Field Committee
Regular MeetingShawano, WI · May 29, 2025
Agenda
CITY OF SHAWANO FIELD COMMITTEE
AGENDA
THURSDAY, MAY 29, 2025 8:30 AM
SHAWANO CITY HALL, 127 S. SAWYER STREET, SHAWANO, WI
https://us02web.zoom.us/j/83207515599?pwd=IppIX16PSpwzBUEX6HSVNqnqgUybny.1
MEETING ID: 832 0751 5599
PASSCODE: 965496
1) CALL TO ORDER
2) PLEDGE OF ALLEGIANCE
3) ROLL CALL OF MEMBERS
4) APPROVAL OF AGENDA
5) APPROVAL OF PRIOR FIELD COMMITTEE MEETING MINUTES
6) CORRESPONDENCE
7) PUBLIC COMMENT
If anyone is present and wishes to speak during public comment, they shall state their name
and address for the record. Public comment participants shall be limited to 3 minutes of time
to speak/present. Please note that Committee/Commission members do not typically engage
with participants during this portion of the meeting.
8) ELECTION OF OFFICERS
9) REPORTS
A. Engineer's Report
B. Public Works Director's Report
10) CONSIDER/APPROVE ACTION ITEMS
A. Submission of the 2026 Community Development Block Grant - Public
Facilities (CDBG-PF) application
B. Completion and Submission of the 2024 Compliance Maintenance Annual
Page 1 of 31
Report (CMAR)
C. Second driveway request at 733 W. 1st Street
11) DISCUSSION REGARDING THE 5-YEAR CAPITAL IMPROVEMENT PLAN
(CIP) FOR PUBLIC WORKS
12) FUTURE AGENDA ITEMS
At this time, Committee/Commission members may request to have items placed on the next
meeting's agenda for discussion and/or action.
13) ADJOURNMENT
* NEXT MEETING DATE: JUNE 24, 2025 @ 8:30 AM
DISABLED ACCESSIBLE (contact City Hall at 715-526-6138)
It is possible that members of and possibly a quorum of members of other governmental bodies of the municipality
may be in attendance at the above-stated meeting to gather information; no action will be taken by any governmental
body at the above-stated meeting other than the governmental body specifically referred to above in this notice.
OPEN MEETING LAW COMPLIANCE
This agenda was posted in 3 public places (City Hall, Premier Community Bank and the Shawano Library) as well
as sent to local news media. Therefore, all laws regarding posting of agendas for open meeting law compliance have
been met.
Page 2 of 31
FIELD COMMITTEE MINUTES
April 29, 2025 8:30 AM Shawano City Hall, 127 S. Sawyer Street, Shawano, WI
CALL TO ORDER
• The meeting was called to order at 8:30 am by Alderperson Hoeffs.
PLEDGE OF ALLEGIANCE
ROLL CALL OF MEMBERS
• Committee Members Present: Mayor Milavitz and Alderperson John Hoeffs, Mark Braun, Joe Cicero, & Aaron
Wallrich.
• Staff Present: Administrator Eddie Sheppard, Public Works Director Mike Mahloch, & Deputy Clerk Leah
Pierquet.
APPROVAL OF AGENDA
• A motion was made by Wallrich, seconded by Cicero, to approve the agenda. Motion carried by voice
vote 4-0.
APPROVAL OF PRIOR FIELD COMMITTEE MEETING MINUTES
• A motion was made by Braun, seconded by Wallrich, to approve the Field Committee minutes. Motion
carried by voice vote 4-0.
CORRESPONDENCE
• None.
PUBLIC COMMENT
• None.
CONSIDER/APPROVE ACTION ITEMS
• Installation of user-activated crosswalk at Airport Dr. on the Mountain Bay Trail.
Shawano Pathways has proposed a crosswalk signal on Airport Drive at the Mountain Bay Trail.
Shawano Pathways is willing to pay for the signals, and the City of Shawano is willing to take on the
installation cost of the poles.
The three user-activated crosswalks within the city have been very well received.
