City Council Committees
Regular MeetingSchenectady, NY · July 6, 2020
Agenda
SCHENECTADY CITY COUNCIL
COMMITTEE AGENDA
for
Monday, July 6, 2020
5:30 p.m.
Teleconference
The Council President reserves the right to add or delete any agenda item prior to Committee Meeting.
Join by Phone: 1-415-655-0001
WebEx Access Code: 161 107 3643
Meeting Password: CommitteeMeeting
Claims
1 Moore v. City of Schenectady Andrew Koldin
2 Ramel Gentry v. City of Schenectady Andrew Koldin
3 Golden Gates Associates, LLC Tax Certiorari Andrew Koldin
City Development & Planning
1 Sale of Vacant Lot – 306 Green Street Maurice Brown, III
2 Sale of 1461 State Street Maurice Brown, III
3 Sale of 1643 Foster Avenue Maurice Brown, III
Public Service & Utilities
1 ABAC for the “Schenectady City Hall Re-Roofing” to Pulver Roofing Co., Inc. Chris Wallin
2 ABAC for the “Mechanical and Chemical Tree Eradication System” to Applied Ecological Chris Wallin
Services, Inc.
3 Change Order to “The City of Schenectady Street Improvement Program Fall 2019” for Chris Wallin
Community Development and Block Grant Funded Projects
4 Discussion & CPH - Amend City Code Section 248-18 to allow Sunday Traffic John Mootooveren
Modification on Ostrander Place from Chrysler Avenue to Crane Street
5 Discussion & CPH – to Amend City Code Section 248 Andrew Koldin
Administrative Efficiency
1 Discussion – Amending Chapter 6 of the Code of the City of Schenectady Regarding Ron Gardner / John
Affirmative Action Mootooveren
Finance
1 Authorizing Fee Waivers for Exterior Building Repair Permits John Mootooveren
2 CPH – Amending the 2020 Annual Action Plan John Polimeni
3 Building Trades CBA James Commodore
4 Carpenters CBA James Commodore
Health & Recreation
1 Discussion – A Diamond Maintenance Carmel Patrick / John
Polimeni
2 Discussion – Premier Upstate Baseball John Polimeni
3 Discussion – Cooling Options for Summer Leesa Perazzo
Thursday, July 2, 2020
CITY OF SCHENECTADY
LEGISLATIVE REQUEST FORM
COMMITTEE ASSIGNMENT: Claims DATE: July 6, 2020
TO: City Council
FROM: Andrew Koldin, Corporation Counsel
SUBJECT: Moore v. City of Schenectady
Background Information:
Case Status
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY_______________ _________
CITY OF SCHENECTADY
LEGISLATIVE REQUEST FORM
COMMITTEE ASSIGNMENT: Claims DATE: July 6, 2020
TO: City Council
FROM: Andrew Koldin, Corporation Counsel
SUBJECT: Ramel Gentry v. City of Schenectady
Background Information:
Case Status
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY_______________ _________
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Claims Committee Date: Monday, July 06, 2020
From: James Commodore
Subject Golden Gates Associates, LLC Tax Cert
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 7/2/20
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Vacant Lot 306 Green St.
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 7/2/20
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Vacant Lot 1461 State
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 7/2/20
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: 1643 Foster
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Public Service & Utilities Committee Date: Monday, July 06, 2020
From: John Mootooveren
Subject CPH - Sunday Traffic Modification on Ostrander Place from Chrysler Avenue to Crane Street
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
CITY OF SCHENECTADY
LEGISLATIVE REQUEST FORM
COMMITTEE ASSIGNMENT: DATE: July 6, 2020
TO: City Council
FROM: Andrew Koldin, Corporation Counsel
SUBJECT: Amending City Code §248
Background Information:
The City is in the process of rolling out a new parking system that will require people to
pay either at a kiosk or through an application on their smart phones. With this significant
change to how our residents and visitors pay for parking, it is necessary to make changes
to the City Code to reflect the use of the new technology.
Input on the proposed changes were sought from and provided by the police department,
engineering department, law department, signal superintendent, and the Mayor’s Office.
Since a change to the City Code is required for the proposed request, the Law Department
is seeking that the Public Service and Utilities Committee pass the legislative request for
a call for a public hearing in order for the public to review the proposed changes to the
City Code and provide feedback on those proposed changes.
Evaluation/Analysis:
The proposed changes account for the newly provided application-based payment
technology, the removal of single-payment meters, and antiquated provisions in the City
Code.
Amendments to the City Code require a public hearing to allow members of the public to
review the proposed changes and provide feedback of those proposed changes.
Recommendation:
Pass the legislative request for the City Council to call for a public hearing on
amendments to City Code §248.
LEGISLATION WILL BE PREPARED BY_____LAW DEPARTMENT________
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Administrative Efficiency Committee Date: Monday, July 06, 2020
From: Ron Gardner / John Mootoov
Subject Discussion - Amending Chapter 6 of the Code of the City of Schenectady Regarding Affirmative
Action
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
City of Schenectady 2020 MWBE and Workforce Goals
Administrative Regulations and Procedures
Background
In an effort to achieve a workforce that reflects the demographics diversity of the City Of
Schenectady, the City has devised the following goals for Minority and Women Business
Enterprises (MBE/WBE) participation as well as Equal Employment Opportunity (EEO).
The City Of Schenectady establish the goal for MWBE’s as percentages of annual contract
awards for contracts over $100,000.00 for three types of city contracts, Public Works
Construction, Public Works Consultants, Professional Services Consultants, with the aggregate
minority and women awards goals as shown in table 1.
The City of Schenectady will use a weighted scoring system outlined in table 2 to encourage and
assist contractors in reaching the stated MWBE goals.
The City of Schenectady establish the goal that MWBE’s will receive as percentages of annual
contract awards for city commodity (goods and services ) contracts as shown in Table 3.
The City Of Schenectady establishes the Workforce EEO goals to be phased in as illustrated in
Table 4.
Public works construction contracts exceeding $250,000.00 may only be awarded to contractors
and subcontractors that have an approved apprenticeship program.
Please direct any questions you may have regarding this information to:
Ronnie Gardner
Affirmative Action Officer
City Hall, 105 Jay Street Room 2
Schenectady, NY 12305
Phone 518-382-5199 Ext 5374
Email Rgardner@schenectadyny.gov
MWBE and Workforce Goals Administrative Regulations and Procedures
Table of Contents
Part 1 – MWBE Goals
Section 1. Who Qualifies for MWBE Status for Purposes of Meeting City Goals
Section 2. Procedures for MWBE Requirements: Public Works Contracts
Section 3. Procedures for MWBE Requirements: Professional Services Consulting Contracts
including Public Works Consulting Contracts
Section 4. Procedures for MWBE Requirements: Purchases of Goods and Services
Part 2 – Workforce Goals
Section 1. Overall Requirements
Section 2. Procedures for Workforce Requirements: Public Works Contracts
Section 3. Procedures for Workforce Requirements: Professional Services Consulting Contracts
including Public Works Consulting Contracts
Part 3 - Responsibilities of Departments
Part 4 - Duties of the MWBE Office
MWBE and Workforce Goals Administrative Regulations and Procedures
Part 1 – MWBE Goals
Section 1. Who Qualifies for MWBE Status for Purposes of Meeting City Goals
1.1.APPLICATION. A contractor, vendor or consultant shall be eligible for meeting the City of
Schenectady MWBE goals if:
1.1.1 It is a state-certified MWBE at the time of the contract award. State certification requires
that a business be at least 51% owned and controlled by minorities (M), women (W), or
both. Minority shall be defined consistent with state and federal definitions, e.g. Black,
Hispanic, American Indian or Alaskan Native, Asian – Indian Subcontinent, and Asian
Pacific. State certified shall mean that the MWBE business has a valid current
certification as listed in the Empire State Development (ESD) directory, or has been
approved through another state agency MWBE or DBE certification process, or is under
recertification review by ESD if verified and approved by the Affirmative Action Officer.
