Planning Commission
Regular MeetingSpearfish, SD · September 6, 2022
Minutes
Spearfish Planning Commission
Regular Session Minutes
06Sep22 at 3:00 p.m.
The Spearfish Planning Commission met in regular session on Tuesday,
06Sep22 at 3:00 p.m. in the council chamber of city hall and via Zoom video conference. Meghan Byrum
called the meeting to order at 3:00 p.m. Roll call was taken with the following members present - Meghan
Byrum, Greg Kruskamp, Bob Meyer, Larry Vavruska, Barbara Zwetzig, Rick Tysdal, and Toby Bordewyk.
City staff was represented by Planning Director Nick Broyles, Mayor John Senden, City Administrator
Steve McFarland, City Attorney Ashley McDonald, and Administrative Assistant Erica Bussiere.
APPROVAL OF MINUTES
Kruskamp moved – Zwetzig seconded, and all voted to approve the minutes of the 02Aug22
Planning Commission meeting.
DECLARATIONS OF CONFLICTS OF INTEREST
Byrum called for any potential conflicts of interest to be identified. No conflicts were expressed.
1. Request: Discuss Development Options for the Highway 85 Corridor
Location: City Council Chamber, 625 Fifth Street, Spearfish, SD
Applicant: N/A
Action: Request Motion from Planning Commission on How to Proceed
Broyles presented findings for questions posed by the Planning Commission on 02Aug22. The
Planning Commission asked for details on the following three topics; (1) potential special
permitted land uses and criteria, (2) changes to the subdivision code to reflect the special
permitted uses, and (3) methods to identify and quantify risks with septic and drain fields. Staff
was asked to consider our responses through the lenses of risk, simplicity, and flexibility.
Broyles presented hypotheticals for land uses that may use lower sewer flows as well as higher
sewer flows. Broyles also presented possible language to modify the subdivision code to align
with suggested special permitted uses. Thoughts surrounding identifying and quantifying risk
were also discussed. Regarding risk, staff recommended including a professional engineering
consultant and obtaining City Council concurrence with future plans. Staff also recommended
that creating a list of special permitted uses must be simple and written in such a way for staff to
make a quick determination that would be administratively approved by city staff. Lastly, staff
highlighted that any proposed process must be flexible enough to allow property owners options
for how they want to develop their property. We should avoid a one-size-fits-all solutions and
allow for specific solution for low and high impact uses. Attached with the agenda packet were
an NRCS Soils Survey for the Highway 85 corridor, and specific State requirements for the
design of septic tanks.
The Planning Commission engaged in lengthy discussion across a variety of topics. The
following list is intended to be an exhaustive list of the ideas raised in the meeting.
1. Commission was in favor of pursuing Special Permitted Uses to allow for septic/wells
2. There was interest in looking at only low sewer flow rates for the time being
3. Community wells were presented; perhaps having 1 well serve 2 or 3 owners
4. Septic density concerns were discussed, and how we tie in the subdivision ordinance
5. Idea to keep a minimum of 8 acres for a septic tank was proposed
6. Septic tanks must be designed by a professional engineer
7. We must comply with State guidelines
8. Add attribute of ‘cost’ to the risk, simplicity, flexibility assessment
Spearfish Planning Commission
«Meeting_Date»
Regular Session Minutes
Page 2
9. City must have a method for septic inspections and follow-up, cost should be the landowner’s
responsibility, special permitted uses must be reviewed annually, and the possibility of bonds
was presented
Staff suggested that if the Planning Commission seeks to strengthen the input/design aspect of
this process, it may require the assistance of a consultant as staff does not possess expertise in
soils and geology as it relates to septic design. Furthermore, staff suggested that if any of ideas
presented over the last couple of months are to be initiated, that City Council needs to be made
aware of options to determine future staff actions, as option presented may have budget
impacts.
Tysdal made a motion and Zwetzig seconded to direct staff to do the following.
1. Obtain appetite from City Council regarding their interest in allowing septic systems for ‘low
sewer flow’ rates within the Highway 85 corridor
The motion passed 6-1 with Meyer dissenting.
Chair Byrum requested that Meyer provide written information regarding his position on the
item.
2. City Council Update: As there has not been a City Council meeting since the last Planning
Commission meeting, Broyles had no City Council updates for the Planning Commission. Broyles did
inform the Commission that a new Planning Director has been hired and will begin on 26Sep22.
3. Public Comment: No public comment was provided.
4. Adjournment: Byrum adjourned the meeting at 4:21 PM.
Agenda
Spearfish Planning Commission Agenda
06Sep22 at 3:00 p.m.
