Planning Commission Meeting - ARCHIVED
Regular MeetingSouth Jordan, UT · September 12, 2023
Minutes
CITY OF SOUTH JORDAN
ELECTRONIC
PLANNING COMMISSION MEETING
COUNCIL CHAMBERS
September 12, 2023
Present: Commissioner Michele Hollist, Commissioner Nathan Gedge, Commissioner
Trevor Darby, Commissioner Steven Catmull, Commissioner Laurel Bevans,
Assistant City Attorney Greg Simonsen, City Planner Greg Schindler, Deputy
City Recorder Cindy Valdez, Deputy City Engineer Jeremy Nielson, GIS
Coordinator Matt Jarman, IS Tech Phill Brown, Meeting Transcriptionist Diana
Baun, Planner Andrew McDonald
Others: Jamie Mansouri, Troy, Todd Braithwaite, Rod Anderson, Marilyn Anderson, Jeff
Almond, Kenyon Clark, Neil Smith, Travis Hiatt, Bart Hoenes, Betsy Hoenes,
Lori Howa, Brent Howa, Lucynthia Rockwood, Jared Osmond, Devan Hatch,
Josh Hatch, Mili Pioquinto, Kal Robbins, Tyler Robbins
Absent:
6:30 P.M.
REGULAR MEETING
A. WELCOME AND ROLL CALL – Chair Michele Hollist
Commissioner Michele Hollist welcomed everyone to the Electronic Planning Commission
Meeting.
B. MOTION TO APPROVE AGENDA
Commissioner Gedge motioned to approve tonight’s agenda as published. Chair Hollist
seconded the motion; vote was unanimous in favor.
C. APPROVAL OF THE MINUTES
C.1. August 22, 2023 Planning Commission Meeting Minutes
Commissioner Darby motioned to approve the August 22, 2023 Planning Commission
Meeting Minutes as published. Chair Hollist seconded the motion. Vote was unanimous in
favor.
D. STAFF BUSINESS
City Planner Greg Schindler shared that Commissioner Aaron Starks has resigned from the
Planning Commission via email to the Mayor.
South Jordan City 2
Planning Commission Meeting
September 12, 2023
Chair Michele Hollist asked about training and staff shared that it is still on the schedule and will
probably be at the end of the meeting.
E. COMMENTS FROM PLANNING COMMISSION MEMBERS - None
F. SUMMARY ACTION - None
G. ACTION - None
H. ADMINISTRATIVE PUBLIC HEARINGS
H.1. MINERS COVE NORTH PRELIMINARY SUBDIVISION PLAT
Address: 10435 S. 2200 W.
File No.: PLPP202300048
Applicant: Jeffrey Almond
Planner Andrew McDonald reviewed background information from the Staff Report and noted
there was an email received as public comment from a resident (Attachment A).
Chair Michele Hollist asked to clarify the parking ratios.
Planner McDonald responded that, based on the current floor space of the existing building, there
are only five excess parking spots. With the dance academy, they could also calculate the
parking based on the seats in the lobby.
Chair Hollist asked about permitted uses in the zone.
Planner McDonald responded that the Commercial-Neighborhood Zone would permit a daycare,
another dental or medical clinic, an office, personal services, professional services, general retail
and instructional training. It would also allow, with a conditional use, a gas station, a bank or
credit union, lodging, telecommunication utilities, animal services, light services and repair,
churches, public safety, community services and restaurants.
Chair Hollist invited the applicant up to speak.
Jeffrey Almond (Applicant) said that regarding the parking issue, he has been issuing parking
permits to the high school over the last five years with at least 30 parking spots being rented out
each year; they have never had an issue with parking, even with those spots being used.
Chair Hollist asked if he knew what might be going into the new building.
South Jordan City 3
Planning Commission Meeting
September 12, 2023
Mr. Almond responded that the dance studio is inquiring about more space, and he also has been
contacted by a daycare/minor school which subleases from the dance studio one day a week from
9:00 am to about 3:20 pm.
Chair Hollist asked if they would be able to accommodate a drive through drop-off and pick-up
situation with the current layout.
Mr. Almond responded no, that’s something he would have to look through with the planning
department in the future. There were some issues in the beginning, but he has talked to the
school and they appear to have resolved that. They manage it very well in the morning with
someone standing at the 2200 W entrance, allowing only a small amount of cars in at a time to
pick up or drop off a child and leave before allowing more cars. This prevents a long line
blocking his patients, and it has never been an issue.
Chair Hollist noted that when driving by the dance classes appear to spend time out on the grass
and asked for more information on that.
Mr. Almond responded it’s not part of their class, he believes they go out there when they take a
break; they have never held a class out there, it just gets a little crowded inside.
Chair Hollist asked if he knew the number of chairs in the dance studio’s lobby.
Mr. Almond responded they have a number of benches, maybe enough for 15-20 people; there is
also seating in each of the four studios.
Commissioner Nathan Gedge asked if the applicant would be agreeable to eliminating or
rescinding the leases of parking spots to the high school students down the road.
Mr. Almond responded yes, saying that they have 33 leases this year, but he keeps track and
there are usually only about 18-22 spots used per day.
Commissioner Laurel Bevans asked about a possible timeline for putting in the new building.
Mr. Almond responded there is not a timeline, the dance studio would like to have it done by
next August or September if they commit to the space.
Chair Hollist opened the public hearing for comments.
