Bicycle & Pedestrian Committee
Regular MeetingSummerville, SC · July 15, 2020
Minutes
Bicycle and Pedestrian Advisory Committee Meeting
July 15, 2020 9:00 a.m. - Zoom Meeting
Attendees:
Members: Rick Reiff, Kelley Johnson, Mike Peebles, John Mott, John Pardee, Ned Shows,
Sandy O’Keefe,
Visitors: Bonnie Miley, Town of Summerville, Karen Fairchild, Town of Summerville
The minutes from the May 13 2020 meeting were approved.
Public Comment
John Mott referred to the SMB extension and some public property near to the Summerville
Country Club (Miler). He noted that if you use Lucretia Lane there could be a good access point.
Old Business
Rick updated the BPAC 2020 Improvement Priority List. The committee overviewed the last
few adjustments. Bonnie noted that new sidewalks were already approved near the Gum Street
Post office, so that could be removed from our list.
Kelley motioned to approve the Priority List and Mike seconded the motion. Motion passed.
It was noted that the Planning Commission would meet on July 20th. Rick volunteered to attend
the meeting and present our list.
Sandy gave an overview of some of the recent activities of the Bike/Walk Summerville group.
The group went on a group fact-finding ride along the SMB trail with the Parks Director from
the Town and from Dorchester County, to discuss possible enhancements and improvements.
Any improvements would begin in the Oakbrook area due to the planned closing of the SMB
trail during construction of the parkway.
The committee further discussed future Oakbrook projects, as well as the traffic-calming efforts
made by the Town on Sumter Avenue.
The next regular meeting of the BPAC will be on Wednesday, Sept. 16th at 9:00 a.m.
Adjournment: The meeting was adjourned at 10:45 a.m.
Respectfully submitted by Kelley Johnson
Agenda
Agenda BPAC Meeting
Wednesday 07-15-2020
Zoom meeting ____9:00am
I. Public Comment:
II. Acceptance of minutes from 5-20-2020
III. NEW BUSINESS:
IV. OLD BUSINESS:
1. Approval of Sidewalk and Bicycle Plan 2021 (BPACPriorityList.DRAFT052920.pdf)
2. Present to Planning committee on __________________________
3.
Next Meeting: 09-16-2020
Town of Summerville Bicycle and Pedestrian Advisory Committee (BPAC)
BPAC 2020 Improvement Priority List AADT Max: 17,800
DRAFT May 29, 2020 AADT Min: 900
CRITERIA SCORING
2019 Traffic B/P SCDOT
2020 B/P 2020 Pedestrian Construct- Permit-
Year Related New Path Conceptual Pedestrian Counts Construct- Permit- Connect- Daily
Activity ability ability
Priority
Projects
Improvement Location Notes BPAC Activity
Connect-
(vehicles per ability ability
BPAC ivity Traffic
Added Length Cost Opinion
Score ivity Score
day) (1-5) (1-5) (1-5) (1-3) (1-3)
From N. Maple St. to W. Carolina Av., connects
W. Richardson Avenue/W. Doty Avenue
1 2016 5, 8 Shared-Use Path the future N. Maple Street widening/path 3,000' $ 600,000
N. Maple Street/Sawmill Branch Connection improvements to SMB.
2 2019 Sidewalk Extension S. Cedar Street & W. Doty Avenue Bulb Outs and RRFB across S. Cedar Street 50' 19.38 $ 100,000 Very High Very High 15,200 Not Difficult Medium 19.38 5 5 4.38 3 2
3 2018 5, 7 Flashing Beacon E. Richardson Avenue @ Sawmill Branch Trail Install RRFB at crosswalk 0' 18.37 $ 20,000 Very High Very High 6,700 Not Difficult Not Difficult 18.37 5 5 2.37 3 3
From US 17A to SMB parking lot, connects the
E. Richardson Avenue
4 2019 1, 3, 7 Shared-Use Path future N. Maple Street widening/path 2,500' 16.37 $ 500,000 Very High Very High 6,700 Medium Medium 16.37 5 5 2.37 2 2
