Finance Committee
Regular MeetingShaker Heights, OH · June 17, 2024
Minutes
Finance Committee
Monday, June 17, 2024, 8:00 A.M.
Virtual meeting pursuant to Chapters 113 and 115 of the Codified Ordinances
(as amended in Ordinance 22-28), and Resolution 22-29, enacted on March 22, 2022.
Members present: Council Member, Nancy Moore, Chair
Council Member, Kim Bixenstine
Council Member, Carmella Williams
Citizen Member, Martin Kolb
Citizen Member, Anthony Moore
Citizen Member, Ketan Patel
Citizen Member, Kandis Williams
Others present: Mayor, David E. Weiss
Chief Administrative Officer, Jeri E. Chaikin
Chief of Fire, Patrick Sweeney
Director of Finance, John Potts
Director of Planning, Joyce Braverman
Assistant Director of Public Works, Christian Maier
Regional Mental Health Pilot Program Coordinator, Annette Amistadi
Director of Economic Development, Laura Englehart
* * * *
APPROVAL OF THE MINUTES OF THE REGULAR MEETING MAY 20, 2024.
Chair Nancy Moore stated that the minutes of the May 20, 2024 meeting were unanimously approved.
* * * *
REQUEST TO ENTER INTO AN AGREEMENT WITH CUYAHOGA COUNTY FOR
THE ENGINEERING AND CONSTRUCTION MANAGEMENT OF THE LEE ROAD
INFRASTRUCTURE IMPROVEMENT PROJECT.
Director of Planning, Joyce Braverman requested to enter into agreement with Cuyahoga County for
the engineering and construction management of the Lee Road Infrastructure Improvement Project.
The project includes road reconfiguration and resurfacing and implementing other improvements that
were recommended in the Lee Road Action Plan.
The city has already been awarded significant grant funding toward this project, and the City is now
seeking approval to enter into this agreement with the county. This agreement would be similar to
how we implemented the Van Aken District improvements. The project is about $25 million border
to border with restriping and repaving Lee Road including signal and enhancement crosswalks,
intersection improvements, and lighting to increase pedestrian safety.
South of Van Aken the City will also be adding streetscaping and an off-road bike path and perhaps a
midblock crosswalk. The county anticipates these improvements will begin in the Spring of 2027. The
City does have significant grant funding. We have 17 million in grant funds. In addition, we have
another million from the County for engineering. At this point we anticipate our local match to be
between $4 and $6 million. We are still looking for additional grant funding with the county. The
memo does have a full budget as we know it today. We believe the engineering will cost $2.2 million.
The RFQ is out right now issued by the County with City input.
On June 6th, the Safety and Public Works Committee unanimously recommended approval and there
was discussion and comment about the City practice of awarding bids to the lowest and best bidder.
The County practice is just lowest bidder. So this does require extra practices to be put in place to
make sure we have a high quality project which our staff and Public Works staff are all ready to do.
Council member Kim Bixenstine asked what authority will the City have in terms of controlling what
the design is with this contract. Director Braverman stated that that will be spelled out in the
agreement, which is not yet written. She stated that the City will be partners on the design. The City
did review the RFQ that the County compiled and similar to the Warrensville Van Aken project, we
were at the table at every design meeting. So we are full partners on this.
Council member Bixenstine also inquired if the lights will be LED when put in. She also asked what
would separate the cars from the bikes on the proposed bike path. Director Braverman stated that if
you look at the Lee Road Action Plan, it shows a landscape strip between the bike path and the road
and that is the City’s intention but we haven't started design yet. The same thing with the lights. We
do not intend to replace the street lights as these would be more pedestrian level lights. So we have
not chosen the lights or looked into that. Although right now, most new lights are LED lights, so it's
a good possibility.
Chair Nancy Moore stated that she knew the City had looked at LED but recalled that the answer was
that the City budget had to be looked at and then prioritized and then evaluated for that. She asked
is that how the engineering would go. Director Braverman replied yes, we will go with the concept
and we'll then we'll look at the choices and make sure we can afford that. But hopefully we can afford
any type of lighting we want within reason. That would be the reason why we are amassing the grant
funds so we can do the top of the line lights. But this project is not looking at replacing the regular
overhead streetlights.