Todd Braithwaite (Resident) – I am one of the houses behind this property, and this is probably
just my ignorance, but is part of this property being sold off or just creation of a new building
with the existing owner owning the entire property plus buildings? The current businesses seem
to work very well with the community. The dance studio did have an activity out on the grass the
other day that he saw and he thought it would be a shame when that’s gone.
South Jordan City 4
Planning Commission Meeting
September 12, 2023
Marilyn Anderson (Resident) – our backyard backs up to Mr. Almond’s property and I have to
say he has been a great neighbor for several years. He has landscaped and it is beautiful. We do
have some concerns about the smallness of the parking lot; I think he is being very optimistic
about that as what we have seen from our backyard when the preschool is on, even when the
dance studio is on, the cars are backed up down 2200 W and into our neighborhood. I have seen
more than five cars in that parking lot dropping kids off, so I guess we have a concern about that.
We absolutely have a concern about what will be in there. It is our neighborhood, he doesn’t
reside there, he works there, so we hear tattoo parlor and gas station and that concerns us as
neighbors. For us, it would depend on what is there, but I will say he has been a great neighbor
and we have enjoyed having it behind us, but I do think there is some issues with the parking that
we aren’t being realistic about.
Bart Hoenes (Resident) – When this was presented originally, they did mention that the plan
was to put up another building there and it sounds like the building is being planned so that it
will be the same sort of aesthetics and structure as the original one, which I think is very nice. I
also did not know whether this was a sale of property to someone else or not because of how it
was worded as being subdivided; I would also like that cleared up. I want the council to know I
would be very opposed to a tattoo parlor, a gas station, a restaurant in this area; I don’t think
that’s very appropriate for there. Do you know what the ordinances are on lighting that, the
amount of light put out by commercial structures in a neighborhood area? It is quite bright all
night, so I hope the new building doesn’t add additional brightness to that, and I would prefer to
see what is there toned down a bit. The use of the current property is just fine and Mr. Almond
has been a good neighbor.
Chair Hollist closed the public hearing. She asked staff to address the concerns shared by the
residents.
Planner McDonald shared that regarding lot ownership, staff is unsure if the applicant is setting
himself up in the future to potentially sell off and recuperate some costs since this is creating two
lots which would allow the owner to sell one of those lots in the future. Parking is based upon a
ratio assigned to the use, so it would depend on who wants to come in with the tenant
improvement permits and what would need to be done there. Based upon the description of the
dance studios seating, the city would be able to reduce their parking requirement to one spot per
four seats, opening up more spaces for all units on the property. The recording of the plat would
establish shared access between the two existing points, which wouldn’t change. There is no
shared parking agreement in place, they still need to meet the requirements for all uses on the
site.
Chair Hollist asked how many parking spots this new subdivision will have associated with it.
Planner McDonald responded there are currently 64 spots, with roughly 10 for the dentist’s
office and based on the floor ratio 49 for the dance studio; however, that could be reduced if staff
got an exact number of seats on the inside. In terms of the new building, those numbers would
depend on the use and that will be looked at in the future. Right now, the city hasn’t been
receiving complaints on activity at the location to cause concerns; if that changes, staff would
South Jordan City 5
Planning Commission Meeting
September 12, 2023
circle back to the issue and possibly dig deeper into the daycare operations and plans they have
to handle those situations as if they were going through the CUP process.
Chair Hollist asked, without a shared parking agreement, how do they determine which property
owns which spots.
Planner McDonald responded that staff only looks at the ratio in relation to the use.
City Planner Schindler noted that it appears on the subdivision line that goes across the property
there will be about 14 parking spaces on the new lot to the north, the rest will remain on the
south lot. Without an agreement, technically the owner of the south lot could prohibit the owner
of the new lot use of those parking spaces. He is unsure if that line includes the current
handicapped spaces.
Chair Hollist noted that it appears with the changes, the current building will no longer meet
their parking requirements since they currently only have five extra spaces.
Planner Schindler responded that if that is the case, then the current building will have to
maintain the specific number of spaces required and subdivision could probably not occur
without a shared parking agreement.
Assistant City Attorney Greg Simonsen explained the laws defining a subdivision. He also noted
that if the same person owns both lots in this subdivision, they can allow parking across the
property lines at any time because they own both.
Commissioner Trevor Darby asked if the owner were to develop this and in the future sell one of
the lots, would they need to sign a shared parking agreement or each have their own assigned
parking spots based on the subdivision.
Attorney Simonsen responded that either option would be correct.
Commissioner Steve Catmull asked if the discussion of potential uses is a normal part of a
subdivision review at this stage. If they are here to basically divide this lot into two, creating two
separate tax lots, can they encompass the previous operating business requirements into the
subdivision.
Planner McDonald responded that the application satisfies the requirements of a subdivision.
What Commissioner Catmull described sounds more like what they would discuss when they
reached development. Most of what Planning, Building and Engineering look at have already
been taken into account with the first site plan. With a smaller building anticipated on the second
lot, depending on that application, they would start to look at how the site looks in relation to
what is needed. The final subdivision site plan would come back to the planning commission and
city oversight on the building permit for the new building.
South Jordan City 6
Planning Commission Meeting
September 12, 2023
The commission discussed the issues with parking and that it’s the biggest complaint received
from residents, asking staff if they were aware that a business was queuing onto 2200 W and
around the corner into the neighborhood.