N. Maple Street/Sawmill Branch Connection improvements to SMB.
Bulb Out, and Crosswalk and RRFB across S. Cedar
5 2018 Sidewalk Extension S. Cedar Street & W. 2nd S. Street Street
50' 15.38 $ 75,000 Medium High 15,200 Not Difficult Difficult 15.38 3 4 4.38 3 1
From Gadsen Street to Linwood Lane, including
6 2018 15, 16 Sidewalk W. Carolina Avenue Crosswalk and RRFB across W. Carolina Avenue to 250' 14.99 $ 65,000 High High 9,300 Difficult Not Difficult 14.99 4 4 2.99 1 3
Sumter Avenue
Sawmill Branch Trail Purchase of the property and lot construction
7 2020 3, 5 Sawmill Branch Trail @ E. Richardson Avenue where vehicles park today
0' 14.37 $ 250,000 Very High Low 6,700 Not Difficult Not Difficult 14.37 5 1 2.37 3 3
Parking Lot
8 2019 Sidewalk US 17A/S. Main Street From Luden Drive to E. Carolina Avenue 7,500' 14.00 $ 750,000 Medium Medium 17,800 Medium Difficult 14.00 3 3 5.00 2 1
From W. Carolina Av. to US 17A, connects the
W. Richardson Avenue/W. Doty Avenue
9 2019 1, 5 Shared-Use Path future N. Maple Street widening/path 3,500' 13.99 $ 700,000 Medium Very High 5,100 Medium Medium 13.99 3 5 1.99 2 2
N. Maple Street/Sawmill Branch Connection improvements to SMB.
From US 17A to Magnolia Street, including
10 2019 Sidewalk E. 6th S. Street Crosswalks across US 17A and bicycle/loop 550' 13.00 $ 125,000 Medium High Unknown Not Difficult Medium 13.00 3 4 1.00 3 2
markings
11 2020 Sidewalk Millhouse Drive/Holiday Drive Potential developer-related project(s) 8,000' 12.40 $ 800,000 Low Medium 6,800 Not Difficult Not Difficult 12.40 1 3 2.40 3 3
From Main Street to N. Gum Street and the N.
12 2018 Sidewalk E. 2nd N. Street/N. Gum Street Gum Street connection to Post Office
1,100' 12.26 $ 150,000 Medium Medium 2,000 Not Difficult Medium 12.26 3 3 1.26 3 2
13 2018 Sidewalk E. 1st N. Street From Main Street to N. Gum Street 1,000' 12.00 $ 100,000 Medium Medium 900 Not Difficult Medium 12.00 3 3 1.00 3 2
Crosswalks between Doty Park and N. Cedar
14 2019 Crosswalks W. 4th N. Street Street
0' 12.00 $ 10,000 Medium Medium Unknown Not Difficult Medium 12.00 3 3 1.00 3 2
Sidewalk connections, crosswalks, and
15 2019 6, 16 Sidewalk/Markings Sumter Avenue & Pressley Avenue & W. 5th S. Street intersection markings 100' 11.00 $ 100,000 High Low Unknown Not Difficult Medium 11.00 4 1 1.00 3 2
Sidewalk connections, crosswalks, and
16 2019 6, 15 Sidewalk/Markings Sumter Avenue & Laurel Street intersection markings
100' 11.00 $ 100,000 High Low Unknown Not Difficult Medium 11.00 4 1 1.00 3 2
From Central Avenue to Parkwood Drive, adds to
17 2018 18 Sidewalk Simmons Avenue the area sidewalk network
4,500' 11.00 $ 450,000 Medium Medium Unknown Medium Medium 11.00 3 3 1.00 2 2
Loop From Parkwood Drive to Dorns Way Road,
18 2018 17 Sidewalk Simmons Avenue adds to the area sidewalk network
4,750' 11.00 $ 475,000 Medium Medium Unknown Medium Medium 11.00 3 3 1.00 2 2
Across the Norfolk Southern railroad and E. 3rd N.
