City Council Committees
Regular MeetingSchenectady, NY · September 20, 2021
Agenda
SCHENECTADY CITY COUNCIL
COMMITTEE AGENDA
for
Monday, September 20, 2021
5:30 p.m.
Room 110
The Council President reserves the right to add or delete any agenda item prior to Committee Meeting.
Presentation
1 2020 Consolidated Annual Performance and Evaluation Report (CAPER) Kristin Diotte
City Development & Planning
1 ABAC for the “Animal Waste Cleaning & Disinfection SFD Training Tower” Chris Wallin
2 CR – Hispanic Heritage Month John Mootooveren
Renewal of the Consortium Agreement Between the City of Schenectady, City of Troy, and the
3 Kristin Diotte
Town of Colonie
Reminder – Review of Public Hearing for the Rezoning of 1020 McClellan Street (PH was on
4 Kristin Diotte
09-07-2021)
5 Determination of Negative Declaration for SEQR of 1020 McClellan Street Kristin Diotte
6 The Community Builders – Multiple Properties Maurice Brown, III
7 Sale of 320 Division Street, Vacant Lot Maurice Brown, III
8 Sale of 642 Crane Street, Vacant Lot Maurice Brown, III
9 Sale of 817 Strong Street Maurice Brown, III
10 Sale of 1338 Parkwood Boulevard Maurice Brown, III
11 Sale of 1614 Sixth Avenue Maurice Brown, III
Claims
1 Stephanie Marshall v. City of Schenectady Andrew Koldin
2 Highbridge / Prime Development, Inc. Andrew Koldin
Friday, September 17, 2021
CITY OF SCHENECTADY
LEGISLATIVE REQUEST FORM
COMMITTEE ASSIGNMENT: DATE: September 16, 2021
TO: City Council
FROM: Kristin Diotte, Director of Development
SUBJECT: 2020 Consolidated Annual Performance and Evaluation Report (CAPER)
Background Information:
Requesting presentation and acceptance of the 2020 CAPER from the 2020-2021 Federal Fiscal
year Annual Action Plan (AAP). The CAPER is a report on accomplishments of the projects and
programs, approved and undertaken in the 2020-2021 AAP, using CDBG, ESG and HOME funds.
Evaluation/Analysis:
HUD requires an annual CAPER, due after the close of the Federal Fiscal year. The 2020 CAPER
will be made available to the public for a 15-day comment beginning September 20, 2021 and
ending October 4, 2021.
Recommendation:
Announcement of a 15-day public comment period for comments to be incorporated into the
citizen participation process. In addition, a Public Hearing to be held on Monday, September 27th
at 7:00 pm during the regularly scheduled City Council meeting in City Hall Room 209 for the
purposes of hearing comments on the 2020 CAPER.
LEGISLATION WILL BE PREPARED BY _______Law Department________
City of Schenectady
2020‐2021 Consolidated Annual Performance and Evaluation Report Overview
CDBG HOME ESG Totals
Goa1 #1: Enhance Housing $
Opportunities $ 1,075,500.64 $ 239,003.74 225,796.74 $ 1,540,301.12
Goal #2: Expand Economic & $
Workforce Development $ 707,039.22 $ ‐ ‐ $ 707,039.22
Goal #3: Strengthen Local $
Neighborhoods $ 186,488.39 $ ‐ ‐ $ 186,488.39
$
Administrative Expenses $ 210,370.72 $ 15,587.93 11,415.49 $ 237,374.14
$
Total $ 2,179,398.97 $ 254,591.67 237,212.23 $ 2,671,202.87
The City of Schenectady’s 2020-2024 Consolidated Plan identified three overriding goals for the
next five years in relation to entitlement funding: 1) Enhance Housing Opportunities, 2) Expand
Economic & Workforce Development, and 3) Strengthen Local Neighborhoods.
