City Council Study Meeting - ARCHIVED
Regular MeetingSouth Jordan, UT · May 6, 2025
Minutes
SOUTH JORDAN CITY
CITY COUNCIL STUDY MEETING
May 6, 2025
Present: Mayor Dawn Ramsey, Council Member Patrick Harris, Council Member Kathie
Johnson, Council Member Don Shelton, Council Member Tamara Zander,
Council Member Jason McGuire, City Manager Dustin Lewis, Assistant City
Manager Jason Rasmussen, City Attorney Ryan Loose, Fire Chief Chris Dawson,
Police Chief Jeff Carr, City Engineer Brad Klavano, Associate Director of
Recreation Brad Vaske, Public Works Director Raymond Garrison, Director of
City Commerce Brian Preece, Director of Strategy & Budget Don Tingey,
Communications Manager/PIO, Rachael Van Cleave, CTO Matthew Davis,
Senior Systems Administrator Phill Brown, GIS Coordinator Matt Jarman, City
Recorder Anna Crookston, Engineering Operation Manager Becky Messer, Long-
Range Planner Joe Moss, Assistant City Attorney Greg Simonson, Planner III
Damir Drozdek
Absent:
Others: Fred Philpot, Rachel Jepperson,
4:38 P.M.
REGULAR MEETING
A. Welcome, Roll Call, and Introduction - By Mayor, Dawn R. Ramsey
Mayor Ramsey welcomed everyone present and introduced the meeting.
B. Invocation – By Council Member, Patrick Harris
Council Member Harris offered the invocation.
C. Mayor and Council Coordination
Council Member Harris inquired about receiving an update on the parade, Summer Fest, and
related activities when appropriate.
City Manager Dustin Lewis stated that staff will email council members with final event details.
He noted that there is one more council meeting prior to the events, which begin the week of
June 2. The float preview is scheduled for June 3, though it conflicts with a City Council meeting
this year. Traditional events will take place leading up to the parade on June 7, including
breakfast and transportation to the parade route. Invitations will be sent for chalk art judging and
other related activities. He added that the core activities have been relocated to the west side of
City Park in the larger field area to allow for expanded space for the carnival and other events.
He noted this change will provide more room for activities, improve safety, and enhance the
overall experience.
South Jordan City 2
City Council Study Meeting
May 6, 2025
D. Discussion/Review of Regular Council Meeting:
Utah Black Diamonds Land Use Public Hearing Items:
- Resolution R2025-23, Development Agreement pertaining to property 272 West
11000 South.
- Zoning Ordinance 2025-03-Z, Rezoning property 272 West 11000 South, from
C-F (Commercial - Freeway) Zone to C-F (Commercial - Freeway) Zone and PD
(Planned Development) Floating Zone; Nichols Naylor Architects (Applicant).
Public Hearing Items:
- Resolution R2025-25, Adopting the 2025 Drinking Water System Master Plan.
- Ordinance 2025-05, Amending Section 17.40.020 of the City of South Jordan
Municipal Code.
Action Items:
- Resolution R2025-18, Appointing a member to the BCRPA Board.
- Resolution R2025-20, Adopting FY2025-2026 Tentative Budget.
RDA Action Item:
- Resolution RDA 2025-01, Adopting FY2025-2026 Tentative Budget.
E. Presentation Items:
E.1. Storm Water Rate Study. (By Director of Public Works, Raymond
Garrison)
Public Works Director Raymond Garrison introduced Vice President of LRB Financial Advisors,
Fred Philpot. He noted that the last stormwater rate study was conducted in 2021 and that the
City is approaching the five-year mark, prompting the need for an updated analysis. He stated
that staff has been working with Mr. Philpot and his team over the past few months to complete
the update, and Mr. Philpot would present the findings, with time allotted for discussion
afterward.
Mr. Philpot reviewed prepared presentation (Attachment A), providing an overview of the storm
utility rate review, following the same format used in prior utility analyses. He outlined the
objectives, methodology, and assumptions used in the financial model, which projects through
2030 but focuses on the next five years for rate setting. The model incorporates actuals from
2023, estimates for 2024, and the adopted 2025 budget, including anticipated system growth,
expenditure trends, and construction inflation. He explained that the storm utility is simpler to
evaluate because it typically charges a flat rate per equivalent residential unit (ERU) rather than
using tiered demand structures. The primary goals of the analysis include ensuring financial
sustainability, maintaining adequate cash reserves, covering debt obligations, and avoiding
subsidization from other funds. The model starts with a $1.7 million fund balance and includes
capital improvement needs, such as the storm drain portion of the new Public Works facility.
Two scenarios were presented: one with no rate increase, which would lead to the fund balance
falling below target levels, and another with phased annual 3% rate increases to preserve
financial targets and improve debt coverage. He noted that gradual increases help smooth the
financial impact and align with inflation, as opposed to a single large adjustment. A comparative
analysis of storm rates across neighboring communities was shown, indicating that South
South Jordan City 3
City Council Study Meeting
May 6, 2025
Jordan's proposed rates would fall in the mid-range, not the highest, but not the lowest. Mr.
Philpot concluded by highlighting that other communities, have faced challenges due to delayed
rate adjustments, underscoring the importance of timely and sustainable rate planning.
Council Member Zander asked whether the bar graph showing a rate of approximately $9
reflects the City's highest projected rate under the proposed increases.
Mr. Philpot clarified that the $9.29 shown on the bar graph represents the starting point under the
proposed rate increases. As rates continue to rise over time, the City would eventually exceed
that amount, approaching rates similar to Bluffdale, assuming those other cities do not adjust
their rates. He noted that storm enterprise funds are often the least frequently evaluated, which
can lead to significant future increases when capital needs are eventually addressed. He added
that the comparison chart includes only communities within Salt Lake County.
Council Member Zander asked when the City last implemented a stormwater rate increase.
Director Garrison stated that the last rate study was completed in 2021 and recommended a 6%
annual increase, which the City has implemented each year since.
Council Member Zander confirmed that the City has applied a 6% annual stormwater rate
increase since 2021 and noted that the current recommendation is for a 3% increase moving
forward.
Director Garrison explained that the previous rate study was a five-year plan, and one year
remains on that schedule. He recommended incorporating a 3% rate increase into the upcoming
tentative budget review.
Council Member Harris asked whether the recommended reduction from a 6% to a 3% rate
increase is primarily due to decreased inflation or if other factors are influencing this adjustment.