Sawmill Branch Trail Extension
19 2019 26 Shared-Use Path Street to tie into the future US 78 widening/path 3,500' 11.00 $ 700,000 High Medium Unknown Medium Difficult 11.00 4 3 1.00 2 1
(E. Richardson Avenue north to US 78) improvements
Town of Summerville Bicycle and Pedestrian Advisory Committee (BPAC)
BPAC 2020 Improvement Priority List AADT Max: 17,800
DRAFT May 29, 2020 AADT Min: 900
CRITERIA SCORING
2019 Traffic B/P SCDOT
2020 B/P 2020 Pedestrian Construct- Permit-
Year Related New Path Conceptual Pedestrian Counts Construct- Permit- Connect- Daily
Activity ability ability
Priority
Projects
Improvement Location Notes BPAC Activity
Connect-
(vehicles per ability ability
BPAC ivity Traffic
Added Length Cost Opinion
Score ivity Score
day) (1-5) (1-5) (1-5) (1-3) (1-3)
Sawmill Branch Trail Connection to the Eagle Chandler From SMB to Dorchester County's Eagle Chandler
20 2020 Shared-Use Path Bridge Creek Multi-use path, across Old Trolley 4,250' 11.00 $ 850,000 Fairly Low High Unknown Medium Medium 11.00 2 4 1.00 2 2
Bridge Creek Multi-use Path Road
Rollins Edwards Community Center To tie into the future N. Maple Street
21 2019 Shared-Use Path widening/path improvements
4,000' 10.26 $ 800,000 Fairly Low Medium 2,000 Medium Medium 10.26 2 3 1.26 2 2
Connection to N. Maple Street
Rollins Edwards Community Center
22 2019 Shared-Use Path To tie into the proposed Sawmill Branch Extension 2,000' 10.09 $ 400,000 Fairly Low Medium 1,300 Medium Medium 10.09 2 3 1.09 2 2
Connection to E. Richardson Avenue
23 2019 Sidewalk E. 3rd N. Street From Berlin G. Myers Parkway to Town limits 2,400' 10.04 $ 250,000 Medium Low 5,300 Medium Medium 10.04 3 1 2.04 2 2
Sidewalk connections and markings at
24 2019 Sidewalk/Markings US 17A/N. Main Street & W. 3rd N. Street intersection
100' 10.04 $ 50,000 Low Fairly Low 5,300 Not Difficult Medium 10.04 1 2 2.04 3 2
25 2018 Sidewalk Brandy Mill Boulevard Old Trolley Road to end 6,000' 10.00 $ 600,000 Fairly Low Fairly Low Unknown Medium Not Difficult 10.00 2 2 1.00 2 3
Sawmill Branch Trail Extension
26 2019 19 Shared-Use Path Potential developer-related project(s) 6,500' 10.00 $ 1,300,000 Medium Fairly Low Unknown Medium Medium 10.00 3 2 1.00 2 2
(US 78 north to Jockey Court)
Rollins Edwards Community Center To tie into the future US 78 widening/path
27 2019 Shared-Use Path improvements
1,000' 10.00 $ 200,000 Fairly Low Medium Unknown Medium Medium 10.00 2 3 1.00 2 2
Connection to US 78
28 2018 Crosswalk S. Magnolia Street & Azalea Park Crosswalk 0' 8.20 $ 5,000 Low Low 1,750 Not Difficult Medium 8.20 1 1 1.20 3 2
Power Line Easement between N. Maple Street and
29 2020 Shared-Use Path 6,400' 8.00 $ 1,280,000 Low Fairly Low Unknown Not Difficult Difficult 8.00 1 2 1.00 3 1
Berkeley Circle
Town of Summerville Bicycle and Pedestrian Advisory Committee (BPAC)
Ongoing BPAC Projects Summary
DRAFT May 29, 2020
Roadway Location Notes
Lee Street From King Charles Circle to Bacons Bridge Road Funded for 2020
W. 5th S. Street From Sumter Avenue to Main Street Funded for 2020
N. Hickory Street From US 78 to Richardson Avenue Approved in 2019, currently in design, part of a CDBG application
Parkwood Drive From Simmons Avenue to Central Avenue Under construction
Central Avenue From Near Carolina Avenue to Old Orangeburg Road Currently in design
King Charles Circle From Smythe Drive to Axtell Street Completed in 2019
Springview Lane From Old Trolley Road to Midland Parkway Completed in 2018
Bentons Lodge Road From Midlands Parkway to Ladson Road Completed in 2018
South Laurel Street From W. Richardson Avenue to Central Avenue Complete
W. 2nd S. Street From S. Laurel Street to Hickory Street Complete
S. Hickory Street From W. 2nd S. Street to E. Richardson Avenue Complete