Airport Drive is a county road.
Mike Mahloch met with Grant Bystol from the County Highway Department and discussed plans for
the installation. Bystol agrees that this would be a good addition to the crosswalk.
Shawano Pathways has agreed to pay the cost of the user-activated crosswalk lights and materials up to
$20,000. The total cost of light pole assembly is $20,760.10. The additional $760.10 for installing the
poles will come from DPW CIP savings.
Wallrich asked what the cost of installation would be. Mahloch responded that the price is minimal, public
works will have to pour the concrete into the tubes, and build the rebar. Cicero asked about the maintenance of
the other poles. Mahloch responded that there have been no maintenance costs for the other poles at this point.
The signals are run off of self-contained solar power batteries, and the batteries should last about 10 years.
Wallrich asked if Pathways could check these a few times a year and give the Field Committee a report.
Mahloch responded that it was something he would look into.
Page 1 of 2
Page 3 of 31
Cicero asked what the legal requirements are. Administrator Sheppard stated that this is an additional safety
feature and is not legally required.
Mayor Milavitz asked if the one on Waukechon could be user-activated? Administrator Sheppard responded
No, it is not.
Mahloch stated that SMU is not going to charge Public Works for helping install the signal; they are donating
their time for this project.
Wallrich stated that Pathways came to the Field Committee years ago and laid out their plan, and they have
executed that plan over the years.
Mahloch stated there is a chirp sound for the visually impaired that will lead them to the user-activated button.
Motion by Braun to approve the installation of user-activated crosswalk at Airport Dr. on the Mountain
Bay Trail, seconded by Wallrich. Motion approved by voice vote 4-0.
FUTURE AGENDA ITEMS
• Alderperson Hoeffs asked if public works could crack-seal the Mountain Bay Trail from the Depot to American
Marine's storage shed on Waukechon.
Administrator Sheppard was asked to give a wheel tax review to the Field Committee. Sheppard is working on
a quarterly report to present at the next meeting.
Wallrich asked if the committee could go over the plan for roads for the next 5 years. Administrator Sheppard
stated that staff is working on the CIP budget and can have that information for the committee in a future
meeting.
The railroad tracks on Center Street are missing wood, making it hard to get across. Administrator Sheppard
will check with Matt Pleshek on this topic.
ADJOURNMENT
• Motion to adjourn made by Braun, seconded by Wallrich. Motion carried by voice vote 4-0. Meeting
adjourned at 8:48 AM.
Respectfully submitted,
Leah Pierquet, Deputy Clerk
NEXT MEETING DATE: MAY 27, 2025
Page 2 of 2
Page 4 of 31
ENGINEER’S PROGRESS REPORT FOR MAY 2025
The 2025 HMA Street Paving construction contract with NEA, Inc. is 80% completed with new HMA
pavement on Lieg Avenue and final paving scheduled this week for McDonald Road, Balsam Court and the
City Parking Lot behind DOTCOM Branding.
Asphalt Seal & Repair has completed their crack filling work for 2025 on Beauprey Rd, Engel Dr, Birch Hill
Ln, Prospect St, Sunrise Ln, Hillside Ln, Ashberry Ct, Cleveland St and Lieg Ave.
The sanitary sewer main extension plans have been completed and submitted to the WDNR for approval
on Engel & Airport Dr for the proposed Shawano Family Dental development.
The Pine View Estates IV plat has been developed along with street and utility plans for their next phase of
condo/residential development east off from Timber Trail and Piccadilliy Circle by Davel Engineering. A
developers’ agreement will be considered with the private developer HNKZ, Inc for construction of the first
phase of the plat.
A change management request for additional funding on the W. Green Bay Street project was accepted by
WisDOT. The scope of the project was slightly changed with elimination of the block between the Wolf
River bridge and Bartlett Street. In addition, the City has agreed to up their cost sharing of the project from
20% to 30%. The design and R/W acquisition will continue with a scheduled 2027 construction of the
proposed project!
