1. Freightway Parking Garage - Life Cycle Repairs and Future
Planning of Freightway Site
CS: 12-2-20
E-MAIL: Journal News (Lohud)
Scarsdale 10583
Scarsdale Hamlet Hub
Scarsdale Inquirer
The Daily Scarsdale
cc: Lobby Bulletin Board
UPDATED CONDITION SURVEY REPORT
of the
FREIGHTWAY PARKING GARAGE
Scarsdale, New York
Prepared For:
Village of Scarsdale
Scarsdale, NY 10583
Submitted by
DESMAN
DBA Desman, Inc.
3 West 35th Street
New York, NY 10001
NOVEMBER 2020
UPDATED CONDITION SURVEY REPORT
of the
FREIGHTWAY PARKING GARAGE
Scarsdale, NY
Contents
1. INTRODUCTION ................................................................................................................. 1
A. Authorization .................................................................................................................. 1
B. Scope of Services............................................................................................................. 1
C. Objective ......................................................................................................................... 1
D. Parking Garage Repair and Restoration - An Overview ........................................... 2
2. SUMMARY, CONCLUSION and RECOMMENDATIONS ........................................... 4
3. FINDINGS AND RECOMMENDATIONS ...................................................................... 11
4. BUDGET COST ESTIMATE ................................................................................................ 16
1. INTRODUCTION
A. Authorization
Desman was retained by the Village of Scarsdale to provide consulting engineering
services to perform a condition assessment of the Freightway Parking Garage. The
updated visual condition survey was performed October 2020.
B. Scope of Services
The basic scope of services is outlined in detail in Desman’s proposal. In summary, the
services primarily consist of the following:
• Review existing documentation including design drawings and any previous reports.
• Visual inspection of the parking garage.
• Review the effectiveness of any previous repairs.
• Limited delamination (chain drag) survey of the structurally supported floor slabs.
• Preparation of a report and cost estimate documenting the results of our investigation
along with recommendations for immediate and future action.
C. Objective
It is the intent of this condition evaluation and assessment to: (1) document the current
condition and estimate the extent of deterioration of various components of the parking
garage, (2) determine the causes and estimate the extent of the deterioration, to the
extent possible through our visual observations; (3) develop recommended programs of
repair, and (4) estimate the probable construction costs of the repairs.
Normally, during the evaluation, an assumption is made that the structure was
designed and constructed adequately.
This condition survey was visual and non-destructive; extensive testing is beyond the
scope of this investigation. Therefore, in the development of repair programs within this
report, contingency funds must be anticipated and included in any budget for repairs to
account for concealed, unknown, underestimated or unanticipated conditions, which
may be encountered.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 1
D. Parking Garage Repair and Restoration - An Overview
Concrete is a stone-like material obtained by permitting a carefully proportioned mixture
of cement, sand and gravel, or other aggregate, combined with water, to harden in forms
of the shape and dimensions of the desired structure. The advantages of this building
material include its high fire and weather resistance, local availability, low cost and high
compressive strength. On the other hand, it is a relatively brittle material whose tensile
strength is low compared to its strength in compression. This limitation is overcome by
using reinforcing steel in combination with concrete to reinforce it where its low tensile
strength would normally limit the carrying capacity of the member.
With the widespread use of salt deicing programs for our nation’s highways, the condition
of our bridge decks, parking garages and other reinforced concrete structures directly
exposed to these conditions began to change. The relationship between the deterioration
and the use of deicing salts was most evident by the extent of deterioration found in the
“snow belt” states. With the development of this deterioration, programs were initiated
to study the cause and effect of the problem in order that repair procedures and
preventive maintenance could be instituted.
Research during this period confirmed that the corrosion of the embedded reinforcing
steel was the primary cause of the structural deterioration. It was further determined that
the presence of chloride in the concrete (from both external and internal sources) greatly
accelerated the development of the corrosion process. External sources of chlorides are,
essentially, deicing salt applications. Internal sources consist of calcium chloride
admixtures to the concrete used in winter months to speed up the temperature sensitive
curing of the concrete mix. Repair programs began to consider that the only method to
stop all subsequent corrosion was one where all concrete containing threshold values of
chlorides to cause corrosion was removed and chlorides were further prevented from
entering the new concrete. However, removal of all concrete containing significant levels
of chlorides is seldom a practical solution.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 2
The service environment of parking structures is more severe than most other buildings
and is more nearly like that of highway bridges. In many cases, these structures are
exposed to seasonal and daily ambient temperature variations. Deicing salts may be
spread directly on the slab floors or may be deposited from wheel wells of vehicles.