Deputy City Engineer Jeremy Nielson responded he has not received any related complaints.
Chair Hollist asked staff to explain the steps for residents to go about complaints with traffic.
Engineer Nielson responded that with traffic concerns, residents are always welcome to reach out
to Engineering, him specifically, and he can look into it. The traffic committee ultimately
reviews traffic issues and would respond to any concerns.
Commissioner Gedge asked if staff had any concerns for high school drop-off and pick-up times
and access to the city streets in that area.
Engineer Nielson responded no.
Commissioner Catmull asked if the commercial site plan can encompass more than one
subdivision.
Planner McDonald responded it would be for how they intend to develop Lot 2, but staff would
be able to ask the applicant how they intent to incorporate into the existing lot to get a bigger
picture.
Commissioner Catmull asked if Lot 1 was currently undeveloped but already subdivided, and
this came before them, could the site plan for Lot 2 include the details for Lot 1. This was
originally planned to be subdivided, but the site plan for the Lot 1 area had certain things
addressed for the entire property and he wonders if they have to go back and compare to that
original site plan when the site plan comes in eventually for Lot 2.
Planner McDonald responded that usually it’s one site plan per lot or pad, sometimes there is a
larger discussion with the applicant depending on the intended uses. If this was still residential
property this would be done differently, like a circumstance where someone owns two adjoining
lots and wants to build homes next to each other.
Chair Hollist asked for information on lighting ordinances, and a confirmation that Lot 1 had
their lighting approved and measured to meet the city requirements.
Planner McDonald went over the code requirements, and all of that was approved back in 2017;
no additional lighting is expected. The only changes anticipated with the site plan are an
additional fire hydrant at this time to service the two buildings.
Commissioner Gedge noted that the current lot has what was originally approved on the
landscape plan and green space. However, with subdividing this and getting rid of the grass field
he asked if that eliminates the required city ordinance for the existing building in regards to open
space.
South Jordan City 7
Planning Commission Meeting
September 12, 2023
Planner McDonald responded that they should both still meet requirements as none of the street
trees in park strips or landscape in the planter beds on site are changing, nor are they changing in
the area the building would go. The site was developed as if the building was going to be there
with no additional changes needed.
Commissioner Gedge asked if the current grass field is a flood retention basin.
Engineer Nielson responded no.
Chair Hollist asked if there was any sort of maximum coverage limit in this zone, like there is in
residential zones.
Planner Schindler responded that there is no maximum coverage limit on commercial zones.
There are certain setbacks and parking space requirements that have to be met, but otherwise
there are no limits.
The commission and staff discussed parking requirements and possible future issues with
approving this subdivision without a current shared parking agreement.
Commissioner Gedge motioned to approve File No. PLPP202300048, Preliminary
Subdivision Plat, based on this evening’s discussion, staff report and testimony from the
public with the following conditions: That all South Jordan City Requirements pertaining
to site plan, parking regulations and standards are met.
Commissioner Darby noted that this is a subdivision application, not a site plan.
Commissioner Gedge amended his motion to replace “site plan” with “subdivision,” and
amend the conditions to read only that all South Jordan City requirements are satisfied.
Chair Hollist seconded the motion.
Roll Call Vote
Yes - Commissioner Gedge
Yes - Chair Hollist
Yes - Commissioner Catmull
Yes - Commissioner Darby
Yes - Commissioner Bevans
Motion passes 5-0, unanimous in favor.
Attorney Simonsen addressed the residents, noting their concerns voiced about what type of
business might locate here. That was not an issue for tonight, as that is a zoning issue regarding
what is permitted in each zone. This is a Commercial-Neighborhood Zone, and the public can go
online under Title 17 in the city code to see the lists of permitted uses for each zone.
South Jordan City 8
Planning Commission Meeting
September 12, 2023
Planner McDonald added that specifically Title 17.18.020 outlines what is permitted by right and
by CUP in each zone. Additionally, Title 17.18.060 covers the definitions of those uses.
Chair Hollist highly recommended a parking and traffic plan be included in the site plan
application in the future.
H.2. KINGS LANDING PRELIMINARY SUBDIVISION PLAT
Address: 10828 S. 1055 W.
File No.: PLPP202300080
Applicant: Devan Hatch
Planner Andrew McDonald reviewed background information from the Staff Report.
Commissioner Nathan Gedge asked why they were pushing to get this on the agenda tonight.
Planner McDonald responded that this was a joint decision by the city engineer and the director
of the planning department, to present the application with a list of the specific requirements that
still need to be met.
Commissioner Gedge expressed his concerns with having this public hearing while still having
issues that need to be resolved.
Chair Michele Hollist and Commissioner Bevans shared the same concerns. Chair Hollist asked
a few specific questions about the grading and Planner McDonald was able to respond.
Commissioner Laurel Bevans asked about the type of retention basin on another subdivision of
the applicant’s property.
Deputy City Engineer Jeremy Nielson responded it is an open pond.
Commissioner Bevans asked about the other subdivision again, and where that will come off of
1055 W when it’s developed.
Planner McDonald responded that the basin would require an easement with the owner, which
would detail who is responsible for what infrastructure. Tonight the staff report is addressing the
parcels on 10827 South only. The property lines have been adjusted and the top part of 10827
South has a 20 foot wide access, with the lot opening up in the back, which makes the bottom lot
a bit wider to help with the development of the other properties. There will only be one home on
each of those two lots.
