Board of Historic & Architectural Review
Regular MeetingSmithfield, VA · January 16, 2024
Minutes
The Smithfield Board of Historic and Architectural Review (BHAR) held its regular
meeting on Tuesday, January 16th, 2024 at the Smithfield Center. The meeting was called to order
at 6:30 p.m.
Members present:
Trey Gwaltney – Chairman
Julia Hillegass – Vice Chair
Russell Hill
Justin Hornback
Julie Hess
Judith Lally
Members absent:
Gary Hess
Staff present:
Mark Kluck – Planner
Press: None
Citizens: 3
Chairman Gwaltney welcomed all attendees to the meeting.
2024 Election of Officers
Mark Kluck, Planner, inquired if there were any nominations for the office of Chairman.
Vice Chair Hillegass nominated Trey Gwaltney to remain Chairman. Mr. Hill seconded
the motion.
Mr. Kluck inquired if there were any other nominations. Seeing none, he called for the
vote. Mrs. Hess voted aye, Mr. Hill vote aye, Mr. Hornback voted aye, Mrs. Lally voted aye, Vice
Chair Hillegass voted aye, and Chairman Gwaltney abstained. The motion passed.
Mr. Kluck inquired if there were any nominations for the office of Vice Chair.
Chairman Gwaltney nominated Julia Hillegass to remain Vice Chair. Mr. Hill seconded
the motion.
Mr. Kluck inquired if there were any other nominations. Seeing none, he called for the
vote. Mr. Hill vote aye, Mr. Hornback voted aye, Mrs. Lally voted aye, Chairman Gwaltney voted
aye, Mrs. Hess voted aye, and Vice Chair Hillegass abstained. The motion passed.
Planner’s Report:
Mr. Kluck reported that Town Staff continued to work on the Historic District Guidelines
updates.
Public Comments:
Chairman Gwaltney reported that there were no sign-ups to speak.
Board of Historic and Architectural Review
January 16th, 2024
Board Member Comments:
Chairman Gwaltney recognized Gary Hess for his 9 years on the Board, and expressed
appreciation for his service. He reported that the Board would presumably be getting a new
member beginning in February.
Material Change (Roof) – 230 Cary Street – Contributing – Carole Neider and Patrick
Matijevich, applicants.
Mr. Kluck reported that the applicants were seeking approval for a change to the roofing
material located on the rear addition of their single-family dwelling. He stated that the applicants
would like to change the roof material from a standing seam metal roof to architectural shingles
thereby addressing leaks that were discovered while performing renovations that were previously
approved at the November 21st, 2023 BHAR meeting. He detailed that the shingles would be GAF
Timberline HDZ architectural shingles in “Charcoal.” Mr. Kluck reported that the front porch and
main portion of the dwelling featured a silver-colored standing seam metal roof and were not
proposed to be replaced at this time. He added that Town Staff recommended approval from a
zoning standpoint and deferred to the BHAR for their architectural discretion.
Chairman Gwaltney confirmed that the applicant was present to answer any questions the
Board may have. He confirmed the status of the roofing as shown in the picture provided, and that
work would not be completed on the carport awning.
Carole Nieder of 230 Cary Street stated that was correct.
Chairman Gwaltney asked if the work would be completed on the pitched roof next to the
house, the flat roof over the sunroom, or both.
Mrs. Nieder reported that the shingles would cover the whole pitched area, down and
across, as there were leaks in that location. She confirmed that the whole roof portion would be
replaced.
Heather Harrell, representative from Hatchett Design and Remodel, explained that the
packet included plans for the steep and low slopes on the roof.
Mr. Kluck reported that the information was located on page 8 of the pdf provided.
Mrs. Hess inquired if the shingles matched what was existing on other areas of the home’s
roof as it was hard to tell from the picture provided.
Chairman Gwaltney stated that the rest of the house’s roofing had metal standing-seam
material.
Mr. Hornback pointed out that the alteration would be at the rear of the house, and would
be difficult to see from the street. He confirmed that the plan was to use architectural shingles, and
not three-tabbed shingles. He added that the Board had approved that material in the past.
Mr. Hill asked if they knew what the pitch of the roof was on the porch side.
Mrs. Nieder reported that she did not.
Mr. Hill pointed out that if the pitch was less than 3/12, then it could not have architectural
shingles placed on it, or it would leak.
Mr. Nieder stated that the roofer should know that information.
2
Board of Historic and Architectural Review
January 16th, 2024
Chairman Gwaltney directed Mr. Hill to review the information supplied by the roofer
where it was listed at the “Low-sloped roof section.” After discussion, he confirmed that there
would be a membrane on the flat part of the roof and shingles on the pitched roof.
Mr. Hill asked what color the membrane material would be.
There was general discussion on whether the top of the flat portion of the roof was visible.
Vice Chair Hillegass made a motion to approve the application as submitted. Mr. Hornback
seconded the motion.
Chairman Gwaltney called for a collective vote, all members present were in favor, with
none opposed. The motion passed.