Meeting Location: City Council Chamber, 625 Fifth Street, Spearfish, SD
And Zoom Online Meeting
Join Zoom Meeting
https://us02web.zoom.us/j/88567070608
Meeting ID: 885 6707 0608
Or Dial in:
06Sep22 at 3:00 p.m. and enter Meeting ID
A. Call To Order
B. Roll Call
C. Approve the Minutes from 02Aug22
D. Declaration of Conflicts of Interest
E. Items for Action
1. Request: Discuss development option for Highway 85 corridor
Location: City Council chambers, 625 5th Street, Spearfish SD
Applicant: N/A
Action: Request motion from Planning Commission on how to
proceed
F. City Council Update
G. Public Comment: Public comments are welcome at this time; however, no
action will be taken
H. Adjournment
Spearfish Planning Commission
Regular Session Minutes
02Aug22 at 3:00 p.m.
The Spearfish Planning Commission met in regular session on Tuesday, 02Aug22
at 3:00 p.m. in the council chamber of city hall and via Zoom video conference. Meghan Byrum called the
meeting to order at 3:00 p.m. Roll call was taken with the following members present: Meghan Byrum, Toby
Bordewyk, Bob Meyer, Rick Tysdal, and Barbara Zwetzig; absent Greg Kruskamp and Larry Vavruska. Also
present: Planning Director Nick Broyles, Mayor John Senden, City Administrator Steve McFarland, City
Attorney Ashley McDonald, and Administrative Assistant Erica Bussiere.
APPROVAL OF MINUTES
Zwetzig moved, Meyer seconded, and all voted to approve the minutes of the 19Jul22 Planning
Commission meeting.
DECLARATIONS OF CONFLICTS OF INTEREST
Byrum called for any potential conflicts of interest to be identified. No conflicts were expressed.
Broyles introduced Rick Tysdal via a short biography, and Commissioner Tysdal addressed the Board.
1. Request: Discuss Development Options for the Highway 85 Corridor
Location: City Council Chamber, 625 Fifth Street, Spearfish, SD
Applicant:
Action: Request Motion from Planning Commission on How to Proceed
Broyles and City staff presented findings for questions posed by the Planning Commission on
19Jul22. Findings are articulated in the 02Aug22 agenda: (1) options for de-annexation – how is it
initiated/approved; (2) ordinance 15A compels connection to city services to subdivide; can a
property have septic without subdividing? Does it matter if it is zoned AG or C2? (3) can “special
permitted uses” allow for septics/wells on AG and/or C2? Does it matter if it is subdivided or not?
(4) discuss engineering of septic systems with the result of quantifying septic requirements, and
possibly approving on a case-by-case basis; (5) through “special permitted uses”, can commercial
activities be permitted on AG?
Staff recommended one of two options: (1) recommend City Council to continue to require
development to occur within the parameters of existing code and annexation agreement, or (2)
recommend City Council direct staff to explore changes to current ordinances to facilitate
development through alternative means.
Zwetzig made a motion and Meyer seconded to direct staff to develop high-level, big-picture bullet
points to define general requirements, with particular emphasis on risk, simplicity, and flexibility for
the following three items:
(1) Actual “special permitted uses” language across appropriate zoning districts that would address
septic systems, or onsite sewage disposal. Commission suggested something similar to the
“conditional use permit” language – perhaps where specific questions need to be answered by
applicant
(2) Proposed language edits of Chapter 15A of the code (subdivision) to align with “special
permitted uses” from item 1
(3) At a big picture level, explore a methodology for quantifying risks associated with septic systems
The motion passed unanimously with no Commissioner dissent.
Spearfish Planning Commission
Regular Session Minutes
Page 2
2. City Council Update: Broyles provided an update on the Elkhorn Ridge Lift Station A & B bid letting and
award. The bid came in at ~1% over engineer’s estimate. Elkhorn and KLJ recommended awarding the
contract to Mainline Construction and City Council concurred. Broyles also provided an update on the Exit
8 Community Path Project. Bids came in at ~56% over engineer’s estimate. The bid was rejected. Lastly,
Broyles informed Commission that Council and Staff are currently in 2023 budget discussions.
3. Public Comment: Public comment was provided by Joe Jorgenson.
4. Adjournment: Byrum adjourned the meeting at 4:35 PM.
Spearfish Planning Discussion Item
06 September 2022 at 3:00 p.m.
TO: Planning Commission
FROM: Nick Broyles, Planning Director
RE: Discussion of Highway 85 Development
ATTACHMENTS: NRCS Soils Survey
State Requirements for Septic Design
From the 02Aug22 Planning Commission meeting, staff was requested to provide general
requirements associated with Special Permitted Uses (SPU) in the Highway 85 corridor.