Commissioner Bevans asked for the anticipated duration of construction for the road being
closed and a temporary access provided.
Planner McDonald believes it will be two to three weeks.
South Jordan City 9
Planning Commission Meeting
September 12, 2023
Chair Hollist asked about the reasons for the changes to the road.
Engineer Nielson responded the closure is necessary for the sewer line.
Planner McDonald responded that 1055 W needs to be raised in order to make the six lots and
grade of the road comply with the fire department’s 10% or less requirement.
The commission and staff discussed the specific details from the staff report as to why the road
requires the grade change.
Devan Hatch (Applicant) shared this project is here early because it has been a very
complicated piece to develop. They have run out of time, and money is becoming an issue
because it has gone on so long. He agrees with staff’s comments that the items left to deal with
between him and staff are minor, and can be taken care of easily. He talked about his agreement
to upgrade the road for Roseman University, as it is currently very unsafe and this will benefit
many more people.
Chair Hollist asked the applicant if he had a chance to review the requirements listed in the staff
report that still need to be addressed, and if he agrees to take care of those.
Mr. Hatch responded that he has reviewed them, and they plan on taking care of those.
Commissioner Bevans asked the applicant if he plans on the two lots to the east eventually
joining into the same retention pond.
Mr. Hatch responded the water is to be retained on the lot, but was does drain to the street will go
to the same pond.
Commissioner Gedge asked the applicant if he agrees that the planned closure of the road is for
two to three weeks, and if there is any way to expedite that completion.
Mr. Hatch responded that they want to get it done as quickly as possible as well, and as long as
weather cooperates, they plan on completing it in the estimated three weeks. He also confirmed
that with the temporary road there will always be access for the residents and emergency services
to access the area.
Commissioner Steve Catmull asked about liability on the temporary road.
Mr. Hatch responded that any accidents involving construction equipment would fall under the
construction insurance.
Chair Hollist motioned for a five minute recess. Commissioner Catmull seconded the
motion; vote was unanimous in favor.
South Jordan City 10
Planning Commission Meeting
September 12, 2023
Commissioner Bevans asked about the depth of retention pond.
Engineer Nielson responded that it looks to be about four feet, and these usually have a 3:1
slope.
Chair Hollist opened the public hearing for comments.
Neil Smith (Resident) – I have property that borders 1055 further to the south of where the
property under consideration is located. I had expected to come and just listen tonight because I
didn’t expect there would be anything that potentially impacts my property. I noticed that when
one of the plats was up there was, in addition to the property under consideration tonight, what
looked like a 40 foot turnaround. Does that have anything to do with what’s under consideration
tonight? I was under the impression that there would be changes up to the knuckle, but further to
the south it was my understanding that it was a private road and there wouldn’t be any changes.
Tonight we learned it’s Roseman University that owns the road, is that correct? My other
concern was when Mr. Hatch mentioned the widening and smoothing of the road to the south. I
assumed that was south of the knuckle, and widening I would think could be a problem; is there
a possibility of having to condemn property on the sides of that road? If that’s an issue, that
could involve me.
Kenyon Clark (Resident) – The back of my property is 1055 West. My property is going to be
the lowest point where the road goes. So you are going to build it up, and instead of the water
going across and into Beckstead ditch, it is going to run down to my property. It just doesn’t
make sense. Where I went to school, they taught me that water runs downhill and I’m just afraid
that it’s really going to be an issue. I do come here tonight excited to hear the plan is going
forward, and we get some houses and nice places built next to us rather than where everything is
being dumped at this time. We have had people dumping things there, and I was excited, but then
I get here with a lack of information. We were not sent any information about these changes at
all. I didn’t have a chance to study anything out until I got here, and then everything seemed to
turn negative as far as my property. My property is the one that is probably going to be impacted
more than anyone else’s property. I am really concerned about the building up of the road and
having that road be an issue because I have an entrance at the bottom of my property where I
drive into once or twice a day sometimes with my garden and other things down there. I have a
very steep property and I can’t carry things down, I have to take things down in a truck a lot of
the time.
Kal Robbins (Resident) – I was at my property irrigating last night and the only concerns I have
are for my next door neighbor Dennis Palmer, he is the property to the north. The two concerns I
have are that his home really does sit very low. There will be sewer brought in, but I’m almost
positive his sewer will be below the sewer line being brought in; unless someone can verify that
it’s much, much deeper than I think it is. I know he talked about it dropping from his front porch
about six feet, then you go another 8-10 feet below that; he is going to be down about 16 feet
below and the sewer line would have to be that low for him to connect to it. Otherwise, if he is
required to pump he will be required to pump his sewer out to the sewer line. He is not here
because he taking care of his wife right now, and I think it’s a reasonable thing to mention and
South Jordan City 11
Planning Commission Meeting
September 12, 2023
cover in that regard. I assume the reason the sewer line is going north is because the cul-de-sac
just completed on 1055 W raised the road about four inches with new asphalt, making the
entrance into our pasture rather steep, which was fun to encounter. I have decided I have to be
careful I don’t go too far or I will be falling off that roadway where it has been expanded out
going to the north. There is an issue with water that we had with the wonderful storm the first of
August that came down and washed out all the gravel and stuff we had in our entrance to go into
our gateway. I really thought there was a box there, that if designed right should have met the
elevation already there on 1055. I worry when we get into things like this, have we covered all
the issues, and I just had a new experience so I want you to be aware of those types of issues.