This 2020 Consolidated Annual Performance Evaluation Report (CAPER) addresses the
implementation of the three goals established in the 2020-2024 Consolidated Plan. The report
reflects the first year of the plan, 2020-2021.
In the 2020-2021 program year, the City received $2,320,099 for CDBG, $1,117,501 for the
HOME Consortium in partnership with Troy + Colonie ($558,852 COS), and $194,820 in ESG
funding. These funds were used for many projects while the City dealt with COVID-19 and
disbursement of the Coronavirus Aid, Relief and Economic Security (CARES) Act
funding. The city offices were closed from March 2020 to June 2020 and the staff worked
remote during this time. There were many virtual meetings held about how to address the most
urgent needs in the city, from economic recovery, to addressing the needs of the City's youth,
and implementing the 2020-2024 Consolidated Plan. In addition, the Department of
Development staff worked with community partners and planned for the use of CARES Act
funding throughout the city.
Enhancing Housing Opportunities: Funding was provided to 10 new homeowners in the city
to assist with the purchase of their first home. The City also worked in coordination with Habitat
for Humanity to fund the construction of 7 new homes. Although they are not closed during this
this fiscal period, all 7 are expected to close by June of 2022. The Bureau of Code Enforcement
began a new initiative to combat blight in the city. Working in coordination with Better
Community Neighborhoods Inc. (BCNI) to guide homeowners to the appropriate resources for
home repairs. In addition, 18 blighted properties were demolished, many of the lots were sold to
adjacent property owners, increased both yard space and property values.
Expand Economic & Workforce Development:
In response to COVID-19, the City was still able to implement the goals laid out in the
Consolidated Plan by assisting over 60 small businesses with COVID-19 relief through the
CARES Act CDBG-CV funds. Small businesses received $376,000.00 in grants ranging from
$2,500.00 - $10,000.00 to help with the purchase of PPE supplies, payroll, insurance, training,
etc. The grants helped many businesses to remain operational and to continue employment.
The Schenectady Economic Empowerment Center (SEEC) was developed in 2020 and is part of
the City’s Affirmative Action Office. The SEEC is included in the plans for the 2020-2024
Consolidated plan to increase economic opportunities in the city. Per Consolidated Plan:
“Support “Community Hubs” - Support the development and enhancement of community centers
in challenged neighborhoods to help nurture talent, build leadership capacity, and highlight
diversity.” The SEEC assist small businesses with training, MWBE certifications, and various
webinars. Most recently, a Section 3 training webinar that was partnered with Empire State
Development (ESD). The Section 3 training included sub-recipients that had received HUD
funds.
The SEEC worked with the Capital Region Community Loan Fund to qualify small businesses
for grants. The SEEC provides various trainings to city residents, who are mostly low-income, to
increase their skills and provides a plethora of business opportunities to increase economic
development. SEEC is partnered with non-profits, the local community college, the school
district, and many construction contractors in the city.
A number of key infrastructure projects were completed which assisted to support the economic
viability of the City in the 2020-2021 fiscal year. Over 1 mile of streets were paved with CDBG
funds, along with the installation of sidewalks around Jerry Burrell Park and Orchard Park. The
installation of these sidewalks is key to continued investments and improvements to these parks.
The Craig-Main Connection complete streets project is expected to begin the first phase of
construction during the next fiscal period. There are several ongoing community development
initiatives within the corridor that will increase density, create new transportation demands – and
with proximity to local schools and community organizations, will intensify existing bicycle and
pedestrian needs. The Craig Street Complete Streets design will better serve the neighborhood
through the creation of a safer, more efficient, and more inviting corridor that takes into
consideration the needs of all travelers, including pedestrians, cyclists, transit riders, and
motorists.
Strengthen Local Neighborhoods: Organizations that serve youth in the city formed a Coalition
to better engage the City's youth in a coordinated manner. More than 15 programs and
organizations joined forces to provide programming including arts/culture, urban farming,
mentoring, academic support, volunteer opportunities, catering, and entrepreneurial skills to
more than 1,000 youth located in the City.