The Commission noted that concepts should be considered with the following in mind: risk
mitigation, simplicity, and flexibility. Staff was requested to evaluate three main topics.
1. Potential land uses eligible as SPU with onsite sewage treatment along with criteria
to guide
2. Potential changes in the subdivision code to mirror the SPU sewage treatment
requirements
3. Methods to quantify/ID risk associated with septic/drain fields
For the purposes of this document, the below terms are defined as follows:
Septic a system that separates solids and liquids and is not connected to any
other treatment system or city sewer
Private Treatment Plant a system that collects wastewater from multiple points and
cleans it up before discharge - these are not connected to the City sewer
system when built
1. Potential Special Permitted Land Uses and Criteria
The protection of ground water undergirds this entire document. It is important to identify
common land uses ranging from low to high sewer flows. Some key considerations are (1)
the lower the sewer flow, the more likely it can be served by septic, and (2) the higher the
sewer flow, the more likely it must be served by a private treatment plant. The below land
use list could be coupled with a maximum sewer flow measured in gallons per minute
(GPM) to determine what is eligible for special permitted use using either septic or a private
treatment plant.
Land Uses
The following are examples of likely SPUs and their relative sewer flow measured in
GPM. These could be added as Special Permitted Uses to AG, C-2 Highway Service
Commercial, Light Industrial, and Heavy Industrial zoning districts. The dashed line
below represents a likely cut off point for what would require an onsite plant and is
provided simply for visualization purposes.
1. Storage buildings without indoor plumbing fixtures
2. Outdoor parking for RV’s, trucks, and equipment
3. Manufacturing, workshops, fabricating businesses Lower Sewer Flow
4. Repair services
5. Retail of any type - septic permitted
6. Office and personal services - designed to State
7. Convenience store with gas station standards
Higher Sewer Flow
8. Restaurants and beverage services
9. Single family subdivision - private treatment
10. Multi-Family apartment building plant required
11. Medical clinic - designed to State
12. Hotel standards
13. Nursing home
14. Hospital
Criteria for Special Permitted Uses
SPU criteria must be objective and easily determined because it is a staff level of
approval and requires no public hearing; possible criteria for SPUs follow.
- Septic permitted up to a maximum amount of sewer GPM; all else must be
private treatment plant (staff will research the threshold point)
- Minimum lot size is 8 acres for lots served by septic systems
- Minimum lot size is the standard per the zoning district for lots served by
private treatment plants
- Owner’s design engineer must submit plans that comply with state design
criteria for all systems
- Owner must agree to connect to city sewer when available
- Owner must comply with all other terms of the subdivision code
2. Changes to the Subdivision Code to Reflect SPUs
The required changes to Chapter 15A are straightforward, and as noted by the underlined
text. For consistency and improved readability, changes to the AG provisions for septic
have been reformatted to match paragraph for septic have been reformatted to match
paragraph b.
Sec. 15A-95. Water and Sewer Facilities
(a) Except where otherwise provided in the following paragraphs, the subdivider is
required to connect to the municipal water and sewerage systems and must install all
facilities according to the specifications of the public works department. Service lines must
be stubbed to every lot abutting a street prior to the surfacing of the street.
(b) For lots zoned Rural Large Lot Single Family (RLS-1), and Special Permitted Uses
in the AG (Agriculture), C-2 (Highway Service Commercial), I-LR (Light Industrial), and IH
(Heavy Industrial) zoning districts, private/shared wells and private sewage disposal
systems are permitted according to the following criteria.
i. Septic systems are permitted when maximum sewer flow of the
entirety of the subdivision is (number) or less GPM
ii. Private sewage treatment plants are required when maximum
sewer flow of the entire subdivision is (number) or less GPM
iii. The distance from the overall boundary of the subdivision to the
nearest city sewer or water main must be 200 feet or more
iv. All design of the above must be stamped and sealed by a
licensed Professional Engineer
v. Conflicts between the above criteria and a more restrictive law or
regulation will result in the application of the more restrictive rule
(c) For lots one (1) acre and larger, but less than eight (8) acres, and zoned Agriculture
(AG), private sewage disposal systems are permitted according to the following criteria.
i. The distance from the overall boundary of the subdivision to the
nearest city sewer main by gravity flow must be 200 feet or more
ii. Connection to the municipal water system is required
iii. All design of the above must be stamped and sealed by a
licensed Professional Engineer
iv. Conflicts between the above criteria and a more restrictive law or
regulation will result in the application of the more restrictive rule
3. Methods to Identify & Quantify Risks with Septic / Drain Fields
Attached to the staff report is data published by the Natural Resource Conservation Service
concerning suitability of septic systems in the Highway 85 area. This is a starting point to
identify locations where the existing conditions are not suitable to a traditional septic
design; key considerations follow.