Travis Hiatt (Resident) – I am on the west side of Lots 1 and 2. When will we know final grade
of that private drive up to Lots 1 and 2. I also think it was mentioned that the wall on the west
side was nine feet tall that curves around the private drive. I was wondering, in regards to the
headlights and light pollution coming into the windows, if we could verify that they are saying
it’s supposed to be below 10% but will it be 9.9%, will it be 8%; when will we know what that
final grade will be. Regarding raising the road 2.5 feet to meet the 10% or less grade, have we
checked into the viability of dropping the final grade of lots 1 and 2 down instead of raising the
road up. I don’t know if it’s a cost issue, it seems like dropping final grade may upset water
retention and water runoff less than messing with the road and raising the grade of the road. I
was curious about a maximum height requirement for the two houses going on Lots 1 and 2. At
one time when these plot maps were brought up, on the very west end of Lots 1 and 2 it almost
looked like there was a real thin open space that looked to denote where the ditch used to be;
now the water doesn’t run anymore. It seemed like that delineated the property and was almost a
different use or notating that there was running water there; it is almost as if that has disappeared.
On the knuckle separating private from public, I know that as the snow plows come around they
are going to make that loop, that’s the whole purpose of it for emergency equipment and snow
removal to make that loop so they don’t have to do the backing on the private drive. I was
curious as to how much more liability it was going to put on the customers to the south, as now
they will have an extra pile of snow to remove as it meets whatever pile the snow truck is going
to make as it makes that loop. Now those residents south of that knuckle will have whatever
snow there, plus a nice little pile. We all know how that works when the snow plow comes and
pushes all the snow on your driveway and this is going to be exacerbated by that.
Jared Osmond (Sandy Resident) – I am hoping to buy a lot from Mr. Hatch and build a house;
we feel very confident about this. My concern with 1055 is that the road is terrible right now. We
have been working for a year and half with staff, trying to figure out the best solutions and it has
gone back and forth. We don’t want anybody to end up with a puddle at the bottom to the south,
so right now the way that road goes from the knuckle, it goes down and then comes back up. I
am a contractor, I do this for a living and I do commercial subdivisions so I am very familiar
with this. Raising the road 2.5 feet will create a very smooth transition, 2.5 feet is not that hard to
feather out, and as we come back up obviously we are not going to let it drain into this man’s lot.
We will make sure we fit city standards and city codes. I am excited to buy a lot at the top of the
hill and build my house where I plan to stay forever and be a great neighbor. My house will be a
single story home, we are going to be very conscious of lighting and being good neighbors. We
realize change is hard and we realize tearing all those trees out caused a lot of commotion, but
we have every desire to be good neighbors and we want to live here. We are also very concerned
South Jordan City 12
Planning Commission Meeting
September 12, 2023
about any transitions coming off this road. We are happy to address transitions. A brand new
road brings brand new asphalt, sewer that doesn’t exist right now that can connect everybody to
it. This is something Mr. Hatch has really planned through and looked at. We obviously think it
is of benefit to the neighborhood. I know the city council has talked about the future of 1055 and
I know that’s controversial as well, but we think what we are doing with the subdivision is going
to be beautiful. As stated by other neighbors, this is kind of a trash dumping area that we would
love to get started cleaning up and creating something really beautiful. The way we are meeting
grade requirements makes a lot of sense, the staff obviously feels comfortable enough to
recommend it to come before you today. We will solve the problems with fire hydrants and other
issues; we are happy to move this along. I would love to build a house, I am currently in a
temporary housing situation trying to get a house built here for a year and a half. I know Mr.
Hatch is diligent on this, he is excited to make this happen and I am grateful he is doing this
because I want to be here. I also know, as a builder and contractor that does commercial work,
how these transitions are made. We are happy to address any questions, and Mr. Hatch actually
owns the excavation company that will do the work, so it’s not hard for us to bring in whatever is
needed and we will make sure the drainage concerns are not an issue.
Chair Hollist closed the public hearing.
Chair Hollist asked if the 40 foot turnaround is part of the temporary road while the sewer is put
in.
Planner McDonald was unsure, as that is Roseman’s property. Temporary access would either be
off 1055 where the sewer line heads west and then north via a bypass, or further south of the
turnaround. The 40 foot turnaround doesn’t have anything to do with accessing the subdivision
or the six properties south of the construction area.
Engineer Nielson believes the option being pursued is to put the temporary road on Lot 5 and
divert the road to the west temporarily while the sewer is constructed.
Chair Hollist asked if the portion being discussed tonight for raising is the only portion that will
be raised, or will it continue at some point on to the portion owned by Roseman.
Engineer Nielson responded the knuckle will be elevated to 2.5 feet, and south of that they will
have to slope down 2.5 feet. Just as mentioned, that will be feathered in for a smooth transition.
Chair Hollist asked if this will require condemnation of any other property, and if this will only
affect Roseman’s property.
Engineer Nielson responded that is correct. It will also affect the property to the east which is
currently also owned by Mr. Hatch.
Chair Hollist asked if staff feels the grading addresses any concerns about water inadvertently
being diverted to other properties.
South Jordan City 13
Planning Commission Meeting
September 12, 2023
Engineer Neilson believes this plan adequately addresses that concern.
Commissioner Trevor Darby asked if there will be any adjustments to the end of the property and
under 1055 W, or will it continue to exist as it does now.
