City and Borough Assembly
Regular MeetingSitka, AK · June 14, 2018
Minutes
ASSEMBLY CHAMBERS
CITY AND BOROUGH OF SITKA 330 Harbor Drive
Sitka, AK
(907)747-1811
Minutes - Final
City and Borough Assembly
Mayor Matthew Hunter
Deputy Mayor Steven Eisenbeisz,
Vice Deputy Mayor Bob Potrzuski,
Aaron Bean, Kevin Knox, Dr. Richard Wein,
Benjamin Miyasato
Municipal Administrator: Keith Brady
Municipal Attorney: Brian Hanson
Municipal Clerk: Sara Peterson
Thursday, June 14, 2018 6:00 PM Assembly Chambers
SPECIAL MEETING
I. CALL TO ORDER
II. FLAG SALUTE
III. ROLL CALL
Present: 5 - Miyasato, Eisenbeisz, Hunter, Knox, and Wein
Absent: 2 - Potrzuski, and Bean
IV. PERSONS TO BE HEARD
None.
V. NEW BUSINESS:
A 18-117 Consideration of an appeal filed by Tamico, Inc. of the bid evaluation and letter
of intent to award for the O'Connell Bridge Lightering Facility Pile
Replacement Project (possible executive session)
Municipal Attorney Brian Hanson spoke to the process for the appeal and reminded the
Assembly was acting as a quasi judicial body. Regarding the appeal of the bid
rejection, Hanson stated the scope encompassed the bid documents, proposal made
by Tamico, grounds for the City and Borough of Sitka (CBS) rejecting the proposal,
materiality of the grounds, and the reasonable basis for rejecting. Hanson
recommended that upon reaching a decision the Assembly include findings to support
their decision.
Appellant
Jim Martinsen of Tamico, Inc. stated the main reason for his appeal pertained to
CITY AND BOROUGH OF SITKA Page 1
City and Borough Assembly Minutes - Final June 14, 2018
permitting. Martinsen stated requirements for an Incidental Harassment Authorization
(IHA) permit were unclear and believed CBS had not disclosed all information with
regards to permitting. He relayed that because it was a maintenance project, the US
Army Corp of Engineers (USACE) and National Marine Fisheries Service (NMFS) had
indicated that with some sound mitigation measures, a standard nationwide permit
could be attained. He suggested the CBS reject all bids and rebid the project.
City and Borough of Sitka
Hanson stated in June 2017, CBS Harbor staff discovered the pilings at the O'Connell
Lightering Float were leaning towards shore. Moorage was suspended and an
investigation ensued. After CBS Public Works staff determined the pilings were in need
of repair, a project was initiated and appropriations for the project were obtained from
the Assembly. In October 2017, the USACE informed CBS that the project area fell
within an Endangered Species Act (ESA) action area of 7000 meters. CBS determined
the action area to be impractical and hired an environmental consultant, Solstice
Alaska Consulting, to work with USACE and NMFS and investigate possibilities for a
reduced action area. Despite efforts, NMFS denied a reduction from 7000 meters and
CBS determined extraordinary permitting to be required, one of which could include a
high cost IHA permit. Hanson stated at the April 2018 pre-bid meeting, CBS verbally
advised all participants that an ESA action area would be required and an IHA permit
would likely be required and noted the contractor was responsible for determining,
coordinating, and acquiring all authorizations required and for permit compliance. CBS
received two bids for the project: Tamico, Inc. and Turnagain Marine. Upon evaluation of
the bids, CBS requested permisson from Tamico, Inc. to speak with their proposed
permitting specialist. It was determined the firm did not meet the required bidder
qualification specifications: evidence of having obtained 2 prior IHA permits within the
last 5 years. CBS rejected Tamico's bid as "non-responsive" for (1) failure of their
permitting specialist to list at least 2 previous IHA authorizations of similar scope
within the last 5 years and (2) failure to demonstrate the ability to obtain the required
insurance. In addition, CBS deemed Tamico a "non-responsible bidder" for its failure to
strictly comply with governmental permits when performing the Sitka Transient Float
Project.
Assembly Deliberation
Assembly members discussed the materials presented by both parties. Mayor Hunter
reminded the Assembly was tasked with determining whether or not CBS had justly
found the bid to be responsive or not. Items discussed were insurance, permitting, and
failure to comply with local, state, and federal permits.
