The Spearfish Planning Commission met in regular session on Tuesday, August
1, 2023 at 3:00 p.m. in the council chamber of city hall and via Zoom video conference. Commissioner
Bordewyk called the meeting to order at 3:00 p.m. Roll call was taken with the following members
present: Bob Meyer, Toby Bordewyk, Rick Tysdal, and Larry Vavruska. Also present: Planning Director
Marlo Kapsa, City Attorney Ashley McDonald, City Administrator Steve McFarland, Assistant Planning
Director Jaymia Ecker and Administrative Assistant Erica Bussiere.
APPROVAL OF MINUTES:
Vavruska moved, Meyer seconded and all voted to approve the minutes of the July 5, 2023
Planning Commission meeting.
DECLARATIONS OF CONFLICTS OF INTEREST:
Bordewyk called for any potential conflicts of interest to be identified. No conflicts were expressed.
1. Request: Final Plat for Lot 3 of Block 1 of Thomson Addition
Location: Southwest of Intersection of Hill Street and Harvard Street
Applicant: Stencil Group, LLC
Action: Approve Final Plat with Stipulations
Kapsa presented the staff report noting that the Request is to approve Lots 3 and 4 of Thomson
Addition. Kapsa noted that the main change since Sketch Plat approval was the addition of
north/south right-of-way which creates two separate lots, requiring an update to the legal
description. Tysdal moved, Vavruska seconded and all voted to recommend approval of
the Sketch Plat with the stipulations noted in the staff report.
2.
Request: Conditional Use Permit to operate a new church in an existing building within
the C-3 Office Commercial District
Location: 1300 N Avenue Spearfish, SD
Applicant: Michael Greslin/Jason Boke
Action: Set a Public Hearing for August 15, 2023
Kapsa presented the staff report noting that the church use and school are both conditional
uses within the C-3 District. Vavruska clarified that the school would operate three weeks
days and one weekend day and inquired if a play structure would be added for students
outside. The applicant, Jason Boke stated that outdoor play equipment would be installed in
the grassy area on site. Tysdal moved and Vavruska seconded to set a public hearing for
August 15, 2023.
3. Items for Discussion:
Planning Studies – Project Updates: Kapsa stated that the next public input session for the
Colorado Boulevard Study is scheduled August for August 24th from 5PM-7PM at the Heritage Center
in Spearfish. Kapsa noted the primary concerns from the Highway 85 Corridor Study public input
session were regarding the amount of development proposed along the corridor and specific concerns
with the intersections of Highway 85/Pendo Road and Highway 85/Colorado Boulevard.
Planning Commission Updates: Kapsa stated that a new Planning Commissioner, Amy Davison, will
be appointed during the August 7, 2023 City Council Meeting. Kapsa noted a presentation on Planning
Commission expectations and a review of the bylaws would be included on the August 15, 2023
Planning Commission agenda.
4. City Council Update – Kapsa stated a presentation on the 2024 Planning and Zoning Budget would
be given during the August 2, 2023 Study Session meeting. Major budgeted items for Planning and
Zoning included new permitting software and new aerial imagery which will be cost shared with
Lawrence County and other municipalities within the county. She noted that an additional lot transfer
at Sky Ridge and two letter of support for projects applying for Housing Infrastructure Financing
Program funding were included on the August 7, 2023 City Council agenda
5. Public Comment – No comments were provided by the public.
6. Adjournment - Bordewyk adjourned the meeting at approximately 3:22 p.m.
Agenda
Spearfish Planning Commission Agenda
August 1, 2023 at 3:00 p.m.
Meeting Location: City Council Chamber, 625 Fifth Street, Spearfish, SD
And Zoom Online Meeting
Join Zoom Meeting
https://us02web.zoom.us/j/83971284645
Meeting ID: 839 7128 4645
Or Dial in:
+1 669 444 9171 and enter Meeting ID
A. Call To Order
B. Roll Call
C. Approve the Minutes from July 5, 2023
D. Declaration of Conflicts of Interest
E. Items for Action
1. Request: Final Plat for Lot 3 of Block 1 of Thomson Addition
Location: Southwest of Intersection of Hill Street and Harvard Street
Applicant: Stencil Group, LLC
Action: Approve Final Plat with Stipulations
2. Request: Conditional Use Permit to operate a new church in an existing building
within the C-3 Office Commercial District
Location: 1300 N Avenue Spearfish, SD
Applicant: Michael Greslin/Jason Boke
Action: Set a Public Hearing for August 15, 2023
F. Items for Discussion
1. Planning Studies - Project Updates
2. Planning Commission Updates
G. City Council Update
H. Public Comment - Public comments are welcome at this time, however, no action will be
taken.