1.1.2 The contractor, vendor or consultant has bona fide offices and operations in the Empire
State Development (ESD) Capital Region, which includes the following counties:
Albany, Schenectady, Saratoga, Rensselaer, Columbia, Greene, Schoharie, Montgomery,
Washington, Warren and Fulton.
1.1.3 The Affirmative Action Officer is authorized to approve the use of state-certified
businesses from outside this region if the Affirmative Action Officer determines that a
contract requires either specialty work that cannot reasonably be subcontracted to an
MWBE business, or there is a lack of qualified responsive and responsible MWBE
companies in the region to perform the work.
MWBE and Workforce Goals Administrative Regulations and Procedures
Section 2 Procedures for MWBE Requirements: Public Works Contracts
TABLE 1
Public Works Construction Projects
Contract Type Aggregate Annual Aggregate Annual Aggregate Annual
Award Award Minorities Award Women
Public Work
Construction 23% 11.5% 11.5%
Contracts After
August 1, 2020
Public Works
Consultants After 23% 11.5% 11.5%
August 1, 2020
2.1 APPLICATION. The City’s MWBE goals shall apply to all City public works projects;
unless state or federal or grantee goals are required that supersede City requirements. The
City’s MWBE goals do not replace any state or federal or grantee goals, but may add to
such goals if permitted.
2.1.1 Public works contracts shall include, but not be limited to contracts for work in or on city
streets, sidewalks, bridges, water infrastructure, utility infrastructure, parks, recreational
facilities, and buildings, and any other non-City owned facilities for which the City is
otherwise responsible for constructing or maintaining. Demolition contracts established
by the City shall be classified as public works contracts.
2.1.2 Public works term service and maintenance contracts that are awarded based on
unspecified quantities and/or time frames for work on infrastructure and facilities (in
other words, are not awarded on the basis of a discrete Total Bid Price where quantities
and timing of orders can be reasonably estimated) shall be classified as City commodity
contracts for the purposes of meeting MWBE goals.
2.2 CONTRACT REQUIREMENTS. The requirements and procedures for meeting the
MWBE goals for public works contracts shall be as set forth in the contract documents.
These may be amended from time to time with the approval of the Affirmative Action
Officer and the Corporation Counsel, and consistent with subsequent amendments.
2.3 PRIOR APPROVAL OF BID DOCUMENTS. Prior to advertisement for bids for a
public works contract, the Affirmative Action Officer shall review and approve the bid
documents. Any changes required by the Affirmative Action Officer shall be made prior
to publishing the bid documents.
MWBE and Workforce Goals Administrative Regulations and Procedures
2.4 APPROVAL OF MWBE UTILIZATION PLAN.
The Affirmative Action Officer shall review the MWBE Participation Plan (Form P)
submitted with the bids received and shall work with the apparent low bidder as
recommended by the department to develop an acceptable MWBE Utilization Plan, on a
form designated by the City (Form A). The Affirmative Action Officer is authorized to
adjust individual contract goals by waivers, or to permit the use of state-certified
MWBE’s from outside the region if the contract requires either specialty work that
cannot reasonably be subcontracted to an MWBE business, or there is a lack of qualified
responsive and responsible MWBE companies in the region to perform the work. In
approving the MWBE Utilization Plan for a contract, the Affirmative Action Officer will
use appropriate discretion to ensure that the City’s annual aggregate MWBE goals for
public works contracts are met.
2.4.1 The Affirmative Action Officer must approve an MWBE Utilization Plan, which shall
become incorporated into the contract documents, prior to the contract being executed by
the Director of Finance and Purchasing Agent
.
2.4.2 An otherwise low bidder who fails to provide an MWBE Utilization Plan that the
Affirmative Action Officer will approve shall be declared non-responsive, and the City
will proceed to award the contract to the lowest responsive and responsible bidder.
2.5 CHANGE ORDERS.
If any individual contract change order is 5% or more, or if any change order brings the
total net cumulative amount of change orders to the initial contract award to 5% or more,
the contractor must submit a revised MWBE Utilization Plan for approval by the
Affirmative Action Officer. A Form A MWBE Utilization Plan revision must be
submitted and approved each time a new change order occurs after the 5% threshold has
been reached. The Affirmative Action Officer may also issue a revised MWBE
Utilization Plan for unforeseen changes, such as changes in the availability of MWBE
subcontractors during the term of the contract.
2.6 CONTRACTOR REPORTING REQUIREMENTS.
The Contractor shall submit periodic MWBE utilization reports to the City, on forms or
on a web based system provided by the City. A completed MWBE Form W -
Subcontractor/Supplier Payment Certification Form (Form W) and MWBE Form F -
Report of MWBE Utilization (Form F). These forms shall be submitted with each
application for payment until these forms are superseded by the web based system. In
order for the City to determine if MWBE subcontractors are being utilized according to
the Approved Form A MWBE Utilization Plan, the contractor is required to submit a
payment application/invoice to the City a minimum of once every ninety (90) days after
the date of the Notice to Proceed/start of work and continuing during the term of the
project/contract.
MWBE and Workforce Goals Administrative Regulations and Procedures
2.6.1 GOOD FAITH EFFORTS
49 CFR Appendix A to Part 26 - Guidance Concerning Good Faith Efforts
Appendix A to Part 26 - Guidance Concerning Good Faith Efforts
I. When, as a recipient, you establish a contract goal on a City Of Schenectady -assisted contract
for procuring construction, equipment, services, or any other purpose, a bidder must, in order to
be responsible and/or responsive, make sufficient good faith efforts to meet the goal. The bidder
can meet this requirement in either of two ways. First, the bidder can meet the goal, documenting
commitments for participation by MWBE / SECTION 3 firms sufficient for this purpose.
Second, even if it doesn't meet the goal, the bidder can document adequate good faith efforts.
This means that the bidder must show that it took all necessary and reasonable steps to achieve a
MWBE / SECTION 3 goal or other requirement of this part which, by their scope, intensity, and
appropriateness to the objective, could reasonably be expected to obtain sufficient MWBE /
SECTION 3 participation, even if they were not fully successful.