(a) Example: map and data indicate slow water movement through soil profile;
engineer must account for that in the septic design so that it meets the required
percolation rates in the state standards
(b) Risk managed in design through compliance to State standards
(c) Risk managed after construction requires inspection program which has not
received the support of City Council for the city to develop this kind of program
If the Planning Commission seeks to strengthen the input/design side of the process
(mapping with supporting technical guidance), it will require the help of a consultant as City
staff does not have the needed expertise in soils/geology as it relates to septic design that
would go beyond state regulations. Staff requests that the Commission confirm if any of
the below should be initiated, and this will be shared with City Council who will make the
final determination to proceed since funds need to be budgeted and the (1) review of
existing mapped and written data and create a risk assessment system for septic systems,
(2) review existing state standards in septic design for potential gaps based on new
assessment system, and (3) develop new standards for septic design and methods to
enforce via the inspections process.
4. Conclusion
The Planning Commission requested staff to consider recommendations through the
lenses of risk mitigation, simplicity, and flexibility. Staff comments relative to the three
follows.
Risk Requires assistance of a consultant to develop a system, and
City Council must also concur that this is a desired effort.
Simplicity Developing a list of Special Permitted Uses to be added to the
suggested zoning districts will enable a quick determination by
both staff and the public of what land uses are allowed. Criteria
for the corresponding wastewater treatment solution is objective
and appropriate for staff level of approval.
Flexibility Property owner may weigh out options for how to market or
develop their property. This avoids a one-size-fits all solution and
supports reasonable development in advance of the extension of
city infrastructure. Lower impact uses would be permitted septic
with higher impact uses needing private treatment plants.
ADA Compliance: The City of Spearfish fully subscribes to the provisions of the Americans with Disabilities Act. If you desire to
attend this public meeting and need special accommodations, please notify the Building and Development Office at 642-1335
and 24 hours prior to the meeting so that appropriate auxiliary aids and services are available.
103° 53' 47'' W 103° 48' 35'' W
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South Dakota
588000 589000 590000 591000 592000 593000 594000
4939000
44° 35' 54'' N 44° 35' 54'' N
4938000
4938000
4937000
4937000
4936000
4936000
4935000
4935000
4934000
4934000
4933000
4933000
4932000
4932000
4931000
4931000
4930000
44° 30' 59'' N 4930000 44° 30' 59'' N
588000 589000 590000 591000 592000 593000 594000
103° 53' 47'' W 103° 48' 35'' W
Map Scale: 1:44,300 if printed on A portrait (8.5" x 11") sheet.
Meters
N 0 500 1000 2000 3000
Feet
0 2000 4000 8000 12000
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 1 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South Dakota
MAP LEGEND MAP INFORMATION
Area of Interest (AOI) Background The soil surveys that comprise your AOI were mapped at
Area of Interest (AOI) Aerial Photography 1:24,000.
Soils Please rely on the bar scale on each map sheet for map
Soil Rating Polygons
measurements.
Very limited Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Somewhat limited
Coordinate System: Web Mercator (EPSG:3857)
Not limited
Maps from the Web Soil Survey are based on the Web Mercator
Not rated or not available projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Soil Rating Lines Albers equal-area conic projection, should be used if more
Very limited accurate calculations of distance or area are required.
Somewhat limited This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Not limited
Soil Survey Area: Butte County, South Dakota
Not rated or not available
Survey Area Data: Version 25, Sep 13, 2021
Soil Rating Points
Soil Survey Area: Lawrence County, South Dakota
Very limited
Survey Area Data: Version 24, Sep 13, 2021
Somewhat limited
Your area of interest (AOI) includes more than one soil survey
Not limited area. These survey areas may have been mapped at different
scales, with a different land use in mind, at different times, or at
Not rated or not available different levels of detail. This may result in map unit symbols, soil
Water Features
properties, and interpretations that do not completely agree
across soil survey area boundaries.
Streams and Canals
Soil map units are labeled (as space allows) for map scales
Transportation
1:50,000 or larger.
