homework for the applicant and will have something for them at the
next meeting on April 7th.
2. #20250162 125 S. Broadway (Hilton Garden Inn) Area Variance to permit wall sign placement above the
second floor in the Neighborhood Center (T-5) District.
City of Saratoga Springs - Zoning Board of Appeals – March 24,, 2025 Page 2 of 5
Variances sought for 125 S. Broadway.:
TYPE OF REQUIREMENT ZONE REQUIREMENT PROPOSED RELIEF REQUESTED
MAXIMUM SIGN LETTERING & LOGO 18” 20” 2”
HEIGHT
WALL SIGN MOUNTED ABOVE THE
2ND FLOOR OF MULTI-STORY
BUILDING
MAXIMUM SIGN AREA 12 SQ. FT. 14.5 SQ. FT. 2.5 SQ. FT.
Adam Wakulenko, Adirondack sign Co. represented the applicant. He said the 18” sign on the front
of the building has been there for a while and there’s likely a variance for it but no one can find it. The
only change is that they’re re-facing it with a new graphic. The sign proposed for the second floord is
being requested because the building is in a peculiar spot with heavy vegetation and the building
itself leaves little space for a sign. There’s only one vantage point where you can see the sign and
that’s heading south on Broadway. Adam showed a street view of the building and once you get in
front of it, you can’t see it. If the sign is lower the vegetation covers it up.
Otis said he understands the two signs that the applicant is requesting and asked for a better
understanding of the third sign on the second floor of the building. The UDO restricts signs above the
first floor, so the applicant should show comps, and they might be difficult to find. Adam said he was
able to find comps right before coming to the meeting: The Racing Museum, Saratoga Honda on S.
Broadway and Tree House Brewing Company. Adam said the signs all seem to be in an appropriate
spot for what the signage is. Adam showed a current photo of the building and where they would like
to locate the 2nd floor sign. Currently there are no leaves on the trees, so the view is not obstructed.
He said there is no other place to put the sign on the building where you can see it, especially once
the trees have leaves on them. Gage confirmed with Susan that the wall sign is permitted, provided it
is not installed above the first floor. Susan said that was correct. Gage said the applicant will need to
submit pictures of the comps for the record. Otis noted that there’s a large hotel going up at the
corner of Lincoln and Broadway (Bonacio’s project) that might have a second-floor sign planned. He
said the subject hotel, Hilton Garden Inn, may have been specifically designed with the berm blocking
the site from the south so it could be more “garden like”. Jonah said Homewood Suites next to Tree
House Brewing has a sign on the 4th floor and no vegetation obstacles. Brendan said he appreciated
the presentation and asked how the sign on the side of the building would be lit. Adam said it would
be 3500k halo lit. Brendan asked if the sign would be lit all night. Adam said he wasn’t sure but
whatever the board/city requires the applicant would comply with. Amanda asked Adam to come up
with comps in the same T-5 District. Adam will return with comps for the one sign for the 2nd floor
level. Gage said the board is fine with the other two signs.
Gage Simpson, Chair opened the Public Hearing at 7:04 p.m.. There were no comments, and the Public
Hearing will remain open.
CONTINUED BUSINESS:
3. #20250114 56 Duplainville Road Area Variance to permit construction of a fence using barbed wire in the
Industrial – General (IND-G) District.
City of Saratoga Springs - Zoning Board of Appeals – March 24,, 2025 Page 3 of 5
The applicant’s representative had nothing more to present. Shafer confirmed with Susan that there
was a favorable “no county impact” response from the Saratoga County Planning Board.
Gage Simpson, Chair said the Public Hearing was still open if there were any comments. There were no
comments, and the Public Hearing was closed at 7:05 p.m..
Shafer Gaston made a motion to approve an area variance for construction of a barbed wire fence at 56
Duplainville Road, Saratoga Springs, NY. The motion was seconded by Otis Maxwell. Discussion: First
paragraph, second sentence “the applicant desires to add barbed wire and spiked posts to their fencing”.
Vote: C. LaPointe-Y, J. Cohen-Y, S. Gaston-Y, O. Maxwell-Y, A. Demma-Y, B. Dailey-Y, G. Simpson-Y. 7-0
Motion carried.
4. #20250115 38 Oak St. Area Variance for construction of a detached garage in the Urban Residential – 3
(UR-3) District.
