Historic Resource Commission
Regular MeetingSchenectady, NY · August 22, 2024
Minutes
Schenectady Historic District Commission
Meeting Minutes
August 22, 2024
I. Call to Order
Commissioner Yager called the meeting to order at 6:00 p.m.
II. Roll Call
PRESENT: Patricia Yager Chair; Richard Unger, Zakhar Berkovich, Michael Barron, Sergy Dossous
Assistant Planner, Sean O’Brian Assistant Counsel.
EXCUSED: None
III. Conflicts of Interest
None
IV. Adoption of Prior Meeting's Minutes
A. June 27th
Motion made by Commissioner Unger to approve the minutes of May 23rd and June 27th.
Seconded by Commissioner Berkovich.
Motion carried unanimously.
V. Call for Members of the Public to Speak on Agenda Items
None.
VI. Old Applications
Consideration for approval submitted by Shanti Development to repair or replace the
windows. The property is located in the Union Corridor Historic District at 612 Union
Street.
Mr. Wagner came before the Historic Commission to repair or replace the windows; his
application was tabled at the last meeting because more proof was needed to make a clear
determination on whether the windows would need to be repaired or replaced.
Commissioner Yager had a question about Windows 8 which was described as painted shut,
and broken weights, and her question was “Is it not fixable?” Mr. Wagner answered by
saying “Basically all the bottom of the windows are gone now.” Commissioner Yager
explained how he only mentioned that in some of the windows and not for all of them.
Commissioner Unger was concerned about whether the windows need replacement based
on the previous photos that he had and he did not have time to review the new pictures
that staff did not inform him were uploaded. Commissioner Berkovich mentioned that he
had seen the windows from the inside of the property, he said: “is it possible to repair them,
yes, but it’s going to take a lot more effort, and I don’t know how much of that integrity of
the window will retain”. Commissioner Berkovich felt comfortable having the applicant
repair or replace the windows based on the new pictures he saw after a property tour.
RESOLUTION
Commissioner Unger made a motion to approve the application as submitted.
Commissioner Berkovich seconded the motion with the following conditions and findings of
fact:
· To repair and or replace all windows provided that all windows are being replaced
shall retain the over and under panel with munnions and grills. (I.e., 6X6, 9X9, 1X1, etc.) as
illustrated in the application.
· Repair or replace with details not specifically addressed in the application or those
conditions. The development staff should review these conditions of approval and maybe
approved by the development staff.
· All work to be completed within one year.
· Before any work begins, all necessary permits shall be secured.
Motion carried unanimously.
This is in coordination with standards 2,5, 6, 9. Type II SEQR
VII. New Business
A. Consideration for approval submitted by New York Parks, Recreation, and Historic
Preservation to recommend this property for a historic nomination. The properties are
located at 112 Erie and 108 Erie Boulevard.
Mr. Attar came before the Historic Commission to give a brief history of these properties
that will be considered by the New York State Board for Historic Preservation. The owners of
the properties are looking to do a Historic rehabilitation of the properties. Mr. Attar
explained that there are 4 buildings on the properties, but only two of them are being
considered by the New York State Board for Historic Preservation. These two buildings were
once owned by GE. 112 Erie Blvd dates to 1887 and 108 Erie Blvd dates to 1909. The
commissioners did not have any issue with the two properties being listed as Historic.
RESOLUTION
Commissioner Berkovich made a motion to approve the recommendation of this property
for the historic nomination by the New York Parks, Recreation, and Historic Preservation.
Commissioner Unger seconded the motion with the following conditions and findings of
fact:
· To be part of the State and National Historic Register
· The two structures need to follow the criteria for designation as a historic district per
264-75 (2) and (3) (a) (City of Schenectady Code).
· Recommend the property containing 108 and 112 Erie Blvd buildings be established as
an Overlay Historic District finding that the two properties and their structures meet the
following criteria for designation as historic districts, that it contains properties that meet
one or more of the criteria for designation of Historic site or structures, because of
possessing such quality it constitutes as Historic District of the city.