Rails
Date(s) aerial images were photographed: Sep 18, 2021—Oct
Interstate Highways 16, 2021
US Routes The orthophoto or other base map on which the soil lines were
Major Roads compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
Local Roads shifting of map unit boundaries may be evident.
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 2 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Septic Tank Absorption Fields
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
P028A Barnum silt Somewhat Barnum, rarely Slow water 52.7 2.2%
loam, moist, 0 limited flooded (80%) movement
to 2 percent (0.50)
slopes, rarely
flooded Depth to
saturated zone
(0.43)
Flooding (0.40)
Rockypoint, Slow water
rarely flooded movement
(5%) (0.82)
Flooding (0.40)
Sodawells, rarely Flooding (0.40)
flooded (4%)
Subtotals for Soil Survey Area 52.7 2.2%
Totals for Area of Interest 2,358.1 100.0%
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
P008B Alice fine sandy Very limited Alice, moist Seepage, bottom 103.1 4.4%
loam, moist, 0 (90%) layer (1.00)
to 6 percent
slopes Slow water
movement
(0.08)
Recluse, moist Slow water
(5%) movement
(1.00)
P024A Barnum silt Very limited Barnum, moist, Flooding (1.00) 71.3 3.0%
loam, moist, 0 occasionally
to 2 percent flooded (80%) Slow water
slopes, movement
occasionally (0.50)
flooded Depth to
saturated zone
(0.43)
Sodawells, Flooding (1.00)
occasionally
flooded (4%)
Rapidcreek, Flooding (1.00)
poorly drained
(1%) Depth to
saturated zone
(1.00)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 3 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Seepage, bottom
layer (1.00)
P032E Barnum, moist, Very limited Barnum, moist, Flooding (1.00) 46.1 2.0%
occasionally occasionally
flooded- flooded (31%) Slow water
Tilford-Nevee movement
silt loams, 1 to (0.50)
25 percent Depth to
slopes saturated zone
(0.43)
Nevee (25%) Slope (1.00)
Depth to bedrock
(0.85)
Slow water
movement
(0.82)
Spearfish (5%) Depth to bedrock
(1.00)
Slope (1.00)
P152D Gypnevee- Very limited Gypnevee, moist Slope (1.00) 61.3 2.6%
Rekop silt (35%)
loams, moist, Depth to bedrock
6 to 25 (0.91)
percent slopes Slow water
movement
(0.50)
Gypnevee, Slope (1.00)
moist, very
deep (25%) Slow water
movement
(0.50)
Rekop, moist Depth to bedrock
(25%) (1.00)
Slope (1.00)
P158C Herdcamp, Very limited Herdcamp, Flooding (1.00) 72.4 3.1%
somewhat somewhat
poorly poorly drained Depth to
drained- (40%) saturated zone
Herdcamp- (1.00)
Tilford Slow water
complex, 1 to movement
10 percent (0.68)
slopes,
flooded Herdcamp, Flooding (1.00)
poorly drained
(30%) Depth to
saturated zone
(1.00)
Slow water
movement
(0.68)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 4 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Barnum, moist, Flooding (1.00)
occasionally
flooded (5%) Slow water
movement
(0.50)
Depth to
saturated zone
(0.43)
Ustifluvents (3%) Flooding (1.00)
Slow water
movement
(0.50)
P160A Higgins silt loam, Very limited Higgins (80%) Flooding (1.00) 13.4 0.6%
0 to 2 percent
slopes Depth to
saturated zone
(1.00)
Slow water
movement
(0.68)
Higgins, Depth to
somewhat saturated zone
poorly drained (1.00)
(5%)
Slow water
movement
(1.00)
Flooding (0.40)
Barnum, moist, Flooding (1.00)
occasionally
flooded (5%) Slow water
movement
(0.50)
Depth to
saturated zone
(0.43)
Higgins, very Flooding (1.00)
poorly drained
(5%) Ponding (1.00)
Depth to
saturated zone
(1.00)
Slow water
movement
(1.00)
P246B Nevee silt loam, Somewhat Nevee (85%) Depth to bedrock 129.2 5.5%
2 to 6 percent limited (0.85)
slopes
Slow water
movement
(0.50)
Tilford (7%) Slow water
movement
(0.82)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 5 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Vale (5%) Slow water
movement
(0.82)
P256D Nevee-Spearfish Somewhat Nevee (60%) Depth to bedrock 79.7 3.4%
silt loams, 6 to limited (0.85)
20 percent
slopes Slow water
movement
(0.82)
Slope (0.63)
Tilford (7%) Slow water
movement
(0.87)
Nevee, very Slow water