II. In any situation in which you have established a contract goal, Part 26 requires you to use the
good faith efforts mechanism of this part. As a recipient, you have the responsibility to make a
fair and reasonable judgment whether a bidder that did not meet the goal made adequate good
faith efforts. It is important for you to consider the quality, quantity, and intensity of the different
kinds of efforts that the bidder has made, based on the regulations and the guidance in this
Appendix.
The efforts employed by the bidder should be those that one could reasonably expect a bidder to
take if the bidder were actively and aggressively trying to obtain MWBE / SECTION 3
participation sufficient to meet the MWBE / SECTION 3 contract goal. Mere pro forma efforts
are not good faith efforts to meet the MWBE / SECTION 3 contract requirements. We
emphasize, however, that your determination concerning the sufficiency of the firm's good faith
efforts is a judgment call. Determinations should not be made using quantitative formulas.
III. The Department also strongly cautions you against requiring that a bidder meet a contract
goal (i.e., obtain a specified amount of MWBE / SECTION 3 participation) in order to be
awarded a contract, even though the bidder makes an adequate good faith efforts showing. This
rule specifically prohibits you from ignoring bona fide good faith efforts.
IV. The following is a list of types of actions which you should consider as part of the bidder's
good faith efforts to obtain MWBE / SECTION 3 participation. It is not intended to be a
mandatory checklist, nor is it intended to be exclusive or exhaustive. Other factors or types of
efforts may be relevant in appropriate cases.
A. (1) Conducing market research to identify small business contractors and suppliers and
soliciting through all reasonable and available means the interest of all certified MWBE /
SECTION 3 s that have the capability to perform the work of the contract. This may include
attendance at pre-bid and business matchmaking meetings and events, advertising and/or written
notices, posting of Notices of Sources Sought and/or Requests for Proposals, written notices or
emails to all MWBE / SECTION 3 s listed in the State's directory of transportation firms that
MWBE and Workforce Goals Administrative Regulations and Procedures
specialize in the areas of work desired (as noted in the MWBE / SECTION 3 directory) and
which are located in the area or surrounding areas of the project.
(2) The bidder should solicit this interest as early in the acquisition process as practicable to
allow the MWBE / SECTION 3 s to respond to the solicitation and submit a timely offer for the
subcontract. The bidder should determine with certainty if the MWBE / SECTION 3 s are
interested by taking appropriate steps to follow up initial solicitations.
B. Selecting portions of the work to be performed by MWBE / SECTION 3 s in order to increase
the likelihood that the MWBE / SECTION 3 goals will be achieved. This includes, where
appropriate, breaking out contract work items into economically feasible units (for example,
smaller tasks or quantities) to facilitate MWBE / SECTION 3 participation, even when the prime
contractor might otherwise prefer to perform these work items with its own forces. This may
include, where possible, establishing flexible timeframes for performance and delivery schedules
in a manner that encourages and facilitates MWBE / SECTION 3 participation.
C. Providing interested MWBE / SECTION 3 s with adequate information about the plans,
specifications, and requirements of the contract in a timely manner to assist them in responding
to a solicitation with their offer for the subcontract.
D. (1) Negotiating in good faith with interested MWBE / SECTION 3 s. It is the bidder's
responsibility to make a portion of the work available to MWBE / SECTION 3 subcontractors
and suppliers and to select those portions of the work or material needs consistent with the
available MWBE / SECTION 3 subcontractors and suppliers, so as to facilitate MWBE /
SECTION 3 participation. Evidence of such negotiation includes the names, addresses, and
telephone numbers of MWBE / SECTION 3 s that were considered; a description of the
information provided regarding the plans and specifications for the work selected for
subcontracting; and evidence as to why additional Agreements could not be reached for MWBE /
SECTION 3 s to perform the work.
(2) A bidder using good business judgment would consider a number of factors in negotiating
with subcontractors, including MWBE / SECTION 3 subcontractors, and would take a firm's
price and capabilities as well as contract goals into consideration. However, the fact that there
may be some additional costs involved in finding and using MWBE / SECTION 3 s is not in
itself sufficient reason for a bidder's failure to meet the contract MWBE / SECTION 3 goal, as
long as such costs are reasonable. Also, the ability or desire of a prime contractor to perform the
work of a contract with its own organization does not relieve the bidder of the responsibility to
make good faith efforts. Prime contractors are not, however, required to accept higher quotes
from MWBE / SECTION 3 s if the price difference is excessive or unreasonable.
E. (1) Not rejecting MWBE / SECTION 3 s as being unqualified without sound reasons based on
a thorough investigation of their capabilities. The contractor's standing within its industry,
membership in specific groups, organizations, or associations and political or social affiliations
(for example union vs. non-union status) are not legitimate causes for the rejection or non-
solicitation of bids in the contractor's efforts to meet the project goal. Another practice
considered an insufficient good faith effort is the rejection of the MWBE / SECTION 3 because
its quotation for the work was not the lowest received. However, nothing in this paragraph shall
be construed to require the bidder or prime contractor to accept unreasonable quotes in order to
satisfy contract goals.
MWBE and Workforce Goals Administrative Regulations and Procedures
(2) A prime contractor's inability to find a replacement MWBE / SECTION 3 at the original
price is not alone sufficient to support a finding that good faith efforts have been made to replace
the original MWBE / SECTION 3 . The fact that the contractor has the ability and/or desire to
perform the contract work with its own forces does not relieve the contractor of the obligation to
make good faith efforts to find a replacement MWBE / SECTION 3 , and it is not a sound basis
for rejecting a prospective replacement MWBE / SECTION 3 's reasonable quote.
F. Making efforts to assist interested MWBE / SECTION 3 s in obtaining bonding, lines of
credit, or insurance as required by the recipient or contractor.
G. Making efforts to assist interested MWBE / SECTION 3 s in obtaining necessary equipment,
supplies, materials, or related assistance or services.
H. Effectively using the services of available minority/women community organizations;
minority/women contractors' groups; local, State, and Federal minority/women business
assistance offices; and other organizations as allowed on a case-by-case basis to provide
assistance in the recruitment and placement of MWBE / SECTION 3 s.
V. In determining whether a bidder has made good faith efforts, it is essential to scrutinize its
documented efforts. At a minimum, you must review the performance of other bidders in
meeting the contract goal. For example, when the apparent successful bidder fails to meet the
contract goal, but others meet it, you may reasonably raise the question of whether, with
additional efforts, the apparent successful bidder could have met the goal. If the apparent
successful bidder fails to meet the goal, but meets or exceeds the average MWBE / SECTION 3
participation obtained by other bidders, you may view this, in conjunction with other factors, as
evidence of the apparent successful bidder having made good faith efforts. As provided in §
26.53(b)(2)((vi), you must also require the contractor to submit copies of each MWBE /
SECTION 3 and non-MWBE / SECTION 3 subcontractor quote submitted to the bidder when a
non-MWBE / SECTION 3 subcontractor was selected over a MWBE / SECTION 3 for work on
the contract to review whether MWBE / SECTION 3 prices were substantially higher; and
contact the MWBE / SECTION 3 s listed on a contractor's solicitation to inquire as to whether
they were contacted by the prime. Pro forma mailings to MWBE / SECTION 3 s requesting bids
are not alone sufficient to satisfy good faith efforts under the rule.