I. Adjournment
Spearfish Planning Commission
Regular Session Minutes
July 5, 2023 at 3:00 p.m.
The Spearfish Planning Commission met in regular session on Wednesday, July
5, 2023 at 3:00 p.m. in the council chamber of city hall and via Zoom video conference. Chair Kruskamp
called the meeting to order at 3:00 p.m. Roll call was taken with the following members present: Meghan
Byrum, Bob Meyer, Rick Tysdal, and Larry Vavruska. Also present: Planning Director Marlo Kapsa, City
Attorney Ashley McDonald, City Administrator Steve McFarland, and Administrative Assistant Erica
Bussiere.
APPROVAL OF MINUTES:
Kruskamp moved, Tysdal seconded and all voted to approve the minutes of the June 20, 2023
Planning Commission meeting.
DECLARATIONS OF CONFLICTS OF INTEREST:
Kruskamp called for any potential conflicts of interest to be identified. No conflicts were expressed.
1. Request: Approve a Sketch Plat for Lot 3 of Block 1 of Thomson Addition
Location: Southwest of Intersection of Hill Street and Harvard Street
Applicant: Stencil Group, LLC
Action: Approve Final Plat with Stipulations
Kapsa presented the sketch plat and staff report. Kruskamp inquired about whether the
remainder acreage would be annexed. Kapsa noted that the remainder acreage would not be
annexed as part of this project Byrum moved, Vavruska seconded and all voted to
recommend approval of the Sketch Plat with the stipulations noted in the staff report.
3. Items for Discussion:
Planning Studies – Project Updates: Kapsa stated that there can be up to three Planning
Commissioners present on the Comprehensive Plat committee. Tysdal and Byrum volunteered to be
on that committee. Kapsa noted that the first public open house for the Highway 85 Corridor Study is
set for July 19th at the City of Deadwood at 5:30 PM. Kapsa noted that the Final SAT meeting for the
Welcome Center Study will be held on Tuesday July 18th. Kapsa stated that the second stakeholders
meeting and open house for the Colorado Boulevard Study has been set for August 24th at the Heritage
Center.
4. City Council Update – Kapsa stated there were no items from planning during the previous City
Council meeting.
5. Public Comment – No comments were provided by the public.
8. Adjournment - Kruskamp adjourned the meeting at approximately 3:11 p.m.
Spearfish Planning Commission Staff Report
Meeting Location: 625 Fifth Street, Spearfish SD, Council Chamber of City Hall
and by Zoom Online Meeting
Meeting Date and Time: August 1, 2023 at 3:00 p.m.
Applicant: Stencil Group, LLC
Request: Approve a Final Plat for Lot 3 and Lot 4 of Block 1 of Thomson
Addition to the City of Spearfish
Action: Approve with Stipulations
Location: Southwest of Intersection of Hill Street and Harvard Street;
Within 3-Mile Extraterritorial Jurisdiction Area
Page 1
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Proposal Summary: The subject property is currently an unplatted 75.78-acre parcel. The
proposed plat would create one 5.42 acre lot and one 4.72 acre lot to be known as Lot 3 and Lot
4 of Block 1 of Thomson Addition leaving a 65 acre unplatted remainder parcel.
General Comments:
The proposed plat is a minor plat within the 3-Mile Extraterritorial Jurisdiction area with Lawrence
County. The parcel is currently undeveloped. Upon approval of the Final Plat, proposed Lot 3 and
Lot 4 would be annexed into Spearfish City Limits and rezoned to R3 District. The developer has
indicated that tax increment financing would be requested to aid in infrastructure expansion to
serve the proposed development. Staff would recommend approval of the final plat with the
stipulations noted at the end of the report.
Staff Review:
Zoning: The property is currently located within Lawrence County and zoned Park Forest District.
The proposed 5.42 and 4.72 acre lots meet minimum density requirements for this zone. The
developer has indicated that they would like to rezone the property to R3 District. This would be
consistent with the adjacent R3 zoned property to the north of the subject property. The proposed
lot size would meet all minimum zoning requirements under this new zoning designation. Upon
approval of the Final Plat, the applicant may request annexation, rezoning, and Tax Increment
Financing for Lot 3 and Lot 4.