deep (3%) movement
(0.82)
Slope (0.16)
Gypnevee, moist Depth to bedrock
(2%) (0.91)
Slope (0.63)
Slow water
movement
(0.50)
P262C Nevee-Tilford silt Somewhat Nevee (50%) Depth to bedrock 160.8 6.8%
loams, 3 to 10 limited (0.85)
percent slopes
Slow water
movement
(0.82)
Tilford (30%) Slow water
movement
(0.87)
Gypnevee, moist Depth to bedrock
(5%) (0.91)
Slow water
movement
(0.50)
Nevee, very Slow water
deep (5%) movement
(0.82)
Vale (5%) Slow water
movement
(0.82)
P268E Nihill-Schamber Very limited Nihill, moist Slope (1.00) 31.6 1.3%
gravelly (45%)
loams, moist, Seepage, bottom
6 to 30 layer (1.00)
percent slopes Schamber, moist Slope (1.00)
(40%)
Seepage, bottom
layer (1.00)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 6 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Nevee (5%) Slope (1.00)
Depth to bedrock
(0.85)
Slow water
movement
(0.82)
Spearfish (5%) Depth to bedrock
(1.00)
Slope (1.00)
Nihill, Depth to bedrock
moderately (1.00)
deep (5%)
Slope (1.00)
Slow water
movement
(0.92)
P324D Pierre-Fairburn- Very limited Pierre, moist Slow water 80.1 3.4%
Ucross (30%) movement
complex, (1.00)
moist, 6 to 25
percent slopes Depth to bedrock
(1.00)
Slope (1.00)
Fairburn, moist Depth to bedrock
(25%) (1.00)
Slope (1.00)
Ucross, moist Depth to bedrock
(25%) (1.00)
Slope (1.00)
Slow water
movement
(0.98)
Maitland (5%) Slope (1.00)
Slow water
movement
(0.98)
Recluse, moist Slow water
(5%) movement
(1.00)
Slope (0.16)
Mittenbutte (5%) Depth to bedrock
(1.00)
Slope (1.00)
P328E Pitchdraw- Very limited Pitchdraw (55%) Depth to bedrock 160.1 6.8%
Mittenbutte (1.00)
very fine
sandy loams, Slope (1.00)
moist, 6 to 40
percent slopes
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 7 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Seepage, bottom
layer (1.00)
Mittenbutte, Depth to bedrock
moist (30%) (1.00)
Slope (1.00)
Ucross (5%) Depth to bedrock
(1.00)
Slope (1.00)
Slow water
movement
(0.98)
Recluse, moist Slow water
(5%) movement
(1.00)
Slope (0.16)
Alice, moist (5%) Seepage, bottom
layer (1.00)
Slope (0.16)
Slow water
movement
(0.08)
P330E Pitchdraw- Very limited Pitchdraw (55%) Depth to bedrock 8.9 0.4%
Mittenbutte (1.00)
very fine
sandy loams, Slope (1.00)
moist, 6 to 40 Seepage, bottom
percent layer (1.00)
slopes, very
stony Mittenbutte, Depth to bedrock
moist, very (1.00)
stony (30%)
Slope (1.00)
Recluse, moist Slow water
(5%) movement
(1.00)
Slope (0.16)
Alice, moist (5%) Seepage, bottom
layer (1.00)
Slope (0.16)
Slow water
movement
(0.08)
Ucross (5%) Depth to bedrock
(1.00)
Slope (1.00)
Slow water
movement
(0.98)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 8 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
P334F Pits, gravel- Very limited Pits, gravel Slope (1.00) 15.0 0.6%
Dumps (55%)
complex Slow water
movement
(1.00)
Large stones
(0.92)
P356A Recluse loam, Very limited Recluse, moist Slow water 222.3 9.4%
moist, 0 to 2 (90%) movement
percent slopes (1.00)
Boneek, moist Slow water
(5%) movement
(1.00)
Depth to bedrock
(0.96)
P356B Recluse loam, Very limited Recluse, moist Slow water 145.7 6.2%
moist, 2 to 6 (90%) movement
percent slopes (1.00)
Boneek, moist Slow water
(5%) movement
(1.00)
Depth to bedrock
(0.96)
P370D Recluse-Ziggy Very limited Recluse, moist Slow water 12.2 0.5%
loams, moist, (41%) movement
6 to 15 (1.00)
percent slopes
Slope (0.16)
Ucross (7%) Depth to bedrock
(1.00)
Slow water
movement
(0.98)
Slope (0.63)
Boneek, moist Slow water
(6%) movement
(1.00)
Depth to bedrock
(0.96)
Slope (0.16)
Fairburn, moist Depth to bedrock
(3%) (1.00)
Slope (0.63)
P384D Rekop- Very limited Rekop, moist Depth to bedrock 19.7 0.8%
Gypnevee- (40%) (1.00)
Rock outcrop
complex, Slope (0.04)
moist, 3 to 15 Spearfish (5%) Depth to bedrock
percent slopes (1.00)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 9 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Slope (0.63)
P448A Savo silty clay Very limited Savo, moist Slow water 6.2 0.3%
loam, moist, 0 (85%) movement
