Historic Resource Commission
Regular MeetingSchenectady, NY · January 4, 2024
Minutes
Schenectady Historic District Commission
Meeting Minutes
January 4, 2024
I. Call to Order
Commissioner Yager called the meeting to order at 6:00 p.m.
II. Roll Call
PRESENT: Patricia Yager, Chair; Richard Unger, Shaun Andriano, Michael Barron, Jack Connelly;
Development Staff, Maxine Barasch; City Counsel
EXCUSED: Zakhar Berkovich
III.Conflicts of Interest
None
IV. Adoption of Prior Meeting's Minutes
A. December 7th
Commissioner Unger made a motion to approve the December 7th meeting minutes. Seconded
by Commissioner Andriano.
Motion carried unanimously.
V. Call for Members of Public to Speak on Agenda Items
VI. Old Applications
VII. New Business
A. Consideration for approval submitted by Eun-sil Lee to add a handrail to the front
stairs. The property is located in the GE Realty Plot at 1203 Wendell Avenue.
Ms. Eun-sil Lee came to discuss the proposed handrail with the Commission. Commissioner Yager
said it would be tough to say which type of railing would be most historically accurate because there
was no record of a railing ever being on the property.
Commissioner Unger questioned the angularity of the railing, but did not find it overly
objectionable- the rest of the Commission agreed that it was acceptable for the property and the
specific details would not be overly noticeable from the street.
RESOLUTION
Commissioner Unger made a motion to approve the application. Commissioner Barron
seconded the motion with the following conditions:
All proper permits should be secured
All work to be completed by 1/4/2025
Motion carried unanimously.
This is in coordination with standards 9 and 10. Type II SEQR
B. Consideration for approval submitted by Asad Dawoodani to add signage to the exterior
of the building and remove brick to expose entry/exit point. The property is located in the
Union Street Corridor at 602 Union Street.
The Commission clarified that the signage had been approved last meeting, and the only the entry
way needed to be discussed.
Mr. Amin Dawoodani, Asad’s father, was present to discuss the application. Mr. Dawoodani passed
around a rough sketch of the door, and said that the colors would be whatever the Commission
decided upon. He further clarified for Commissioner Yager that the door would fit solely within the
grey brick frame- there would be no enlarging of the area to accommodate the door.
Mr. Dawoodani said that the glass rectangle added to the door for visibility was planned on being
12”x12” and that the frame would be hollow metal and the arched glass would be surrounded by a
wooden frame. Commissioner Andriano mentioned it may be difficult to have two separate pieces
for the door frame and the transom frame, and that it may be easier to have them as one material.
Commissioner Andriano questioned what exactly was planned for the arched section of the door. He
stated that glass was not mandatory for the arch but needed some further information from the
applicant that detailed what would be in that section, as the information given in the application was
insufficient.
Commissioner Unger noted that the proposed door likely would not fit in the space proposed. Mr.
Dawoodani emphasized that they could make the door fit whatever dimensions the Commission
wanted. Commissioner Andriano mentioned that in any approvals he would like a condition to be
that the width of the door could not exceed the current outline shown with the existing soldiered
brick.
Commissioner Andriano stated that all of the grey brick should be removed as it is not historically
accurate and asked again what the material for the panel at the top of the door. The applicant
confirmed that there would be glass in the arch with a hollow metal frame.
Commissioner Andriano mentioned that he would like the glass panel in the door extended to be
more proportional with the rest of the door. The applicant feared that too much glass would make
break-ins more likely. Commissioner Andriano noted that the rest of the façade was glass and that
would make no difference.
Commissioners Yager and Andriano noted that panels on the door were not necessary.
RESOLUTION
Commissioner Andriano made a motion to conditionally approve the application. Commissioner
Barron seconded the motion with the following conditions:
Door frame to be hollow metal from top to bottom, including the arch
Frame follows the existing masonry with the arched opening
Glass infill between the door header and the head of the frame
Glass panel tempered to meet code
All security features needed to be interior to the door or internal to the glass
Half glass style door
Existing masonry cannot be widened- the door needs to be modified to fit the existing opening
All grey masonry to be removed
Color to match green on existing storefront
Dimensions of existing grey brick to be submitted to Development staff prior to construction of the
door
Motion carried unanimously.
This is in coordination with standards 2, 4, 9 and 10. Type II SEQR
C. Consideration for approval submitted by First Presbyterian Church to replace windows
and trim paintings. The property is located in the Stockade at 215 Union Street.