Legislative Request Form
DEPARTMENT OF ENGINEERING
CHRISTOPHER WALLIN, P.E., CITY ENGINEER
COMMITTEE ASSIGNMENT: DATE: September 20, 2021
TO: City Council
FROM: Christopher R. Wallin, P.E., City Engineer
SUBJECT: Award Bid and Contract for the “Animal Waste Cleaning & Disinfection SFD
Training Tower” to Sullivan Contracting, Inc. in the amount of $29,900.00
TO BE PLACED ON COUNCIL AGENDA OF: September 27, 2021
Background Information:
The City of Schenectady Department of Engineering and Fire Department have been working with our
Consultant H2M Architects and Engineers to perform improvements, safety upgrades, and
restoration work at the Fire Department Facilities. The Training Tower Facility is one of the buildings
that is targeted for selected improvements to restore training functionality. Due to the existing
unsanitary conditions engineering inspections and preliminary design work cannot begin until the
building has been cleaned and disinfected.
Evaluation/Analysis:
The Engineering Department solicited and received bids for “Animal Waste Cleaning &
Disinfection of SFD Training Tower”. A low bid was received on September 15,2021 from Sullivan
Contracting Inc. of Sauquoit, NY in the amount of $29,900.00. Funds for work will be charged to a
Capital Project Code specific to this project.
Recommendation:
Authorize the Mayor to enter into a contract with Sullivan Contracting, Inc. for the
"Animal Waste Cleaning & Disinfection SFD Training Tower" in the total amount of
$29,900.
LEGISLATION WILL BE PREPARED BY: Engineering
CRW: cd
1
RFB-EG-091521-01 - Animal Waste Cleaning and Disinfection SFD Tra... Addendum No: 2 (Published)
Document Request List
Document Request List
Organization Name Main Contact Download Date City Province/State
Martin Environmental Jason Frasier 09/13/2021 12:56 PM EDT Schenectady New York
Services, Inc.
DPX D Scott 09/08/2021 09:58 PM EDT scottsdale Arizona
Utech Products, Inc Puna Madan 09/08/2021 11:19 AM EDT Schenectady New York
Alvion Group Eleftherios Sparakis 09/07/2021 08:17 AM EDT Menands New York
Shay Enterprise Tamara Shay 09/03/2021 09:52 AM EDT Tacoma Washington
Allied Solutions Jason Collier 09/03/2021 09:52 AM EDT Carmel Indiana
AllPro Cleaning Services Stephen Noftle 09/02/2021 04:37 PM EDT Gansevoort New York
Officepartners360 Tim Boylan 09/02/2021 11:49 AM EDT Pittsburgh Pennsylvania
Sullivan Contracting Inc. Tim Davis 09/02/2021 10:29 AM EDT Sauquoit New York
SaniTech Services Inc Robert Madarasz 09/02/2021 10:21 AM EDT Nesconset New York
Merit Apprenticeship Penelope Hazer 09/02/2021 08:15 AM EDT East Syracuse New York
Alliance
North America Tim Loncarich 09/01/2021 08:42 PM EDT Grand Junction Colorado
Procurement Council, Inc.
PBC
ACV Environmental Suzanne Voutsinas 09/01/2021 06:43 PM EDT Rahway New Jersey
Services, Inc.
Rotterdam Lot Cleaners Angeline Schell 09/01/2021 05:21 PM EDT Rotterdam New York
09/17/2021 03:10 PM EDT Page 6 of 6
1
BID SUMMARY TABULATION SHEET DEPARTMENT OF ENGINEERING BUREAU OF CONSTRUCTION AND DESIGN
Received by the COMMITTEE ON BIDS of The City of Schenectady, NY at 10:30 A.M. Eastern Standard Time on the 15th day of September, 2021.