Motion carried unanimously.
B. Consideration for approval submitted by Joseph Solghan to replace a window and
repaint the house. The property is located in the Stockade Historic District at 115 N Ferry
Street.
Mr. Solghan came in front of the Historic Commission because he wanted to repaint the
house and replace a window that was replaced with the wrong windows. The window was
damaged by the inspector who was inspecting the house. The inspector tried to right his
wrong by fixing the window with a window that he found at a workshop without knowing
that the property was in a historical district and the proper step that he needed to take. Mr.
Solghan was able to find a window in the basement and another one in architecture salvage
in Albany, and he is going to be able to fix the window.
For the painting of the windows, the colors that he chose are already in some houses in the
Stockade. Commissioner Berkovich asked him if he could tell which colors were going to
which part of the building. Mr. Solghan said that the body will be painted in Platinum, the
fish shingle will be Jojoba, the accent colors will be Shadow Mountain and January Garnet,
and the trim will be Bleach Linens. The paint's brand is Behr.
RESOLUTION
Commissioner Unger made a motion to approve the application as submitted.
Commissioner Barron seconded the motion with the following conditions and findings of
fact:
· To replace the window and repaint the house.
· The body of the house will be painted with Behr Platinum (PPU 26-11), the fish scale
shingles will be Behr Jojoba (9390-3), the accent will be painted Behr Shadow Mountain
(PPU 24-22) and Behr January Garnet (HDC-CL-11), and the trim will be painted Bleach Linen
(PPU5-09).
· To replace one window that was broken beyond repair by the applicant inspection’s
contractor. The replacement windows will be home-specific wood windows from Albany
Architectural Savage with material and construction like the original window, replacement
window will be wood, 59x38 inches. Replacement windows should have 2x2 window panels,
with munnions, and the windows will be painted with Behr Bleach Linen (PPU5-09).
· All work to be completed within one year.
· Before any work begins, all necessary permits shall be secured.
Motion carried unanimously.
This is in coordination with standards 2, 6, 9. Type II SEQR
C. Consideration for approval submitted by Tablecloths for Granted to install a sliding
gate on the fence. The property is located in the Union Corridor Historic District at 510
Union Street.
Mr. Labnake came in front of the Historic Commission to install a sliding gate on their fence.
Commissioner Unger asked for the width of the gate, and the applicant's response was 18
feet.
RESOLUTION
Commissioner Unger made a motion to approve the application as submitted.
Commissioner Berkovich seconded the motion with the following conditions and findings of
fact:
· To install a sliding gate on the fence at the Union Street entrance.
· The gate should consist of two 8-foot fixed fence panels and one 18-foot sliding panel
in between.
· The three gates’ panels should be the same design as the existing fence, the three
gates panel should be no taller than the existing fence. The height should be provided to the
planning staff before construction.
· The existing stone monuments will remain in place.
· All material will be baked black enamel on aluminum as submitted.
· All work to be completed within one year.
· Before any work begins, all necessary permits shall be secured.
Motion carried unanimously.
This is in coordination with standards 2, 5, 9. Type II SEQR
D. Consideration for approval submitted by Harline Andrus to repair two columns and the
front facia of the building. The property is located in the Union Triangle Historic District at
40 Union Ave.
Nick Plowman came in front of the Historic Commission as the contractor representing
Harline Andrus for the property located at 40 Union Ave. Mr. Plowman is planning on
repairing the two columns and the front facia of the building. Mr. Plowman explained to the
Commissioners, how there is a hole in the fascia because an animal probably chewed on it,
and he is planning on fixing it with the same existing material. Commissioner Yager wanted
to know how he was planning on fixing the columns and their bases. She wanted to know if
the contractor would shorten them and add a box formation, or if it is just replaced in kind.