Jimmy Johns sandwich shop development is under construction with utility connections completed into E
Green Bay Street. A full pavement patch will be completed at the end of their construction this summer.
A Transportation Economic Assistance (TEA) grant application project is being considered for repaving of E
Richmond Street (Waukechon to Rusch) and Industrial Drive (RR Tracks to E Richmond) for 2026. The
project will have to be done in partnership with Charter Aarrowcast for meeting the job retention eligibility
requirement. If awarded, the grant will award 50% funding of the project not to exceed 1 million dollars.
WisDOT along with JT Engineering held public comment meetings for the Main Street (STH 22, 47 & 55)
pavement replacement project from Zingler Ave to the Shawano Channel Bridge. WisDOT construction is
scheduled for 2028.
Safe Step LLC will be contracted this coming construction season for sawing concrete sidewalk trip hazards
in the downtown business district pedestrian walking areas.
Project development for the 2026 Community Development Block Grant – Public Facilities (CDBG‐PF)
application has commenced with MSA, Inc. A proposal with MSA, Inc. for the required income survey and
project application preparation will be considered for approval at this May 2025 Field Committee meeting.
Project location, narrative scope and estimates are provided for consideration. The $1 million grant if
awarded would be to reconstruct 7 blocks in District #4 of the City of Shawano.
Additional 5‐year CIP planning is ongoing by estimating and considering new grant applications to further
solve funding issues for care (replacement) of the City’s failed infrastructure.
Page 5 of 31
Page 6 of 31
Page 7 of 31
Page 8 of 31
Page 9 of 31
Page 10 of 31
Page 11 of 31
Page 12 of 31
Page 13 of 31
Page 14 of 31
Page 15 of 31
Page 16 of 31
Page 17 of 31
Field Committee Action Item
Meeting Date: 5/27/2024
Submitted By: Michael Mahloch, Public Works Director
Agenda Category: Action Item
Title: Compliance Maintenance Annual Report (CMAR)
Subject:
Compliance Maintenance Annual Report (CMAR)
Background:
Each year the city is required to complete and file the Compliance Maintenance Annual
Report in which the city is assessed a grade based on the performance of the city’s
financial management and collection system performance.
The report rates the utilities’ ability to meet the service demands of the city now and in
the future.
Financial /Sustainability Considerations:
A major component of the report is the status of the utilities’ equipment replacement
fund.
The city maintains this fund for future equipment needs like the Vactor, TV System or
other lift station modifications, etc.
Policy Considerations:
Completion of the CMAR report and governing body resolution approving the report is
required for submission to the DNR.
Recommendation:
Review and recommend approval to the finance committee.
Page 18 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Financial Management
1. Provider of Financial Information
Name:
Michael Mahloch
Telephone:
(715) 526-3512 (XXX) XXX-XXXX
E-Mail Address
(optional):
mmahloch@cityofshawano.com
2. Treatment Works Operating Revenues
2.1 Are User Charges or other revenues sufficient to cover O&M expenses for your wastewater
treatment plant AND/OR collection system ?
Yes (0 points)
No (40 points)
If No, please explain:
2.2 When was the User Charge System or other revenue source(s) last reviewed and/or revised?
Year:
2023 0
0-2 years ago (0 points)
3 or more years ago (20 points)
N/A (private facility)
2.3 Did you have a special account (e.g., CWFP required segregated Replacement Fund, etc.) or
financial resources available for repairing or replacing equipment for your wastewater treatment
plant and/or collection system?
Yes (0 points)
No (40 points)
REPLACEMENT FUNDS [PUBLIC MUNICIPAL FACILITIES SHALL COMPLETE QUESTION 3]
3. Equipment Replacement Funds
3.1 When was the Equipment Replacement Fund last reviewed and/or revised?
Year:
2024
1-2 years ago (0 points)
3 or more years ago (20 points)
N/A
If N/A, please explain:
3.2 Equipment Replacement Fund Activity
3.2.1 Ending Balance Reported on Last Year's CMAR $ 130,525.40
3.2.2 Adjustments - if necessary (e.g. earned interest, $ 0.00
audit correction, withdrawal of excess funds, increase
making up previous shortfall, etc.)