Mr. Philpot added that, in addition to decreased inflation, updates to the capital improvement
plan and reassessment of necessary projects contributed to the recommendation for reduced rate
increases. Incorporating these factors into the model produced a scenario supporting a lower
increase.
Director Garrison stated that the stormwater master plan was updated to closely evaluate the
recommended projects. The team reviewed the necessity and timing of each project, resulting in
a more refined and finalized project list that has been incorporated into the current rate study
model.
E.2. Development Fee Study. (By CFO, Sunil Naidu)
CFO Sunil Naidu provided background information, noting that the fee schedule was updated in
2022, but due to recent legislative discussions regarding governmental fees and concerns about
charges to developers, the City opted to conduct a comprehensive study. This study includes cost
and process analyses to ensure fees align appropriately with expenditures and comply with
regulations.
South Jordan City 4
City Council Study Meeting
May 6, 2025
Mr. Philpot reviewed prepared presentation (Attachment B), explaining the City’s updated
approach to evaluating fees for service, emphasizing the importance of aligning fees with the
actual costs of providing those services. The process involves a two-pronged methodology: first,
a cost analysis including employee salaries, department overhead, and administrative overhead;
second, a detailed process map identifying each task involved and the time spent by personnel.
This combined data informs the fee calculations. He provided an example showing how staff
time is calculated with fully loaded costs per minute, including technology fees and overhead
allocations. The process maps identify steps and personnel involved, averaging costs when
multiple employees may be involved, resulting in an estimated total cost per application. The
updated fee schedule generally reflects increases, primarily driven by higher personnel costs
since the previous study. Some new fees were added for services such as right-of-way vacations,
development agreement amendments, and floodplain permits. Certain fees, like the text
amendment, saw minor decreases due to more efficient processes. Mr. Philpot highlighted South
Jordan’s proactive stance in linking building permit fees more closely to actual cost of service
rather than purely valuation-based fees, a practice that some neighboring communities are still
working to adopt. The updated schedule incorporates tiered fees based on valuation and reflects
increases in salaries, benefits, department overhead, and administrative overhead. He added that
a revenue analysis was conducted to estimate the overall financial impact of the revised fee
schedule. Using prior year data for building permits and planning fees, the analysis applied both
the current and proposed fee schedules to show potential changes in revenue. Under the proposed
schedule, building permit revenue could increase from approximately $2.3 million to $2.7
million, nearly a 20% rise. Planning fee revenue could increase by about 25%, from just under
$300,000 to nearly $360,000. He emphasized that these figures are illustrative, based on prior
year activity, and actual revenue will vary depending on factors such as growth, the number of
permits processed, and future development activity. Therefore, the projected amounts should not
be considered guaranteed revenue but rather a contextual estimate assuming other conditions
remain constant.
Mayor Ramsey expressed appreciation for the thorough analysis, noting that many cities will
need a paradigm shift to adopt such a detailed, data-driven approach to justify permit fees down
to the precise time and cost involved. She commended South Jordan for being proactive in
establishing a sound, transparent process. She requested a printed copy of the presentation to
keep for reference, explaining that she and City Manager Lewis will be attending a meeting at
the governor’s mansion with a group discussing the future of housing and development. Since
fees are expected to be a topic, she wants to have this detailed data on hand to demonstrate how
South Jordan manages fees effectively and as an example that other cities could follow. She
emphasized that this would be a valuable educational tool and support for the city’s approach.
Council Member Zander requested clarification on the revenue slide, asking if the approximately
$2.7 million in building permit revenue reflects net revenue to the city after covering all
personnel costs calculated down to the minute and the penny through the cost analysis, or if that
figure represents gross revenue before those costs.
Mr. Philpot clarified that the $2.7 million figure does not represent profit. Instead, it reflects the
total revenue generated by the fees based on the cost analysis. Essentially, it shows the amount
South Jordan City 5
City Council Study Meeting
May 6, 2025
collected to cover the costs associated with providing the services, calculated down to the
minute, rather than a surplus or net income.
Council Member Zander confirmed her understanding, noting that the term “revenue” here refers
only to covering the city’s costs, not generating profit.
Mr. Philpot replied, yes, we’ll generate that revenue, but the intent is to show that amount
essentially covers the costs associated with providing those services, not profit. It’s about
recovering the expenses involved in processing the permits and fees.
City Attorney Ryan Loose added that legally, we can only charge fees that correspond to the
actual work done. That principle really guides how we set fees across the board.
Mr. Philpot explained that staffing and departmental functions do not fluctuate directly with
growth, as there are fixed expenses that remain even if building permits decline significantly. He
noted that the city would not furlough staff during such periods. He emphasized the importance
of accounting for revenues carefully to ensure that any surplus funds are retained to offset future
expenses. The purpose of the analysis is to demonstrate the expected offsetting revenue based on
current cost assumptions.
Council Member Harris expressed support for the updated fee structure, emphasizing the
importance of accurately covering the costs associated with permit processing. He noted that if
fees are insufficient, the city must cover those costs through the general fund, which could lead
to higher taxes for all residents. He stressed that permit applicants should fairly bear the costs
related to their applications and appreciated the thorough approach taken to ensure fees
correspond to actual expenses.
Council Member Johnson noted that cities often encounter financial trouble when they rely on
the general fund to cover all expenses without properly accounting for or recouping costs
through appropriate fees.
Council Member Shelton asked whether the proposed fees are included in the tentative budget.
CFO Naidu responded that the proposed fees are not yet included in the tentative budget but are
intended to be incorporated before the public hearing.
Council Member Zander asked if there is any state mandate requiring cities to justify fees down
to the minute, or if South Jordan is simply being proactive in this approach.
Mayor Ramsey responded that South Jordan is ahead of the game. Although there is no current
state mandate requiring this detailed fee justification, there has been ongoing discussion and
proposals over the last three legislative sessions aimed at eliminating cities' ability to collect
impact fees altogether. This thorough process positions the city well amid such challenges.
Attorney Loose added that while the legislative proposals target impact fees specifically, non-
impact fees, such as building permit fees, still must cover the actual cost of services provided.
South Jordan City 6
City Council Study Meeting
May 6, 2025
For example, inspectors who review and inspect houses must be paid, and it would be unfair for
taxpayers to continue subsidizing those inspections.