Mr. Dave Bowles and Jim Nally approached the condition to speak on the application at hand.
Commissioner Yager noted that Commissioner Unger had broken down the comments made about
the windows individually, and it was recommended that motions would be taken window by
window.
Although some windows were previously replaced using 2 over 1 divided lights, Commissioner
Unger believed that originally they were not 2 over 1. Mr. Bowles said that they did not have the
original windows, but they could look for pictures that visualized the originals. As windows 1-6 had
already been replaced, the Commission decided they would start with window 7 and then move back
to 1-6 afterwards.
Window 7 originally had a 12 over 1 appearance. The recommendation of the Commission was that
the top sash could be repaired but the broken glass should be replaced. Commissioner Andriano
noted that in his visit to the site he saw the exterior of the windows was quite deteriorated, and in
most cases needed attention.
Commissioner Unger asked whether it would be physically possible to maintain the sashes but
rebuild the frame. Commissioner Andriano responded saying that could come with some mechanical
difficulties.
Mr. Bowles questioned whether a manufacturer would be able to replicate a 12 over 1 SDL as seen
in window 7 and asked what the Commission would accept if that was the case. Commissioner
Unger felt comfortable saying that a staff approval could be given in that instance, only if the 12
over 1s were fully unable to be used. Mr. Nally stated later that he could construct a 12 over 1 frame
if needed.
Commissioner Andriano re-emphasized that much of the wood was in very rough shape, and
temporary fixes would delay the problem but that ultimately much of the wood would need to be
replaced. Commissioner Andriano said that generally speaking the upper sashes were in better
condition than the lower sashes as they had less contact with water. Window 7 was an example
where the top sash could be repaired but the bottom sash had more extensive damage.
It was agreed that the sills of window 7 were in very bad shape, and Mr. Nally felt confident that he
would be able to properly take them off to repair them.
The Commission did not have a preference if the applicant used cedar or pine to replace the frame,
and said that they would leave it up to the applicant’s discretion between to choose between those
options. While the Commission was favorable on either choice of wood, they stated that PVC
products would be unacceptable for this project.
RESOLUTION
Commissioner Unger made a motion to approve the repair of window 7. It was noted in the motion
that the windows did not need to be operational, so while aspects such as the sash cords were
allowed to be replaced it was not mandatory. Commissioner Andriano seconded the application
with the following conditions:
Top sash be repaired
Bottom sash be repaired if possible, with the sill being replaced
Window unit to be 12 over 1 with muntins
Broken glass to be replaced
Sash cords can be replaced at the applicant’s discretion
The applicant to choose between cedar and wood for the frame
Paint color to be the same as previous
Motion carried unanimously.
The Commission then moved onto window 8, deciding to complete a vote on SEQR and go over the
Department of the Interior standards at the end when all windows were voted on.
Commissioner Unger noted that window 8 had very similar conditions to window 7 and was also 12
over 1. Mr. Bowles that window 8 was in worse condition and doubted that much of the window was
salvageable.
RESOLUTION
Commissioner Unger made a motion that the approvals for window 7 be carried over to apply for
window 8. Seconded by Commissioner Andriano.
Motion carried unanimously.
Windows 9 and 10 were discussed together as they were in very similar states and both were 6 over
1. Commissioner Andriano recommended that both windows 9 and 10 be replaced, as the state of
disrepair was so serious that repair may not be possible.
The Commission stressed the importance of maintaining the 6 over 1 SDL with the replacement
windows.
Mr. Bowles noted that replacements for windows 9 and 10 had already been purchased. They were
not the exact original color, as that was not available and described them more as a taupe color. The
Commission agreed that no matter what color was officially decided upon would need to be
consistent throughout the entirety of the third floor as was stated in the two earlier motions. The
Commission discussed whether is would be an issue that if the taupe was used that it would make the
third floor a different color than the bottom two. Commissioner Yager mentioned that as paint is not
permanent she would be comfortable approving a different color. The Commission came to an
agreement that the window units of 9 and 10 would be the color used throughout the third floor.
RESOLUTION
Commissioner Andriano made a motion that windows 9 and 10 be replaced. Seconded by
Commissioner Unger with the following conditions and findings of facts:
Both windows are beyond repair, with both the sills and frames being in extreme disrepair
Aluminum clad wooden windows to match rest of third floor
6 over 1 SDL to remain
Paint color to match rest of third floor windows
Window 11 was discussed by itself. It was noted that the bottom sill of window 11 was already
replaced and the existing divided light was 1 over 1. The Commission was unsure what the light
division was before it was 1 over 1 but the true original state of the window was unknown.