VI. A promise to use MWBE / SECTION 3 s after contract award is not considered to be
responsive to the contract solicitation or to constitute good faith efforts.
2.7 FAILURE TO MEET THE APPROVED GOALS, If a contractor fails to provide
required reports and forms that demonstrate the contractor’s success in meeting the goals
set in the initial or subsequent approved form A MWBE utilization plan, the City has the
right to withhold payment for failure to submit required documentation per Section 13.3
of the Special Terms and Conditions of the contract documents. If a contractor fails to
meet the goals set in the Final MWBE Utilization Plan (i.e. the initial Form A or last
dated revision), The Purchasing Supervisor shall take such failure into account in
determining whether or not the contractor is a responsible bidder, for purposes of
evaluating subsequent bids submitted by that contractor.
MWBE and Workforce Goals Administrative Regulations and Procedures
Section 3. Procedures for MWBE Requirements: Professional Services Consulting
Contracts.
3.1 APPLICATION. The City’s MWBE goals shall apply to all City professional services
consulting contracts, including public works consulting contracts, over $10,000, unless
state, federal or grantee goals are required that supersede City requirements. The City’s
MWBE goals do not replace any state or federal or grantee goals, but may add to such
goals if permitted. While any individual Professional Services Agreement (PSA) for
professional services consulting and public works consulting may or may not meet the
overall and minority category goals, it is the City’s policy to achieve the goals in
aggregate based on the annual value of contracts awarded. Therefore, departments are
expected to strive to meet or exceed the goals on as many contracts as possible.
3.1.1 MWBE goals shall apply to all professional services consulting contracts, including
public works consulting contracts. “Consulting Services” shall be those professional
services that are provided by a consultant based upon the accumulation of information,
the synthesis of that information into conclusions, and the preparation and transmittal of
recommendations for action – all informed and guided by the knowledge, experience and
specialized training of the consultant. A consultant is an experienced professional or firm
in a given field who provides expert advice to the City or acts for the City in a particular
area for a fee, including but not limited to the following areas: engineering, architecture,
finance, security, management, education, accountancy, law, human resources, marketing
and information technology.
3.1.2 The Mayor has discretion over Professional Services Contracts
3.2 CONTRACT AND RFP REQUIREMENTS. Departments shall follow the PSA/RFP
policy and procedures as set forth by the Mayor.
For each RFP and PSA for a professional services or public works consulting contract,
the RFP and PSA shall include MWBE goals language as provided in the Professional
Services Agreement Form approved by the Law Department per Appendix 1.
Respondents to the RFP are expected to address the MWBE goals requirements specified
in the RFP. Departments shall award respondents the additional MWBE evaluation
weighting points specified in Table
TABLE 2
Additional Evaluation Weighting Points for MWBE Goals
Responding Company Weight Awarded
Prime Contractor is an MWBE 10%
Prime Uses 10%-20% MWBE Subcontractors 5%
Prime Uses More Than 20% MWBE Subcontractors 10%
MWBE and Workforce Goals Administrative Regulations and Procedures
3.2.1 The evaluation weighting points for use of one or more subcontractors shall be based on
how the prime contractor will utilize MWBE subcontractors, shown as either a percent of
the total contract dollar amount or as a percent of the total full-time-equivalent labor
hours budgeted for this project
3.3 PRIOR APPROVAL OF RFP. Prior to advertising, publishing and distributing the RFP
for a professional services consulting or public works consulting contract, the department
shall ensure that the Affirmative Action Officer has reviewed the RFP for the relevant
MWBE and workforce goals language and forms. The review process will provide the
opportunity for the Affirmative Action Officer to work with the department to identify
potential MWBE consultants for the work and determine if a waiver of the MWBE goals
is appropriate given the type of work required and the availability of qualified MWBE’s.
3.4 PRIOR APPROVAL OF RECOMMENDATION FOR AWARD. Departments are
required to have the Affirmative Action Officer review the recommendation for award
prior to the department submitting the Mayor’s transmittal letter to City Council for
authorization for all proposed PSA’s. As part of this review, the Affirmative Action
Officer and the Law Department will determine whether or not the proposed PSA is
subject to the MWBE and workforce goals per Section 3.1. NOTE – since MWBE and
workforce goals apply to all professional services consulting contracts, even if a
department does not issue an RFP to obtain a contract with a professional consultant, the
department is still required to review the proposed PSA with the Affirmative Action
Officer.
3.4.1 The Affirmative Action Officer will review the proposed MWBE and workforce plans
and work with the department to make any preliminary adjustments with the proposed
consultant that demonstrate the consultant’s understanding of and commitment to the
City’s MWBE and workforce goals
3.4.2 This review will include verifying that the prime consultant and/or any subcontractors are
certified MWBE’s in order to qualify for any MWBE evaluation weighting points.
3.5 APPROVAL OF MWBE UTILIZATION PLAN. After City Council has authorized
entering into the PSA, the department shall work with the consultant and the Affirmative
Action Officer to complete the Form A MWBE Utilization Plan and related documents.
The Affirmative Action Officer shall review the Plan, and once approved, the Plan shall
be incorporated into the contract documents. NOTE – since the MWBE requirements
apply to all professional services consulting and public works consulting contracts, even
if a department does not issue an RFP to obtain a contract with a professional consultant,
the department must review the proposed contract with the Affirmative Action Officer to
ensure that an approved MWBE Utilization Plan is incorporated into the agreement.
3.6 CHANGE ORDERS. If the contract incorporates the use of MWBE subcontractors, the
agreement requires that the consultant shall notify the authorized City agent (the
MWBE and Workforce Goals Administrative Regulations and Procedures
department) if a change occurs that will result in a significant (5% or more) increase or
decrease in the MWBE Utilization Plan goals. If so, the consultant is expected to submit
a revised MWBE Utilization Plan, which must be approved by the Affirmative Action
Officer. The Affirmative Action Officer may also issue a revised MWBE Utilization Plan
for unforeseen changes such as changes in the availability of MWBE subcontractors
during the term of the contract. Revised plan(s) will become incorporated into the
agreement as an amendment.
3.7 CONSULTANT REPORTING REQUIREMENTS. If the contract incorporates the use
of MWBE subcontractors, the consultant shall submit to the department an MWBE Form W -
Subcontractor/Supplier Payment Certification Form (Form W) and MWBE Form F - Report of
MWBE Utilization (Form F). These forms shall be submitted with each application for payment
until these forms are superseded by the web based system. When the department receives an
invoice and forms F and W, the department shall transmit copies of those forms (until the web
based reporting system is utilized) to the Affirmative Action Officer and Contract Compliance
unit of the Department of Finance. In order for the City to determine if MWBE subcontractors
are being utilized according to the approved Form A MWBE Utilization Plan, the consultant is
required to submit a payment application/invoice to the City a minimum of once every ninety
(90) days after the date of the Notice to Proceed/start of work and continuing during the term of
the project/contract.