3.2.3 Adjusted January 1st Beginning Balance $ 130,525.40
3.2.4 Additions to Fund (e.g. portion of User Fee,
earned interest, etc.) + $ 0.00
Page 19 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
3.2.5 Subtractions from Fund (e.g., equipment
replacement, major repairs - use description box
3.2.6.1 below*) - $ 0.00
3.2.6 Ending Balance as of December 31st for CMAR
Reporting Year $ 130,525.40
All Sources: This ending balance should include all
Equipment Replacement Funds whether held in a
bank account(s), certificate(s) of deposit, etc.
3.2.6.1 Indicate adjustments, equipment purchases, and/or major repairs from 3.2.5 above.
None
3.3 What amount should be in your Replacement Fund? $ 130,525.40 0
Please note: If you had a CWFP loan, this amount was originally based on the Financial
Assistance Agreement (FAA) and should be regularly updated as needed. Further calculation
instructions and an example can be found by clicking the SectionInstructions link under Info
header in the left-side menu.
3.3.1 Is the December 31 Ending Balance in your Replacement Fund above, (#3.2.6) equal to, or
greater than the amount that should be in it (#3.3)?
Yes
No
If No, please explain.
4. Future Planning
4.1 During the next ten years, will you be involved in formal planning for upgrading, rehabilitating,
or new construction of your treatment facility or collection system?
Yes - If Yes, please provide major project information, if not already listed below.
No
Project Project Description Estimated Approximate
# Cost Construction
Year
1 Up grade of televising equipment. $195,000 2025
2 Backup generator at Aarrow lift station $54,000 2026
5. Financial Management General Comments
ENERGY EFFICIENCY AND USE
6. Collection System
6.1 Energy Usage
6.1.1 Enter the monthly energy usage from the different energy sources:
COLLECTION SYSTEM PUMPAGE: Total Power Consumed
Number of Municipally Owned Pump/Lift Stations: 8
Page 20 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Electricity Consumed Natural Gas Consumed
(kWh) (therms)
January 5,724
February 4,939
March 5,198
April 5,574
May 5,388
June 4,982
July 5,110
August 4,854
September 4,375
October 4,550
November 5,485
December 5,505
Total 61,684 0
Average 5,140 0
6.1.2 Comments:
6.2 Energy Related Processes and Equipment
6.2.1 Indicate equipment and practices utilized at your pump/lift stations (Check all that apply):
Comminution or Screening
Extended Shaft Pumps
Flow Metering and Recording
Pneumatic Pumping
SCADA System
Self-Priming Pumps
Submersible Pumps
Variable Speed Drives
Other:
6.2.2 Comments:
6.3 Has an Energy Study been performed for your pump/lift stations?
No
Yes
Year:
By Whom:
Describe and Comment:
Page 21 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
6.4 Future Energy Related Equipment
6.4.1 What energy efficient equipment or practices do you have planned for the future for your
pump/lift stations?
Install VFD drives @ lift stations
Upgrade wiring at our 5th St. lift station.
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Page 22 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Sanitary Sewer Collection Systems
1. Capacity, Management, Operation, and Maintenance (CMOM) Program
1.1 Do you have a CMOM program that is being implemented?
Yes
No
If No, explain:
1.2 Do you have a CMOM program that contains all the applicable components and items
according to Wisc. Adm Code NR 210.23 (4)?
Yes
No (30 points)
N/A
If No or N/A, explain:
1.3 Does your CMOM program contain the following components and items? (check the
components and items that apply)
Goals [NR 210.23 (4)(a)]
Describe the major goals you had for your collection system last year:
Continue to replace sanitary mains and laterals with utility projects.
Televise a third of our sanitary system and make necessary repairs.
Develop replacement projects based off of televising reports.
Did you accomplish them?