Extreme temperature and volume changes can cause cracking of the floors, beams,
columns, and walls that can lead to the ingress of water and chlorides, leading eventually
to deterioration.
To the greatest extent possible, a field visual inspection, selective field testing, laboratory
tests and review of existing documents are used to gain as much information about the
structure as possible. Normally, an assumption during the evaluation of the condition is
that the structure was designed and constructed adequately. Due to budget constraints
and the on-going operations of the facility, extensive destructive testing regarding
confirmation of existing conditions is beyond the scope of this investigation. As stated by
the ACI (American Concrete Institute) committee 362 State of the Art Report on Parking
Structures issued in 1985, “Repairing an existing deteriorated structure involves many
unknowns, uncertainties and risks. Especially with regard to repair of deicer caused
corrosion damage, the process is considered an extension of the useful life of the
deteriorated structure. It is not equivalent to building a new structure with current
technology.” It is our experience that even if all delaminated concrete is removed, the
concrete that appears to be sound but is contaminated will continue to delaminate even
if the further ingress of moisture and salt are eliminated by the use of a waterproofing
membrane. Generally, delamination is between ½% and 2% of the contaminated area.
Further, in the development of repair programs within this report, contingency funds
must be anticipated and included in any budget for repairs to account for concealed,
unknown, or unanticipated conditions that may be encountered.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 3
2. SUMMARY, CONCLUSION and RECOMMENDATIONS
In order to prepare this report, a limited delamination survey and visual observations were made
of the parking garage. Following is a description of each element along with a summary of
findings and recommendations for repair.
The Freightway Parking Garage is located off Garth Road in Scarsdale, New York and is bounded
on the north by Freightway Road and the Metro North Railroad to the East. There is a small
adjacent parking lot to the South. The parking garage services commuters at the Metro-North
Scarsdale Train Station.
The parking structure has four supported levels, and is approximately 233 feet by 125 feet. The
parking structure is a structural steel frame with a corrugated metal deck and cast-in-place
concrete. There are two stair towers providing pedestrian access to the garage. One is located
in the North-East corner, and the other in the South-West corner. There are two main entrances
and exits to the garage. One on the West side leads to Garth Road, and two on the North side
lead to Freightway Road. There is also an entrance and exit on the South side that leads to an
adjacent parking lot. A two-way ramp provides access between the levels (see photo 2.1).
Photo 2.1
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 4
Based on our survey, we observed the Freightway Parking Garage to be in fair to poor physical
condition. There were cracks on the structural slab and traffic membrane observed throughout
the parking garage. The cracks and the failed caulk joints have permitted seepage of moisture
into the concrete slab initiating corrosion of the embedded reinforcement and metal deck soffit,
resulting in deterioration of the supported concrete floors. Several areas of the metal decking
were observed to be corroded and deteriorated at all supported levels. In addition, floor areas at
all parking levels were found to be spalled/delaminated, requiring partial depth or full depth
replacement. Most of the observed deterioration at the original slab appears to be a direct result
of water infiltration. The water infiltration combined with road salts (chlorides), causes corrosion
of embedded structural elements, resulting in the deterioration of the structure. If these
problems are not addressed, the continued seepage of salt laden moisture will only accelerate
the corrosion of the structural elements of the garage, which will result in serious structural
problems in the future. Our observations conclude that the parking structure requires the
implementation of a comprehensive repair and preventive maintenance program in order to
ensure its structural integrity and to extend its useful life. The delamination survey showed that
several areas of the deck have delaminated. Additionally, sections of the traffic bearing
membrane have deteriorated. These delaminations along with a presence of water and chlorides
in the garage, typically indicates that a significant amount of structural slab deterioration exists
(see photos 2.2 and 2.3).
Photo 2.2 Photo 2.3
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 5
The visual observations of the soffits particularly at the upper floor levels showed corrosion of
the corrugated metal deck. Some areas of the metal deck have completely corroded, and other
areas of the metal deck show signs of corrosion (see photos 2.4 and 2.5). (Metal decks typically
corrode from the inside out.)
Photo 2.4 Photo 2.5
Generally, the structural steel members and connections were found to be in fair condition.
Corrosion of steel beams and girders have occurred at some locations due to seepage of moisture
through cracks in the concrete slab and construction joints (See photos 2.6 and 2.7).
