Muyni
← Back to Springfield

Board of Mayor & Aldermen

Regular Meeting

Springfield, TN · August 7, 2012

AgendaMinutes

Minutes

MINUTES BOARD OF MAYOR AND ALDERMEN SPECIAL MEETING AUGUST 7, 2012 Board present Staff present Mayor Billy Paul Carneal City Manager Paul John Nutting Alderman James Hubbard Asst. City Manager Gina Holt Alderman Willie Mason City Recorder Jane Shugart Murphy Vice Mayor Jerome Ellis City Clerk Connie W. Watson Alderman Ann Schneider Alderman Bruce Head Alderman Shane Shoemaker 1.0 Mayor Billy Paul Carneal called to order the regular meeting of the Board of Mayor and Aldermen at 7:00 p.m. 2.0 Administration 2.1 Mr. Mike Flatt and Mr. Jody Vance of Gresham Smith and Partners briefed the board on their preliminary evaluation of the ongoing drainage problems at the sinkhole and detention pond serving the greater Queen Ann Court/Bill Jones Industrial Drive area. They recommended approaching the project in two (2) phases to reduce the risk of flooding due to the backup of drainage flow at the sinkhole adjacent to Bill Jones Industrial Drive. Phase 1 of the project would include the acquisition and removal of three (3) homes adjacent to the detention pond on Queen Ann Court in order to widen, deepen, grade and seed the detention pond to increase its capacity. The project would also include the acquisition of easements on three (3) other lots to create additional storage area. A graded and landscaped berm would be constructed around the detention pond to a top elevation of at least the 702 foot contour. In addition, grading is proposed around the sinkhole. This grading would only include work above the existing rock elevation, and would not be in areas requiring utility relocations or adjustments. The sinkhole and detention pond would also be fenced to prohibit unauthorized access during high water. The estimate cost to construct Phase 1 is $504,800. Phase 2 of the project would consist of one (1) of two (2) options for pumping and discharging drainage flow away from the sinkhole and detention pond. The estimated cost for the construction of this phase of the project is between $435,300 and $529,600. The cost for the total construction of the project is between $940,100 and $1,034,400. The estimated construction cost of the project does not include engineering costs. Alderman Schneider moved to obtain appraisals of the properties located at 2502, 2506 and 2508 Queen Ann Court to initiate the acquisition process. The motion was seconded and passed by 7-0 roll call vote. Alderman Hubbard moved to secure an engineering proposal for the project. The motion was seconded and passed by 7-0 roll call vote. 2.2 The City Manager reviewed with the Board the capital improvement projects that were budgeted to be funded with bond proceeds during fiscal year 2013. Mr. Nutting identified the projects with the highest priority as follows: the Queen Ann Court/Bill Jones Industrial Drive drainage improvements; a new roof and two (2) new air conditioning units for The Center; the construction of a new animal control facility; sewer system improvements to meet the EPA Administration Order on Consent; the construction of the new Water/Wastewater Department facility; and Phase 2 of the Highway 41 South sewer extension project. No action was taken. 3.0 Adjournment With no further business to discuss, the meeting adjourned. ______________________________ Billy P. Carneal, Mayor Attest: ______________________________ Jane Shugart Murphy, City Recorder

Get email alerts for Springfield

A daily email when new agendas and minutes are posted.

Report an issue with this meeting