Engineer Nielson noted that is correct, and added there is in fact a ditch noted on the plan on the
south property line.
Chair Hollist asked staff about the final grade of the private drive.
Engineer Nielson responded that at the peak the retaining wall looks to be about 10 feet, possibly
nine feet, based on what he can see on the plan.
Chair Hollist asked staff to address concerns raised about lighting.
Engineer Nielson responded the retaining wall was not created to control the light pollution, he
believes the Rhino Rock fence along the west side that is about six feet high will take care of
that.
Planner McDonald confirmed that the six foot Rhino Rock wall, in addition to a finished grade
of 4393 feet on the west boundary line, should control any lighting issues. Staff didn’t require an
analysis for headlights specifically, but with the changes in elevation and the current wall plans
meeting city requirements, staff didn’t have any additional concerns.
Chair Hollist asked staff about the suggestion to drop the elevation on the lots versus raising the
road.
Engineer Nielson responded that during the civil engineering process, they were trying to
balance the cuts and fills, and this is the design that was optimized.
Chair Hollist asked about the concerns regarding things being shown on the west boundary in
previous plans, but not showing currently.
Planner McDonald responded there was never a site plan that showed a ditch. He believes the
comment was referring to the parcel itself, and currently this subdivision is four separate parcels
of four different sizes and dimensions. On the west boundary there is a very narrow, elongated
rectangular parcel; there is no ditch or drainage there. The property to the north did have an
egress and ingress easement, but they have since recorded what was needed to abandon it, so it
no longer exists. In conversations with the applicant, they are on the end of a private irrigation
line and they are essentially abandoning the rights to that, abandoning it in place instead of going
through everyone’s properties and removing the line. There was an irrigation box there that was
damaged, which has historically caused flood water to run over the property, and that is being
removed with this project.
South Jordan City 14
Planning Commission Meeting
September 12, 2023
Chair Hollist asked how emergency vehicles are currently accessing these properties, as the road
is very narrow.
Engineer Nielson agreed that it is very narrow currently, but he is sure there is enough room for
emergency access.
Chair Hollist noted in regards to concerns about water flows being affected by the road changes,
staff has indicated their review and satisfaction with the grading and current plans. She asked
how these properties are getting sewer access currently.
Engineer Nielson responded there is a current sewer line on the west side of the cul-de-sac that
can service Lots 1 and 2, and then sewer is being brought in for the remainder of the lots.
Chair Hollist asked how these changes will affect the neighbor to the north, where there was
concerns about changes in his service.
Engineer Nielson wasn’t sure about that situation specifically. South Valley Sewer District is
handling the design of that sewer main, and unfortunately even the current GIS maps don’t show
how Mr. Palmer currently has sewer access.
Commissioner Gedge asked if a current resident is going to be materially impacted by the new
sewer design, would it be that resident’s responsibility to pay for needed changes, or would the
applicant or sewer district be responsible for providing those services.
Engineer Nielson doesn’t believe this will impact the current resident’s service in any way, as it
is a new pipe in the road. If he elects to tie into that new pipe then he could work with the sewer
district to make that connection. He is not aware of South Valley Sewer cutting anyone off or
making any modifications to existing sewer services.
Planner McDonald noted that the building department shared there is a state law requirement for
those within 300 feet to tie into the system. This means that 10911 South 1055 West would meet
that requirement. Since that is also a requirement outlined by South Valley in their conditional
approvals for the septic on the property, the resident will have to comply. All properties with
septic in this area were given conditional approval from South Valley to have their septic system,
in addition to other things on the property. However, once a sewer line is available they have to
connect as that agreement supersedes everything else and their conditional approval goes away
once the line is put into place. He is unclear of the timeline for that to be done, it would have to
be discussed with the district given their approval, rules and enforcement.
Commissioner Gedge asked if, since that is between South Valley District and the property
owners, that is not something under the purview of the city; he assumes that would be between
the property owners and the utility.
Planner McDonald added that the same approval could apply to everyone south of the area
currently on septic, it just depends on the paperwork at the time.
South Jordan City 15
Planning Commission Meeting
September 12, 2023
Commissioner Gedge asked staff if this could be a liability for the city with an approval tonight,
or if this is strictly a civil issue.
Attorney Simonsen responded that this does not open up the city to any liability in regards to the
sewer system for neighboring properties.
Chair Hollist asked staff for details about snow removal in the area, including the private lane.
Engineer Nielson responded that Public Works has been plowing at least the public portion of
1055 W. Based on the plan, the snow is to be stored at the top of the cul-de-sac, not at the
knuckle, and he doesn’t see a city worker piling all the snow in front of an access. If that did
happen, residents could contact the city and file a complaint.
Commissioner Darby asked the applicant if they will just be capping off the irrigation being
abandoned in place and leaving it where it is. He also asked if there are any concerns for the
patch failing in the future and flooding out the homeowner.
Mr. Hatch responded currently the box has a hole in the side of it, and the past owners were
using it to flood the area; however, it can no longer be controlled with the hole in it. The plan is
to patch up the box so it will work as intended, and then cover the area up. He is the homeowner
that would be flooded if anything failed, so he will be making sure it is patched up correctly.
Commissioner Catmull asked for the latest date the applicant could start construction and
complete the desired portion this year.
Mr. Hatch responded the only restrictions they have are asphalt and temperatures.