Utilities: Any development to occur on proposed Lot 3 and Lot 4 would be required to utilize City
sewer and water services. There is an existing 15-foot wide utility easement present on the
property. A 40-foot-wide drainage and utility easement is proposed as part of this plat to convey
site drainage to the detention pond located on existing Lot 2 which will be maintained by the
developer but remain under ownership of the Thomson family. A written easement agreement
identifying maintenance responsibilities must be submitted with the final plat document for
recording.
Access: Access to the property is provided via Hill Street which is classified as a Collector Street
on the City’s Major Street Plan. The required additional 33-foot wide right-of-way dedication for
Hill Street is being shown on the plat document. That portion of Hill Street adjacent to proposed
Lot 10 must be improved to minimum City design standards upon annexation and rezoning of the
property.
An additional north/south roadway is shown on the applicant’s submitted site plan. Prior to Final
Plat approval, the plat document must be revised to show the dedication of a 66-foot wide right-
of-way for the proposed north/south roadway. The revised plat document must also include a road
name for the new street to be reviewed and approved by Lawrence County E911 staff. The
proposed road must be constructed to minimum City design standards upon annexation and
rezoning of the property. Maintenance of the adjacent portion of Hill Street and the new roadway
would be the responsibility of the developer during construction. Once improved to City standards,
the infrastructure would be dedicated to the City for ownership and maintenance.
Platting Process: Following approval of the Final Plat by the Planning Commission, the plat will
go before the City Council for a Public Hearing and final approval. Once the Final Plat has been
approved, the applicant’s request for annexation and rezoning may be considered along with the
request for Tax Increment Financing.
Page 2
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Summary:
The proposed plat generally complies with all applicable Zoning and Subdivision Regulations. As
such, staff would recommend approval of the proposed plat with the following stipulations:
1. Upon Final Plat approval, the applicant shall submit an application for rezoning,
annexation, and tax increment financing (TIF) for the property.
2. Prior to recording of the Final Plat, a written easement document including maintenance
responsibilities for the 40-foot-wide drainage and utility easement and detention pond shall
be submitted. A drainage easement shall be included on Lot 2 for any area to be used for
stormwater detention.
3. Prior to recording of the Final Plat, the plat document shall be revised to include a 66-foot-
wide Right-of-Way between Lot 3 and Lot 4. A road name meeting minimum E911
standards shall be included on the final plat document.
4. Prior to recording of the Final Plat, The plat document shall be revised with an updated
legal description that includes both proposed lots.
5. Prior to recording of the Final Plat, the Developer shall enter into a Developer’s Agreement
with the City of Spearfish.
6. Prior to recording of the Final Plat, booster station construction costs and a cost share
agreement shall be finalized.
7. Upon approval of the annexation, rezone, and TIF request, 65% design plans shall be
submitted for review and approval. Phasing shall be documented in the design plans.
8. Upon submittal of subdivision construction plans, a Traffic Impact Study shall be
submitted.
9. Prior to dedication of the infrastructure improvements to the City, the developer shall be
responsible for roadway maintenance of Hill Street adjacent to the proposed parcel.
STAFF CONTACT: Marlo Kapsa – Planning Director, 605-717-1122;
marlo.kapsa@cityofspearfish.com
ATTACHMENTS:
Page 3 – Aerial Map
Page 4 – Final Plat
Page 3
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Aerial Map
Page 4
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Final Plat
Page 5
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Spearfish Planning Commission Staff Report
Meeting Location: 625 Fifth Street, Spearfish SD, Council Chamber of City Hall
and by Zoom Online Meeting
Meeting Date and Time: August 1, 2023 at 3:00 p.m.
Applicant: Michael Greslin and Jason Boke
Request: Conditional Use Permit to operate a new church and school in an
existing building within the C-3 Office Commercial District
Action: Set a Public Hearing for August 15, 2023
Location: 1300 N Avenue, Spearfish, SD
Proposal Summary: The applicant is seeking to obtain a Conditional Use Permit to operate a
new church and school in an existing structure located at 1300 N Avenue in Spearfish, SD.
Page 1
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
General Comments:
The subject property is located within city limits and is zoned C-3 Office Commercial District. The
proposed church and school uses are both uses eligible for a conditional use permit within this
district. The site is approximately 0.5 acres in size. There is an existing 4,129 square foot office
building constructed on site which would be home to the proposed new church and school. The
church and school would operate 4 days per week between the hours of 7:30 AM – 6:30 PM.