Commissioner Andriano recommended that the window be repaired as needed. Commissioner Unger
said that since the windows to the left and right of 11 had different divided lights there was no way
to match both of them, and therefore keeping it 1 over 1 was the best bet.
RESOLUTION
Commissioner Andriano made a motion that window 11 be replaced with the following findings of
facts and conditions. Seconded by Commissioner Unger
Bottom sash, sill and exterior trim are all beyond repair
Unit to be replaced with a 1 over 1 divided light
Aluminum clad window
Color to be consistent with the color of the rest of the third floor
Trim paintings to be consistent with adjacent trims
Motion carried unanimously.
The Commission discussed windows 12 and 13 which were square windows but were located within
the arch of the building. Commissioner Andriano believed that the condition on these windows was
poor enough that it warranted them being replaced.
The jambs and sill in particular were in exceptionally poor condition. Commissioner Andriano said
that portions of the window could be repaired rather than replaced, but that would likely prohibit the
window from being functional.
The Commission agreed that although maybe some portions of the window could be repaired,
enough of the window was beyond repair that replacement was recommended.
RESOLUTION
Commissioner Andriano made a motion that windows 12 and 13 be replaced with the following
findings of facts and conditions. Seconded by Commissioner Unger
The unit sills, jambs and bottom sashes are beyond repair
Units can be replaced
Sash lights should be 9 over 1
Aluminum clad wooden windows
Color should be consistent with the rest of the third floor
Motion carried unanimously.
Windows 14 and 15 were handled together due to their similar conditions. Due to their severe
deterioration Commissioner Andriano recommended that they be replaced.
Both windows were 1 over 1 and the Commission wanted them to remain that way after
replacement.
RESOLUTION
Commissioner Andriano made a motion that windows 14 and 15 be replaced. Seconded by
Commissioner Unger with the following findings of facts and conditions.
The windows and structure around the windows are beyond repair
Replacement is approved
Aluminum clad wooden windows
1 over 1 light window
Color to be consistent with remainder of the third floor
Motion carried unanimously.
The Commission decided to handle window 16 by itself. Commissioner Andriano stated that the sill
of window 16 was in worse condition than any other sill on the site. The condition of the rest of the
window was unknown. It was recommended that the applicant attempt to repair the window, but if
repair was deemed impossible than a staff approval could be given to replace the window. It was
clarified that staff would consult with a Commissioner prior to issuing any approvals
RESOLUTION
Commissioner Andriano made a motion to repair window 16. Seconded by Commissioner Unger
with the following findings of facts and conditions.
Exterior condition of the unit is unclear
Repair of the unit is recommended, but applicant should discuss with City staff if repair is
found to be impossible
Motion carried unanimously.
Windows 17 and 18 were next discussed, and were deemed to be beyond repair.
RESOLUTION
Commissioner Andriano made a motion to replace windows 17 and 18. Seconded by
Commissioner Unger with the following findings of facts and conditions.
Windows 17 and 18 were beyond repair
Sills and jambs were extensively damaged
Replacement is approved
Aluminum clad wooden windows
9 over 1 SDL for both units
Color consistent with the rest of the third floor
Motion carried unanimously.
The Commission circled back to windows 1-6. Commissioner Barron noted that windows 1-4 had
already been replaced previously, and were 2 over 1 which was assumed to not be the original
makeup of the windows.
Commissioner Andriano expressed that he felt the top sashes should be replaced so that SDLs could
be put in, but rose the question of how the SDLs should be, since the original windows were
unknown. Commissioner Unger pointed out that while there isn’t consistency with the SDLs, the one
commonality was that they were all “over 1”, and therefore that should be kept the same in windows
1-6.
Commissioner Andriano recommended that all of windows 1-6 get 1 over 1 SDLs so that the
window proportions could not get messed up.
RESOLUTION
Commissioner Andriano made a motion to replace windows 1-6. Seconded by Commissioner
Barron with the following findings of fact and conditions.
The original SDL makeup of the windows was unknown
Replacements were to be 1 over 1
Aluminum clad wooden windows
Color consistent with the rest of the third floor
Motion carried unanimously.