3.8 FAILURE TO MEET THE GOALS IN THE APPROVED MWBE UTILIZATION
PLAN. The contract agreement language stipulates that failure to submit the required
MWBE utilization reports and documents shall constitute a default in the performance of
the agreement subject to potential termination for default by the City. In addition, if the
consultant fails to meet the goals in the most recent approved MWBE Utilization Plan,
such failure may result in disqualification from award of future contracts with the City
unless the consultant has demonstrated a good faith effort to meet the goals set forth in
Ordinance No. 2018-54 for future agreements.
Section 4. Procedures for MWBE Requirements: Commodity Contracts - Purchases of
Goods and Services.
TABLE 3
Commodity Contracts
Contract Type Aggregate Annual Aggregate Annual Aggregate Annual
Award Award Minorities Award Women
Commodity
Contracts After 10% 5% 5%
August 1, 2020
MWBE and Workforce Goals Administrative Regulations and Procedures
4.1 The Purchasing Supervisor shall develop practices and procedures to meet the annual
MWBE goal set forth in Table 4 for City commodities (goods and services)
contracts.
4.2 The Purchasing Supervisor is authorized to utilize best value bids for City purchase and
services bids, consistent with Article 8A of City Code, and to permit a 5% price advantage to
MWBE bidders for contracts awarded on the basis of best value.
4.3 The Purchasing Supervisor shall submit quarterly and annual reports to the Affirmative
Action Officer including the total value of all purchase orders issued against City contracts, the
total value of those purchase orders that were issued to MWBE’s, and any other tracking
information requested by the Affirmative Action Officer to demonstrate efforts and abilities to
meet the MWBE goals specified.
MWBE and Workforce Goals Administrative Regulations and Procedures
Part 2 – Workforce Goals
Section 1. Overall Requirements.
TABLE 4
Workforce Goals on Public Works Contracts, Construction Contracts
Contracts Aggregate Annual Aggregate Annual Aggregate Annual
Award Award Minorities Award Women
After August 1, 2020 12% 7% 5%
After January 1, 2021 17% 10% 7%
After January 1, 2022 20% 12% 8%
1.1 APPLICATION. The City’s workforce goals shall apply to all City public works contracts
and professional services consulting contracts, including public works consulting contracts,
over $100,000, unless state, federal or grantee goals are required that supersede City
requirements. The City’s workforce goals do not replace any state or federal or grantee goals,
but may add to such goals if permitted.
Section 2. Procedures for Workforce Goals Requirements: Public Works Contracts
2.1 APPLICATION. The City’s workforce goals shall apply to all City public works projects,
unless state or federal or grantee goals are required that supersede City requirements.
2.1.1 Public works contracts shall include, but not be limited to contracts for work in or on city
streets, sidewalks, bridges, water infrastructure, utility infrastructure, parks, recreational
facilities, and buildings, and any other non- City owned facilities for which the City is otherwise
responsible for constructing or maintaining. Demolition contracts established by the City shall be
classified as public works contracts.
2.1.2 Public works term service and maintenance contracts that are awarded based on
unspecified quantities and/or time frames for work on infrastructure and facilities (in other
words, are not awarded on the basis of a discrete Total Bid Price where quantities and timing of
orders can be reasonably estimated) shall be classified as City commodity contracts for the
purposes of meeting MWBE goals.
2.2 CONTRACT REQUIREMENTS. The requirements and procedures for meeting the
workforce goals for public works contracts shall be as set forth in the contract documents,
Special Laws and Regulations (SLR). These may be amended from time to time with the
approval of the Affirmative Action Officer and the Corporation Counsel, and consistent with
Ordinance No. 2018-54 or subsequent revisions. Key requirements are:
2.1 The prime contractor and all subcontractors are required to submit a Workforce Staffing Plan
prior to the initiation of any work.
MWBE and Workforce Goals Administrative Regulations and Procedures
2.2 The Workforce Staffing Plan(s) shall be reviewed by the Affirmative Action Officer, and
once signed by the Affirmative Action Officer, shall become an integral part of the performance
agreement between the parties.
2.3 Workforce goals may be met in the aggregate by any combination of prime and subcontractor
employees, independent owner operators and supervisors who work on the job
2.3 PRIOR APPROVAL OF BID DOCUMENTS. Prior to advertisement for bids for a public
works contract, the Affirmative Action Officer shall review and approve the bid documents. Any
changes required by the Affirmative Action Officer shall be made prior to publishing the bid
documents.
2.4 WORKFORCE UTILIZATION REPORTS. The requirements and procedures for submitting
workforce utilization information during the term of the contract shall be as set forth in the
contract documents, Special Laws and Regulations (SLR). Key requirements are:
2.4.1 Workforce utilization will be tracked through certified payrolls.
2.4.2 Independent owner operators and supervisory personnel who work on the job will be
counted for meeting workforce goals.
2.5 CHANGE ORDERS. Aggregate workforce utilization goals shall apply to and reflect any
and all change orders authorized during the course of the contract.
2.6 CONTRACTOR REPORTING REQUIREMENTS
2.6.1 The prime contractor and all subcontractors shall be required to submit certified payrolls
that, in addition to meeting the requirements of Labor Law, include worker category, minority
and gender information for each employee on the payroll. Additional information for
independent owner operators and supervisory personnel who work on the job shall also be
reported as appropriate. This information will be reported to the City on a form acceptable to the
City, which may be paper or on a web based system provided by the City.
2.6.2 The information provided in Section 2.6.1 shall be reviewed by the City and tracked to
determine actual employees utilized on the project. The City reserves the right to require the
contractor to provide monthly and cumulative summary reports on a form acceptable to the City.
This information will be the basis for determining how the workforce goals were met. Failure of
the contractor to provide these reports shall be deemed a default of the contract.
2.6.3 The workforce goals outlined in table 2 may be met in aggregate by any combination of
prime contractor and subcontractor employees, including independent owner operators and
supervisory personnel. Workforce M and W utilization shall be calculated by determining the
total hours of all employees paid and the corresponding percentage of hours worked by minority
(M) employees and female (W) employees. However, if it appears that the workforce goals are
MWBE and Workforce Goals Administrative Regulations and Procedures
not being met or are not likely to be met during the course of the contract, the City reserves the
right to require the contractor to demonstrate what steps will be taken to ensure that, by the end
of the work of the contract, the workforce goals will be met.
2.6.4 In order for the City to determine if workforce goals are being met, the Contractor is
required to submit a payment application/invoice to the City a minimum of once every ninety
(30) days after the date of the Notice to Proceed/start of work and continuing during the term of
the project/contract.