Yes
No
If No, explain:
Organization [NR 210.23 (4) (b)]
Does this chapter of your CMOM include:
Organizational structure and positions (eg. organizational chart and position descriptions)
Internal and external lines of communication responsibilities
Person(s) responsible for reporting overflow events to the department and the public
Legal Authority [NR 210.23 (4) (c)]
What is the legally binding document that regulates the use of your sewer system?
City Municipal Code 6.03.2
If you have a Sewer Use Ordinance or other similar document, when was it last reviewed and
revised? (MM/DD/YYYY) 2016-05-11
Does your sewer use ordinance or other legally binding document address the following:
Private property inflow and infiltration
New sewer and building sewer design, construction, installation, testing and inspection
Rehabilitated sewer and lift station installation, testing and inspection
Sewage flows satellite system and large private users are monitored and controlled, as
necessary
Fat, oil and grease control
Enforcement procedures for sewer use non-compliance
Operation and Maintenance [NR 210.23 (4) (d)]
Does your operation and maintenance program and equipment include the following:
Equipment and replacement part inventories
Up-to-date sewer system map
Page 23 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
A management system (computer database and/or file system) for collection system
information for O&M activities, investigation and rehabilitation
A description of routine operation and maintenance activities (see question 2 below)
Capacity assessment program
Basement back assessment and correction
Regular O&M training
Design and Performance Provisions [NR 210.23 (4) (e)]
What standards and procedures are established for the design, construction, and inspection of
the sewer collection system, including building sewers and interceptor sewers on private
property?
State Plumbing Code, DNR NR 110 Standards and/or local Municipal Code Requirements
Construction, Inspection, and Testing
Others:
Overflow Emergency Response Plan [NR 210.23 (4) (f)]
Does your emergency response capability include: 0
Responsible personnel communication procedures
Response order, timing and clean-up
Public notification protocols
Training
Emergency operation protocols and implementation procedures
Annual Self-Auditing of your CMOM Program [NR 210.23 (5)]
Special Studies Last Year (check only those that apply):
Infiltration/Inflow (I/I) Analysis
Sewer System Evaluation Survey (SSES)
Sewer Evaluation and Capacity Managment Plan (SECAP)
Lift Station Evaluation Report
Others:
2. Operation and Maintenance
2.1 Did your sanitary sewer collection system maintenance program include the following
maintenance activities? Complete all that apply and indicate the amount maintained.
Cleaning 26.5 % of system/year
Root removal 2.6 % of system/year
Flow monitoring 100 % of system/year
Smoke testing 0 % of system/year
Sewer line
televising 28 % of system/year
Manhole
inspections 15 % of system/year
Lift station O&M 8 # per L.S./year
Manhole
rehabilitation 1 % of manholes rehabbed
Mainline
rehabilitation 1 % of sewer lines rehabbed
Private sewer
inspections 1 % of system/year
Page 24 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Private sewer I/I
removal 1 % of private services
River or water
crossings 1 % of pipe crossings evaluated or maintained
Please include additional comments about your sanitary sewer collection system below:
3. Performance Indicators
3.1 Provide the following collection system and flow information for the past year.
38.15 Total actual amount of precipitation last year in inches
33.51 Annual average precipitation (for your location)
52.76 Miles of sanitary sewer
8 Number of lift stations
0 Number of lift station failures
0 Number of sewer pipe failures
1 Number of basement backup occurrences
8 Number of complaints
.749 Average daily flow in MGD (if available)
.975 Peak monthly flow in MGD (if available)
Peak hourly flow in MGD (if available)
3.2 Performance ratios for the past year:
0.00 Lift station failures (failures/year)
0.00 Sewer pipe failures (pipe failures/sewer mile/yr)
0.00 Sanitary sewer overflows (number/sewer mile/yr)
0.02 Basement backups (number/sewer mile)
0.15 Complaints (number/sewer mile)
1.3 Peaking factor ratio (Peak Monthly:Annual Daily Avg)
0.0 Peaking factor ratio (Peak Hourly:Annual Daily Avg)
4. Overflows
LIST OF SANITARY SEWER (SSO) AND TREATMENT FACILITY (TFO) OVERFLOWS REPORTED **
Date Location Cause Estimated
Volume
None reported
** If there were any SSOs or TFOs that are not listed above, please contact the DNR and stop work
on this section until corrected.
