Public Works Committee (Meets 1st Thursday of each month at 5:00 p.m.)

Regular Meeting

Superior, WI · November 4, 2021

AgendaMinutes

Minutes

PUBLIC WORKS COMMITTEE MEETING November 4, 2021 GOVERNMENT CENTER ROOM 204 Members Present: Nick Ledin, Jenny Van Sickle, Ruth Ludwig Members Absent: Keith Kern Also Present: Todd Janigo, Chris Carlson, Jodi Saylor, Shelley Nelson, Thor Trone, Councilor Van Sickle called the meeting to order at 5:00 pm. 1. Approval of the September 2, 2021 meeting minutes. MOTION by Ludwig, second by Ledin and carried to approve the September 2, 2021 meeting minutes. 2. Councilor Ledin a. Continued discussion regarding traffic calming efforts at 58th Street and Baxter Avenue. (held from 9/2/21) Councilor Ledin has had some discussions with residents in the area and they do not seem to be receptive to traffic calming efforts in this area. He said at this time, there is no need to continue discussions. Lt Trone did give an update on some traffic data the Police Department collected. During the time they collected this data, officers logged 7 hours and 5 minutes of targeted time in this area. This is logged time where they put in at least 15 minutes of monitoring traffic and running radar in the area. This does not include any drive-by they may have made. The Officers that patrol this area believe that, other than commuter traffic, things have slowed down due to the change in seasons and not having as much traffic going to the golf course or ball fields, as well as the completion of E 2nd Street projects. 3. Public Works a. 3rd Quarter Fleet Vehicle Auction Removals (no action needed) This was the auction of a 1995 Trail King Trailer. Public Works received $20,600 for this sale. b. Request approval for the Annual Contract Extension with Tire Aggregate LLC for Tire Recycling. This is for the landfill. With the WLSSD loads that are received at the landfill, tires are sometime brought in. The Street Department Crews also sometimes pick up tires that have been left around the City in various areas such as ditches. The landfill will take tires from the public for a fee and we then contract with Tire Aggregate LLC to pick them up on a regular basis. MOTION by Ledin, second by Ludwig and carried to approve the Annual Contract Extension with Tire Aggregate LLC for Tire Recycling. 1 Pubic Works Committee Meeting November 4, 2021 c. Request approval for the Landfill Consultant contract with SEH Inc. for 2022. SEH has been contracted to work with the landfill for quite some time. They do things like volume surveys, fill plan efficiencies, air permitting and more. The landfill has greatly reduced that amount that we need them by hiring Cathy to do a lot of the testing and monitoring, but we still have the need to have some of the bigger things completed. The contract has averaged less than $55K over the last three years. SEH tracks our permits and lets us know when things are due. They follow a schedule to keep up with certain services as well as help with some on-call type situations as needed. MOTION by Ludwig, second by Ledin and carried to approve the Landfill Consultant contract with SEH Inc. for 2022. d. Request approval for the Renewal of Joint Powers Agreement with WLSSD for Household Hazardous Waste. This is a contract we have had for quite a few years. The cost of the City starting its own program was looked at and it was pretty expensive so we started bringing items that we can’t accept to WLSSD. It is $45 per drop off. WLSSD invoices the City and the City uses the recycling fees to cover these payments. MOTION by Ledin, second by Ludwig and carried to approve the Renewal of Joint Powers Agreement with WLSSD for Household Hazardous Waste. e. Recommendation to Purchase three Cab & Chassis/Dump Body, Plow & Wing These units are similar to what we already have. We try to purchase them a few at a time and try to minimize the parts we have to keep on hand by purchasing same or very similar units. The three older units will be sold at auction as these enter the rotation. MOTION by Ludwig, second by Ledin and carried to approve the Purchase of three Cab & Chassis/Dump Body, Plow & Wing. 4. ESD Director’s Report - Received and filed. 