Historic Resource Commission
Regular MeetingSchenectady, NY · April 28, 2022
Minutes
Schenectady Historic District Commission
Meeting Minutes
April 28, 2022
I. CALL TO ORDER
Commissioner Yager called the meeting to order at 7:00 p.m.
II. ROLL CALL
PRESENT: Patricia Yager, Chair; Shaun Andriano; Richard Unger; Joe Fava; Dr. Dean
Bennett; Matt Smith, Senior Planner; Sylvia Jimison, Development Staff; Chris Marney,
Assistant Corporation Counsel.
ABSENT: Frank Gilmore
III. CONFLICT OF INTEREST
Chris Marney stated that he is the applicant for items G and H and therefore can not
provide the commission any legal counsel regarding them.
IV. ADOPTION OF MEETING MINUTES
Motion by Commissioner Fava, seconded by Commissioner Unger, to approve the
amended Minutes of the March 24, 2022.
Motion carried unanimously.
V. CALL FOR MEMBERS OF PUBLIC TO SPEAK ON AGENDA ITEMS
None.
VI. APPLICATIONS
A. Consideration for approval submitted by Lynn & Linda Seal to paint the shutters.
The premises is located at 19 Front St. in the Stockade Historic District.
Jim Plowman, the contractor for the owner, appeared before the commission. He stated
that the current shutters are burgundy and would like permission to paint them black.
Commissioner Yager asked if any commissioners had comment and no objections were
raised.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Fava to approve the
application with the following conditions:
1. The project will be completed within one year.
And with the following finding of fact:
1. This is a Type II SEQRA.
2. The Commissioners cited Preservation Standards #2, #5, and #6 as the guidelines
for their decision.
Motion carried unanimously.
B. Consideration for approval submitted by Erika Winkler to paint the house. The
premises is located at 3 Front St. in the Stockade Historic District.
Erika Winkler appeared before the commission. She explained that she intends to close
on the house in the next ten days. She stated that the current paint is peeling and decided
to paint the property different colors than currently exist.
Commissioner Yager asked about the window boxes that were mentioned in the
application. Ms. Winkler stated that she would like to install some flower boxes below
the windows. Commissioner Unger asked if the trim work would be painted blue or
white. Ms. Winkler stated that she intended to paint the trim in Platinum Gray. She
explained further that any features that are currently painted blue would be repainted the
Hale Navy color.
Commissioner Unger asked what material the window boxes would be constructed of.
Ms. Winkler stated that they would be wood, and painted the same color as the trimwork.
RESOLUTION
Motion by Commissioner Bennett, seconded by Commissioner Unger to approve the
application with the following conditions:
1. The project will be completed within one year.
And with the following finding of fact:
1. This is a Type II SEQRA.
2. The Commissioners cited Preservation Standards #2, #5, #6, as the guidelines for
their decision.
Motion carried unanimously.
C. Consideration for approval submitted by Mabel Leon to install a new driveway.
The premises is located at 22 Front St. in the Stockade Historic District.
The applicant decided to reset the existing bricks on the driveway as opposed to
replacing the driveway material and therefore does not need approval for the Historic
District Commission. The applicant withdrew their application.
D. Consideration for approval submitted by Home Evolution Contractor LLC to install
a new roof. The premises is located at 32 Washington Ave. in the Stockade Historic
District.
Mary Zawacki, Executive Director of the Schenectady County Historical Society,
appeared before the commission. She stated that the current roof is a three-tab shingle,
approximately 30 years old and is looking to replace the shingles with an architectural
shingle in a similar color.
Commissioner Unger stated that the commission has approved architectural shingle
replacements for three-tab shingles on other applications and therefore has no objections.
Commissioner Andriano asked if any of the flashing will be replaced. The applicant
stated that the flashing will remain.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Fava to approve the
application as submitted with the following conditions:
1. The project will be completed within one year.
2. The shingles will be in the Castle Gray color.
3. Any flashing in need of replacement will be replaced in the same color and
material as existing.
And with the following finding of fact:
1. This is a Type II SEQRA.
2. The Commissioners cited Preservation Standards #2, #5, and #6 as the guideline
for their decision.
Motion carried unanimously.