Page 2 of 11
The Finance Committee approved the request to enter into agreement with Cuyahoga County for the
engineering and construction management of the Lee Road Infrastructure Improvement Project.
* * * *
REQUEST TO APPROPRIATE A $1,000 DONATION FROM HEIGHTS CHRISTIAN
CHURCH FOR THE FIRST CALL (CRISIS ASSISTANCE AND LOCAL LINKAGE)
PROGRAM.
Regional Mental Health Pilot Program Coordinator, Annette Amistadi requested to appropriate a $1,000
donation from Heights Christian Church for the First CALL Program.
The First CALL Program expands our mental health program here in Shaker Heights into Cleveland
Heights Richmond Heights, University Heights, and South Euclid, as well as our dispatch center. This
donation will go towards purchasing bus tickets, snack items, some hygiene and other necessities that
individuals may need while we're out there working with them.
The Finance Committee approved the request to appropriate the donation from Heights Christian
Church for the First CALL Program.
* * * *
REQUEST TO AMEND THE CURRENT CONTRACT WITH METRO
CONSULTING, INC. TO PERFORM OWNER’S REPRESENTATIVE SERVICES FOR
COMPLETION OF THE SECOND PHASE OF VAN AKEN DISTRICT
DEVELOPMENT AS WELL AS PRECONSTRUCTION AND CONSTRUCTION OF
THE NEW ARCADIA MIXED-USE REDEVELOPMENT PROJECT.
Director of Economic Development, Laura Englehart requested to amend the amend the current
contract with Metro Consulting Inc. to expand the scope of the owner's representative services.
Director Englehart stated that Don Frantz is a Shaker resident and the principal of Metro Consulting,
Inc. He is currently performing owner's rep services on behalf of the city for the Van Aken District
development. He was previously engaged on the phase one mixed use product that we all call the Van
Aken District. He is now currently continuing to work on the apartments, now known as RAYE that
are being constructed and almost complete. His work has been absolutely critical in making sure that
everyone is coordinated from the City’s multiple departments to the developer, the contractor, and all
of the subcontractors as well. At this time, the City would like to amend the contract to also now
include the upcoming Arcadia Mixed Use Development Project.
Page 3 of 11
The Arcadia project is set to be constructed on the former Qua Buick. It will have approximately 140
apartments and office space on the second floor to be occupied by RDL Architects and first floor
retail. The project is slated to probably get started later this summer and we are anticipating the same
level of coordination and expertise needed.
The City is not requiring any additional funds for the this expansion of scope. Metro has been quite
efficient and Mr. Frantz has been really wonderful in making sure his time is effective and efficient.
We have approximately $55,000 remaining on his contract now. Some of that will continue to be used
for RAYE likely through the end of this calendar year, but we anticipate there should be sufficient
funds to also have him work with us and complete his services on the Arcadia project. The memo
includes a lot more detail on the types of services.
The Finance Committee approved the request to amend the current contract with Metro Consulting
Inc. to expand the scope of the owner's representative services.
* * * *
REQUEST TO ENTER INTO A SERVICE AGREEMENT WITH THE CITY OF
UNIVERSITY HEIGHTS TO PROVIDE FIRE DEPARTMENT VEHICLE AND
APPARATUS MECHANIC SERVICES.
Chief of Fire Patrick Sweeney requested to enter into a service agreement with the City of University
Heights to provide Fire Department vehicle and apparatus mechanic services.
Chief of Fire Patrick Sweeney explained that the City was looking to collaborate with University Heights
on a shared service agreement for mechanical services for their fire service fleet. Historically, the Fire
Department has had a mechanic on staff here dating back many years. Right now our current mechanic,
has been here for a long time and he retired this past March. The department wanted to change the
position from a part-time to a full-time status. During discussions with the Administration, we talked
about how we could potentially offset the cost of that transition through a collaborative initiative with a
partnering agency. We thought University Heights would be a good agency to do that with. We already
have worked with them very closely.
Mr. Sweeney went on to say that the size of their fleet would not hurt the initiative too much and would
create a good balance. These types of agreements with Fire Departments are not new to us. Dating back
many we have developed partnerships with the surrounding communities. Years ago, we provided fire
protection to Beachwood until they could build their city out and develop their own full-time department.
We have also collaborated on joint dispatching services.