Bids for: "Animal Waste Cleaning & Disinfection SFD Training Tower"
PAY ITEM
PAY ITEM DESCRIPTION QUANTITY UNIT BIDDER No. 1 EXTENSION BIDDER No. 2 EXTENSION BIDDER No. 3 EXTENSION
No.
1 Animal Waste Cleaning and Disinfection SFD Training Tower 1 LS $30,504.06 $49,975.00 $29,000.00
Total Base Bid: $30,504.06 $49,975.00 $29,900.00
BIDDER No. COMPANY NAME ADDRESS C.A.P. SECURITY DEPOSIT
1 ACV Environmental Services, Inc. 1500 Rahway Avenue, Avenel, NJ 07701 N/A Bid Bond
2 Martin Evironmental Services, Inc. 1710 Erie Boulevard, Schenectady, NY 12308 N/A Bid Bond
3 Sullivan Contracting, Inc. 9362 Paris Hill Road, PO Box 502, Sauquoit, NY 13456 N/A Bid Bond
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: City Development & Planning Committee Date: Monday, September 20, 2021
From: John Mootooveren
Subject CR - Hispanic Heritage Month
Background Info:
Evaluation/Analysis
Recommendation
Friday, September 17, 2021
CITY OF SCHENECTADY
LEGISLATIVE REQUEST FORM
COMMITTEE ASSIGNMENT: DATE: September 16, 2021
TO: City Council
FROM: Kristin Diotte, Director of Development;
SUBJECT: Renewal of the Consortium Agreement Between the City of Schenectady,
City of Troy and Town of Colonie
Background Information:
In August of 1991 the City of Schenectady, the City of Troy and the Town of Colonie agreed to
enter a Consortium Agreement to provide each municipality with HOME funding. This Agreement
must be renewed every 3 years to continue to receive funding.
Evaluation/Analysis:
For the City of Schenectady to continue to receive the roughly $500,000 of HOME funding
annually, an agreement must be in place with the City of Troy and the Town of Colonie
Recommendation:
The City Council authorize the Mayor to renew the three year HOME Consortium Agreement
with the City of Troy and the Town of Colonie
LEGISLATION WILL BE PREPARED BY _______Law Department________
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: City Development & Planning Committee Date: Monday, September 20, 2021
From: Kristin Diotte
Subject Reminder - Review of Pubic Hearing for the Rezoning of 1020 McClellan Street (PH was on 09-07-
2021)
Background Info:
Evaluation/Analysis
Recommendation
Friday, September 17, 2021
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 9/16/21
TO: COUNCIL MEMBERS
FROM: Kristin Diotte
SUBJECT: Rezoning Request by Stewart’s Shops Corp. for a parcel at 1020 McClellan Street
Background Information:
Stewart’s Shops Corp. is currently pursuing the purchase of 1501 Union Street; current site of the Sunoco gas
station, 1503 Union Street; current site of the Jones Funeral Home, and 1020 McClellan Street; current site of
parking for the Jones Funeral Home and 4-stall garage with an apartment above.
Evaluation/Analysis:
1501 and 1503 Union Street are zoned “C-2” Mixed-Use Commercial.
1020 McClellan Street is zoned “R-1” Single Family Residential.
The residential zoning designation does not allow for the redevelopment of the parcel to be used for
commercial purposes, ie a newly constructed Stewart’s Shop with gas pumps.
The Planning Commission reviewed the rezoning request on August 18, 2021. There was a lengthy
discussion, including questions and comments from the public; please see attached Planning Commission
meeting minutes for August 18, 2021.
After a lengthy debate, the Planning Commission voted in favor of a recommendation to the City Council
to approve the rezoning of the parcel at 1020 McClellan Street, from “R-1” Single Family Residential to
“C-2” Mixed Use Commercial District.
Recommendation:
The City Council shall review Parts 2 and 3 of the Short Environmental Assessment Form and pass a
resolution to adopt a negative declaration.
The City Council shall pass a resolution to determine the zoning of 1020 McClellan Street.