Training Requirements for Construction Contract
The City Of Schenectady requires all construction contracts that are greater than
($100,000.00) one hundred thousand dollars in total construction cost and is
anticipated to exceed 6 months of construction; to include a detailed and well
defined plan on how they will provide a certified pre-apprenticeship or
apprenticeship training programs to at least (1) one Section 3 Resident in its priority
order. (1) One additional Section 3 Resident in its priority order will be provided
training for every additional ($500,000) five hundred thousand to ($1,000,000.00)
one million dollars of the total contract value. The training plan and trainings must
be aligned with the scope of work in the contract and approved by The City of
Schenectady. A training program participant can only count for (1) one training slot
per total contract amount. Those who do not offer a certified pre-apprenticeship or
apprenticeship training program will contribute into the City Of Schenectady Section
3 Training Fund as prescribed in the chart listed below.
Total Contract Amount # of Section 3 Contribution to CITY OF SCHENECTADY
Training Fund if
Training / Interns
At least $100,000, but less than 1 hi 6% iofi the Total Contract
hi Sl Value up to
$500,000
At least $500,000, but less than 2 $
5% of the Total Contract Value up to
$
At least $1,000,000, but less than 3 $
4% of the Total Contract Value up to
$
At least $2,000,000, but less than 4 $
3% of the Total Contract Value up to
$
At least $4,000,000, but less than 10 $ of the Total Contract Value up to
2%
$7,000,000.00
$
2.7 FAILURE TO MEET WORKFORCE GOALS. A contractor’s failure to meet the aggregate
workforce goals at the time the final payment application for this contract is submitted may be a
basis for the City to declare the contractor non-responsive on future bid submissions.
MWBE and Workforce Goals Administrative Regulations and Procedures
Part 3 - Responsibilities of Departments
Each department that is the administrator/owner of a public works contract, public works
consulting contract, or professional services consulting contract, is responsible for administering
their contracts to meet the MWBE and workforce participation goals specified in Ordinance No.
2018-54 and these regulations and procedures. To that end, departments shall:
1. Ensure that any bids or RFP’s issued by the department include MWBE and workforce goals
language as specified in these administrative regulations and procedures.
2. Prior to issuing a bid or RFP, submit the bid or RFP to the Affirmative Action Officer for
review and approval at least three business days prior to publishing and advertising bids or
RFP’s. Or, if no RFP is issued, the department must ensure that the selected consultant fully
understands the MWBE and workforce goals requirements.
3. Ensure that prospective respondents are made aware of the new MWBE and workforce
requirements. This shall include, but not be limited to:
3.1 Clearly marked and highlighted at the front of each bid specification and/or RFP a summary
of the new MWBE and workforce goal requirements. RFP’s should have similar language
referencing the appropriate section(s) of the RFP.
3.2 Clearly identify the new requirements in the announcement of the bid or RFP.
3.3 Clearly identify where the new MWBE and workforce requirements may be found in the
specification or RFP.
3.4 Discuss the MWBE and workforce requirements at any pre-bid/pre-proposal meeting with
potential bidders or respondents. NOTE – even if the department does not issue an RFP to obtain
consulting services, the department must notify the potential consultant of the MWBE and
workforce goals that will be incorporated into the Agreement.
4. Ensure that public bids and responses to RFP’s that are received include sufficient
documentation to demonstrate how the bidder/respondent plans to meet the MWBE and
workforce goals.
5. Prior to submitting the Mayor’s transmittal letter to City Council for authorization for all
proposed PSA’s, ensure that the Affirmative Action Officer has reviewed the MWBE and
workforce plans submitted by the recommended consultant or contractor.
6. After City Council has authorized a PSA that includes MWBE and/or workforce goals, work
with the consultant to obtain a Form A MWBE Utilization Plan that is approved by the
Affirmative Action Officer, and a Workforce Staffing Plan that is reviewed by the Affirmative
Action Officer. Both the MWBE Utilization Plan and the Workforce Staffing Plan will be
incorporated into the Agreement.
MWBE and Workforce Goals Administrative Regulations and Procedures
To summarize, departments interact with the Affirmative Action Officer at the following points
in the RFP/PSA process:
A). Prior to release of an RFP. Send the RFP to the Affirmative Action Officer, who will do a
quick format review and offer department suggestions for potential respondents. As part of this
review, the department may request that the Affirmative Action Officer and the Law Department
determine whether or not the proposed PSA is a public works/professional services consulting
contract subject to MWBE and workforce goals.
B).Prior to submittal to Council. The Affirmative Action Officer is required to review each PSA
submitted as part of the Mayor’s transmittal letter information package requesting authorization
from City Council. As part of this review, the Affirmative Action Officer and the Law
Department will determine whether or not the proposed PSA is subject to MWBE and workforce
goals if this hasn’t been determined previously.
C). After Council authorization and before routing the Agreement in MUNIS. The department is
required to obtain a Form A MWBE Utilization Plan that is approved by the Affirmative Action
Officer, and a Workforce Staffing Plan that is reviewed by the Affirmative Action Officer and
incorporated into the Agreement.
After the Agreement has been executed, departments:
7. Collect MWBE and workforce utilization reports required to be submitted, and not approve
payments until such reports have been properly submitted, either in paper form or on the web
based system provided by the City. This shall include ensuring that all information regarding
MWBE and/or DBE and/or workforce utilization required by other funding agencies or grantors
is properly submitted by the contractor/consultant and transmitted to the funding agency to meet
their requirements. Copies of these forms (or the relevant data as provided in the City’s web
based system) must be transmitted to the Affirmative Action Officer and Contract Compliance
unit in Finance by the department.
8. Notify the Affirmative Action Officer of any changes to the original contract so that MWBE
and workforce utilization plans are properly adjusted.
9 Provide information as the contract administrator to any funding agency or grantor that is
required to demonstrate compliance with that agency’s MWBE and/or DBE and/or workforce
utilization and other affirmative action goals.
10. Assist the Affirmative Action Officer as requested to ensure that City, state and federal
MWBE, DBE, workforce and other affirmative action goals required by grantors are being met
and reports are filed as required.
11. Provide the Affirmative Action Officer with an MWBE and workforce utilization summary
report at the end of each contract for public works consulting and professional services
MWBE and Workforce Goals Administrative Regulations and Procedures
consulting administered by the department. The summary reports shall be on a form requested by
the Affirmative Action Officer, or electronically if available on a web based system provided by
the City. This information must be kept by the department as part of the contract records for
audit purposes.
Part 4 - Duties of the Affirmative Action Officer
To ensure that the requirements and these regulations and procedures are followed, the
Affirmative Action Officer shall:
1. Work with departments as appropriate to ensure that MWBEs have the opportunity to
participate in City public works projects, professional services contracts and purchases of
goods and services.
2. Review all City contracts and requests for proposals over $100,000 prior to solicitation
for public works bids and public works consulting services and professional services
consulting services RFP’s, to ensure that MWBE and workforce goals are included where
appropriate. The Affirmative Action Officer, with the review of the Law Department,
shall determine whether or not the proposed contract is subject to the MWBE and
workforce goals.
3. Maintain the City’s MWBE directory that is provided on the City’s web site as a primary
resource for City departments and the public, and maintain and update the MWBE web
site page.
4. Review and approve MWBE Utilization Plans and review Workforce Staffing Plans
submitted for public works projects, public works consulting contracts and professional
services consulting contracts. This shall include, but not be limited to, working with
departments, contractors and consultants to resolve any problems associated with
achieving the goals specified in the contract documents.
5. Review and track MWBE utilization reports and workforce utilization reports, and
determine when a contractor/consultant has not met the MWBE and workforce goals set
in the MWBE and workforce plans incorporated into the contract/agreement.