Upon review of the Conditional Use Permit application staff finds the proposed use to generally
comply with all required evaluation criteria. As such, staff would recommend approval of the
Conditional Use Permit.
Evaluation Criteria Review:
1. Describe how the proposed use is compatible with the location, physical character,
and topographic features of the property: The new use of the building (church and
school) would be similar to the previous office use of the building and surrounding
businesses with a significant reduction in the amount of daily traffic as noted by the
applicant as the building will only be use four days a week. There are no exterior building
alterations being proposed as part of the new use.
2. Describe buffering measures along parcel boundaries that exist or will be or be
incorporated to mitigate any visual impact of outdoor use areas onto adjacent
property: The existing site is comprised of a 4,129 square foot building, green space, and
a parking lot. There are no substantial changes being proposed as part of the new use,
however, the broken fencing will be on site will be repaired. As noted previously, no
anticipated exterior building alterations are proposed.
3. If new lighting is proposed, describe how it is designed so that it does not
unreasonably affect adjacent property: No new lighting is proposed as part of this
design.
4. Describe the public safety issues related to the proposed use of the land, or
surroundings, and if will there be an increased risk of an existing public safety
issue: The proposed use is in line with adjacent property uses. There is no anticipated
increased risk of public safety issues as a result of this change of use.
5. Describe the existing or proposed pedestrian and vehicular access and parking
including accommodations for bicycle transportation and transportation by
persons with physical disabilities: Parking lot access from North Avenue and all parking
spaces will remain unchanged including the ADA spaces. Pedestrian access to the front
door is available via stairs or ramp and the rear door is located at ground level. Bicycle
racks will be added to the site.
6. Describe the methods to address any impacts to the adjacent properties that may
result from parking; include dimensions of fencing, types of landscape or other
buffering to be provided: The existing parking lot will continue to be used and is
contained by concrete curbing on three sides. Existing broken split rail fencing along
eastern property border will be repaired and replaced.
7. Describe the number of vehicle trips per day resulting from the use of the property
and compare it to the existing traffic volume on the adjoining street network:
Weekdays (3 days/week): approximately 30 vehicles in/out primarily at 7:30 am, 3:00 pm,
Page 2
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
and 6:30 pm - less than current use since the building was previously used all 5 weekdays.
Sunday: vehicle traffic at 10am and 3pm. Building is currently unoccupied and unused on
weekends.
8. Describe what types of noise may result from the property and compare it to the
existing noise levels of the adjoining land uses: Internal noise levels on weekends
would not impact adjoining property owners. Weekday use (3 days/week), intermittent
activity breaks for the children (15-30 minutes each) for anticipated total outdoor activity
time of 1 hour. With the distance between adjoining properties, the applicant does not
anticipate significant impact.
9. Describe what public services and utilities are available to accommodate the
proposed use, and if these may adequately serve the use: The existing building is
connected to City services. There are two unisex bathrooms with two stalls each, one of
which is ADA compliant. High/low drinking fountain will be added. In speaking with the
Building Official, this fits the needs of the occupancy rate of the facility.
10. Describe any existing property features, or planned improvements that will make
the proposed use compatible with the surrounding area: The building has existing
green space on the north side with landscaped areas and trees on the west side of the
property. The applicant plans to maintain and improve the vegetation on the north and
west sides of the building and will repair and replace broken fencing along the east
property line adjacent to Polly Drive.
11. If the request is for a wireless telecommunications facility, small wind energy
system, or a solar energy conversion system, describe how the specific zoning
code criteria pertaining to these uses will be met. Not applicable.
PUBLIC COMMENTS:
Owners within 140 feet of the property will be notified of the public hearing via first class mail 10
days before the public hearing. The property will also have a notice sign posted on it and notice
of the public hearing will also be published in the official newspaper, both 10 days prior to the
public hearing.
Summary:
The proposed uses of church and school generally comply with all required evaluation criteria. As
such, staff would recommend approval of the Conditional Use Permit.
STAFF CONTACT: Marlo Kapsa – Planning Director, 605-717-1122;
marlo.kapsa@cityofspearfish.com
ATTACHMENTS:
Page 3 – Site Plan
Page 4 – Floor Plan
Page 3
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Site Plan
Page 4
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Floor Plan
Page 5
Spearfish Planning Commission Staff Report
Meeting Date: August 1, 2023 at 3:00 p.m.
Get email alerts for Spearfish
A daily email when new agendas and minutes are posted.