LEGISLATION WILL BE PREPARED BY _____Law Dept._____
City of Schenectady
Planning Commission
Meeting Minutes
August 18, 2021
STEWART’S SHOPS CORP. requests a recommendation to the City Council
pursuant to Section 264-131 of a proposal to change the zoning of the parcel at 1020
McClellan Street, tax parcel # 50.21-2-74.2, from “R-1” Single Family Residential
District to “C-2” Mixed Use Commercial District.
Marcus Andrews from Stewarts Shops Corp. presented the project concept. Mr.
Andrews stated that the request is to change the zoning of one of the three parcels that
comprise the redevelopment proposal. Two parcels are currently zoned C-2 and the
third parcel is zoned R-1. The request is to recommend that the R-1 parcel be
rezoned to C-2. The redevelopment proposal will be to construct a 4,000 sq. ft. store
with 3 gasoline islands and a canopy. There will be an entrance to the site from
Union Street and from McClellan Street. The closest residential neighbor would be
32 feet away from the new building.
Commissioner Lewis asked what separates the parcel from the residential parcels on
the north side.
Mr Andrews answered that there is an existing fence line.
Commissioner Wallinger asked if the existing monument sign was staying.
Mr. Andrews answered that a new monument sign will be installed with landscaping
area surrounding it.
Commissioner Wallinger asked how much parking would be onsite and if the
proposed gas canopy will look like the existing Sunoco canopy.
Mr. Andrews answered yes that the new canopy would be like the current Sunoco
canopy.
Commissioner Wallinger opened the public hearing.
Tom Carey appeared representing the Upper Union Street Neighborhood Association.
Mr. Carey stated that they like Stewarts, but it is not clear if the proposal is consistent
with the 2020 Comprehensive Plan because this is a pedestrian heavy area, there are
already other convenience stores that sell gas nearby and that adding a larger gas
station that would draw more vehicular traffic contradicts having a strong, walkable
community. Mr. Carey stated that we all need to start thinking about the switch to
Electronic vehicles that is coming in the near future. There should be more
consideration of this in the environmental review. Additionally, if this is approved,
the store should have an entrance on Union Street and the building should be at the
front of the site to maintain the established street wall.
A member of the public requested clarification regarding the building location.
Mr. Andrews showed the elevation drawings and conceptual site plan for clarification
and explained that you would see the canopy first from Union Street, but that there
will be entrances to the building on the McClellan Street side and facing Union
Street.
Commissioner Wallinger asked if the existing gas station and funeral parlor parcels
were zoned C-2 and the narrow parcel with the apartment building is R-1?
Mr. Andrews confirmed that is correct.
Commissioner Ferro asked if they do not get the zoning change, can they make the
other two parcels work.
Mr. Andrews stated that it would be very difficult to make it work.
Commissioner Ferro asked if there are any locations built now on .7 acres or less.
Mr. Andrews stated that there are not any parcels that size with gas service and that
Stewarts looks for sites that are at least 1.5 acres.
Commissioner Petrillo asked for a response to the question of why the building can’t
be sited on Union Street.
Mr. Andrews stated that at the request of the Planning Department they did look at
putting the building on the corner up on Union Street but that would put the gas and
canopy towards the back of the site, closer to the residential properties, with not much
room for a buffer.
Commissioner Wallinger reminded everyone that the purpose of tonight’s review is to
provide a recommendation to the City Council regarding the zoning change of the R-
1 parcel. The question is, based on the Comprehensive Plan, would the zone change
to C-2 be consistent with the goals established by the neighborhood.
Commissioner Wallinger asked if there were any more public comments.
Lev Grin, from 1620 Rugby Road, asked how many gas pumps there would be and
stated that the current gas station is quiet and does not have much business. Mr Grin
expects that there will be much more business with the Stewarts and that he is very
concerned about traffic and noise.
Commissioner Wallinger asked Tom Carey to talk about consistency with the
Comprehensive Plan for this neighborhood.