E. Consideration for approval submitted by Nancy Baum Delain to replace the front
stairs and railing. The premises is located at 107 N. College St. in the Stockade
Historic District.
Ms. Delain appeared before the commission. She stated that the steps are in disrepair and
she would like permission to repair or replace them.
Commissioner Yager stated that the bottom stair looks severely deteriorated and is
concerned the other steps may not be far behind. She asked what the reasoning was for
just doing the repair as opposed to the replacement. Ms. Delain stated that the reasoning
is financial. She explained that she believes the contractor she hired to fix the steps will
ensure the other two steps are solid.
Commissioner Bennett asked whether the commission needs to approve a specific railing.
Ms. Delain stated that she is proposing a cast iron railing that will be the same or
substantially similar to the existing railing. Commissioner Unger stated that there are
subtly different cast iron railings throughout the Stockade, so long as the new railings are
similar in design.
Commissioner Yager asked if the new bottom tread will have the same lip as the other
two treads. Ms. Delain stated that she did not know, but explained that the contractor
will either put in a new lip on the bottom step, or cut off the lips on the top treads so they
all match. Commissioner Andriano stated that code requires nosings on the treads. He
stated further that it is going to be quite difficult to repair the existing step and he doesn’t
believe that there is enough information to render a decision. He explained that a lot of
the discussion has been based off of what the applicant has said the contractor will do,
but that he doesn’t fully understand whether the contractor will be able to achieve what
the applicant has presented. The applicant stated that she will call the contractor to
explain what he intends to do to complete the project.
The contractor stated that he intends to form up the sides of the remaining portion of the
bottom step and fill it in with concrete to best match the existing steps. Commissioner
Andriano stated that it looks like there is some slight reinforcement coming up from the
bottom of the step and asked how the contractor intends to tie into that. The contractor
stated that he intends to put rebar in to tie the new concrete in to the existing step.
Commissioner Andriano stated that the existing step is very jagged and asked if the
contractor intends to cut the concrete into a straight line before pouring the new concrete
or if intends to try and form to the old concrete. The contractor stated that he intends to
use a hammer drill to chip out the jagged edges of the existing step and will cover the
formed step with hydraulic cement.
Commissioner Bennett stated that he doesn’t believe that the applicant needs to install the
heart ornamentation on the railings. The applicant stated that she would be ok with either
installing the heart ornamentation or leaving them off and just installing the straight
railings.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Fava to approve the
application with the following conditions:
1. The project will be completed within one year.
2. The bottom step will be constructed such that it matches the top two steps in form,
texture, and color.
3. The railing will be black cast iron of similar design as the existing railing, with or
without the heart ornamentation.
And with the following finding of fact:
1. This is a Type II SEQRA.
2. The Commissioners cited Preservation Standards #2, #5, and #6 as the guideline
for their decision.
Motion carried unanimously.
F. Consideration for approval submitted Paul Ambrose to replace the driveway. The
premises is located at 1191 Stratford Rd. in the GE Realty Plot Historic District
Paul Ambrose appeared before the commission. He explained that he would like to
narrow the existing driveway and repave it in concrete and that the driveway will be
heated. The applicant’s contractor stated that he intended to stamp the concrete driveway
all the way down to the sidewalk, and the sidewalk would be replaced to match the
neighboring sidewalk panels.
Chris Marney suggested that the commission also give approval for the sidewalk
installation, as the building department may request formal approval for its replacement.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Bennett to approve the
application with the following conditions:
1. The project will be completed within one year.
2. The new driveway will be tinted and stamped concrete from the sidewalk to the
garage as per the sample provided to the commission, and the sidewalk being
replaced will be completed in a standard finish and meeting all city code
requirements.
And with the following finding of fact:
1. This is a Type II SEQRA.
2. The Commissioners cited Preservation Standards #2, #5 and #6 as the guideline
for their decision.
Motion carried unanimously.
G. Consideration submitted by Chris Marney to request an extension of a prior
approval. The premises is located at 205 Union St. in the Stockade Historic District.
Chris Marney appeared before the commission and stated that he is requesting a two-year
extension on the previous approval to provide enough time to complete the project. In
addition, he stated that there are some modifications to the original application that he is
requesting as well. He explained that he has since discovered that the original entry door
was once much larger and he is looking to restore the doorway to its original size.