All motions taken for 215 Union Street were in coordination with standards 3, 5, 6, 9 and 10. Type II
SEQR.
D. Consideration for approval submitted by Harline Andrus to repair the chimney and the
front steps. The property is located in the Union Triangle at 40 Union Avenue.
Ms. Harline Andrus came before the Commission to discuss the project. It was stated for the
Commission that Ms. Andrus had spoken with the City’s Chief Building Inspector who had given
authorization to redo the chimney as it posed a safety hazard in its current state.
Ms. Andrus said that the chimney on the right is completely rebuilt, while the other was only
partially taken down with plans to finish work in the spring.
Commissioner Yager informed Ms. Andrus that the sealer noted in the application was not approved
by SHPO, and therefore should not be used. Ms. Andrus said she was unsure if it had been put on the
completed chimney.
Commissioner Unger was not a fan of the proposed concrete for the steps, and recommended
untinted concrete be used instead.
Ms. Andrus confirmed that the reparation of the stairs included the walls on the side of the stairs as
well.
RESOLUTION
Commissioner Unger made a motion to approve the repair to the chimney and the front stairs. This
was seconded by Commissioner Barron with the following conditions:
New mortar should match the existing color
No sealer to be put over the chimney
Front stairs would be reconstructed to their original design
Concrete used for stairs would be consistent with City of Schenectady requirements
All necessary permits to be secured
Work to be completed by 1/4/2025
Motion carried unanimously.
This is in coordination with standards 2, 5, 9 and 10. Type II SEQR.
E. Consideration for approval submitted by Charles Meisner to repair a portion of the roof.
The property is located in the GE Realty Plot at 1412 Lowell Road.
Mr. Charles Meisner appeared before the Commission to discuss the desired changes to be made to
the roof, which were needed as the roof was leaking. Mr. Meisner said that the intent of the
application was not to change the appearance- everything would look identical and the same
materials would be used.
Mr. Meisner said that the valley is old copper and that the drip edges would match the existing
exactly. The Commission requested that any copper removed would be replaced with new copper.
The Commission was unsure if there were any snow slides on the roof that would be impacted by
this application. After looking further, Commissioner Barron did not believe that there were any
snow slides in the portion in question.
RESOLUTION
Commissioner Unger made a motion to approve the reparation of the roof. The motion was
seconded by Commissioner Barron, with the following conditions.
Shingles to be replaced using GAF Timberline HDZ architectural shingles
Any copper removed from roof will be replaced with copper
All necessary permits to be secured
All work to be completed by 1/4/2025
Motion carried unanimously
This is in coordination with standards 2, 5, 9 and 10. Type II SEQR
VII. Miscellaneous
Mr. Connelly discussed the desire to update the Historic Commission’s application process in order
to receive more consistently complete applications. He said that anyone wishing to assist with that
would be welcome, and the updated application can be reviewed by the Commission at the next
meeting.
VIII. A d j o u r n
Motion to adjourn made by Commissioner Unger. Seconded by Commissioner Andriano. Meeting
adjourned at 8:26 PM
Agenda
Schenectady Historic District Commission
To: Historic District Commission
From: Jack Connelly, Planner
Subject: Regular Meeting, Thursday, January 4th, 2023 at 6:00 PM – City Hall – Room 110
I. Call to Order
II. Roll Call
III. Conflicts of Interest
IV. Adoption of Prior Meeting's Minutes
A. December 7th
V. Call for Members of Public to Speak on Agenda Items
VI. Old Applications
A. Consideration for approval submitted by Eun-sil Lee to add a handrail to the front stairs.
The property is located in the GE Realty Plot at 1203 Wendell Avenue.
B. Consideration for approval submitted by Asad Dawoodani to add signage to the exterior
of the building and remove brick to expose entry/exit point. The property is located in
the Union Street Corridor at 602 Union Street.
C. Consideration for approval submitted by First Presbyterian Church to replace windows
and trim paintings. The property is located in the Stockade at 215 Union Street.
VI. New Applications
A. Consideration for approval submitted by Harline Andrus to repair the chimney and the
front steps. The property is located in the Union Triangle at 40 Union Avenue.
B. Consideration for approval submitted by Charles Meisner to repair a portion of the roof.
The property is located in the GE Realty Plot at 1412 Lowell Road.
VII. Miscellaneous
Historic Properties for Discussion:
IX. Adjourn
Get email alerts for Schenectady
A daily email when new agendas and minutes are posted.