Mayor Ramsey noted that the legislature has previously proposed eliminating certain fees, but
emphasized that not everyone should bear the cost of specific services, reinforcing the
importance of fee structures that fairly allocate expenses to those who directly use or benefit
from them.
Attorney Loose explained that in the housing sector, fees are a major topic of discussion. He
noted that while some reports claim fees make up about 30% of the cost of a house, the actual
impact depends on how the data is presented. He cautioned that removing governmental fees
entirely to reduce housing costs is often oversimplified and doesn’t fully reflect the true cost
factors.
Council Member Zander asked for clarification on whether the City is being required by the
legislature to conduct this level of detailed fee analysis.
CFO Naidu clarified that, no, the City is not being required by the legislature to conduct this
level of detailed analysis. He emphasized that this approach has been the City’s preference for a
long time, reflecting a proactive commitment to transparency and accuracy in setting fees.
Attorney Loose explained that, even without conducting a formal study, the City would still be
required to demonstrate the justification for its fees if they were ever challenged. By proactively
conducting detailed cost and process analyses, the City is better positioned to defend its fees. He
noted that challenges to fees do occur, but with expert-backed data and a transparent
methodology already in place, the City is well-prepared to respond.
Mr. Philpot clarified that there will always be some level of generalization in fee structures due
to the nature of averaging across different user groups. While this ensures broad equity, it
doesn’t create exact fairness for every individual scenario. He emphasized that the City’s
ordinance, similar to impact fee statutes, already allows for flexibility by permitting applicants to
present data to justify an alternative fee if their situation is unique. He also noted that although
there's no current legislative mandate requiring this level of fee justification, pressure is
increasingly coming from auditors. Several neighboring cities have engaged in similar studies
after audit findings raised concerns about lacking documentation for how fees were determined.
The State Auditor's Office has also weighed in, signaling a growing emphasis on accountability
and transparency in municipal fee structures.
Council Member Harris expressed concern about the potential for legislative action that could
eliminate cities’ ability to collect building permit and planning fees. He emphasized that the
combined revenue from these sources, over $3 million, represents actual costs tied to services the
City must provide. If those fees were prohibited, it would effectively become an unfunded
mandate, requiring the City to raise taxes to cover the same expenses. He stressed that these
obligations and associated costs don't disappear just because the revenue source is removed.
Moreover, legislative expectations for prompt service delivery remain high. He underscored the
importance of policymakers and voters understanding the real-world financial implications of
South Jordan City 7
City Council Study Meeting
May 6, 2025
such decisions, noting that the costs must be paid somehow, either through user-based fees or
general taxation.
Mayor Ramsey noted that this issue is part of a broader conversation that the League has been
actively engaged in for several years. She explained that water and sewer districts are also facing
similar legislative challenges. She referenced a specific instance from two years ago when
Senator McKay proposed a bill that would have eliminated the ability of water districts to charge
any impact fees. This reflects a growing trend of proposals aimed at restricting local entities’
ability to recover costs through fees, highlighting the need for continued vigilance and advocacy.
Council Member McGuire expressed appreciation for the foresight of those who implemented
priority-based budgeting in South Jordan years ago. He emphasized that this approach laid the
essential groundwork for the City to now deeply understand its costs and appropriately align fees
with actual services provided. He noted that while government is not structured to make a profit
like private businesses, the City can, and should, strive to break even by ensuring that those who
incur costs are the ones who pay them.
City Manager Lewis stated that this type of detailed cost analysis is applied to every City
program. He gave the example of tracking the exact cost when a crew is sent out to fix a light
pole, noting that they account for the personnel, equipment, and time involved. He emphasized
that this level of tracking ensures the City operates in a fiscally responsible manner.
Council Member Zander asked whether the City plans to make the fee analysis publicly
accessible on the website, rather than only sharing it upon request. She suggested that offering a
“deeper dive” tab where residents can review the detailed breakdown would reflect positively on
the City and highlight the proactive approach staff have taken, especially since most cities are
not yet doing this kind of comprehensive analysis.
Mr. Philpot explained that while much of the fee analysis data is public, some details are
sensitive. Because of this, many communities hesitate to publish the full detailed data online.
Instead, they typically keep the information at a higher, more general level in publicly shared
studies to balance transparency with privacy concerns.
Council Member Zander asked how much detailed information the city shares when residents or
applicants challenge their fees.
City Manager Lewis responded that if someone wants to challenge a fee, the city is willing to sit
down and review the details as thoroughly as needed. He referenced City Attorney Loose’s point
that when fees are challenged, they go through the analysis carefully with the concerned parties.
Attorney Loose noted that while the city doesn’t often face formal challenges, some jurisdictions
do end up in court over fees. He expressed caution about broadly publishing detailed fee analyses
online. He mentioned that while the detailed data won’t be directly posted on the city’s website,
it remains public and accessible through meetings and records requests.
South Jordan City 8
City Council Study Meeting
May 6, 2025
F. Discussion Item:
F.1. R-M text amendments. (By Long-Range Planner, Joe Moss)
Long-Range Planner Joe Moss had a handout of a online survey (Attachment C). Planner Moss
reviewed prepared presentation (Attachment D), explaining that in February, they explored how
design standards could shape and influence R-M style (residential multifamily) development.
They discussed creating a “menu” of design options to incentivize certain features. The goal for
tonight’s meeting was to review these potential options with the council to gauge priorities and
help weigh them appropriately in the draft. He noted that R-M zones may be separated from
other residential zones due to their distinct development patterns. For example, townhomes
require different regulations than single-family homes, and small-lot single-family homes may
have different setback and design needs compared to larger lots. The current draft framework is
organized into two main sections, with the first covering purpose and applicability, and the
second focusing on standards. The aim is to make the document more visual and user-friendly,
and shared a preview of the work in progress, emphasizing it is not yet complete.
Council Member Harris asked if the design options presented are the current standards.
Planner Moss explained that some of the design options are current standards while others are
modified. They are working on separating standards for different development types, such as
small-lot single-family homes versus townhomes. Currently, the city lacks specific design
criteria for anything beyond single-family homes, especially for Planned Developments (PDs).
Although there are no undeveloped R-M zones currently, this framework would provide a useful
zoning tool, allowing developers to start with a clear set of standards focused on quality
development that the city supports.
Mayor Ramsey asked for clarification that there are currently no undeveloped R-M zones within
the city. Planner Moss confirmed that while there are a few very small, leftover parcels zoned R-
M, they are minimal and not really available for development.