Variances sought for 38 Oak St.:
TYPE OF REQUIREMENT#3 ZONE REQUIREMENT PROPOSED RELIEF REQUESTED
MAX. BUILDING COVERAGE 40% 46% NOW (WAS 6% (15%)
48%)
ACCESSORY TO SIDE (GARAGE) 5 FT. 3.5 FT. NOW (WAS 1.5 FT. (30%)
3.3 FT.)
TOTAL SIDE (MAIN HOUSE) 12 FT. 3.2 FT. 8.8 FT. (73%)
MAIN HOUSE – INTERIOR SIDE 2 5 FT. 0 FT. 5.0 FT. (100%)
(ALLEY)
Tonya Yasenchak, Y Engineering said they have modified the footprint for the garage since the last
meeting and researched the size of the building that was previously on the site. She said they were
able to reduce the amount of variance needed for the coverage from 48% to 46% and the accessory
to side (garage) from 3.3 ft. to 3.5 ft. Tonya showed photos of the barn and shed (now demolished)
area off of the side that went over to the property line. She looked at the tax assessor’s records and
found that there was an existing barn in 1925 that was 16 ft. by 19 ft. without the shed. The shed was
approximately the same size as the barn, and Tonya calculated that together they equaled 661 sq. ft.,
which is larger than their proposed garage at 548 sq. ft. Tonya said she looked up the zoning
variance for the property directly to the south, and they have a building and a garage with an
apartment overhead and were granted a coverage variance for 50% in 2017. Tonya said she feels
they’re consistent with what the ZBA has reviewed and approved in the past. They’re 4% lower in
coverage and not asking for another dwelling unit or making the neighborhood any denser. Brendan
said he appreciates the changes that were made. He said he still feels it’s a little dense, but the size
of the lot has an impact on it. The neighborhood comps and comments from neighbors were helpful in
his decision. Amanda said she appreciates the changes and the reduction in coverage. Chris
appreciates the changes but still feels it’s too much for the lot. In the past the board was against a 2-
car garage on this property and did approve a 1.5 car garage. Shafer asked how Tonya calculated
the barn and shed sq. ft. Tonya said the tax assessor’s records showed the sq. ft. for the barn but not
the shed. She calculated the shed size by the space it took up next to the barn. Otis said he’s not
completely comfortable comparing “apples to apples” with the barn/shed to the new garage. Tonya
showed a photo of a two-car garage next door with a second dwelling unit above on the same sized
City of Saratoga Springs - Zoning Board of Appeals – March 24,, 2025 Page 4 of 5
lot as the subject property and a variance was approved by this Board for that structure. Gage said
he appreciated all the work Tonya did and he thinks it fits the neighborhood.
Gage Simpson, Chair said the Public Hearing was still open if there were any comments. There were no
comments, and the Public Hearing was closed at 7:22 p.m..
Brendan Dailey made a motion to approve an area variance for construction of a detached garage at 38 Oak
St., Saratoga Springs, NY. The motion was seconded by Jonah Cohen. Discussion: #3 add “by the factors
stated above in addition to the pre-existing undersized lot”. In #2 add “this proposed garage is replacing a
dilapidated barn/shed of similar size and stature”. In #1 before the last sentence add “The applicants also
desire to put a roof over their side stoop that was previously removed”. Vote: C. LaPointe-Y, J. Cohen-Y, S.
Gaston-Y, O. Maxwell-Y, A. Demma-Y, B. Dailey-Y, G. Simpson-Y. 7-0 Motion carried.
5. #20250104 48 White St. Area Variance to permit a secondary dwelling unit in the Urban Residential – 3
(UR-3) District.
Variances sought for 48 White St.:
TYPE OF REQUIREMENT ZONE REQUIREMENT PROPOSED RELIEF REQUESTED
MIN. LOT SIZE 8000 SF 7500 SF 500 SF (6.3%)
MIN. AVERAGE WIDTH 80 FT. 50 FT. 30 FT. (37.5%)
MAX. COMBINED COVERAGE % 40% 41.33% 1.33% (3.3%)
REAR SETBACK (SECONDARY 25 FT. 10.2 FT. 14.8 FT. (59.2%)
DWELLING)
Bob Flansburg, Dreamscapes Unlimited represented the applicant and came back with comps.
Bob said they have reduced the coverage from 42% to 41.33%. They reduced the first floor as much
as they could, especially since it’s handicapped accessible. He reduced the overhangs from 12” to 8”.
The updated survey reflects the change from a 12” overhang down to 8”. Bob showed photo slides of
comps in the area at 9 Stratton St., Cottage St., 21 Murphy Lane.