5. Public Works Director’s Report a. The signal on 105 and Tower Avenue is nearing completion. Janigo saw the railroad out there working on building their bungalow today. Once that is done and all of their stuff is connected, electricians have to come in and do the full interconnect. Signals will be turned on and tested on November 11th. As long as testing goes well, it should be operational that evening. b. Parkland had another run today. Things are going well. They have hired MSA as a consultant and are working through their process. The odor has been gone since it was shut down. There is a data logger in the manhole where Parkland comes in and we have been logging and watching that carefully. With the changes they are making, everything should fall into place. We are looking at a data logger on the power pole near there so we can be constantly checking it. This would send us an alarm when something is wrong and we will have the ability to turn their system off. 2 Pubic Works Committee Meeting November 4, 2021 c. Budget – our Landfill budget, which includes collection, disposal and recycling and the ESD will be going to the next Finance Committee meeting. d. Belknap/Tower intersection - Now that you can no longer go to and from Duluth on the Blatnik, those vehicles are being funneled to the Bong Bridge. There is an engineer working in our system on traffic signal timing to keep things moving with the added usage. Lt. Trone said the Police Department has issued 70-80 tickets on the Belknap viaduct due to speeders. With the system being worked on, it is not backing up as much. The engineer added some dedicated left turns in places and by using little changes like that, it helps clear up traffic. It seems to be working well right now and we will continue to monitor it. We will also have the engineer work with us when the project is complete to get things back to a more normal flow and hopefully even make some improvements on that. e. Bagged leaf pickup is happening through November 12th. f. The Street Department is currently excavating alleys and should be done in the next 2-3 weeks. These alleys will be paved next year. g. The Crews are working on getting winter equipment ready for the season. h. Public Works had hoped to bring three Ford Escape Hybrids to the committee meeting, however, due to sourcing we are not sure when we will be able to get pricing. With changes to CIP, some things were moved around and we plan to start with the three admin vehicles first. i. The Parks Crew is working on clearing the sidewalks of trees and bushes to ensure there is a clear route for the new sidewalk clearing program. It will be very important for us to stick to the route, especially this year while we are learning. The crew will not be able to do special requests. At the end of this first season, we will look at other pieces that people tell us about (i.e. – kids walk on the other side of where sidewalks are being cleared) so please keep track of that so adjustments can be made next year. Ledin said that with lights going on at 105 and Tower, Bryant Elementary would like to see the change on the safer route from 60th to 61st. Lt Trone has spoken with the Principal as well and will connect again after the lights are actually on. Van Sickle asked about how the garbage pickup adjustment is going. From a customer standpoint, it seems to be going well after the first couple of pickups. Drivers are working on adjusting which truck gets what area. When the change was made, we had very good can counts but we did not have the weight of each so we may have to adjust to make the weight more equal so drivers are making less trips to the Landfill. E 2nd – working through final punch list but we have not signed off on that. Likely in the spring. DOT will do the actual sign off on it, but usually they give us some say in that. Councilor Van Sickle adjourned the meeting at 5:49 p.m. The next Public Works Committee meeting will be held December 2, 2021 at 5 p.m. in Room 204 of the Government Center. Minutes submitted to the Council Meeting of November 16, 2021. 3 Pubic Works Committee Meeting November 4, 2021 Sold Asset Report Superior, WI Date range: 01 Jul 2021 ‐ 31 Jul 2021 Inventory ID Description VIN/Serial Type Sold Amount Auction End Date Street366 1995 Trail King TK100‐HDG 50‐ton Low‐Boy Trailer SM108290 USD $20,600.00 25‐Jul‐21 $20,600.00 AMENDMENT III TO THE SERVICE AGREEMENT By and Between The City of Superior And Tire Aggregate, LLC The City of Superior, a Wisconsin municipal corporation (City), located at 1316 North 14th Street, Superior, Wisconsin, and Tire Aggregate, LLC (Contractor), an limited liability corporation, are parties to a services agreement for tire recovery services at the City Landfill dated January 1, 2019 and amended January 1, 2020 and January 1, 2021. The parties hereby wish to amend the Agreement, effective as of January 1, 2022, as follows: Term: The term of this agreement shall be from the date of the agreement through December 31, 2022. This Agreement may be renewed annually for additional one year periods, as agreed upon by both parties in writing. This Agreement may be terminated by either party without cause upon thirty (30) days written notice to the other. In the event of termination, Contractor shall be paid only for services performed up to date of termination. Services and Fees: Contractor shall provide services at the rate of two hundred twenty dollars