5. Infiltration / Inflow (I/I)
5.1 Was infiltration/inflow (I/I) significant in your community last year?
Yes
No
If Yes, please describe:
5.2 Has infiltration/inflow and resultant high flows affected performance or created problems in
your collection system, lift stations, or treatment plant at any time in the past year?
Yes
Page 25 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
No
If Yes, please describe:
5.3 Explain any infiltration/inflow (I/I) changes this year from previous years:
In 2024 with televising, we were able to identify areas with I/I and fix the leaks.
5.4 What is being done to address infiltration/inflow in your collection system?
Through our annual televising program, we are able to identify I/I and fix the issues
immediately.
Total Points Generated 0
Score (100 - Total Points Generated) 100
Section Grade A
Page 26 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Grading Summary
WPDES No: 0047341
SECTIONS LETTER GRADE GRADE POINTS WEIGHTING SECTION
FACTORS POINTS
Financial A 4 1 4
Collection A 4 3 12
TOTALS 4 16
GRADE POINT AVERAGE (GPA) = 4.00
Notes:
A = Voluntary Range (Response Optional)
B = Voluntary Range (Response Optional)
C = Recommendation Range (Response Required)
D = Action Range (Response Required)
F = Action Range (Response Required)
Page 27 of 31
Compliance Maintenance Annual Report
Shawano Sewage Collection System Last Updated: Reporting For:
5/22/2025 2024
Resolution or Owner's Statement
Name of Governing
Body or Owner:
City Of Shawano
Date of Resolution or
Action Taken:
Resolution Number:
Date of Submittal:
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO SPECIFIC CMAR
SECTIONS (Optional for grade A or B. Required for grade C, D, or F):
Financial Management: Grade = A
Collection Systems: Grade = A
(Regardless of grade, response required for Collection Systems if SSOs were reported)
ACTIONS SET FORTH BY THE GOVERNING BODY OR OWNER RELATING TO THE OVERALL
GRADE POINT AVERAGE AND ANY GENERAL COMMENTS
(Optional for G.P.A. greater than or equal to 3.00, required for G.P.A. less than 3.00)
G.P.A. = 4.00
Page 28 of 31
Field Committee Action Item
Meeting Date: 5/27/2025
Submitted By: Michael Mahloch, Public Works Director
Agenda Category: Action Item
Title: Second Driveway at 733 W 1st St.
Subject: The owner at 733 W 1st St. has requested a second driveway.
Background:
• 733 W 1st St. is at the very west end of W 1st and butts up to the Wolf River.
• This property was previously three separate lots between 733, 721, and 717, now these
are two combined lots that split ownership of 721.
• The owner is looking at putting a garage addition and concrete slab for parking their
motor home on the east end of their garage.
Financial /Sustainability Considerations:
• Municipal Code
Chapter 5 Streets and Sidewalks
Code 5.021
• Number of driveways. Only one driveway shall be permitted for residential lots. A
second driveway may be permitted for corner lots on the adjacent street of the existing
driveway with the approval of the Public Works Field Committee. A typical commercial
property shall be allowed a maximum of two driveways, located at least 50 feet apart.
The minimum distance between a driveway and the nearest public road or street shall
be 50 feet. A minimum distance of 450 feet shall be required between the center lines
of entrances into shopping and similar developments that generate high traffic volumes.
[Amended 11-10-2016 by Ord. No. 1906]
Recommendation:
• To consider a variance to allow a second driveway at 733 W 1st St.
• Variance request. If any person desires to obtain a variance from the provisions of this
section, said person shall take such request to the Field Committee, which Committee
shall have the authority to approve or disallow the requested variance, with said action
to be taken at a regularly scheduled Field Committee meeting.
Page 29 of 31
Page 30 of 31
Page 31 of 31
Get email alerts for Shawano
A daily email when new agendas and minutes are posted.