Assorted Exterior Changes – 107 Institute Street – Contributing – Hallwood Properties I
LLC c/o Mark Hall, applicant.
Mr. Kluck reported that the applicant was seeking approval for assorted exterior changes
to the building to accommodate an interior reconfiguration. He detailed that the proposed
renovations included:
1) Install an ADA-compliant concrete wheelchair ramp clad with Key West red
brick manufactured by Triangle Brick. The ramp will include a forty-two inch (42”)
tall white Liberty Series Intex PVC railings with an aluminum handrail. The ramp
will also feature two landscaped planters, one at the foot of the ramp and one on
the left side of the ramp. To accommodate the installation of the wheelchair ramp,
the existing half-round entry red brick steps will be removed and replaced with a
set of finished concrete steps located on the front right side of the building.
2) Install two (2) gable-style porch awnings over the two proposed sets of French
doors. Each awning will be supported by two (2) twelve-inch (12”) fiberglass
reinforced plastic (FRP) Chadworth Tuscan plain square non-tapered columns for
a total of four (4) columns. The columns will be painted a gray color known as “Tin
Lizzie (SW9163).” The gable ends of each awning will feature Hardie Vertical
Siding painted in a white color known as “Westhighland White (SW7566).” The
applicant will also be installing a “Westhighland White (SW 7566)” painted trellis
between the two awnings.
3) Install two (2) sets of wooden Marvin Ultimate French doors, with each door
featuring a single pane of glass. The two sets of French doors will be painted a dark
green color known as “Rookwood Shutter Green (SW 2809)”. This will result in
the removal of the existing single-entry door.
4) Install two (2) wooden Marvin Ultimate picture windows painted in “Rookwood
Shutter Green (SW2809)” to match the French doors. The windows will feature a
three-by-three (3x3) grid pattern. One window will be centered between the two
sets of French doors, and the other window will be located on the front left side of
the building.
5) The exposed white cinder block will be covered with “Westhighland White
(SW7566)” painted Hardie siding, which will be the same color as the vertical
Hardie siding in the gable ends of the two new awnings. Additionally, the corner
3
Board of Historic and Architectural Review
January 16th, 2024
posts will be constructed out of Hardie trim boards and painted in a gray color
known as “Tin Lizzie (SW 9163).”
6) The existing charcoal-colored architectural shingles will be replaced with GAF
Timberline HDZ Architectural Shingles in a light brown color known as
“Weathered Wood.”
7) The applicant will also be installing new trim, gutters, and downspouts on the
building. The trim material will be “Tin Lizzie (SW 9163) painted Hardie trim
boards, which will match the proposed columns. The gutters will be four-inch (4”)
round aluminum gutters, and three-inch (3”) round downspouts will be painted
“Westhighland White (SW7566)” to match the Hardie siding.
He reported that since the drafting of the staff report, the applicant had submitted an
additional rendering that proposed a wheelchair lift in place of the ramp as an alternative option.
Mr. Kluck stated that Town Staff recommended approval from a zoning standpoint and deferred
to the BHAR for architectural discretion.
Mark Hall of 7432 Barton’s Landing in Smithfield was present to discuss the application.
He stated that he had been working on the building for quite a while, and was at a point where he
could focus on finishing the project. He updated that he already had a tenant lined up who would
be utilizing the space for professional offices open 5 days a week. He continued that there was
additional space available for perhaps a lawyer who also employed a paralegal. Mr. Hall said that
his original application had included the use of “Rose Range Tudor” brick, which was found all
over Smithfield but unfortunately had been discontinued. He stated that as a result he had requested
approval to use “Spalding Tudor” brick with “Argos” colored mortar. He reported that he had
brought examples of some of the materials for the Board to examine.
Mr. Hall explained that he had second thoughts about including a ramp in the proposal as
it was very large for such a small building. He said that he was not expecting a great need for use
of Americans with Disabilities Act (ADA) apparatuses, and as such he was interested in the
installation of a wheelchair lift. He stated that he felt both options were worthy of approval based
on their aesthetics and merits. He requested that, if possible, the Board could pass both options
which would allow him to make the best choice based on budget when it came time for installation.
He emphasized that he was willing to work with the Board on whatever their decision was.
Mr. Hornback noted that the ramp would be fronted by a brick façade from the front, with
its entrance being to side of the front of the building.
Mr. Hall confirmed that was correct.
Mr. Hornback confirmed that the building’s porch area would have a concrete floor.
Vice Chair Hillegass informed the Board that the Planning Commission had heard the
application last week and had recommended approval of both options presented.
Mr. Hall added that they would also have to go before the Town Council for approval as
the property was non-conforming due to not having side yard setbacks.
Chairman Gwaltney pointed out that the rendering provided showed what appeared to be a
white fence around the property.
Mr. Hall reported that had been added to clean the picture up, to allow focus just on the
building. He stated that both options included planters that would be built into the masonry.
4