Mr. Carey stated that the area has historically been “Doctors’ Row” and that the
Comprehensive Plan states that undeveloped parcels in the neighborhood should
maintain this character of small professional offices with minimal traffic. This is not
an undeveloped parcel but they should consider some of the other undeveloped
properties nearby like the former Fireside Restaurant.
Commissioner Wallinger closed the public hearing.
Commissioner Ferro stated that the zoning change would be a 15% increase in the C-
2 zoned parcels. Not approving the Stewart’s site plan proposal would not mean that
another station would not try to develop the currently zoned C-2 parcels.
Commissioner Wilson stated that he is not excited about the hole created by tearing
down the existing funeral home. The current gas station is not in the best shape
either.
Mr. Carey asked to address the Commission to clarify his request to have the
Commission table the request so that they can consider the proposal carefully.
Commissioner Ferro asked how large is the Stewarts on Van Vranken Avenue.
Mr. Andrews stated that the Van Vranken site is just under 1 acre and stated that
proposal decreased impervious surface from 52% down to 26%.
Commissioner Wallinger expressed feeling torn given the existing conditions and the
amount of existing asphalt and that adding more commercial land to an area that is
the transition from the Upper Union Street Commercial district to the residential
neighborhood. Commissioner Wallinger also expressed concern for the safety of kids
and pedestrians overall and that safety improvements would be required.
Commissioner Wallinger asked if maybe a smaller scale is more appropriate for this
location.
Mr. Andrews stated that the existing curb cuts will be moved further away from the
intersection, thus providing more safety at the intersection.
Commissioner Wallinger posed the question again – is this consistent with the
Comprehensive Plan?
Commissioner Petrillo thinks this proposal encroaches into the residential
neighborhood, does not protect the residential neighborhood, and does not have the
support of the Neighborhood Association.
Commissioner Wilson asked what about the setback requirements from the residential
in the C-2 zone if the proposal is approved.
Mr. Andrews answered that the required setback is 5 feet.
Commission Wilson stated that there needs to be more of a setback than that and that
5 feet is not acceptable.
Mr. Andrews stated that this is a similar layout as the last few Stewarts
redevelopments that the City recently approved.
Commissioner Lewis stated that one advantage to the residential neighborhood is that
a lot of people could walk because Stewarts has more products than a normal gas
station. Commissioner Lewis also relayed the observation that there already is a lot
of traffic at this corner and that he understands it is a good match for Stewarts.
Commissioner Lewis also expressed that it would be an improvement to what is
currently there.
Commissioner Ferro asked if the setback was really only 5 feet.
Andrew Koldin referenced the City Code, Chapter 264-37 Transitional yards, states
that the setback of a commercial property is equivalent to what the setback
requirement is for the residential zone. In this case it would be 20% of the lot depth
or 25 feet, whichever is greater.
Commissioner Wallinger reminded the Commissioners that it is important to
remember that once the zoning is changed, it applies to all allowable uses in that
zoning district, not only what the Stewart’s is proposing.
The Commissioners discussed the setbacks and building distance from the residential
zone.
Commissioner Wallinger stated that this is a small parcel and comparable to a
residential lot.
Commissioner Ferro stated that it is an underdeveloped parcel.
Commissioner Wilson asked the applicant if they considered putting the building
where the Funeral home building is.
Commissioner Wallinger polled the Commissioners on their thoughts and pros vs.
cons.
Commissioner Lewis stated that he thinks they are underestimating the benefits to
surrounding residents who would walk there; the present conditions at the site are
poor for pedestrians and this proposal would be much better; the proposal will
enhance a busy intersection.
Commissioner Beach stated that he does not see a significant enough impact by
changing the zoning to C-2 because the existing condition is commercial and will
likely remain so.
Commissioner Healey stated that most of the parcels are C-2 in the area and that this
is a small “sliver” of a parcel to change from R-1 to C-2, therefore not having a
largely meaningful impact; in favor of rezoning.