The contractor told Commissioner Yager that the columns themselves are not rotted and it
is just the wood blocks under them, and they are made in sections, which makes them
easier to repair.
RESOLUTION
Commissioner Berkovich made a motion to approve the application as submitted.
Commissioner Barron seconded the motion with the following conditions and findings of
fact:
· To repair the two columns with like materials and the front fascia with like materials as
well.
· All work to be completed within one year.
· Before any work begins, all necessary permits shall be secured.
Motion carried unanimously.
This is in coordination with standards 2, 5, 6, 9. Type II SEQR.
E. Consideration for approval submitted by Peter Frisoni to repair the roof of the
building. The property is located in the Union Street Corridor Historic District at 1205
Union Street.
Mr. Frisoni came in from the Historic Commission looking to repair the roof of the building.
Mr. Frisoni mentioned to the Commissioners that the roof has leaks and it is leaking in the
attic. The new roof shingles will be Owen Corning- Tru-Definition Duration Driftwood color.
Commissioner Berkovich wanted to know what material was in between the fascia. Mr.
Frisoni told him that the slide was made of aluminum, and it would stay. Commissioner
Unger wanted to know if the entire roof were going to be replaced or if it was only just a
portion of it, the same with the fascia board, and he also wanted to know if new drip edges
would be needed. Mr. Frisoni told him that the entire roof would be replaced, only the
fascia boards that were damaged would be replaced, and all new drip edges would be
needed. Commissioner Yager asked if the applicant had any further plans for the siding of
the house which is in very bad condition, the applicant said sometimes down the line he
would address it.
RESOLUTION
Commissioner Barron made a motion to approve the application with modifications
Commissioner Berkovich seconded the motion with the following conditions and findings of
fact:
· To replace the roof with the Owens Corning Duration Driftwood color shingles.
· To replace drip edges with aluminum and cream color.
· To replace the facia board, using pine material.
· All work to be completed in one year
· Before any work begins, all necessary permits shall be secured.
This is in coordination with standards 2, 5, 6, 9. Type II SEQR.
Motion carried unanimously.
VII. Miscellaneous
Staff Approvals
§ 1053 Park Avenue.
§ 1302 Stratford Road
§ 40 Union Ave
VIII. Adjourn
Motion to adjourn was made by Commissioner Unger and seconded by Commissioner
Berkovich. The meeting was adjourned at 7:35 pm.
Agenda
Schenectady Historic District Commission
To: Historic District Commission
From: Sergy Dossous Assistant Planner
Subject: Regular Meeting, Thursday, August 22nd, 2024, at 6:00 PM – City Hall – Room 110
I. Call to Order
II. Roll Call
III. Conflicts of Interest
IV. Adoption of Prior Meeting's Minutes
A. June 27th
V. Call for Members of Public to Speak on Agenda Items
VI. Old Applications
Consideration for approval submitted by Shanti Development to repair the windows. The
property is located in the Union Corridor Historic District at 612 Union Street.
VII. New Applications
A. Consideration for approval submitted by New York Parks, Recreation and Historic Preservation
to recommend this property for a historic nomination. The properties are located at 112 Erie
and 108 Erie Boulevard.
B. Consideration for approval submitted by Joseph Solghan to replace a window and repaint the
house. The property is located in the Stockade Historic District at 115 N Ferry Street.
C. Consideration for approval submitted by Tablecloths for Granted to install a sliding gate on the
fence. The property is located in the Union Corridor Historic District at 510 Union Street.
D. Consideration for approval submitted by Harline Andrus to repair two columns and the front facia
of the building. The property is located in the Union triangle Historic District at 40 Union
Ave.
E. Consideration for approval submitted by Peter Frisoui to repair the roof of the building. The
property is located in the Union Street Corridor Historic District at 1205 Union Street.
IX. Adjourn
Get email alerts for Schenectady
A daily email when new agendas and minutes are posted.