Mr. Sweeney stated that he spoke to the University Heights Fire Chief to see if they were interested in
this. The discussions centered around efficiency to their department. It also helps them keep their fleet
in service as much as possible instead of outsourcing this type of repair work. They were excited about
Page 4 of 11
it so we began having more discussions with their Mayor, Council, and Safety Committees. We developed
a service agreement and presented it to University Heights.
We did a financial analysis and knew that we were going to be short by about $60,000 moving from a
part-time to full-time position and we wanted to gauge what type of revenue we could collect from this
type of an agreement. Just doing the preventative maintenance needs for their fleet we could realize about
$16,000 in revenue. More often than not though, there is always repairs that have to happen as there are
breakdowns. We also did a rough analysis of how many hours we might generate as billable hours for
these emergency repairs. We calculated anywhere from $20,000 to $40,000 a year. So based on this
analysis we believe we can generate anywhere between $35,000 to $56,000 a year for this work.
This was presented to University Heights. They took it through their Council and it passed on May 20th.
We took it to our Safety and Public Works on June 6th and received unanimous support.
Chair Moore inquired as to what University Heights is doing right now at the moment. Chief Sweeney
explained that they send all of their equipment and vehicles out for repair and it can take a long time for
them to get them back. The rates that they are charged by the outside repair agency are right at around
$198 an hour. We are looking to charge them $100 an hour. We will be doing all of this repairs and
preventative maintenance work at Fire Station Two. Our equipment would be prioritized if we had some
equipment that was down. We also might be doing some of the work over in their station to try to keep
their equipment in service while repairs are happening.
The Finance Committee approved the request to enter into a service agreement with the City of
University Heights to provide Fire Department vehicle and apparatus mechanic services.
* * * *
REQUEST TO APPLY FOR AND ACCEPT A $238,750 GRANT FROM THE
NORTHEAST OHIO REGIONAL SEWER DISTRICT MEMBER COMMUNITY
INFRASTRUCTURE PROGRAM FOR THE WINSLOW ROAD & AVALON ROAD
SEWER STUDY & DESIGN PROJECT, WITH A CITY MATCH OF $238,750, FOR A
TOTAL PROJECT COST OF $477,500.
Assistant Director of Public Works, Christian Maier requested to apply for and accept a $238,750 grant
from the Northeast Ohio Regional Sewer District (NEORSD) Member Community Infrastructure
Program for the Winslow Road & Avalon Road Sewer Study & Design Project, with a City match of
$238,750.
Mr. Maier explained that in in 2022, the NEORSD notified public works of two potential illicit
discharges coming from 17200 Van Aken Boulevard and 3440 Avalon. In conjunction with the
district and our consultants, Public Works performed a variety of different investigations and tests to
determine whether or not there was an illicit connection. What the City found was that the 17200
Page 5 of 11
Van Aken apartment buildings were actually tied to an undocumented, unidentified sanitary system
that we did not have any records of. The flow that is generated from those apartments is actually
being conveyed to a combined sewer overflow that is at the corner of Avalon and Winslow. With
our other investigations for 3440 Avalon, that building is also connected to this combined sewer that
runs from the east to the west along Winslow. When we kept on digging a little bit deeper to see
what was happening within that intersection, it appears that the flow that is coming from Winslow
to the east and flowing towards the west is also connected.
When we look at the maps this CSO is actually tributary to a regulator that is in Cleveland called S
45. It is owned and operated by NEORSD. Over the years, there have been multiple different
modifications done to this regulator by the NEORSD to minimize the amount of overflows to the
environment. NEORSD came out with an MCIP Grant in Spring of 2024 and we thought that this
would be a good candidate for them. On May 17th, Public Works submitted a grant application for
the study and design to eliminate this connection that exists within that Avalon Winslow
intersection. We would also want to figure out how to take these apartments that have this
connection to the CSO and take them offline and actually get that sanitary flow into the sanitary
system.
The general scope of work for the project is a feasibility study and design. This is not for
construction. And the general scope of work is going to be expanding the area study flow
monitoring, dye testing, and ultimately with the idea that we would have a construction documents
that we could go out to bid. The idea is that once we get through the study, and then we get through
the design, that we would apply again for the MCIP Grant in the following year. When we
developed the cost estimate for the study and the design, in conjunction with GPD, our city
engineer, we came up with an estimate of $477,500. In order to maximize the amount of points for
the grant we decided that a 50 50 split would be give us the most competitive advantage, which
would make the city's contribution $238,750. Provided that we're successful in obtaining the grant,
Public Works would be requesting the funding for the project from Council in our 2025 sewer
capital budget.