Gage Simpson, Chair said the Public Hearing was still open if there were any comments. There
were no comments, and the Public Hearing was closed at 7:35 p.m..
Amanda Demma made a motion to approve area variances for construction of a secondary dwelling at 48
White St., Saratoga Springs, NY. The motion was seconded by Otis Maxwell. Discussion: The last sentence
in #2 should be moved to #3. New last sentence in #2 “neighborhood comparables were provided that show lot
width and structures of similar size and locations. Combined coverage should be a percentage 1.33% or 3.3%.
Second paragraph add “secondary dwelling unit”. Vote: C. LaPointe-Y, J. Cohen-Y, S. Gaston-Y, O. Maxwell-
Y, A. Demma-Y, B. Dailey-Y, G. Simpson-Y. 7-0 Motion carried.
Gage Simpson, Chair concluded the meeting at 7:45 p.m.
Respectfully submitted,
Donna Gizzi, Recording Secretary
City of Saratoga Springs - Zoning Board of Appeals – March 24,, 2025 Page 5 of 5
Agenda
3/18/25, 1:36 PM (7) ZBA Agenda to Publish - Smartsheet.com
ZBA Members
City of Saratoga Springs Gage Simpson (Chair)
ZONING BOARD OF APPEALS Brendan Dailey (V. Chair)
City Hall • 474 Broadway Christopher LaPointe
Jonah Cohen
Saratoga Springs, New York 12866
Shafer Gaston
518.587.3550 Otis Maxwell
Amanda Demma
www.saratoga-springs.org
Chris Maslak (Alternate)
• NOTE: This meeting is being held IN- PERSON at City Hall
• To participate or provide input during the meeting, please attend the meeting in person
• To view the webcast live or once recorded, go to www.saratoga-springs.org.
• Comments may be submitted up to 12PM on the day of the meeting using the Public Comment form on the Planning
Department page.
ZONING BOARD OF APPEALS AGENDA
Monday, March 24, 2025, at 6:30 p.m.
Procedural Business
Agenda
Project # Project Project Location Project Description Ordinance Type
Order
New Business
Agenda Project
Project # Project Project Location Project Description Ordinance Type
Order Index
85 Lincoln Ave Area Area variance for an addition to an existing single-family residence in UDO
1 20250163 85 Lincoln Ave
Variance the Urban Residential - 2 (UR-2) District.
125 S Broadway Area 125 S Area variance to permit wall sign placement above the second floor UDO
2 20250162
Variance Broadway in the Neighborhood Center (T-5) District.
Continued Business
Agenda Ordinance
Project # Project Project Location Project Description Project Index
Order Type
56 Duplainville Road Area 56 Duplainville Area variance to permit construction of a fence using barbed wire UDO
3 20250114
Variance Road in the Industrial - General (IND-G) District.
Area variance for construction of a detached garage in the Urban UDO
4 20250115 38 Oak St Area Variance 38 Oak St
Residential - 3 (UR-3) District.
Area variance to permit a secondary dwelling unit in the Urban UDO
5 20250104 48 White St Area Variance 48 White St
Residential - 3 (UR-3) District.
3. Upcoming Meeting
April 7, 2025, at 6:30 PM
April 28, 2025, at 6:30 PM
4. Announcement:
If you are interested in supporting our community by sitting on a Land Use Board, please fill out the form on the City's website.
VIRTUAL PARTICIPATION
• Due to unexpected circumstances, one or more of our members may need to participate remotely; if the meeting is remote or hybrid, please
find relevant meeting details here.
• A video recording of the meeting will be available here.
GENERAL MEETING GUIDELINES
• Applicant presentations to the Board will be limited to 15 minutes.
• Public comments from the audience during public hearings will be limited to 3 minutes.
• All speakers will be timed to ensure compliance.
• Individuals may not donate their allotted time to other speakers.
• Please be respectful to the speakers while they are addressing the Board.
• Comments to the Board should relate specifically to the application under consideration and the review criteria.
• All written comments will be distributed to the Board and made part of the public record.
Note: This agenda is subject to change. Please check the website for the latest version.
https://app.smartsheet.com/dashboards/3pR68xGHpHvmMwQhjPp8pF5mCCq7XgVR9579Gfg1 1/2
3/18/25, 1:36 PM (7) ZBA Agenda to Publish - Smartsheet.com
https://app.smartsheet.com/dashboards/3pR68xGHpHvmMwQhjPp8pF5mCCq7XgVR9579Gfg1 2/2
Get email alerts for Saratoga Springs
A daily email when new agendas and minutes are posted.