to 2 percent (1.00)
slopes
Altvan, moist Seepage, bottom
(5%) layer (1.00)
Slow water
movement
(0.08)
Kyle (4%) Slow water
movement
(1.00)
Slope (0.84)
McKenzie (1%) Ponding (1.00)
Depth to
saturated zone
(1.00)
Slow water
movement
(1.00)
P488A St. Onge loam, 0 Somewhat St. Onge, rarely Slow water 1.2 0.1%
to 2 percent limited flooded (80%) movement
slopes, rarely (0.92)
flooded
Flooding (0.40)
Sodawells, rarely Flooding (0.40)
flooded (4%)
Recluse (4%) Slow water
movement
(0.47)
Thirtynine, moist Slow water
(4%) movement
(0.82)
Tilford (3%) Slow water
movement
(0.82)
P508A Swint silt loam, 0 Somewhat Swint (85%) Slow water 40.7 1.7%
to 2 percent limited movement
slopes (0.92)
Vale (4%) Slow water
movement
(0.82)
Barnum, rarely Slow water
flooded (4%) movement
(0.50)
Depth to
saturated zone
(0.43)
Flooding (0.40)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 10 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
St. Onge, rarely Slow water
flooded (3%) movement
(0.92)
Flooding (0.40)
P514A Tilford silt loam, Somewhat Tilford (85%) Slow water 18.7 0.8%
0 to 2 percent limited movement
slopes (0.82)
St. Onge (5%) Slow water
movement
(0.82)
Flooding (0.40)
P514B Tilford silt loam, Somewhat Tilford (85%) Slow water 231.5 9.8%
2 to 6 percent limited movement
slopes (0.82)
Nevee (4%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
St. Onge (4%) Slow water
movement
(0.82)
Flooding (0.40)
P514C Tilford silt loam, Somewhat Tilford (80%) Slow water 70.9 3.0%
6 to 10 limited movement
percent slopes (0.82)
Nevee (10%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
Vale (5%) Slow water
movement
(0.82)
Suglo (5%) Slow water
movement
(0.24)
P536D Ustorthents, Somewhat Ustorthents, Slow water 6.0 0.3%
reclaimed, 1 to limited reclaimed movement
20 percent (90%) (0.95)
slopes
Slope (0.16)
Nihill, moist (4%) Slope (0.16)
P538A Vale silt loam, 0 Somewhat Vale (85%) Slow water 257.2 10.9%
to 2 percent limited movement
slopes (0.82)
Tilford (6%) Slow water
movement
(0.87)
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 11 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Map unit Map unit name Rating Component Rating reasons Acres in AOI Percent of AOI
symbol name (percent) (numeric
values)
Nevee (3%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
P538B Vale silt loam, 2 Somewhat Vale (85%) Slow water 223.3 9.5%
to 6 percent limited movement
slopes (0.82)
Tilford (5%) Slow water
movement
(0.87)
Nevee (3%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
P538C Vale silt loam, 6 Somewhat Vale (85%) Slow water 3.2 0.1%
to 9 percent limited movement
slopes (0.82)
Nevee (5%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
Tilford (5%) Slow water
movement
(0.87)
P540B Vale silt loam, Somewhat Vale, gravelly Slow water 12.5 0.5%
gravelly limited substratum movement
substratum, 1 (85%) (0.98)
to 6 percent
slopes Nevee (5%) Depth to bedrock
(0.85)
Slow water
movement
(0.82)
W Water Not rated Water (100%) 1.3 0.1%
Subtotals for Soil Survey Area 2,305.4 97.8%
Totals for Area of Interest 2,358.1 100.0%
Rating Acres in AOI Percent of AOI
Somewhat limited 1,287.6 54.6%
Very limited 1,069.2 45.3%
Null or Not Rated 1.3 0.1%
Totals for Area of Interest 2,358.1 100.0%
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 12 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Description
Septic tank absorption fields are areas in which effluent from a septic tank is
distributed into the soil through subsurface tiles or perforated pipe. Only that part
of the soil between depths of 24 and 60 inches is evaluated. The ratings are
based on the soil properties that affect absorption of the effluent, construction
and maintenance of the system, and public health. Saturated hydraulic
conductivity (Ksat), depth to a water table, ponding, depth to bedrock or a
cemented pan, and flooding affect absorption of the effluent. Stones and
boulders, ice, and bedrock or a cemented pan interfere with installation.