This was presented to the Safety and Public Works Committee on June 6th and was passed
unanimously. Council member Moore asked whether or not there were other SSOs that were
identified after the storm event in 2014. We did a pretty extensive look at our system. And at this
point, there does not appear to be any other SSOs that we are aware of. And it should just be noted
that the configuration that exists within Winslow and Avalon is not considered an SSO. It is more
of a illicit discharge detection and elimination, or IDDE. And we had a general conversation about
the differences between SSO’s, CSO’s and IDDE’s. Citizen member Salmon inquired whether or
not there are similar configurations that were found at Avalon and Winslow along Van Aken and
again, to the best of our knowledge, we do not believe that there are. Council Member Hren asked
if an RFP for this service would be needed and from an engineering firm. We will be distributing
RFPs to different consulting firms to help us go through this process.
Page 6 of 11
Citizen member Ketan Patel inquired as to whether this was illegal connection and who has the
ultimate responsibility for the illegal connection. If at the end of the day, would this be property
owner's responsibility, and if so, would the city have any ability to seek, if it chooses to do so,
reimbursement in any way from the landowner. Mr. Maier explained that if a property owner has an
illicit connection to a pipe that it should not be connected to, then yes the City can go after that
property owner to make sure that that they have to get rid of the configuration. What's unique about
this Winslow Avalon is that we do have an undocumented sanitary main that we never knew about
and does not show up in our records. It is within the right of way. So my suspicion is that the
property owners connected to this pipe were thinking that they were doing the right thing. The fact
that it is connected to a CSO leads us to believe that this connection was made before 1972 which is
when the Clean Water Act passed. So at that time, they did not think that they were doing anything
wrong. So we do not think in this particular case that we could go after the property owner to say
that they have an illicit connection. We need to rectify this in contrast to another property that, had
this connection and maybe had done that illegally.
Mr. Patel stated that perhaps this is not illegal, inappropriately or improperly, but there's some
question as to whether or not the undocumented nature of this connection is not their fault at all.
Mr. Maier stated that was correct.
Chair Moore asked if the ownership of this building had changed multiple times. So she asked if
there was an issue that if this was done illegally, even unbeknownst to the City prior to the Clean
Water Act, can future owners be held responsible for an act that occurred 50 years before. Council
Member Bixenstine stated that it would depend on the contract about successor liability.
The Finance Committee approved the request to apply for and accept a $238,750 grant from the
Northeast Ohio Regional Sewer District (NEORSD) Member Community Infrastructure Program for
the Winslow Road & Avalon Road Sewer Study & Design Project, with a City match of $238,750.
* * * *
REQUEST TO ACCEPT FUNDING FROM THE U.S. ENVIRONMENTAL
PROTECTION AGENCY (EPA) IN THE AMOUNT OF $1,600,000 FOR THE
LYNNFIELD / LOMOND SSO CONSTRUCTION PROJECT, WITH A CITY MATCH
OF $400,000, FOR A TOTAL OF $2,000,000 TOWARD THE $6.6 MILLION PROJECT.
Assistant Director of Public Works, Christian Maier requested to accept finding from the U.S. EPA in
the amount of $1,600,000 for the Lynnfield / Lomond SSO Construction Project, with a City match of
$400,000.
Page 7 of 11
Assistant Director of Public Works Christian Maier explained that since 2020 Public Works has been
planning and coordinating the design for the Lynnfield / Lomond SSO project. The general scope
of the work is to eliminate that SSO by increasing the capacity of the sewers within that sewer shed.
The limits of that project are outlined in the memo. In addition to the sewer work, we are replacing
a portion of the water line along Sherrington and in the other parts of the scope of the work for that
project we will be resurfacing, restoration and the construction of different control structures to
make sure that we are causing additional problems within that sewer shed. The duration of the
project is anticipated to be 18 months, and the probable cost of construction is $6.6 million. Public
Works has been successful in securing additional funds. One of them is from the Sewer district for
the same grant that we just discussed.