Director of Planning Steven Schaefermeyer clarified that while the city has undeveloped planned
developments with R-M as the base zone, there are no undeveloped areas zoned strictly as R-M.
He noted that other zones, such as BHMU, do allow for additional residential development. He
also referenced recent projects like The Rise and the Jerry Salt project, mentioning that despite
the extensive work done, the Jerry Salt project will not proceed. He added that although the city
is actively developing, there are currently no new applications being submitted specifically for
R-M zones.
Council Member Harris asked if, despite the extensive work being done, the city is not
anticipating any new applications for R-M zones in the near future.
Director Schaefermeyer responded that the city does anticipate future applications, particularly
for developments like townhomes, which are common. He noted that staff often directs
applicants accordingly. He added that the purpose of this discussion is to gauge the council’s
comfort level. Although the zone has been changed, it doesn’t mean new projects will suddenly
appear everywhere the R-M zone exists, as most of those areas are already developed. He
South Jordan City 9
City Council Study Meeting
May 6, 2025
explained that future projects would likely involve rezone requests, and if applicants are not
comfortable with pursuing a planned development, staff can guide them to consider the R-M
zone as an alternative, which might be less complex than going through the planned development
process.
Mayor Ramsey clarified for the benefit of all viewers and readers that these standards and
processes do not apply to the master-planned community of Daybreak, and may or may not apply
to other upcoming master plan developments.
Director Schaefermeyer explained that the BHMU zone serves as a good example of existing
residential entitlements that are not zoned R-M. While there are no undeveloped R-M zones
available, which would typically be the primary tool for rezones, there are numerous planned
developments already in place, including large ones like Daybreak.
Planner Moss explained that they have been putting together different elements based on the
feedback the council provided last time regarding what is most important to them. He noted that
the current slide is a draft framework and that things might shift depending on how the council
prioritizes the various aspects. He described the approach as having two options: on the left side
are items that would be required as mandatory standards, while on the right side are items that
would be incentivized, meaning developers could choose from those options. The goal is to
create a menu of options where developers can select from various features and accumulate
points to meet a certain threshold, ensuring the inclusion of key items that promote high-quality
development. He highlighted some of the important points, such as managing transitions and
compatibility of scale, especially in areas where townhomes or multifamily housing meet single-
family neighborhoods. This could include requirements to limit the number of stories or restrict
certain features like second-story roof decks to soften the scale differences. He also mentioned
screening, which would involve a combination of walls and shade trees to create a layered buffer
that provides privacy between different types of uses. He then invited the council to provide
input on the relative importance of these items, asking them to rank each from zero to ten, where
zero means the item is not needed in the code and ten means it is absolutely essential. He
emphasized that the ranking is not a zero-sum game, so one item being less important than
another does not necessarily mean it will be excluded, but it might receive fewer points.
Council Member Harris expressed some reservations about the process, acknowledging that
while the concept behind the survey is good, he is uncertain about how the information gathered
will be used. He shared his preference for open public voting and discussion when making
recommendations, feeling that this survey approach feels somewhat uncertain and risks leading
to closed or less transparent decision-making.
Planner Moss clarified that the results of the survey would be included in the public notes and
minutes provided to City Recorder Anna Crookston, emphasizing that this is part of a public
meeting and the process remains transparent. He added that the purpose of the exercise is simply
to give staff a sense of which elements the council wants to weigh more heavily than others. Due
to limited time, they opted not to dive into each item individually, instead grouping them
together for efficiency.
South Jordan City 10
City Council Study Meeting
May 6, 2025
Council Member Harris expressed that if he were a resident watching the meeting, he would
likely feel frustrated and confused, unsure about what council members were doing, how they
were voting, or what the implications of those actions might be. He emphasized the importance
of open discussion to ensure transparency and public understanding.
Director Schaefermeyer clarified that the intention of the exercise was not to bypass open
discussion or to present a finalized code based solely on the results. He emphasized that staff still
wanted to have meaningful dialogue with the council and that the survey-style ranking was
meant to guide early drafting efforts based on council input. He acknowledged the concern raised
and said if the process felt uncomfortable or inappropriate, they were more than willing to stop,
regroup, and take a different approach. The goal was to avoid investing significant time drafting
something that might not reflect the council’s priorities, and instead ensure their direction was
properly understood from the outset.
Council Member Harris expressed discomfort with participating in the prioritization exercise
without first having a full discussion. He acknowledged the intent behind the exercise, relating it
to prioritization in budgeting, but emphasized that, unlike in previous instances where discussion
preceded input, this process lacked that open exchange. While he recognized the results wouldn’t
be final, he believed they would still influence the direction of the code development. Because of
that concern, and the absence of prior dialogue on the individual items, he stated he would not be
participating in the ranking.
Mayor Ramsey asked the council whether they preferred to continue with the prioritization
exercise as planned or to pause and reschedule in order to first have a more in-depth discussion.
She acknowledged the concerns raised and emphasized the importance of making sure everyone
is comfortable with the process moving forward.
Council Member Shelton acknowledged the value in the conversations the Council has had,
noting that while staff likely gets a general sense of their priorities through discussion, he
understands the staff's intent to try and quantify those priorities more clearly. However, he
expressed support for stepping back from the current exercise, especially out of respect for
Council Member Harris’s discomfort. He suggested it may be better to find a different approach
to communicate the Council’s preferences to staff.
Council Member Zander shared that she sees value in the exercise because it gives all six
members of the Council, including those who may be less vocal in open discussion, an
opportunity to express their individual opinions. She acknowledged Council Member Harris’s
concerns but proposed a possible compromise: having a full discussion first, and then allowing
each member to share their individual stance. This way, staff still receives clear direction from
all Council members, not just the most outspoken ones, which she believes is important. She
concluded by affirming that she agrees with the intent behind gathering everyone’s input.
Mayor Ramsey emphasized that the Council typically operates by engaging in open discussion,
where each member is given a chance to voice their perspective. She acknowledged the intent
behind gathering individual input quickly, such as through ranking or surveys, but reinforced
that, as a body, their process involves hearing each other out. Through discussion, members often
South Jordan City 11
City Council Study Meeting
May 6, 2025
gain new understanding or see different viewpoints, and from there, the Council tends to arrive at
a shared direction. She pointed out that while members may begin with differing views, it's the
collective dialogue that shapes the Council’s final stance, and that approach has served them well
historically.
