City Council
Regular MeetingSeat Pleasant, MD · June 28, 2022
Minutes
DocuSign Envelope ID: A53C5C4E-DEC9-4347-A268-CB558800E595
MAYOR AND CITY COUNCIL
CITY OF SEAT PLEASANT
SPECIAL SESSION
TUESDAY, JUNE 28, 2022
6:00P.M.
1. OPENING
1.1.1 Call to Order
Council Vice President Higgs called the meeting to order at 6:09p.m.
1.2 Roll Call
Present: Councilmember Monica Higgs, Councilmember Hope Love, Vice Mayor
Shireka McCarthy, Councilmember Kelly Porter, Councilmember Gerald Raynor,
Sr., Councilmember Kizzie Scott, Councilmember Gloria Sistrunk
Staff: Dashaun Lanham, City Clerk, and Stanley Mosley, Interim City Manager
2. PRESENTATION
2.1 Audio Visual Verbal Presentation-Dominic Cappelletti
Mr. Cappelletti stated that the purpose of the meeting today was show the
council with a similar design system. The school board system is native with
the technology built-in for Seat Pleasant. It will take the city some time to
obtain a comcast station, but the system does allow you to stream on
YouTube or other channel sources.
Councilmember Porter inquired on the training for the equipment and to
ensure that the training will be provided.
Mr. Cappelletti stated that the training has been built into the contract for 40
hours.
Councilmember Porter stated that he was referring to having a student come
in that need community service hours to operate the training.
Mr. Cappelletti stated that he can refer a student to contact Seat Pleasant for
operating the AV equipment.
Mr. Lapp stated that his training is hands-on and sit the person at the system
and allow them to learn the system.
Councilmember Sistrunk inquired about the delays of shipping with
obtaining equipment, and she wanted to know if the council agreed to
approve the contract do have any type of knowledge when the equipment
will be delivered.
Page 1 of 4
DocuSign Envelope ID: A53C5C4E-DEC9-4347-A268-CB558800E595
Mr. Cappelletti stated that the equipment is attainable, but the system that is
built to order it will take 4-6 weeks to build. They have the cameras in-stock,
as they are in a good position. The audio equipment will need to be verified
for availability. The biggest hurdle was what will put in the display for the
system. They had systems they ordered last November, and they did not
come in until March. The product that they picked at the time of bidding was
hundred percent available. They could possibly get the dais available but
may need to come back with other equipment. They will need to verify the
availability of the equipment, when approved by the council.
Councilmember Sistrunk inquired if the products will be available in three to
six weeks?
Mr. Cappelletti stated that he would say about twenty-six weeks for delivery,
but the max will be 2-3 months maximum.
Councilmember Love stated that she would like to know the cost for the
system, and will they maintain it?
Mr. Cappellitti stated that they built flex time in the proposal to provide on-
call services. The television that in Council Chambers are for home use and
not commercial use. The options have commercial grade displays for 24-7
operation with a five-year warranty. The tri-caster has a full replacement
within one year, and the manufacture will send you a notice and so will
WPS. They will replace the system, and someone can remote in to diagnose
the issue, and if it is defective, they will send a new one via fed-ex, and the
city will need to return the defective product.
Vice Mayor McCarthy inquired how long will it take for the install?
Mr. Cappelletii stated it will take about one week for the install and training.
He would recommend a mock meeting within that week for in-person and
hybrid.
2.2. Audio Visual Verbal Presentation-Chris Evans and Sol Aziz
Mr. Evans stated that he put together a quick power point for the council to
view.
Mr. Evans stated they completed the system for Walkerville Town Hall and
Purciville, as well as Reid Temple Church and other commercial sites.
Mr. Evans stated that they will provide a drawing of the system after the
contract is awarded. The equipment will be ordered after the drawings are
approved. The equipment is taking six months for delivery, and they will
fabricate the system in their facility. They will come to location to perform
on-site testing of the wiring. The final installation consists of calibration and
Page 2 of 4
DocuSign Envelope ID: A53C5C4E-DEC9-4347-A268-CB558800E595
testing of the system. The training will take place after the system is in place
on the system. The documents will be provided to the city to troubleshoot,
and drawings that was performed by their company.
Mr. Evans stated that the scope of the work will include video camera, the
audio system will be a DSP, will give the availability to ground the sources
and send them to a specific location in the room. The speaker will be above
the council head to provide a better balance and eliminate feed-back in the
room. The system will have wireless microphones with different presets,
which will allow the mics to be moved around the room. The video system
will be used with a tri-Caster system that will allow the capture around the
room. The feed will allow for broadcast, and other live stream options. They
have robotic cameras that will pan tilt and zoom around the room and will
allow you to move one camera while reviewing another camera.
Councilmember Porter inquired about the mobility of the system?
Mr. Evans stated that we do have a mobile system that requires an internet
connection to go remotely, and it can be streamed to the website or
YouTube.
Mr. Evans stated that a telephone system that will allow constituents to call-
in to speak during the meeting, and you can park the caller. The Closed
Caption system was requested with no subscription services, but the price
includes a subscription service.
Council Vice President inquired on the time to receive the equipment?
Mr. Evans stated that it will take 6-8 weeks and they have used loaner units
to ensure that they can bridge the gap until the equipment arrives.
Councilmember Raynor inquired on the number of people to operate the
system?
Mr. Evans stated that it will take three-four people, one on the camera, one
on the audio, one manning the telephone and one dealing with closed
captioned.
Councilmember Raynor inquired if the person will need to have an IT
background?
Mr. Evans stated that they would not be required to have IT background.
Councilmember Raynor inquired what can they do to ensure that the system
is not hacked?
Mr. Evans stated that he would recommend box caster to plug the videos and
the subscription service is recommended.
3. CITIZEN COMMENTS
Page 3 of 4
DocuSign Envelope ID: A53C5C4E-DEC9-4347-A268-CB558800E595
3.1 There was no citizens on the zoom call and no comments was submitted.
4. MEETING TOPICS
4.1. Review and Discussion of the Fiscal Year 2022-2023 Budget
The City Council requested clarification on the vacant position and the
revision to the salary for one position in Public Engagement to include the
FICA and COLA.
5. LEGISLATION
5.1. None
6. UNFINISHED BUSINESS
6.1. None
7. ANNOUNCEMENTS
7.1. Regular Work Session, Tuesday, July 5, 2022, by Zoom Video at 6:00pm,
Meeting Link details will be on the city’s website, Seat Pleasant, MD
7.2. Seat Pleasant Police Department PAL Splash Party, Saturday, July 9, 2022,
from 2:00p.m.-5:00p.m., Goodwin Park, 311 68th Pl., Seat Pleasant, MD
8. ADJOURN:
The meeting adjourned at 9:20pm
Submitted by,
Dashaun N. Lanham, CMC
City Clerk
Page 4 of 4
Get email alerts for Seat Pleasant
A daily email when new agendas and minutes are posted.