Additionally he stated that he was originally looking to install two gas lamps and an
overhead lamp, but has decided that it would look too busy, so he would instead like to
install a recessed overhead light in lieu of the lamp, while keeping the two proposed gas
lamps. Lastly, Mr. Marney stated that the current windows are a two-over-two lite
configuration, and would like to restore the windows to the original six-over-six lite
configuration by milling and installing new muntins.
RESOLUTION
Motion by Commissioner Fava, seconded by Commissioner Bennett to approve the
application as submitted with the following conditions:
1. The project will be completed within two years.
And with the following finding of fact:
1. This is a Type II SEQRA.
Motion carried unanimously.
H. Consideration submitted by 145 Barrett Street, LLC for a recommendation to be
designated as a historic structure. The premises is located at 145 Barrett St.
Chris Marney appeared before the commission. He explained that he is working with a
potential tenant of the building that would like to open a music venue. He stated that he
is looking to designate the property as a historic structure. He explained that the
designation would create an historic overlay zoning district on his parcel and would
subject the property to review by the Historic District Commission on any exterior
modifications. Mr. Marney stated that the designation also makes available some local
property tax exemptions.
Commissioner Bennett asked whether the commission’s decision whether to make a
recommendation is just one step in the process. Mr. Marney stated that it is.
Commissioner Bennett asked whether there’s an exit clause if in the future, the current or
future owner decided they no longer wished to have the historic designation. Mr. Marney
stated that the designation is a function of the zoning code, and a request to be removed
as a historic structure would require a rezoning application to the city council.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Andriano for the
commission to recommend that the structure be locally designated as a historic structure.
Motion carried unanimously.
VII. Miscellaneous
A. Review of the potential nomination of the Schenectady Police Department building
to the State and National Registers of Historic Places. The premises is located at 301
Clinton St.
The commissioners discussed the property, and no objections were raised regarding its
nomination.
RESOLUTION
Motion by Commissioner Unger, seconded by Commissioner Bennett, to support the
nomination.
Motion carried unanimously.
VIII. Adjourn
Motion by Commissioner Fava, seconded by Commissioner Andriano, to adjourn the
meeting.
Motion carried unanimously.
The meeting was adjourned at 8:34 p.m.
Agenda
Schenectady Historic District Commission
To: Historic District Commission
From: Matthew Smith, Senior Planner
Subject: Regular Meeting, Thursday, April 28, 2022 at 7:00 PM – City Hall – Room 110
I. Call to Order
II. Roll Call
III. Conflicts of Interest
IV. Adoption of Prior Meeting's Minutes
V. Call for Members of Public to Speak on Agenda Items
VI. Applications
A. Consideration for approval submitted by Lynn & Linda Seal to paint the shutters. The premises
is located at 19 Front St. in the Stockade Historic District.
B. Consideration for approval submitted by Erika Winkler to paint the house. The premises is
located at 3 Front St. in the Stockade Historic District.
C. Consideration for approval submitted by Mabel Leon to install a new driveway. The premises is
located at 22 Front St. in the Stockade Historic District.
D. Consideration for approval submitted by Home Evolution Contractor LLC to install a new roof.
The premises is located at 32 Washington Ave. in the Stockade Historic District.
E. Consideration for approval submitted by Nancy Baum Delain to replace the front stairs and
railing. The premises is located at 107 N. College St. in the Stockade Historic District.
F. Consideration for approval submitted Paul Ambrose to replace the driveway. The premises is
located at 1191 Stratford Rd. in the GE Realty Plot Historic District
G. Consideration submitted by Chris Marney to request an extension of a prior approval. The
premises is located at 205 Union St. in the Stockade Historic District.
H. Consideration submitted by 145 Barrett Street, LLC for a recommendation to be designated as a
historic structure. The premises is located at 145 Barret St.
VII. Miscellaneous
A. Review of the potential nomination of the Schenectady Police Department building to the State
and National Registers of Historic Places. The premises is located at 301 Clinton St.
VIII. Adjourn
Get email alerts for Schenectady
A daily email when new agendas and minutes are posted.