6. Adjust individual contract goals by waiver, or permit the use of state-certified MWBE’s
from outside the region, where the Affirmative Action Officer concludes that the contract
includes specialty work that cannot reasonably be subcontracted to an MWBE business,
or there is a lack of qualified responsive and responsible MWBE companies in the region
to perform the contract work. The Affirmative Action Officer shall apply professional
experience and judgment, in conjunction with staff in the departments, to determine how
best to address and resolve MWBE goal shortfalls for any contract. The Affirmative
Action Officer shall document when waivers are granted and how shortfalls are resolved.
7. Recommend to the Director of Finance when a bidder should be declared non-responsive
and/or non-responsible due to failure to make a good faith effort to meet the City’s
MWBE and/or Workforce goals for public works projects.
MWBE and Workforce Goals Administrative Regulations and Procedures
8. Recommend to the Director of Finance when a consultant should be declared in default
for failure to submit MWBE and subcontractor/supplier payment certification forms
and/or workforce utilization reports required by the Agreement, or for failure to meet the
workforce and/or MWBE goals included in the Agreement with that consultant.
9. Prepare and submit quarterly and annual MWBE and workforce utilization reports to the
Mayor and City Council.
MWBE and Workforce Goals Administrative Regulations and Procedures
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Finance Committee Date: Monday, July 06, 2020
From: John Mootooveren
Subject Authorizing Fee Waivers for Exterior Building Repair Permits
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
Permit Fee Waiver:
Waiver of (Application Fee) for projects that qualify from the following criteria:
The scope of the work for the permit is for essential repairs and improvements,
such as roof repair / replacement, siding repair/ replacement, porch repair/
replacement, windows replacement, garage, fencing or any exterior repairs /
replacement to an existing owner occupied and rental property up to 4 units.
If a building project has multiple permits, the maximum permits value of $35,000
will apply to the combined total of all permits and not to each individual permit.
2020
$56 for Exterior Permits
$100 for Roof Permit
Permit Fee Waiver Period: Beginning July 20, 2020 until October 18, 2020
Residential Properties (1 to 4 Units)
For this program, building permits must be pulled within the pilot period of
July 20, 2020 to October 18, 2020.
In order to close a building permit all works, required documents and
inspections are to be completed within 6 months.
If after 6 months the permit remains incomplete, a building permit renewal is
required with full permit fees.
Property taxes must be current.
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Finance Committee Date: Monday, July 06, 2020
From: John Polimeni
Subject CPH - Amending the 2020 Annual Action Plan
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
2020 PROPOSED CAPITAL IMPROVEMENT RECOMMENDATIONS = $228,000
Funding Proposed
Organization Project Description
Source Funding
Fundswill be used for building rehab to repair roof and building façade so
Friendship House Rehab Roof & Façade CDBG $ 25,000.00
that space is madeavailable for community activities.
Schenectady Community
Building repair and façade
Action Program, Inc. Funds will be used for Capital Improvements for building CDBG $ 25,000.00
improvements
(SCAP)
Urban Initiatives Group / Funds will be used to rehab makers spaces that will be provide job training
Artist Worker's Space CDBG $ 35,000.00
SEAT Center and support artists and entrepreneuers.
Engineering Department Sidewalk Improvement Help with sidewalk improvement within CDBG areas CDBG $ 90,000.00
Office of General Seniors Citizens
Code/SNAP assistant toward senior citizens code violations improvements CDBG $ 53,000.00
Services/SNAP Improvements
Paige Total $ 228,000.00
2020 PROPOSED EMERGENCY SOLUTIONS GRANT RECOMMENDATIONS = $180,209
Proposed
Organization Project Description Funding Source
Funding
Funds will be used for salaries/fringes and non personnel ESG $ 44,258.50
Homeless Housing and costs providing intake, assessment, referral, followup case
Bethesda House Eviction Prevention management, and assertive outreach services to secure
Program permanent housing, regain housing, or maintain housing for CDBG
the homeless population citywide.
Funds will be used for salaries/fringes and non personnel
Day Program DropIn costs for the Day Program DropIn Center, providing
Bethesda House ESG $ 23,250
Center comprehensive services to the homeless, disabled and
disadvantaged populations citywide.
Homeless Management Funds will be used to provide administrative/personnel costs
CARES, Inc. and Information System and software licenses for the HUD mandated Homeless ESG $ 10,127.00
(HMIS) Management and Information System (HMIS).
Funds will be used to provide administrative/personnel costs
Continuum of Care for the Continuum of Care administration including creation
CARES, Inc. ESG $ 10,127.00
Administration and submittal of the consolidated application, data collection,
training, and technical assistance.
Funds will be used for salaries/fringes of the House Manager
and Street Outreach Worker and rent and utilities for Safe
Safe, Inc. Safe House House, a temporary emergency shelter for runaway and ESG $ 33,500.00
homeless youths 1620 years old, primarily serving the
Hamilton Hill/Central State Street neighborhoods.
Homeless Prevention and Funds will be used for personnel program delivery costs of
Schenectady Community
Rapid ReHousing counselors and attorneys providing for court advocacy, legal ESG $ 58,946.00
Action Program, Inc. (SCAP)
Program assistance, rapid rehousing and tenant/landlord services.
Page Total $180,208.50
2020 PROPOSED HOUSING ASSISTANCE RECOMMENDATIONS = $702,966
Funding
Organization Project Description Proposed Funding
Source
Funds will be used for salaries/fringes and nonpersonnel costs in
Better Community
Administrative/ Operating Costs support of BNI's housing programs including housing HOME $ 25,000.00
Neighborhoods, Inc. (BNI)
rehabilitation, in the Hamilton Hill neighborhood.
Homeowner Occupied or First Funds will be used to assist ten (10) income eligible homeowners
Better Community
Time Homebuyer Housing or first time homebuyers with housing rehabilitation services, CDBG $ 175,000.00
Neighborhood, Inc. (BNI)
Rehabilitation particulary code violations.
Office of General Services/ Office of General Services/ Code/SNAP assistant toward senior citizens code violations
CDBG $25,000.00
SNAP SNAP improvements
Funds will be used to build three single famly homes in the Mt.
Habitat of Schenectady Habitat Single Family Homes Pleasant Neighborhood in collaboration with the Capital Region HOME $ 292,966.35
Land Bank.
Funds will be used to provide closing or down payment
Department of assistance to a maximum of 10% of the purchase price for an
Second Mortgage Program HOME $ 100,000.00
Development owneroccupied house for low and moderate income persons,
citywide.
Funds will provide tenantbased rental assistance and security
Homeless Prevention and
Bethesda House deposits to resident families of the City of Schenectady that are HOME $ 60,000.00
Rental Assistance Program
homeless or at imminent risk of becoming homeless.
Office of General Services/ Office of General Services/ Code/SNAP assistant toward senior citizens code violations
HOME $ 25,000.00
SNAP SNAP improvements
Page Total $ 702,966
2020 PROPOSED NRSA PUBLIC SERVICE RECOMENDATIONS $55,000
Funding
Organization Project Description
Source Proposed Funding
Electric City Barn Workforce Development Funds will be used to pair artisan makers with workforce development programs to train workers in creative trades CDBG $ 20,000.00
Funds will be used for personnel and nonpersonnel costs for Project ArtReach, providing educational and cultural
Hamilton Hill Arts Center ArtReach CDBG $ 35,000.00
programming for primarily low and moderate income youth in the Hamilton Hill neighborhood.