Photo 2.6 Photo 2.7
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 6
The garage drains were observed to be in good condition, however multiple drains appeared to
be clogged and should be cleaned on a regular basis. (see photo 2.8).
Photo 2.8
Asphalt repairs are required at the on grade parking area adjacent to the third floor parking level.
Areas of asphalt have settled, cracked and deteriorated over the years (see photos 2.9 and 2.10).
We recommend that the sub-grade be properly compacted at any depressed areas before
installing new asphalt and returning the pavement to its original level.
Photo 2.9 Photo 2.10
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 7
The two stair towers were observed to be in fair condition with some concrete spalling, minor
spalled bricks and minor rusting at the steel members (see photo 2.11, 2.12 and 2.13).
Photo 2.11 Photo 2.12
Photo 2.13
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 8
The top of the supported concrete slabs contained a traffic bearing membrane. During our
inspection many areas of the membrane were worn-out while other areas of the membrane have
de-bonded from the structural slab (see photos 2.14, and 2.15). The warn and damaged
membrane areas and other areas that would be affected by any concrete floor repairs should be
patch repaired and the entire membrane should be recoated to extend the system useful life.
Any applied waterproofing measures should be periodically inspected and as conditions warrant
repairs should be implemented to maintain the system effectiveness. These waterproofing
measures should be maintained for the life of the facility to avoid future moisture infiltration and
chloride penetration to the level of the reinforcing. Maintaining a watertight facility is especially
important because it will protect the concrete structure from deterioration and will thus extend
its useful life. Allowing water latent with chlorides to penetrate all the way through the slabs may
lead of structural issues due to corrosion induced deterioration of the concrete structure or steel
framing.
Photo 2.14 Photo 2.15
Other areas requiring repairs include: exterior concrete stairs, exterior retaining walls and metal
spandrels at the roof level (See Photos 2.16, 2.17 and 2.18).
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 9
Photo 2.16 Photo 2.17
Photo 2.18
Based on our condition survey, the cost of the repairs is approximately $8,352,607.00 over the
next 25 years. It should be understood that the maximum benefit would be obtained at the least
cost if the repairs are performed in one phase and under one contract. A phased approach would
result in additional costs due to splitting up into several smaller contracts, increase in costs due
to inflation and lastly due to increase in required work because of on-going deterioration. We
estimate an additional cost of 10% to 15% for phased repairs (not included in our estimates).
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 10
3. FINDINGS AND RECOMMENDATIONS
Desman was retained to perform an assessment of the Freightway Parking Garage, located in
Scarsdale, New York. The conclusions, recommendations and opinions of costs represented in
this report area based on discussions with personnel familiar with the property, our field
observations and our experience with similar projects.
It is not the intent of this survey to perform an exhaustive study to locate every existing defect in
the structure. A team of trained professionals made “walk-through” observations but there may
be defects at the facility that were not readily accessible, not visible or that were inadvertently
overlooked.
Based on our field condition survey, we have developed a comprehensive repair and preventive
maintenance program. This program addresses the present deterioration conditions as well as
the preventive maintenance measures for the long-term durability of the structure. Due to the
preliminary nature of this study, the estimate is presented for budget purposes only. The
estimate is based on our experience with similar parking garage rehabilitation projects and prices
in the Westchester, New York area. A detailed cost estimate is provided in section 4 of this report.
If required, the repairs can be phased over a period of time. However, the maximum advantage
would be obtained at the least cost and inconvenience, if the repairs are performed in one phase
and under one contract. A phased approach would result in additional costs due to splitting up
the work into several smaller contracts, increase in costs due to inflation and lastly due to
increase in required work because of the on-going deterioration.
Generally, parking structures require periodic maintenance and repairs to keep them in working
order and prevent serious structural deterioration. In an effort to develop a repair and
maintenance program, it is helpful to assess the current condition of the structure.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 11
Following is an itemized budget cost estimate and associated description of the work items for
the recommended repairs at the Freightway Parking Garage:
1. Structural Work:
a. Partial depth concrete repairs:
This item consists of the partial depth removal of delaminated/deteriorated concrete
from the topside of the supported floor slabs. The slabs shall be repaired back to their
original elevations using high quality concrete or an approved trowel applied repair
material which is compatible with the existing concrete. Any existing corroded reinforcing
shall be cleaned and supplemented with new epoxy coated reinforcing as required. The
construction joint around each repair will also be tooled and sealed with an approved
two-part polyurethane sealant.