The City did get a $2 million zero interest loan from DOPWIC, the District One Public Works
Integrating Committee. We have $1.6 million from the US EPA and $670,000 from Cleveland Water
to help replace or help offset the cost for the water line on Sherington. $2 million of our City capital
fund was appropriated to meet our match requirements for the different grants. With the support of
Congresswoman Shontel Brown and Senator Sherrod Brown, the City applied for federal funding in
the Spring of 2022. It was appropriated in the 2023 Consolidated Appropriations Act, and we found
out that the U.S. EPA would be administering that grant. When we received that notification it came
with a number of documents that needed to be submitted to the EPA.
It was a cumbersome process to complete these document, to the point that we needed to get our
City engineer involved to help with the environmental review and with submitting this
documentation. Ultimately we did get acceptance and we are now authorized to start drawing down
funds. The grant amount, as stated before, is $1.6 million with our contribution being $400,000.
Our request was presented to the Safety and Public Works on June 6th, and it was passed
unanimously. There was a general discussion with Council Member Moore about the length of time
it took to secure the funding. The EPA has provided the necessary documents to use funding in an
amount not to exceed $1.6 million for this project. Of note, unlike other agreements, the EPA does
not require any signatures for this grant so we can start drawing down funds as soon as we get into
construction.
The Finance Committee approved the request to accept the grant from the U.S. EPA in the amount of
$1,600,000 for the Lynnfield / Lomond SSO Construction Project, with a City match of $400,000.
* * * *
REQUEST TO ENTER INTO AN AGREEMENT WITH THE MANNIK SMITH
GROUP FOR ENGINEERING SERVICES RELATED TO SERVICE YARD
IMPROVEMENTS IN THE AMOUNT OF $44,321.
Page 8 of 11
Assistant Director of Public Works, Christian Maier requested to enter into an agreement with the
Mannik Smith Group for engineering services related to service yard improvements in the amount of
$44,321.
Assistant Director of Public Works, Christian Maier stated that the southeast corner of the Public
Works facility is used throughout the year to stockpile different materials and stage equipment. The
area itself is 7,500 square yards. The space is essential for overall operations but because of poor
drainage and the amount of heavy truck traffic it is in need of extensive repairs. Public Works did
solicit RFPs from five different consulting firms for this service. The general scope of the work is to
include geotechnical investigations surveying the development construction documents, and also
limited construction administration services.
On April 26th Public Works received four proposals. We evaluated those using a QBS system,
meaning that we looked at the proposals based on the merits itself and the fee did not factor into
our decision making process. The criteria that we use is outlined in the memo. We are looking at
technical expertise, project team experience, and the overall team or firm's project experience.
Based on that criteria, the Mannik Smith Group was collectively the one that we thought could do
the job. There is a table in the memo that outline the scoring and the fee. They have done similar
types of projects throughout Northeast Ohio and they are located in Shaker. And so if need be, they
can come during construction to answer any questions that may arise.
When you look at the table of the different consultants that provided a proposal was Alpha
Landscaping and Design and it did not seem like they had a complete understanding of what the
project was. When we were looking at the different proposals, it was clear that Mannik provided the
most detail concerning their DEI Program. They have an internal DEI Advisory Board and have
contracted with the Next Pivot Point, a nationally recognized DEI consultant to manage and guide
best practices.
There was funding that was appropriated in Ordinance 23-122 in the amount of $300,000 and
Public Works will be requesting additional funds in late 2024 after we've developed the probable
cost of construction. We have that $44,000 that will go to design and then we will figure out what
we think the overall construction cost And we will make our request this fall for the balance of that
work.
This was presented to the Safety and Public Works Committee on June 6th. Citizen member Hren
asked if additional funds were going to be requested for next year and we replied yes. Our request is
going to be based on the amount of money that we have remaining and what the construction costs
are estimated to be. He also asked if the construction would be performed by Public Works. We
stated that it will not be because it is too specialized. He also asked if there is a DEI commitment
within the proposal and we stated that at this point we do not dictate whether or not we need a
certain percentage of the contract to be an MBE or SBE similar to projects with Federal funds.
However we do want to see what kind of support they have for the their DEI Program.