Funds will be used for personnel and nonpersonnel costs for Project ArtReach, providing educational and cultural $5000 + Taken
Hamilton Hill Arts Center ArtReach CDBG
programming for primarily low and moderate income youth in the Hamilton Hill neighborhood. from Surplus
Page Total $ 55,000.00
2020 PROPOSED PUBLIC SERVICE RECOMMENDATIONS = $328,000
Funding Proposed
Organization Project
Source Funding
Jerry Burrell DropIn Summer Funds will be used for Jerry Burrell Park summer programming including day and night programs consisting of
YMCA CDBG $ 30,000.00
Program arts and crafts, fitness, nutrition, swimming lessons, sports and education.
Funds will be used to pay for the Schenectady Senior Center which will provide lunch, educational and
Ancient Order of Hibernians Schenectady Senior Center CDBG $ 44,328.00
recreational activities to Seniors within the City of Schenectady
Funds will be used for personnel costs for a Homebuyer Education and Foreclosure Prevention Program,
Better Community Homebuyer Education and providing prepurchase and default housing counseling, intervention and assistance to low and moderate income
CDBG $ 35,000.00
Neighborhoods, Inc/BNI Foreclosure Prevention Program potential homebuyers/homeowners in maintaining decent affordable housing, primarily serving the Hamilton Hill
and Central State Street neighborhoods.
Quackenbush Park, Hillhurst and Funds will be used for personnel and nonpersonnel costs for a park program providing families and youths with
Boys and Girls Club of
Steinmetz Parks Recreational and increased opportunities including sports programs, swimming lessons, arts and crafts, nutrition education, CDBG $ 100,000.00
Schenectady
Educational Enrichment program prevention education, family programs and special events at Quackenbush, Hillhurst and Steinmetz Parks.
Schenectady Youth Boxing Funds will be used for program to assist with hirng a program coordinator and to serve children and youth, 18
Peaceful Warriors Boxing Club CDBG $ 10,000.00
and Fitness, Inc. and under, in low and moderate income areas.
Funds will be used to assist with increasng the number of girls served in weekly girls circles at Schenectady City
Working Group on Girls Building Brighter Futures for Girls CDBG $ 10,000.00
Schools, Mother/ Daughter circles, field trips and celebration dinner activities
Schenectady Community Funds will be used to provide a fulltime presence at the new Mt. Pleasant Library to asisit residence to navigate
Mt. Pleasant Outreach CDBG $ 15,000.00
Action Program (SCAP) various social services resources available to low and moderate income residence
Funds will be used to provide an introductory Craft Skills & Employment Training programs that will specifically
Affirmative Action Office Job Training Program designed to provide this training to those who are unemployed, dislocated or disadvantaged,this program will qualify CDBG $ 30,000.00
them for entrylevel employment in the construction industry.
Schenectady Inner City
Summer Lunch Program Funds will be used to support the SICM summer lunch program CDBG $ 15,000.00
Ministry
CREATE Community
Art in the Community Funds will be used to support expressive arts program to bring the arts to underserved populations in Schenectady. CDBG $ 5,000.00
Studios
New Programs/Projects
Funding Proposed
Organization Project Description
Source Funding
Capital District Center for Funds will be used to support the CDCI effort to support individuals with disabilities with the services they need to
Disibilities Support Services CDBG $ 6,000.00
Independence maintain independent and selfsufficient lives
Funds will be used to increase food insecurity and to train 25 urban youth to grow food and maintain an onsite
Cocoa House Meals and More CDBG $ 10,000.00
garden.
Funds will be used to develop and implement an urban farmer trining program and to expand educational
Urban Farms Training Program CDBG $ 17,672.00
programming for home gardners.
Page Total $328,000
2020 PROPOSED PUBLIC WORKS RECOMMENDATIONS = $1,045,340
Funding Proposed
Organization Project Description
Source Funding
Funds will be used for personnel and nonpersonnel costs for code
Code Enforcement Program Delivery CDBG $ 125,000.00
enforcement activities in low and moderate income neighborhoods.
Department of Development, Office of Funds will be used for City Staff time related to the demolition of City
Program Delivery CDBG $ 30,000.00
General Services owned Buildings
Funds will be used for the acquisition and demolition of approximately
Department of Development Demolition of Properties CDBG $ 229,340.00
twelve (12) blighted and abandoned properties throughout the city.
Funds will be used for the rehabilitation or reconstruction of
Street Rehabilitation and
approximately one (1) mile of CDBG eligible streets and include ADA
Engineering Department Facilities Improvement CDBG $ 400,000.00
improvements required under Federal Law and where specified by
Program
the City in various CDBG target areas.
Funds will be used for personnel and nonpersonnel costs in support
Schenectady
of SNAP and property management activities, providing for the
Office of General Services Neighborhood Assistance CDBG $ 155,000.00
stablization of inrem properties taken through foreclosure to stop
Program (SNAP)
deterioration and retain marketability.
Funds will be used to implement the strategies that are developed for
The Schenectady Foundation Thriving Neighborhoods neighborhood revitalization from the Thriving Neighborhoods CDBG $ 50,000.00
Challenge with The Schenectady Foundation
Funds will be used for the partial repayment of the Section 108 Loan
Property Acquisition/
Section 108 Loan Guarantee Program Guarantee Program's principal and interest for property acquisition CDBG $ 56,000.00
Demolition
and demolition for the removal of citywide blighting conditions.
Page Total $1,045,340.00
2020 PROPOSED ADMINISTRATION RECOMMENDATIONS = $534,5822
Funding Proposed
Organization Project Description
Source Funding
CDBG $ 399,085.00
Funds will be used for oversight, management, monitoring
Department of and coordination of the CDBG, ESG and HOME programs.
Administration Costs
Development Salaries/Benefits = $394,085 (CDBG) + $55,885 (HOME) +
HOME $ 55,885.15
$14,612 (ESG). Nonpersonnel Costs = $5,000 (CDBG).
ESG $ 14,611.50
Department of Administration and Funds will be used for administrative and program delivery
CDBG $ 25,000.00
Finance Program Delivery costs associated with Consolidated Plan activities.
Affirmative Action/ Funds will be used for affirmative action, minority recruitment
Department of
Minority Recruitment/ and contract compliance activities serving the City of CDBG $ 40,000.00
Finance
Contract Compliance Schenetady.
Page Total $ 534,581.65
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Health & Recreation Committee Date: Monday, July 06, 2020
From: Carmel Patrick / John Polimen
Subject Discussion - A Diamond Maintenance
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Health & Recreation Committee Date: Monday, July 06, 2020
From: Leesa Perazzo
Subject Discussion - Cooling Options for Summer
Background Info:
Evaluation/Analysis
Recommendation
Thursday, July 02, 2020
Get email alerts for Schenectady
A daily email when new agendas and minutes are posted.