b. Full depth concrete repairs:
This item consists of full depth removal and replacement of delaminated/deteriorated
concrete from the supported floor slabs. The slabs shall be rebuilt back to their original
elevations using high quality 5000 psi concrete. Any existing corroded reinforcing shall be
cleaned and supplemented with new epoxy coated reinforcing as required. The
construction joint around each repair will also be tooled and sealed with an approved
two-part polyurethane sealant.
c. Metal Deck Repairs:
This item consists in the removal of all deteriorated metal decking and replacing it with a
reinforced flat slab.
d. Asphalt repairs:
Remove and replace any areas of deteriorated asphalt system at the parking areas. Water
ponding and depressed areas should also be addressed.
e. Steel Repairs:
Plates shall be welded to steel web or flange where beam has lost over 20% of its cross-
sectional area. Corroded beam and columns shall be sand blasted, primed and painted
with a rust inhibitive paint.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 12
f. Masonry Repairs:
This item consists of the removal of any spalled, cracked or bulging brick and replacing it
with new to match existing.
g. Interior Stairs repairs:
This item consists in repairing any spalled concrete and scraping, priming and painting
rusted the steel members.
2. Waterproofing Work:
a. Rout and Seal Cracks:
All floor cracks greater than 1/16" wide are to be routed and sealed with a two-part
polyurethane sealant.
b. Sealant replacement:
This item consists of removing the existing deteriorated and failed caulking, then installing
closed cell backer rod and an approved two-part polyurethane joint sealant.
c. Waterproofing Membrane Patch Repairs:
In order to minimize further ingress of moisture and reduce further concrete
deterioration, the application of a traffic bearing waterproofing membrane system is
recommended at the areas of deteriorated membrane.
d. New Top-coat at all Supported Levels:
This item consists of shot blasting clean the slab surfaces and install a new elastomeric
topcoat waterproofing membrane system.
3. Drainage:
a. Drainage Repairs and Upgrading:
Repair and/or replace any deteriorated existing drains and piping and install new drains
and associated piping. Water ponding areas shall also be evaluated.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 13
4. Guards:
a. New Interior Guard Rail:
This item consists of installing a new interior guard railing at the ramp openings.
5. Paint:
a. Cleaning and Painting of Steel Beams and Columns:
Scrape, prime and paint steel beams and columns.
b. Restripe Garage:
Providing new signage and striping for the garage.
6. Exterior:
a. Concrete Stairs Repairs:
This item consists in repairing all spalled concrete steps by restoring them to their original
dimensions.
b. Retaining Wall Repairs:
This item consists of removing any spalled concrete and grouting out any cracks and
repairing it back to its original dimensions.
c. Metal Facades Panels:
Repair and/or replace loose and damage panels at the exterior facades particularly at the
roof level.
d. Façade Upgrades:
Replace and upgrade the existing exterior garage façade panels.
7. Miscellaneous Items:
a. New LED Lighting:
Replace and upgrade the existing lighting system with new LED lighting.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 14
b. Miscellaneous work:
Any miscellaneous items such as miscellaneous steel repairs/additions, installation and
removal of temporary partitions/barricades separating work areas from public areas of
the garage, etc.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 15
4. BUDGET COST ESTIMATE
10-20122.00-2 Freightway Garage Printed:
Repairs and Preventive Maintenance
Engineer's Estimated Construction Cost - November 2020
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 1 to 10 Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20 Year 11 to 20 Year 21 Year 22 Year 23 Year 24 Year 25 Year 21 to 25
Item No. Description 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 TOTAL 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 TOTAL 2041 2042 2043 2044 2045 TOTAL
1. Structural Work
a. Partial Depth Slab Repairs $ 70,000 $ 70,000 $ 35,700 $ 175,700 $ 82,016 $ 83,656 $ 1,268 $ 166,941 $ 47,105 $ 47,105
b. Full Depth Slab Repairs $ 320,000 $ 320,000 $ 160,000 $ 800,000 $ 374,931 $ 382,430 $ 195,039 $ 2,536 $ 954,936 $ -
c. Metal Deck Repairs $ 37,500 $ 37,500 $ 8,160 $ 83,160 $ 43,937 $ 44,816 $ 88,753 $ 10,767 $ 10,767
d. Asphalt Pavement Repairs $ 84,000 $ 84,000 $ 102,396 $ 102,396 $ -
e. Steel Repairs $ 10,000 $ 10,000 $ 5,100 $ 25,100 $ 11,717 $ 11,951 $ 23,668 $ 6,729 $ 6,729
f. Masonry Repair $ 6,000 $ 6,000 $ 2,550 $ 14,550 $ 7,030 $ 7,171 $ 14,201 $ 3,365 $ 3,365
g. Interior Stair Repairs $ 5,000 $ 10,000 $ 3,641 $ 18,641 $ 5,975 $ 12,190 $ 18,165 $ 4,805 $ 4,805
Subtotal $ 443,500 $ 448,500 $ 254,000 $ - $ - $ - $ - $ 51,510 $ 3,641 $ - $ 1,201,151 $ - $ - $ - $ - $ 519,631 $ 535,999 $ 309,625 $ - $ 3,805 $ - $ 1,369,059 $ - $ 67,966 $ 4,805 $ - $ - $ 72,771
2. Waterproofing Work
a. Rout And Seal Cracks (Elevated Slabs) $ 1,400 $ 1,400 $ 1,200 $ 1,040 $ 1,061 $ 6,102 $ 1,640.32 $ 1,673 $ 1,463 $ 1,268 $ 6,044 $ 1,373 $ 1,400 $ 2,773
b. Sealant Replacement $ 14,000 $ 14,000 $ 7,000 $ 18,207 $ 18,571 $ 71,778 $ 16,403.23 $ 16,731 $ 8,533 $ 41,667 $ 24,024 $ 24,504 $ 48,528
c. Waterproofing Membrane Patch Repairs $ 10,000 $ 10,000 $ 5,000 $ 7,650.00 $ 32,650 $ 11,716.59 $ 11,951 $ 6,095 $ 29,762 $ 10,094.01 $ 10,094
d. Waterproofing Membrane Recoating (All Supported Levels) $ 220,200 $ 220,200 $ 229,096 $ 233,678 $ 903,174 $ 273,791 $ 25,618.48 $ 299,410 $ 308,333 $ 314,500 $ 622,833
Subtotal $ 25,400 $ 25,400 $ 13,200 $ 220,200 $ 220,200 $ - $ - $ 7,650 $ 248,343 $ 253,310 $ 1,013,704 $ - $ - $ - $ - $ 29,760 $ 30,355 $ 16,091 $ 273,791 $ 26,887 $ - $ 376,884 $ - $ 10,094 $ 25,397 $ 334,238 $ 314,500 $ 684,228
3. Drainage
a. Drainage Repairs and Upgrading $ 7,500 $ 7,500 $ 15,000 $ 5,412 $ 5,520 $ 10,933 $ 14,282 $ 14,282
Subtotal $ 7,500 $ 7,500 $ - $ - $ - $ - $ - $ - $ - $ - $ 15,000 $ 5,412 $ 5,520 $ - $ - $ - $ - $ - $ - $ - $ - $ 10,933 $ - $ - $ - $ - $ 14,282 $ 14,282
4. Guards
a. New Interior Guard Rail $ 25,000 $ 25,000 $ 50,000 $ 31,706 $ 31,706 $ -
Subtotal $ - $ - $ 25,000 $ 25,000 $ - $ - $ - $ - $ - $ - $ 50,000 $ - $ - $ - $ - $ - $ - $ - $ - $ 31,706 $ - $ 31,706 $ - $ - $ - $ - $ - $ -
5. Paint
a. Cleaning Painting of Steel Beams and Columns $ 60,000 $ 60,000 $ 120,000 $ 64,946 $ 66,245 $ 131,191 $ 80,752 $ 82,367 $ 163,119