Commissioner Catmull asked how that impacts the cost of construction that was mentioned at the
beginning.
Mr. Hatch responded that construction in winter is more costly, so the further this goes into the
season the higher his development costs will be. He also noted that the turnaround is on
Roseman’s property, and it’s just an access for the manhole that will be installed there for the
Sewer District. It is also their future parking lot, so it will be eventually removed and converted.
Chair Hollist asked for the maximum building height in the zone.
Planner McDonald responded the limit is overall 35 feet to the highest peak in this residential
zone.
Commissioner Bevans asked if, with the intention is to store snow at the top of the cul-de-sac,
there is any concern with snow melt overwhelming the retention pond in the spring.
South Jordan City 16
Planning Commission Meeting
September 12, 2023
Engineer Nielson responded it is always a concern, but it meets the city’s engineering
requirements for storms which is a 24 hour, 100 year storm. If it exceeds that volume then it will
run over the pond and likely go into the Beckstead Ditch.
Chair Hollist asked if the city is culpable if they approve an extreme retention wall and it fails in
the future, or is that on the manufacturer of the wall.
Engineer Nielson responded that, engineering wise, a nine foot retaining wall isn’t considered
extreme.
Attorney Simonsen added that these kinds of things are always complicated, and we saw this
happen recently in Draper. Someone in the city as some point looked at engineering plans
submitted, and they probably met city standards, but somehow the wall still failed. Those things
do happen, but as far as liability, everybody gets named in the lawsuit in those kinds of
circumstances. There is something called the Governmental Immunity Act, and when it comes
down to a government acting within their scope, usually that is going to bar those claims against
the city. Not always, as there are specific exceptions outlined in the law, but that is generally the
result.
Commissioner Gedge noted that they have seen the rezone, and then this area several times with
various proposals and he thinks they have done a very good job trying to address this, especially
with it being a very unique property. He does still have concerns about the requirements still
open and listed, and the commission potentially setting precedent for future applications of
properties that wish to be pushed along quickly and approving something with recommendation
that have yet to be approved by the appropriate departments with the city. He is overall in favor
of this application, but he will be voting no tonight because he doesn’t want to set that precedent
for future applications trying to fast track their projects.
Commissioner Catmull has some concerns about the timing. There is a challenge from the
applicant’s perspective regarding their investment and confidence with everything being
approved. Given the constraints, he feels good about the project but he is concerned about the
number of outstanding items on the list and the precedent set, especially around speeding things
up to lower the development costs. He is still deciding on his vote, as he is right on the edge.
Commissioner Darby was in agreement with Commissioner Gedge’s statements, but based on
the fact that city staff, who he trusts a great deal, brought this to the commission, he would
probably approve this. However, if more came forward he would probably say no. He is okay
with this particular project going forward as long as they are willing to meet the
recommendations. He would like to have a conversation in the future to understand internally
why this came forward with so many extra requirements not yet met.
Commissioner Bevans noted that, based on it being a requirement that the applicant meet all the
recommendations listed, she is okay with this based on her background with construction and
understanding the cost of concrete changing with weather and the inability to pour asphalt after a
certain point. She does share the concerns of this coming to them with unmet concerns, but
South Jordan City 17
Planning Commission Meeting
September 12, 2023
knowing they will be met prior to recording and that development can’t begin until that
recording, she is okay with allowing this to pass.
Commissioner Catmull would feel more comfortable if, in the motion, these are not referred to as
“recommendations,” as they don’t feel like recommendations.
The commission discussed their thoughts on that verbiage.
Commissioner Bevans noted that staff indicated some of the language had changed from what
was originally shared with the planning commission, and asked for clarification on that.
Planner McDonald responded that was correct, the current recommendation from staff is
different from what is listed in the staff report. He shared that with additional information that
became available, and the circumstances of this application being a little different than what is
normally presented, the recommendation was specified to include language on A, B, and C
before construction commences to make it clear and concise.
- Clarifying what needs to be done with the storm water maintenance agreement and the
storm water easement paperwork.
- Clarifying that the subdivision is required to have a retaining wall permit. Which, at the
time of submission, was still pending review but is now ready for issuance tonight. It was
clarified by the building department that construction on the retaining wall is not to
commence without an issued grading permit and the final submittal of the civil plan is
approved by the city engineer to lock everything down before construction can begin.
- Clarification on the fire hydrant was still pending with Engineering and Public Works in
relation to their water calculations, the water plan, and the storm drain; this was a huge
thing for the storm drain system not existing and what is being proposed.
- Clarifying continuous access on their temporary detour, full construction, and who needs
to finalize and approve that, including the encroachment permit through the Engineering
Department, is required before construction is allowed to commence.
The commission discussed options for making the motion and the verbiage.
Commissioner Catmull motioned to approve File No. PLPP202300080, Preliminary
Subdivision Plat, subject to the list of updated requirements that were presented in the
tonight by City Staff. Chair Hollist seconded the motion.
Roll Call Vote
Yes – Commissioner Catmull
Yes – Chair Hollist
No – Commissioner Gedge
Yes – Commissioner Darby
Yes – Commissioner Bevans
Motion Passes 4-1, with Commissioner Gedge voting in the negative.
South Jordan City 18
Planning Commission Meeting
September 12, 2023
I. LEGISLATIVE PUBLIC HEARINGS - None
J. OTHER BUSINESS
Discussion amongst staff and commissioners regarding potential training topics and suggestions
for the training during the next meeting.