Council Member Johnson expressed that evaluating priorities in the abstract is challenging
because each development project is so context-dependent. She noted that factors such as
location, whether a property is near a railroad or a busy road versus being more interior,
significantly affect what the community might need from a project. Additionally, the intended
demographic for a project plays a role; for example, design elements for a senior housing
development would differ from those suitable for families with young children. Because of this
variability, she felt it's difficult to assign rigid priorities without knowing specific project details,
and emphasized that each case should be assessed individually.
Council Member Shelton acknowledged Council Member Johnson’s point but emphasized the
challenge of creating a code that applies broadly. He explained that the city needs a code that
serves the entire community, rather than tailoring standards to individual projects, because the
code must provide consistent guidance citywide.
Council Member Johnson agreed, noting that the master development process is designed to
address those unique project circumstances.
Council Member McGuire emphasized that the frequent use of development agreements allows
the city to tailor development projects specifically to their unique circumstances.
Council Member Shelton noted that many projects don’t come before the legislative body but are
approved by the planning commission if they meet existing code requirements.
Council Member McGuire added that if the council is going to postpone this discussion to fully
dive into each item and hear everyone’s opinions, it would essentially turn into a study session
focused solely on the R-M code, which would require a dedicated meeting.
Mayor Ramsey shared that she feels the same way and believes this topic deserves much more
time and attention to ensure it’s done right. She expressed concern that the council doesn’t have
adequate time tonight to fully address what’s needed, including the information staff requires and
the decisions the council must make. While understanding staff’s need for input, she
acknowledged this format isn’t working well and recommended setting a future meeting
dedicated to having a thorough conversation on this issue.
City Manager Lewis suggested sending pre-meeting materials to the council members in advance
for their review. This way, the council can come prepared, and the city can dedicate a full
meeting solely to discussing the R-M code and design standards.
Mayor Ramsey expressed appreciation for the work staff is doing and emphasized the
importance of getting clear direction from the council. She acknowledged that the topic deserves
more time than what was available and that the reality of limited time means it’s best to schedule
South Jordan City 12
City Council Study Meeting
May 6, 2025
more focused discussion later. She believes dedicating more time will lead to better outcomes
and thanked everyone for their efforts.
Council Member McGuire motioned to recess the City Council Study Meeting and move to
City Council Executive Closed Session to discuss the purchase, exchange, or lease of real
property and to discuss the character, professional competence, physical or mental health
of an individual. Council Member Johnson seconded the motion; vote was 5-0 unanimous
in favor.
RECESS CITY COUNCIL STUDY MEETING AND MOVE TO EXECUTIVE CLOSED SESSION
G. Executive Closed Sessions:
G.1. Discussion of the purchase, exchange, or lease of real property.
Council Member McGuire motioned to recess the Executive Closed Session and City
Council Study Meeting and return to discuss the character, professional competence,
physical or mental health of an individual after the Combined City Council &
Redevelopment Agency Meeting. Council Member Zander seconded the motion; vote was
5-0 unanimous in favor.
Council Member Johnson motioned to adjourn the Combined City Council &
Redevelopment Agency Meeting and move back into Executive Closed Session to discuss
the character, professional competence, physical or mental health of an individual. Council
Member Harris seconded the motion; vote was 5-0 unanimous in favor.
G.2. Discuss the character, professional competence, physical or mental health
of an individual.
ADJOURN EXECUTIVE CLOSED SESSION AND RETURN TO CITY COUNCIL STUDY
MEETING
Council Member McGuire motioned to adjourn the Executive Closed Session and return to
the City Council Study Meeting. Council Member Zander seconded the motion; vote was 5-
0 unanimous in favor.
Council Member Johnson motioned to adjourn the May 6, 2025 City Council Study
Meeting. Council Member Shelton seconded the motion. Vote was 5-0, unanimous in favor.
ADJOURNMENT
The May 6, 2025 City Council Meeting adjourned at 10:17 p.m.
South Jordan City 13
City Council Study Meeting
May 6, 2025
This is a true and correct copy of the May 6, 2025 City Council Study Meeting Minutes,
which were approved on June 17, 2025.
South Jordan City Recorder
ATTACHMENT A
SOUTH JORDAN, UTAH
UTILITY RATES REVIEW
MAY 2025
STORM WATER
AGENDA
Financial Plan Objectives & Policies
Review Current Utility Model Methodology
Model Assumptions
Scenario Analysis
2
FINANCIAL PLAN OBJECTIVES
Key Policies
Financial Ratios
Revenue Sufficiency – Each Utility Pays its Own Way
Cash Reserves – Goal to Maintain a Minimum of 150 Days of Cash
on Hand
Maintain Debt Service Coverage Ratio
Ensure Ease of Implementation and Equity
Review Rates for Five-Year Period
3
FINANCIAL PLAN METHODOLOGY
Key Policies
Revenue Growth Analysis
LRB studied existing revenue data and growth projections provided by the
City. This information was then analyzed to determine the potential
allocation of new accounts and the revenue potential within each utility.
Cost of Service Analysis
The cost-of-service analysis is structured to balance revenue sufficiency with
future operating and maintenance costs, contracts, repair and replacement,
capital expenditures, funding for current system deficiencies and bond
service coverage ratios.
Rate Design Analysis:
The final phase focuses on structuring rates that will collect the necessary
revenues based on the City’s budgetary needs and rate objectives.
Entities should evaluate enterprise funds every 3-5 Years.
4
FINANCIAL PLAN ASSUMPTIONS
Key Assumptions
Model Based on 2023 Actuals, 2024 Estimated Figures,
2025 Budget, with Projections through 2030
3% Growth in ERUs
1% Growth in Misc. Revenues and Other Revenues
3.20% Growth in Salaries & Benefits Expense
5.25% Growth in General O&M Expense
3% Construction Inflation
5
FINANCIAL PLAN ASSUMPTIONS
Key Assumptions: Storm
Existing Fund Balance Starting Point: $1.68M
Model Assumes Amortization for portion of
Public Works Facility: ~$366K Annually
Proposed CIP:
2026 2027 2028 2029 2030
Total $1,637,742 $1,792,964 $1,737,480 $1,789,605 $1,843,293
6
SCENARIO ANALYSIS
Storm Utility
Scenario 1: Baseline Scenario - No Rate Change
Scenario 2: Revenue Increase Needed to Maintain
System Sustainability (Rate Increase)
7
SCENARIO ANALYSIS
Storm Baseline Scenario (No Action)
Debt payments begin in 2027 for PW Building
8
SCENARIO ANALYSIS
Storm Scenario 2 (Rate Increase)
Debt payments begin in 2027 for PW Building
Assumes Rate Increases to Promote Sustainability
9
SCENARIO ANALYSIS
Storm Scenario 2 (Rate Increase)
ERU Fee – Annual Increase of 3%
Current 2026 2027 2028 2029 2030
ERU Fee $9.02 $9.29 $9.57 $9.86 $10.16 $10.46
10
COMPARISON OF TOTAL BILL
Average Storm Comparison:
* Represents average between residential and commercial rates.
