1. Bonding Bill Prospects
2. 5th Mondays (2023)
3. CLOSED SESSION: Labor Negotiations
4. Council Comments & Questions
A COUNCIL WORKSESSION REPORT
DATE: NOVEMBER 28, 2022 1
DEPARTMENT: ADMINISTRATION
PREPARED BY: Ryan Garcia, City Administrator
ADMINISTRATOR: RG
AGENDA ITEM: Bonding Bill Prospects
DESIRED MEETING OUTCOMES:
• Review previously submitted Capital Bonding requests, none of which have been funded.
• Provide Council with brief update on potential special State Capital Bonding Bill for
2023.
• Discuss Council’s priorities for 2023 Capital Bonding requests; provide staff direction.
DISCUSSION:
In June 2021 and September 2021, the City Council adopted several resolutions to formally
support requests for financial assistance from the State of Minnesota for the following projects:
• Resolution 2021 – 103; $1,650,000 for assistance with procuring architectural and
engineering design services for relocated meat processing facilities
• Resolution 2021 – 107; $2,440,000 for City Utility Rehabilitation Measures, specifically
targeting the replacement of undersized cast iron watermain traversing I-494 in the area
between 9th Avenue South and 5th Avenue South. The resolution was amended in
September to include funding for the construction of the Water Treatment Plant at Well
#3 with a total combined request of $5,940,000.
• Resolution 2021 – 108; not a request but instead a resolution in support of Dakota
County’s efforts to secure state funding for a new public library in South St. Paul.
• Resolution 2021 – 141; $11,000,000 for the design and construction of a new public
works / maintenance facility.
From the above list, the City submitted a formal request in late 2021 for the utility upgrades and
public works facility. Governor Walz submitted his recommendations for Capital Investment in
May 2022, which included the $11,000,000 for the public works facility, but as everyone by now
knows the legislature adjourned in late May without passing a bonding bill. As such, no South
St. Paul projects are currently in queue for State assistance, unless and until (a) the State
announces intentions for a bonding bill for the 2023 legislative session, and (b) we submit
updated requests.
With the 2022 general election having been concluded, there is a possibility that Legislation will
be passed in the 2023 Legislative Session to include a 2023 Omnibus Capital Investment
(Bonding) Bill. In the event that this happens, Staff feels the City should consider whether and
for what purposes we should request State assistance. If so, Staff has compiled the following
“short list” of potential requests, mostly based on previous priorities that still lack funding
clarity:
• Public Works Facility: Request $13,000,000 for a grant to predesign, design, construct,
furnish, and equip its Public Works Central Maintenance Facility and Offices. Total
Project Cost is estimated at $25,000,000.
• 1927 American Legion Memorial Library: Request $175,000 to conduct a repurposing
study for the (current) South St. Paul Library building.
• Woog Arena: Request $800,000 to complete design and construction, and replacement of
the roof and mechanical systems at Doug Woog Arena . Total project cost is estimated at
$9,000,000, with a significant portion anticipated to be covered by LMCIT through a hail
damage claim.
• Drinking Water Infrastructure Upgrades: Request $8,000,000 to support the
reconstruction of substandard water infrastructure underlying the I-494 Wakota Bridge,
critical water pressure control infrastructure throughout the City, and construction of a
blending and treatment plant to remediate radium contamination in the City’s drinking
water system at City Well #3. Total project cost is estimated at $13,450,000.
SOURCE OF FUNDS:
Each of the projects besides the Library Repurposing Study would include some form of local
match. These projects appear in the Capital Improvement Plan, and other Funding Sources
besides state funds are identified as a potential Bond Referendum Funding (2024 – 2025, Public
Works Building), Tax Levy (2023 – 2026, Arena), and the Water Utility Fund (2023 – 2024,
Drinking Water Infrastructure Upgrades).
A COUNCIL WORKSESSION REPORT
DATE: NOVEMBER 28, 2022 2
DEPARTMENT: ADMINISTRATION
PREPARED BY: Ryan Garcia, City Administrator
ADMINISTRATOR: RG
Agenda item: 5th Mondays (2023)
Desired Meeting Outcomes:
• Provide Staff with direction related to the three “5th Mondays” (and the one 5th Tuesday
following a Monday holiday) in 2023.
For Discussion:
At the most recent worksession, Council reviewed the meeting calendar for 2023 which was
ultimately approved on 11/21. It was noted that there were 4 months in which there would be a “5th
Monday” which typically would be a no-meeting night (one of the 5th Mondays is May 29th,
Memorial Day, so technically there’s also a “5th Tuesday”).
Perhaps it was off-the-cuff, but there also seemed to be a suggestion that we hold “special sessions”
on one or more of the “5th Mondays” to drill down on what seemed to be unresolved topics
discussed at the 11/14 Worksession, which included:
• “Back to Work” program / Worker’s Compensation – it was noted that the City’s premium
for Worker’s Compensation coverage continues to increase in cost. The suggestion was that
we explore alternatives – whether alternative coverage or an alternative approach to getting
employees off of Worker’s Compensation and back to work – at a focused session.
• Airport Revenue – there was a suggestion that the City might be missing revenue
opportunities at the Fleming Field Airport, specific examples referenced included T-Hangar
lease rates and assessments for (generally) pavement improvement projects.
• Fee Schedules – there was discussion about some of the City’s fees and how they compared
to other communities’, and whether a deeper look would reveal the need to adjust SSP fees.
Specific examples related to Solar Panel Fees and Building Permit and Plan Review fees.
Staff is certainly open to looking more deeply at each of these topics and re-engaging the Council
in a more focused manner. Generally, that should be possible at a regularly scheduled worksession
in the near future, as requested. Frankly, 5th Mondays are cherished by Staff so to the extent they
can be avoided for night meetings we certainly appreciate that opportunity! But we fully recognize
the benefit that might be realized by carving out focused, dedicated time for especially important
policy discussions, so if it is the Council’s desire that we identify a couple of critical topics and
target any one or more of the “5th Mondays” for a special session, we are absolutely willing to
make that happen.
Get email alerts for South St. Paul
A daily email when new agendas and minutes are posted.