A motion was made by Eisenbeisz to DENY THE APPEAL based on bidder
qualification 1.2.c.4 Permitting Specialist (List of at least two previous
Incidental Harassment Authorizations successfully obtained for marine projects
of similar scope and considerations within the past 5 years). The motion
PASSED by the following vote.
Yes: 5- Miyasato, Eisenbeisz, Hunter, Knox, and Wein
Absent: 2- Potrzuski, and Bean
VI. PERSONS TO BE HEARD:
None.
VII. ADJOURNMENT
CITY AND BOROUGH OF SITKA Page 2
City and Borough Assembly Minutes - Final June 14, 2018
A motion was made by Miyasato to ADJOURN. Hearing no objections, the
meeting ADJOURNED at 9:10pm.
ATTEST: ______________________________
Sara Peterson, MMC
Municipal Clerk
CITY AND BOROUGH OF SITKA Page 3
Agenda
ASSEMBLY CHAMBERS
CITY AND BOROUGH OF SITKA 330 Harbor Drive
Sitka, AK
(907)747-1811
Meeting Agenda
City and Borough Assembly
Mayor Matthew Hunter
Deputy Mayor Steven Eisenbeisz,
Vice Deputy Mayor Bob Potrzuski,
Aaron Bean, Kevin Knox, Dr. Richard Wein,
Benjamin Miyasato
Municipal Administrator: Keith Brady
Municipal Attorney: Brian Hanson
Municipal Clerk: Sara Peterson
Thursday, June 14, 2018 6:00 PM Assembly Chambers
SPECIAL MEETING
I. CALL TO ORDER
II. FLAG SALUTE
III. ROLL CALL
IV. PERSONS TO BE HEARD
Public participation on any item off the agenda. All public testimony is not to exceed 3
minutes for any individual, unless the mayor imposes other time constraints at the
beginning of the agenda item.
V. NEW BUSINESS:
CITY AND BOROUGH OF SITKA Page 1 Printed on 6/12/2018
City and Borough Assembly Meeting Agenda June 14, 2018
A 18-117 Consideration of an appeal filed by Tamico, Inc. of the bid evaluation and
letter of intent to award for the O'Connell Bridge Lightering Facility Pile
Replacement Project (possible executive session)
Attachments: Process Outline.pdf
Appellant Submittal Tamico Appeal Lightering-Assembly.pdf
Appellant Submittal Tamico Appeal Lightering-City Engineer.pdf
Appellant Submittal STF Supporting Documents.pdf
Appellant Submittal STF Tamico-CBS Letters.pdf
CBS Exhibit List.pdf
CBS Exhibit 1 O'Connell Lightering Float Project Timeline.pdf
CBS Exhibit 2 Email dated October 11, 2017.pdf
CBS Exhibit 3 Email dated November 7-28, 2018.pdf
CBS Exhibit 4 O'Connell Bridge Project Manual.pdf
CBS Exhibit 5 Bidder Qualifications.pdf
CBS Exhibit 6 Email dated April 23, 2018.pdf
CBS Exhibit 7 Email dated April 24, 2018.pdf
CBS Exhibit 8 Email dated April 25, 2018.pdf
CBS Exhibit 9 Email dated April 24-27, 2018.pdf
CBS Exhibit 10 Email dated April 30, 2018.pdf
CBS Exhibit 11 Email dated April 30, 2018 with letter to Jason Davis.pdf
CBS Exhibit 12 Email dated May 10, 2018.pdf
CBS Exhibit 13 Email dated October 11, 2017 to June 11, 2018.pdf
VI. PERSONS TO BE HEARD:
Public participation on any item on or off the agenda. Not to exceed 3 minutes for any
individual.
VII. ADJOURNMENT
Note: Detailed information on these agenda items can be found on the City website at
https://sitka.legistar.com/Calendar.aspx or by contacting the Municipal Clerk's Office at
City Hall, 100 Lincoln Street or 747-1811. A hard copy of the Assembly packet is
available at the Sitka Public Library. Assembly meetings are aired live on KCAW FM
104.7 and via video streaming from the City's website. To receive Assembly agenda
notifications, sign up with GovDelivery on the City website.
Sara Peterson, MMC, Municipal Clerk
Publish: June 12
CITY AND BOROUGH OF SITKA Page 2 Printed on 6/12/2018
Get email alerts for Sitka
A daily email when new agendas and minutes are posted.