11
QUESTIONS
Fred Philpot | Vice President/COO
LRB Public Finance Advisors
O 801.596.0700 | C801.243.0293
lrbfinance.com
Lewis Young Robertson & Burningham is now LRB Public Finance Advisors
ATTACHMENT B
SOUTH JORDAN CITY
COST OF SERVICE STUDY UPDATE
MAY 2025
PURPOSE
Utah Code 10-9a-510
To ensure that the fees charged reflect the
actual/reasonable cost of processing the
application, permit, inspection, regulation or
review.
2
PROCESS
Fee Analysis
Task 1: Cost Analysis Task 2: Process Analysis
Base Employee Cost
Coordination with Staff
Department Overhead Cost
Update Process Maps
Administrative Overhead Cost
Establish Fee
3
TASK 1: COST ANALYSIS
Analysis of current and projected budgets to
determine base costs, department overhead, and
administrative overhead costs:
Base costs include employee salaries and
benefits
Department overhead costs include general
costs to operate each department
Administrative overhead costs include the cost
of the services provided to all departments
(i.e. legislative, executive and administrative
costs)
4
TASK 1: EXAMPLE COST ANALYSIS
Base, department overhead, and administrative
overhead costs compared to total hours worked
to determine employees’ cost per minute
DEPARTMENT ADMINISTRATIVE
BASE COST TECHNOLOGY TOTAL UNIT COST
PERSONNEL OVERHEAD COST OVERHEAD COST
(PER MIN) FEE (PER MIN)*
(PER MIN) (PER MIN)
Planner I $0.67 $0.01 $0.05 $0.51 $0.99
Planner II $1.18 $0.01 $0.05 $0.51 $1.50
Planner III $0.76 $0.01 $0.05 $0.51 $1.08
*50% of Administrative Cost
5
TECHNOLOGY FEE CALCULATION
Technology Fee: Annual maintenance cost
for technology (does not include initial startup
cost)
Calculated by taking the total annual
maintenance cost ($79,377) and dividing it
across all hours spent by building, planning,
and engineering Full-Time Equivalent
Employees (FTEs).
6
TASK 2: PROCESS MAPS
Example: Accessory Dwelling Unit Staff
Review
STEP # ACTION HOURS PERSONNEL INVOLVED
Administrative Assistant I, Administrative Assistant II, Administrative
1 Application review 0.25
Assistant III, and Executive Assistant
2 Planning staff review 1.50 Planner I, Planner II, Planner III, or City Planner
Close-out file and send notice to
3 0.50 Planner I, Planner II, Planner III, or City Planner
applicant
TOTAL 2.25
7
ESTABLISHING THE FEE
Apply employees’ cost per minute to time spent on
each process to calculate actual average costs
Accessory Dwelling Unit Staff Review
PERSONNEL INVOLVED HOURS COST PER MIN. TOTAL COST
Administrative Assistant I $0.72
Administrative Assistant II $0.72
Administrative Assistant III $0.82
Executive Assistant $1.03
Administrative Assistant I, Administrative Assistant II, Administrative
0.25 $3.29 $49.35
Assistant III, and Executive Assistant
Planner I $0.99
Planner II $1.08
Planner III $0.88
City Planner $2.02
Planner I, Planner II, Planner III, or City Planner 2.00 $1.24 $148.50
TOTAL 2.25 $197.85
8
SUMMARY OF RECOMMENDED FEES
Fee Category Proposed Fee* Fee Category Existing Fee Change
Accessory Living Unit Staff Review $197.85 Accessory Living Unit Staff Review $147.00 $50.85
Accessory Living Unit Planning Accessory Living Unit Planning
$868.30 $642.00 $226.30
Commission Review Commission Review
Additional plan review required by
Additional Plan Review Fee $218.72 $171.00 $47.72
changes, additions, or revisions
Annexation (including land use and
Annexation $2,290.25 $1,546.00 $744.25
rezoning)
Appeals to City Council $988.80 Appeal to City Council (Title 11) $975.00 $13.80
Cold Weather Permit Paving
$330.90 Cold Weather Paving Application Fee $252.00 $78.90
Application Fee (Oct. 15 - March 15)
Conditional Use Permit $765.48 Conditional Use Permit $676.00 $89.48
Encroachment Permit Fee (Drive
Curb Cut Encroachment Permit $229.35 $193.00 $36.35
Approaches with Building Permits)
Land Disturbance Fee $154.95 Land Disturbance Permit $126.00 $28.95
Land Use Amendment $1,038.15 Land Use Amendment $890.00 $148.15
Lot Line Adjustment $926.33 Lot Line Adjustment Fee $742.00 $184.33
Minor Site Plan Amendment Permit $745.76 Minor Site Plan Amendment $496.00 $249.76
Reinspection fees assessed under
Re-Inspection Fee $226.52 $158.00 $68.52
provisions of Sec. 305.8
Residential Chicken Permit $108.05 Residential Chicken Permit $76.00 $32.05
Rezone $1,006.78 Rezone $890.00 $116.78
$1,006.78 Base Rezone +
Rezone with Development $890 Base Rezone + $1,584
$1,903.25 Development Rezone
Agreement (Optional) Development Agreement
Agreement
Rezone9and Land Use Amendment $1,061.15 Rezone $924.00 $137.15
SUMMARY OF RECOMMENDED FEES