b. Restripe Garage $ 15,000 $ 15,000 $ 15,606 $ 15,918 $ 61,524 $ 18,651 $ 19,024 $ 37,674 $ 21,004 $ 21,424 $ 42,427
Subtotal $ - $ - $ 60,000 $ 75,000 $ 15,000 $ - $ - $ - $ 15,606 $ 15,918 $ 181,524 $ 64,946 $ 66,245 $ - $ - $ - $ - $ - $ 18,651 $ 19,024 $ - $ 168,865 $ - $ 80,752 $ 82,367 $ 21,004 $ 21,424 $ 205,547
6. Exterior
a. Concrete Stair Repairs $ 20,000 $ 20,000 $ 21,649 $ 21,649 $ 26,917 $ 26,917
b. Retaining Wall Repairs $ 6,000 $ 6,000 $ 6,624 $ 7,609 $ 14,234 $ 8,569 $ 8,569
c. Metal Façade Panels $ 10,000 $ 10,000 $ 16,236 $ 16,561 $ 32,798 $ 20,188 $ 20,592 $ 40,780
d. Façade Upgrades $ 150,000 $ 150,000 $ 300,000 $ - $ -
Subtotal $ 20,000 $ 6,000 $ 10,000 $ 150,000 $ 150,000 $ - $ - $ - $ - $ - $ 336,000 $ 37,885 $ 23,186 $ - $ - $ - $ - $ - $ - $ 7,609 $ - $ 68,680 $ - $ 47,105 $ 20,592 $ - $ 8,569 $ 76,267
7. Miscellaneous Items
a. New LED Lighting $ 150,000 $ 150,000 $ 300,000 $ - $ 201,880 $ 205,918 $ 407,798
b. Miscellaneous Work 7% $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ - $ - $ 6,000 $ 12,000 $ 12,000 $ 105,000 $ 12,000 $ 8,000 $ - $ - $ 18,000 $ 18,000 $ 13,000 $ 13,000 $ 8,000 $ - $ 90,000 $ - $ 15,000 $ 12,000 $ 20,000 $ 20,000 $ 67,000
Subtotal $ 15,000 $ 15,000 $ 15,000 $ 165,000 $ 165,000 $ - $ - $ 6,000 $ 12,000 $ 12,000 $ 405,000 $ 12,000 $ 8,000 $ - $ - $ 18,000 $ 18,000 $ 13,000 $ 13,000 $ 8,000 $ - $ 90,000 $ - $ 216,880 $ 217,918 $ 20,000 $ 20,000 $ 474,798
Total Above $ 511,400 $ 502,400 $ 377,200 $ 635,200 $ 550,200 $ - $ - $ 65,160 $ 279,591 $ 281,228 $ 3,202,379 $ 120,243 $ 102,951 $ - $ - $ 567,391 $ 584,354 $ 338,715 $ 305,442 $ 97,031 $ - $ 2,116,127 $ - $ 422,798 $ 351,078 $ 375,241 $ 378,775 $ 1,527,893
Estimated Contingency 10% $ 51,140 $ 50,240 $ 37,720 $ 63,520 $ 55,020 $ - $ - $ 6,516 $ 27,959 $ 28,123 $ 320,238 $ 12,024 $ 10,295 $ - $ - $ 56,739 $ 58,435 $ 33,872 $ 30,544 $ 9,703 $ - $ 211,613 $ - $ 42,280 $ 35,108 $ 37,524 $ 37,878 $ 152,789
Estimated Engineering Budget 12% $ 61,368 $ 60,288 $ 45,264 $ 76,224 $ 66,024 $ - $ - $ 7,819 $ 33,551 $ 33,747 $ 384,286 $ 14,429 $ 12,354 $ - $ - $ 68,087 $ 70,123 $ 40,646 $ 36,653 $ 11,644 $ - $ 253,935 $ - $ 50,736 $ 42,129 $ 45,029 $ 45,453 $ 183,347
Grand Total $ 623,908 $ 612,928 $ 460,184 $ 774,944 $ 671,244 $ - $ - $ 79,495 $ 341,101 $ 343,099 $ 3,906,903 $ 146,697 $ 125,600 $ - $ - $ 692,217 $ 712,912 $ 413,233 $ 372,639 $ 118,377 $ - $ 2,581,675 $ - $ 515,814 $ 428,315 $ 457,794 $ 462,106 $ 1,864,029
1. Costs are in 2020 dollars.
2. Lost revenues are not included.
3. Utility costs are not included.
4. Contingency for project conditions beyond Owner's control such as variation in quantities, bidding climate and regulatory costs are not included.
5. Estimated costs are based on prevaling wage rates.
6. Costs assumes construction phasing of 20%-25% of the total occupied area at one time, with no phases being captures concurrently.
7. Costs from year 8 on include a 2% cost increase due to inflation.
8. Costs do not include upgrades in structural, mechanical, fire protection or electrical systems.
9. Costs do not include further investigations, investigation costs or upgrades/modifications associated with possible investigation findings.
Updated Condition Survey Report
Freightway Parking Garage, Scarsdale NY Page 16
Get email alerts for Scarsdale