ADJOURNMENT
Commissioner Gedge motioned to adjourn the September 12, 2023 Planning Commission
Meeting. Chair Hollist seconded the motion; vote was unanimous in favor.
The September 12, 2023 Planning Commission Meeting adjourned at 9:09 p.m.
This is a true and correct copy of the September 12, 2023 Planning Commission minutes,
which were approved on September 26, 2023.
From: Andrew McDonald
To: PLANNING COMMISSION
Subject: FW: file plpp202300048
Date: Tuesday, September 12, 2023 8:06:09 AM
Please see the public comment received for the record for Miners Cove North, the first item of
tonight’s agenda.
From: dipika patel <dipika511patel@gmail.com>
Sent: Thursday, September 7, 2023 10:25 AM
To: Andrew McDonald <AMcDonald@sjc.utah.gov>
Subject: file plpp202300048
hello andrew
my name is dipika patel and my home address is
10428 s plum harvest way
south jordan utah 84095
we are against of the subdivide the property in to two lot
because there is multiple reason behind it
-our backyard has too much noise already with existing business
there parking lot is always full and lots of people come and go
-business is working in weekend too
-if it's divide in to two plot it will block the view and not going to look appealing will look
congested as there is two businesses is already there
-because of the noise and traffic surrounding area our home has degraded the value this year
I don't want it to degrade again.
-We have crossed the street bingham high school which brings lots of traffic in our
community as well as surroundings.
hope you understand and let me know if you need any help
thank you
Agenda
CITY OF SOUTH JORDAN
PLANNING COMMISSION MEETING AGENDA
CITY COUNCIL CHAMBERS
TUESDAY, SEPTEMBER 12, 2023 at 6:30 PM
Notice is hereby given that the South Jordan City Planning Commission will hold a Planning Commission
Meeting on Tuesday, September 12, 2023, in the City Council Chambers, located at 1600 W. Towne
Center Drive, South Jordan, Utah with an electronic option via Zoom phone and video conferencing.
Persons with disabilities who may need assistance should contact the City Recorder at least 24 hours prior
to this meeting.
In addition to in-person attendance, individuals may join via phone or video, using Zoom. Note, attendees
joining virtually may make public comments through video conferencing, and participant must have their
video on and working to speak. Attendees who wish to present photos or documents to the Planning
Commission must attend in person. Those who join via phone may listen, but not comment.
In the event the electronic portion of the meeting is disrupted in any way that the City in its sole discretion
deems inappropriate, the City reserves the right to immediately remove the individual(s) from the meeting
and, if needed, end virtual access to the meeting. Reasons for removing an individual or ending virtual
access to the meeting include but are not limited to the posting of offensive pictures, remarks, or making
offensive statements, disrespectful statements, or actions, and other any action deemed inappropriate.
Ability to participate virtually is dependent on an individual’s internet connection. To ensure comments
are received regardless of technical issues, please have them submitted in writing to City Planner, Greg
Schindler, at gschindler@sjc.utah.gov by 3:00 p.m. on the day of the meeting.
Instructions on how to join the meeting virtually are below.
Join South Jordan Planning Commission Electronic Meeting September 12, 2023 at 6:30 p.m.
- Join on any device that has internet capability.
- Zoom link, Meeting ID and Meeting Password will be provided 24 hours prior to meeting start time.
- Zoom instructions are posted https://www.sjc.utah.gov/254/Planning-Commission
THE MEETING WILL BEGIN AT 6:30 P.M. AND THE AGENDA IS AS FOLLOWS:
A. WELCOME AND ROLL CALL – Commission Chair Michele Hollist
B. MOTION TO APPROVE AGENDA
C. APPROVAL OF THE MINUTES
C.1. August 22, 2023 - Planning Commission Meeting Minutes
D. STAFF BUSINESS
E. COMMENTS FROM PLANNING COMMISSION MEMBERS
F. SUMMARY ACTION
G. ACTION
Planning Commission Meeting - September 12, 2023 Page 1 of 2
H. ADMINISTRATIVE PUBLIC HEARINGS
H.1. MINERS COVE NORTH PRELIMINARY SUBDIVISION PLAT
Address: 10435 S. 2200 W.
File No: PLPP202300048
Applicant: Jeffrey Almond
H.2. KINGS LANDING PRELIMINARY SUBDIVISION PLAT
Address: 10828 S. 1055 W.
File No: PLPP202300080
Applicant: Devan Hatch
I. LEGISLATIVE PUBLIC HEARINGS
J. OTHER BUSINESS
ADJOURNMENT
CERTIFICATE OF POSTING
STATE OF UTAH )
:§
COUNTY OF SALT LAKE )
I, Cindy Valdez, certify that I am the duly appointed City Deputy Recorder of South Jordan City,
State of Utah, and that the foregoing Planning Commission Agenda was faxed or emailed to the
media at least 24 hours prior to such meeting, specifically the Deseret News, Salt Lake Tribune
and the South Valley Journal. The Agenda was also posted at City Hall, on the City’s website
www.sjc.utah.gov and on the Utah Public Notice Website www.pmn.utah.gov.
Dated this 7th day of September, 2023
Cindy Valdez
South Jordan City Deputy Recorder
Planning Commission Meeting - September 12, 2023 Page 2 of 2
Get email alerts for South Jordan