Fee Category Proposed Fee* Fee Category Existing Fee Change
Sign Permit $286.23 Sign Permit $221.00 $65.23
Site Plan Review (Small Site 0-3 Site Plan (including conditional use
$6,748.98 $5,551.00 $1,197.98
acres) permit)
Site Plan Review (All other Sites 3+
$8,281.38 $6,882.00 $1,399.38
acres)
Small Residential Development $1,638.40 Small Residential Development $1,445.00 $193.40
Standard Encroachment Permits $312.30 Encroachment Permit Fee $263.00 $49.30
Subdivision Amendment (same
$4,631.60 Amended Subdivision $3,637.00 $994.59
regardless of size)
Subdivision Preliminary $2,567.25 Base + $53.98 per lot Preliminary Subdivision $1,953 Base + $50 per lot
Subdivision - Final $3,629.7 Base + $223.53 per lot Final Subdivision $2,816 Base + $209 per lot
Temporary Banner/Sign Permit $105.04 Banner Permit $61.00 $44.04
Text Amendment $1,429.78 Zone Text Amendment $1,546.00 ($116.23)
$73.2 Base + $0.77 per linear $63 Base + $0.77 per linear foot
TV Video Inspection Fee TV Video Inspection Fee
foot of pipe of pipe
Wind Energy Conversion Systems
Wind Energy Conversion Systems $629.65 $610.00 $19.65
PC Zone
Zoning Compliance Letter $346.35 Zoning Compliance Letter $284.00 $62.35
Right of Way Vacation $1,054.25 New Application NA
Development Agreement
$1,187.54 New Application NA
Amendment
New Application
Floodplain Permit $1,140.90 NA
10
SUMMARY OF RECOMMENDED FEES
Proposed Existing Fee
Proposed Existing Fee
AG BLDG (PRGA)
Single Family Detached $0-$500 $255.42 $218
(PRSFD)
$501-$2,000 $553.59 $469
$0-$500,000 $3,298.45 $2,786
$2,001-$40,000 $851.76 $720
$500,001+ $4,203.25 $3,555
$40,001-$100,000 $1,209.61 $1,020
Single Family Attached $100,001-$500,000 $1,717.79 $1,447
(PRSFA)
$500,001-$1,000,000 $2,439.47 $2,051
$0-$500,000 $3,089.70 $2,692
$1,000,001+ $3,464.35 $2,908
$500,001+ $3,937.24 $3,436
DECK (PRDK)
DEMO (PRDE)
$0-$500 $205.87 $174
Per Permit $44.21 $38
$501-$2,000 $541.25 $454
RET WALL (PRRW) $2,001+ $797.94 $683
$0-$500 $592.39 $500 DETACHED ACCE (PRDA)
$501+ $809.65 $683 $0-$500 $969.78 $805
SIGN (PRSG) $501-$2,000 $969.78 $805
$0-$500 $267.20 $223 $2,001-$40,000 $1,292.50 $1,101
$501+ $410.79 $343 $40,001-$100,000 $1,350.25 $1,145
$100,001-$500,000 $1,350.25 $1,145
ROOF (PRRF)
$500,001+ $1,698.23 $1,431
Per Permit $187.08 $158
11
SUMMARY OF RECOMMENDED FEES
Existing Combined
Proposed Existing Combined
Fee Proposed
Fee
CARPORT (PRCP)
Res POOL (PRPO)
$0-$500 $631.60 $543
$0-$500 $976.06 $816
$501-$2,000 $672.56 $577
$501-$2,000 $1,053.64 $886
$2,001-$40,000 $713.53 $612
$2,001-$40,000 $1,131.21 $957
$40,001+ $776.83 $652
$40,001-$100,000 $1,131.21 $957
TEMP POWER (PRTP)
$100,001+ $1,460.96 $1,127
Per Permit $109.83 $93
Res ADD (PRAD)
GAS (PRGS)
$0-$500 $220.45 $183
Per Permit $322.25 $274
$501-$2,000 $679.83 $565
POWER METER (PRPM)
$2,001-$40,000 $1,139.20 $946
$0-$500 $249.27 $0
$40,001+ $2,223.74 $1,856
$501+ $1,079.57 $0
Res REMODEL (PRRR)
ELEC ONLY (PREL)
$0-$500 $196.18 $179
Per Permit $252.07 $212
$501-$2,000 $253.04 $179
APPLIANCE (PRAP)
$2,001-$40,000 $411.91 $326
Per Permit $188.13 $160
$40,001-$100,000 $415.16 $326
Res SOLAR (PRSO)
$100,001+ $602.45 $478
$0-$500 $355.76 $298
Res Bsmt (PRBS)
$501-$2,000 $440.72 $370
$0-$500 $460.64 $386
$2,001-$40,000 $525.68 $443
$501-$2,000 $659.80 $585
$40,001-$100,000 $614.17 $517
$2,001+ $858.96 $784
$100,001+ $987.60 $837
12
SUMMARY OF RECOMMENDED FEES
Proposed Existing Combined Fee Existing
Proposed
Combined Fee
R-2 (PRAC)
Commercial (PRNR)
$0--$1,000,000 $5,294.27 $4,416
0-$100,000 $4,136.29 $3,422
$1,000,001-$5,000,000 $19,813.40 $16,568
$100,001-$500,000 $8,710.05 $7,183
$5,000,001+ $39,428.78 $32,652
$500,001-$1,000,000 $13,725.66 $11,505
Comm Addition (PRCA)
$1,000,001-$5,000,000 $19,916.84 $16,551
$0-$500 $936.08 $759
$5,000,001+ $35,735.91 $29,453
$501-$2,000 $1,344.45 $1,119
$2,001-$40,000 $1,930.99 $1,650
$40,001-$100,000 $2,773.42 $2,434
$100,001-$500,000 $3,021.80 $2,639
$500,001-$1,000,000 $3,284.62 $2,855
$1,000,001-$5,000,000 $3,365.84 $2,930
$5,000,001+ $5,814.62 $4,953
Comm TI (PRCR)
$0-$500 $632.63 $598
$501-$2,000 $957.20 $888
$2,001-$40,000 $1,281.78 $1,179
$40,001-$100,000 $1,554.64 $1,433
$100,001-$500,000 $2,196.07 $2,038
$500,001-$1,000,000 $2,196.07 $2,038
$1,000,001-$5,000,000 $2,237.30 $2,060
$5,000,001+ $4,343.81 $3,951
13
SUMMARY OF RECOMMENDED FEES
Reasons for fee change:
The last fee study update was completed in
2022
Salary/benefits changes
14
REVENUE ANALYSIS
Total annual fee revenue compared to the
annual fee revenue anticipated if the
recommended fees are adopted.