Subsidence interferes with installation and maintenance. Excessive slope may
cause lateral seepage and surfacing of the effluent in downslope areas.
Some soils are underlain by loose sand and gravel or fractured bedrock at a
depth of less than 4 feet below the distribution lines. In these soils the absorption
field may not adequately filter the effluent, particularly when the system is new.
As a result, the ground water may become contaminated.
The ratings are both verbal and numerical. Rating class terms indicate the extent
to which the soils are limited by all of the soil features that affect the specified
use. "Not limited" indicates that the soil has features that are very favorable for
the specified use. Good performance and very low maintenance can be
expected. "Somewhat limited" indicates that the soil has features that are
moderately favorable for the specified use. The limitations can be overcome or
minimized by special planning, design, or installation. Fair performance and
moderate maintenance can be expected. "Very limited" indicates that the soil has
one or more features that are unfavorable for the specified use. The limitations
generally cannot be overcome without major soil reclamation, special design, or
expensive installation procedures. Poor performance and high maintenance can
be expected.
Numerical ratings indicate the severity of individual limitations. The ratings are
shown as decimal fractions ranging from 0.01 to 1.00. They indicate gradations
between the point at which a soil feature has the greatest negative impact on the
use (1.00) and the point at which the soil feature is not a limitation (0.00).
The map unit components listed for each map unit in the accompanying
Summary by Map Unit table in Web Soil Survey or the Aggregation Report in Soil
Data Viewer are determined by the aggregation method chosen. An aggregated
rating class is shown for each map unit. The components listed for each map unit
are only those that have the same rating class as listed for the map unit. The
percent composition of each component in a particular map unit is presented to
help the user better understand the percentage of each map unit that has the
rating presented.
Other components with different ratings may be present in each map unit. The
ratings for all components, regardless of the map unit aggregated rating, can be
viewed by generating the equivalent report from the Soil Reports tab in Web Soil
Survey or from the Soil Data Mart site. Onsite investigation may be needed to
validate these interpretations and to confirm the identity of the soil on a given
site.
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 13 of 14
Septic Tank Absorption Fields—Butte County, South Dakota, and Lawrence County, South
Dakota
Rating Options
Aggregation Method: Dominant Condition
Aggregation is the process by which a set of component attribute values is
reduced to a single value that represents the map unit as a whole.
A map unit is typically composed of one or more "components". A component is
either some type of soil or some nonsoil entity, e.g., rock outcrop. For the
attribute being aggregated, the first step of the aggregation process is to derive
one attribute value for each of a map unit's components. From this set of
component attributes, the next step of the aggregation process derives a single
value that represents the map unit as a whole. Once a single value for each map
unit is derived, a thematic map for soil map units can be rendered. Aggregation
must be done because, on any soil map, map units are delineated but
components are not.
For each of a map unit's components, a corresponding percent composition is
recorded. A percent composition of 60 indicates that the corresponding
component typically makes up approximately 60% of the map unit. Percent
composition is a critical factor in some, but not all, aggregation methods.
The aggregation method "Dominant Condition" first groups like attribute values
for the components in a map unit. For each group, percent composition is set to
the sum of the percent composition of all components participating in that group.
These groups now represent "conditions" rather than components. The attribute
value associated with the group with the highest cumulative percent composition
is returned. If more than one group shares the highest cumulative percent
composition, the corresponding "tie-break" rule determines which value should
be returned. The "tie-break" rule indicates whether the lower or higher group
value should be returned in the case of a percent composition tie. The result
returned by this aggregation method represents the dominant condition
throughout the map unit only when no tie has occurred.
Component Percent Cutoff: None Specified
Components whose percent composition is below the cutoff value will not be
considered. If no cutoff value is specified, all components in the database will be
considered. The data for some contrasting soils of minor extent may not be in the
database, and therefore are not considered.
Tie-break Rule: Higher
The tie-break rule indicates which value should be selected from a set of multiple
candidate values, or which value should be selected in the event of a percent
composition tie.
Natural Resources Web Soil Survey 8/22/2022
Conservation Service National Cooperative Soil Survey Page 14 of 14
Get email alerts for Spearfish
A daily email when new agendas and minutes are posted.