Commissioner Wilson stated that he was torn with the decision because it is
important to maintain the Union Street as a consistent commercial corridor.
Commissioner Wilson also stated that he is more supportive of the proposal with the
proper setback of at least 25 feet and that he would be more in favor of a different site
plan layout when that is presented to the Commission.
Commissioner Ferro stated that this proposal will not impact the transition from C-2
to residential due to the setback required. He also stated that the existing conditions
for pedestrians is a nightmare and that he would be in favor of the zoning change.
Commissioner Petrillo stated that he agrees this will improve the corner but has 2
concerns: 1. Changing the residential to commercial eliminates the transition between
the districts. 2. The Comprehensive Plan calls for working with the Neighborhood
Association and they did not submit feedback to take more time for consideration.
Commissioner Petrillo stated that he was undecided at that point.
Commissioner Wallinger stated that she agrees that this proposal will be better than
what is there but is concerned about the distance that the building is set back from
Union Street and has other serious concerns about the site plan layout. Commissioner
Wallinger is also concerned that this does not reflect the historical nature of the
neighborhood and that she is undecided.
Andrew Koldin suggested that the Commissioners be polled to either recommend for
or against the rezoning.
Commissioner Lewis stated that they could be more creative with the site plan to
make it more uniform and the design could have historic character.
Commissioner Ferro asked the applicant to clarify how much asphalt there will be.
Mr. Andrews stated there is currently 19,000 sq.ft and they are proposing that it be
reduced to 9,000 sq. ft.
Commissioner Wallinger asked what the requirement for impervious surface is in the
City Code.
Mr. Andrews stated that the Code allows up to 80% impervious. The site currently is
86% impervious and they are proposing 57% impervious.
Commissioner Wallinger then polled the Commissioners.
In-Favor of Rezoning: Lewis, Beach, Healey, Wilson, Ferro, Wallinger
Commissioner Wallinger stated that all points of discussion will be sent to the City
Council for their review and information and encouraged the applicant to work on the
site plan. Commissioner Wallinger stated that the site plan appeared to be in conflict
with the design guidelines for the Upper Union Street area, that the heavily
commercial nature of the canopy was in direct conflict, and recommended that the
Applicant reconsider the layout and work with the Neighborhood Association to
come up with a better plan.
Motion by Commissioner Ferro, seconded by Commissioner Petrillo, to recommend
to the City Council that the zoning for the parcel at 1020 McClellan Street be changed
from R-1 to C-2.
Motion carried unanimously.
Agency Use Only [If applicable]
Zoning Change 1020 McClellan St
Project:
Date: 9/27/21
Short Environmental Assessment Form
Part 2 - Impact Assessment
Part 2 is to be completed by the Lead Agency.
Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by
the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by
the concept “Have my responses been reasonable considering the scale and context of the proposed action?”
No, or Moderate
small to large
impact impact
may may
occur occur
1. Will the proposed action create a material conflict with an adopted land use plan or zoning
regulations? ✔
2. Will the proposed action result in a change in the use or intensity of use of land? ✔
3. Will the proposed action impair the character or quality of the existing community? ✔
4. Will the proposed action have an impact on the environmental characteristics that caused the
establishment of a Critical Environmental Area (CEA)? ✔
5. Will the proposed action result in an adverse change in the existing level of traffic or
affect existing infrastructure for mass transit, biking or walkway? ✔
6. Will the proposed action cause an increase in the use of energy and it fails to incorporate
reasonably available energy conservation or renewable energy opportunities? ✔
7. Will the proposed action impact existing: ✔
a. public / private water supplies?
b. public / private wastewater treatment utilities? ✔
8. Will the proposed action impair the character or quality of important historic, archaeological, ✔
architectural or aesthetic resources?
9. Will the proposed action result in an adverse change to natural resources (e.g., wetlands,
waterbodies, groundwater, air quality, flora and fauna)? ✔
10. Will the proposed action result in an increase in the potential for erosion, flooding or drainage
problems?