CURRENT FEES RECOMMENDED PERCENT CHANGE
Building Permit Revenue $2,323,277 $2,772,647 19.3%
Planning Fees $285,868 $358,080 25.3%
15
ATTACHMENT C - HANDOUT
ATTACHMENT D
City Council Study
Session
5.6.25
RM Zone
Text Amendment Discussion
General
• Purpose
• Applicability
• Procedures
• Uses
Organization Standards
• Lot and Building Envelope Standards
• Residential Design Standards
• Required Features
• Development Design Score
• Nonresidential Development Standards
• Other Requirements
Lot & Building Envelope Standards
Required Features Scored Features
Transitions to less intense uses Connectivity
Maximum stories Streetscape Enhancements
Prohibit second story outdoor Site Layout
spaces
Ground Floor Activation
Screening Context integration
Property line screening and 360 Architecture
Design landscape buffer
Enhanced Building Materials
Features Surface parking lots
Mechanical equipment
Mix of Housing types
EV Infrastructure
Trash facilities
Bicycle Infrastructure
Open Space
Low impact development
Minimum % of site and
minimum dimensions Neighborhood input
Passive or active amenities Mixed Income Housing
based on unit count
Private open space per
dwelling unit
Two story limit within Balcony oriented to single-
transition area family prohibited
PROPERTY LINE
Transitions
Transition Area
RM Single-Family
Shade Trees Wall
Screening
PROPERTY LINE
RM Single-Family
Poll
Passive Active Private
Open Space
Poll
Avoid Encourage
Connectivity
Avoid Encourage
Streetscape
Enhancement
Avoid Encourage
Site Layout
Avoid Encourage
Ground Floor
Activation
Poll
Avoid Encourage
Context
Integration
Avoid Encourage
360
Architecture
Avoid Encourage
Enhanced
Building
Materials
Avoid Encourage
Mix of
Housing
Types
Poll
EV and Bike
Infrastructure
Low Impact
Development
(LID)
Neighborhood
Input
Mixed
Income
Housing
Poll
Questions
Agenda
CITY OF SOUTH JORDAN
CITY COUNCIL STUDY MEETING AGENDA
CITY COUNCIL WORK ROOM
TUESDAY, MAY 6, 2025 at 4:30 p.m.
Notice is hereby given that the South Jordan City Council will hold a City Council Study Meeting at 4:30
p.m. on Tuesday, May 6, 2025, in person in the City Council Work Room, located at 1600 W. Towne
Center Drive, South Jordan, Utah and virtually via Zoom phone and video conferencing. Persons with
disabilities requesting assistance should contact the City Recorder at least 24 hours prior to the Meeting.
The Agenda may be amended, and an Executive Session may be held at the end of the Meeting. Times
listed are approximate and may be accelerated or delayed.
In addition to in-person attendance, individuals may join via phone or video, using Zoom. In the event the
Meeting is disrupted in any way that the City in its sole discretion deems inappropriate, the City reserves
the right to immediately remove the individual(s) from the Meeting and, if needed, end virtual access to
the Meeting. Reasons for removing an individual or ending virtual access to the Meeting include but are
not limited to the posting of offensive pictures, remarks, or making offensive statements, disrespectful
statements or actions, and other any action deemed inappropriate.
Ability to participate virtually is dependent on an individual’s internet connection. Instructions on how to
join virtually are below.
Join Study Meeting Virtually:
• Join on any device that has internet capability.
• Zoom link, Meeting ID and Password will be provided 24 hours prior to meeting start time.
• Zoom instructions are posted https://ut-southjordan.civicplus.com/241/City-Council.
Study Meeting Agenda: 4:30 p.m.
A. Welcome, Roll Call, and Introduction: By Mayor, Dawn R. Ramsey
B. Invocation: By Council Member, Don Shelton
C. Mayor and Council Coordination
D. Discussion/Review of Regular Council Meeting:
Utah Black Diamonds Land Use Public Hearing Items:
- Resolution R2025-23, Development Agreement pertaining to property 272 West 11000 South.
- Zoning Ordinance 2025-03-Z, Rezoning property 272 West 11000 South, from C-F
(Commercial - Freeway) Zone to C-F (Commercial - Freeway) Zone and PD (Planned
Development) Floating Zone; Nichols Naylor Architects (Applicant).
Public Hearing Items:
- Resolution R2025-25, Adopting the 2025 Drinking Water System Master Plan.
- Ordinance 2025-05, Amending Section 17.40.020 of the City of South Jordan Municipal Code.
Action Items:
- Resolution R2025-18, Appointing a member to the BCRPA Board.
- Resolution R2025-20, Adopting FY2025-2026 Tentative Budget.
RDA Action Item:
- Resolution RDA 2025-01, Adopting FY2025-2026 Tentative Budget.
City Council Study Meeting – May 6, 2025 Page 1 of 2
E. Presentation Items: 4:40 p.m.
E.1. Storm Water Rate Study. (By Director of Public Works, Raymond Garrison)
E.2. Development Fee Study. (By CFO, Sunil Naidu)
F. Discussion Item: 5:00 p.m.
F.1. R-M text amendments. (By Long-Range Planner, Joe Moss)
RECESS CITY COUNCIL STUDY MEETING AND MOVE TO EXECUTIVE CLOSED SESSION
G. Executive Closed Sessions: 5:20 p.m.
G.1. Discussion of the purchase, exchange, or lease of real property.
G.2. Discuss the character, professional competence, physical or mental health of an
individual.
ADJOURN EXECUTIVE CLOSED SESSION AND RETURN TO CITY COUNCIL STUDY MEETING
ADJOURNMENT
CERTIFICATE OF POSTING
STATE OF UTAH )
:§
COUNTY OF SALT LAKE )
I, Anna Crookston, the duly appointed City Recorder of South Jordan City, Utah, certify that the foregoing
City Council Agenda was emailed to at least one newspaper of general circulation within the geographic
jurisdiction of the public body. The agenda was also posted at the principal office of the public body and
also posted on the Utah State Public Notice Website http://www.utah.gov/pmn/index.html and on South
Jordan City’s website at www.sjc.utah.gov. Published and posted May 2, 2025.
City Council Study Meeting – May 6, 2025 Page 2 of 2
Get email alerts for South Jordan
A daily email when new agendas and minutes are posted.