Page 9 of 11
Citizen Member Patel inquired as to what the current issue is with that corner of the service yard
and what exactly the City was looking to do in that corner. Mr. Maier explained that the area itself
having poor drainage and heavy truck volume, there is just a lot of rutting. There are just not
enough good surfaces in the yard. We have the stockpile material that we use our equipment to
scoop up. It is not an optimal way to do it because then we are co-mingling between the material we
are trying to pick up versus the dirt that is on the ground. In various parts of the year, depending on
the amount of rainfall that we have, the soil gets saturated to the point that it is unsafe at times for
our trucks to be coming back there. As part of our road program, we will use and throw our asphalt
grindings into temporary bridges to make it a more uniform driving surface. We are thinking about
doing to correct this is after we get the geotech reports we are going to cement stabilize that soil to
minimize the amount of rutting. We will ask the engineers to give us advice on whether or not we
want to use a combination of concrete asphalt so that we have a more durable surface to make sure
that we're not coming back in five years because we have the same issue. We want to create a long-
term solution to make sure that this is not going to continue to be a problem for us.
The Finance Committee approved the request to enter into an agreement with the Mannik Smith Group
for engineering services related to service yard improvements in the amount of $44,321.
* * * *
2025 TAX BUDGET FOR THE FISCAL YEAR BEGINNING JANUARY 1, 2025.
Director of Finance John Potts presented the 2025 Tax Budget for the Fiscal year beginning January
1, 2025.
The Ohio Revised Code requires that Ohio city councils adopt a tax budget for the next fiscal year
no later than July 15th of the current year and that the adopted tax budget be submitted to the
County Budget Commission no later than July 20th. The tax budget represents the City’s first
estimate of its anticipated financial resources and needs for the coming fiscal year. The primary
purpose of the tax budget is to demonstrate the City’s need to levy property taxes for the coming
fiscal year (2025).
The Ohio Revised Code Section 5705.281 allows county budget commissions, if desired, to waive
the adoption of the tax budget requirement. While not waiving the requirement completely, the
Cuyahoga County Budget Commission implemented the prescribed alternate tax budget format in
order to gather basic fiscal data from County governments while streamlining the process. The City
of Shaker Heights’ 2025 Tax Budget has been prepared in the prescribed format and it is attached.
The City of Shaker Heights has been submitting this alternate format since 2003 when the new
requirement was implemented in Cuyahoga County. The alternate format includes four separate
schedules and the approved resolution adopting the 2025 tax budget.
Page 10 of 11
Revised Code also stipulates that the tax budget be made available for public inspection. Therefore,
a copy of the proposed 2025 Tax Budget is available in the City’s Finance Department prior to
adoption and submission to the Budget Commission. In accordance with ORC 5705.30, a public
hearing is not required prior to the City Council’s adoption of the tax budget. However, the City of
Shaker Heights in previous years has held such hearings prior to City Council’s adoption.
Maintaining the public hearing prior to adoption will enable the public to comment if desired. In
addition, an advertisement of the 2025 Tax Budget public hearing was published in the Sun
Newspaper on June 13, 2024 and again on June 20, 2024. The published notification satisfies the ten
day advance notice required by Revised Code.
It is recommended that the resolution adopting the 2025 Tax Budget be approved by City Council
on June 24, 2024 and subsequent transmittal to the Cuyahoga County Budget Commission.
Although not required by the Ohio Revised Code per Section 5705.30, it is also recommended that a
public hearing be held on June 24, 2024 prior to City Council’s consideration of the 2025 Tax
Budget to continue the City of Shaker Heights’ open government philosophy.
Council Member Kim Bixenstine inquired about the new property tax assessments that are
forthcoming and how that might impact this tax budget. Mr. Potts explained that it is likely the City
will see an increase in property tax receipts due to the sexennial adjustment but we will not know
those amounts until next year and the tax budget is prepared based on the City’s assessed valuation
as of January 2024. Once we know our City’s new assessed value from the sexennial work we will
have that information after the next year and that amount will be used to calculate the 2026 Tax
Budget.
The Finance Committee approved the 2025 Tax Budget for the Fiscal year beginning January 1,
2025.
* * * *
There being no further business, the meeting was adjourned at 8:50 a.m. The next meeting will be July
15, 2024.
* * * *
Respectfully submitted,
________________________________
John J. Potts, CPA
Director of Finance
Finance Committee
Page 11 of 11