✔
11. Will the proposed action create a hazard to environmental resources or human health? ✔
PRINT FORM Page 1 of 2
SEAF 2019
Agency Use Only [If applicable]
Project: Zoning Chg 1020 McCl
Date: 9/27/21
Short Environmental Assessment Form
Part 3 Determination of Significance
For every question in Part 2 that was answered “moderate to large impact may occur”, or if there is a need to explain why a
particular element of the proposed action may or will not result in a significant adverse environmental impact, please
complete Part 3. Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that
have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency
determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting,
probability of occurring, duration, irreversibility, geographic scope and magnitude. Also consider the potential for short-
term, long-term and cumulative impacts.
The proposed change of zoning from R-1 Single Family Residential District to C-2 Mixed Use Commercial District
for the parcel located at 1020 McClellan Street will create no moderate or large adverse environmental impacts as a
result of this action.
The proposed zoning change is consistent with the zoning designation of the parcels immediately adjacent to this
site along the Union Street corridor.
Changing the zoning district to Mixed Use Commercial will allow the property to be used at an increased intensity,
however, the property is currently serving as parking for a commercial use, a funeral home, in addition to a single
family house, therefore the impact will be small.
Once the site, along with the adjacent properties at 1501 and 1503 Union Street are consolidated and redeveloped
into one commercial use, there is the potential for a small increase in the level of traffic, use of energy, and use of
water and waste water facilities. All of these small impacts can be accommodated by the existing infrastructure.
Any commercial redevelopment of this site will improve the drainage system on this property, as it is required to
comply with all New York State Department of Environmental Conservation regulations for storm water runoff and
local zoning regulations for maximum impervious surface requirements.
Check this box if you have determined, based on the information and analysis above, and any supporting documentation,
that the proposed action may result in one or more potentially large or significant adverse impacts and an
environmental impact statement is required.
✔ Check this box if you have determined, based on the information and analysis above, and any supporting documentation,
that the proposed action will not result in any significant adverse environmental impacts.
Schenectady City Council 9/28/21
_________________________________________________ _______________________________________________
Name of Lead Agency Date
John Mootooveren President, Schenectady City Council
_________________________________________________ _______________________________________________
Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer
_________________________________________________ _______________________________________________
Signature of Responsible Officer in Lead Agency Signature of Preparer (if different from Responsible Officer)
PRINT FORM Page 2 of 2
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: The Community Builders
Background Information:
Offer to purchase:
5 Daggett Terrace, 10 Catherine Street, 1 Barney Street & 115 Victory Ave
Offer to Transfer:
701 Stanley Street from The Community Builders to the City of Schenectady
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Sale of Vacant lot, 320 Division Street
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Sale of Vacant lot, 642 Crane Street
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Sale of 817 Strong Street
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Sale of 1338 Parkwood Boulevard
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
CITY OF SCHENECTADY
LEGISLATION REQUEST FORM
COMMITTEE ASSIGNMENT: City Development & Planning DATE: 09/20/21
TO: COUNCIL MEMBERS
FROM: Development
SUBJECT: Sale of 1614 Sixth Avenue
Background Information:
Evaluation/Analysis:
Recommendation:
LEGISLATION WILL BE PREPARED BY Development
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Claims Committee Date: Monday, September 20, 2021
From: Andrew Koldin
Subject Stephanie Marshall v. City of Schenectady
Background Info:
Evaluation/Analysis
Recommendation
Friday, September 17, 2021
SCHENECTADY CITY COUNCIL
Legislative Request Form
Committee: Claims Committee Date: Monday, September 20, 2021
From: Andrew Koldin
Subject Highbridge / Prime Development, Inc.
Background Info:
Evaluation/Analysis
Recommendation
Friday, September 17, 2021
Get email alerts for Schenectady
A daily email when new agendas and minutes are posted.