per ton ($220.00 per ton), inclusive of all taxes, fees and applicable expenses. Such payment shall be full compensation for work performed or services rendered and for all labor, materials, supplies, equipment, fuel, and incidentals necessary to complete the work. Fuel surcharge will be as follows: for every $0.25/gallon increase above $3.15/gallon price at the Kwik Trip in Scanlon, Minnesota, there will be a 5% increase per ton. The price is read on the first of the month and that price sets the rate of increase for the entire month. Changes to services and/or fees must be agreed upon by both parties and acknowledged in an amendment signed by both parties. All other terms and conditions of this Agreement remain in full force and effect. IN WITNESS WHEREOF, the parties have signed the Amendment as of the date first written above. ATTEST: Tire Aggregate, LLC By:______________________________ David M. Chmielewski, President ATTEST: City of Superior _________________________________ ________________________________ Mayor City Clerk _________________________________ ________________________________ Finance Director City Attorney Provision has been made to pay the liability that will accrue under this Agreement. *Approved by the City of Superior Common Council on Landfill Consultant Supplement to the Master Agreement Between The City of Superior and Short, Elliot, Hendrickson, Inc. The City of Superior, a municipal corporation existing by and under the authority of the laws of the State of Wisconsin (hereinafter referred to as ‘City’) and Short, Elliot, Hendrickson, Inc., a Minnesota corporation located in Duluth, MN, (hereinafter referred to as ‘Consultant’) are parties to a Master Agreement dated March 1, 2016, Amendment I dated January 1, 2017, Amendment II dated January 1, 2018, Amendment III dated January 1, 2019, Amendment IV dated January 1, 2020, and Amendment V dated January 1, 2021, for Professional Engineering Services to be provided to the City of Superior. Both parties desire the following amendments: Term: The City and the Consultant do hereby agree to the supplement as per the term outlined through December 31, 2022. Scope: Add the scope of work indicated per the attached Exhibit A. In Witness Whereof, the parties, intending to be legally bound have executed this agreement on the day and year set forth above. On behalf of: Short, Elliot Hendrickson, Inc. __________________________________ ______________________________________ Bob Ellis, Principal Matt Bolf, Principal CITY OF SUPERIOR, WISCONSIN __________________________________ ______________________________________ Mayor City Attorney __________________________________ ______________________________________ Finance Director City Clerk Provision has been made to pay the liability that will accrue under this contract Supplement approved at the __________________, Common Council meeting. Landfill Management Supplement to SEH Master Agreement Page 1 Exhibit A: Landfill Consultant 2022 Scope of Work 1. Air Permit Coordinate DNR inspections and compliance reporting required under landfill air permit. Advise on matters of air permit compliance including, but not limited to: monitoring schedules, methods and results; maintenance and repair of landfill equipment as it relates to air permit compliance (ex. gas extraction wells, flare); and identify critical timelines and reporting requirements within the air permit and state statute. 2. Technical Assistance with Landfill Environmental Monitoring Upon request, provide technical assistance to City landfill staff on environmental monitoring, including but not limited to: sampling methodology, monitoring equipment troubleshooting, DNR submittal timelines and formats, data interpretation, and statutory requirements. City will provide SEH an electronic copy of monitoring results within 14 days of each monitoring event (to be sent to Brian Kent unless otherwise directed by SEH). 3. Surface Emission Scan Conduct surface emission scan in October, with follow‐up scans if necessary to obtain compliance. Provide documentation to City within 30 days of completion. City will submit results to DNR. 4. Annual Gas Sampling for Total Reduced Sulfur and VOC’s Collect one landfill gas sample from flare and submit to lab for analyzing total reduced sulfur and VOC’s. Provide results to City upon receipt from lab. City will submit results to DNR with other monitoring data. 5. Volume Surveys Conduct two volume surveys: one during the first quarter and one during the last quarter of 2021. Within 30 days of the survey, a report shall be provided to the City including: plan sheet showing updated contours, fill rate, compaction rate, remaining volume capacity, remaining life span of the landfill, and estimated total volume in place. 6. General Landfill Consultation Upon request, advise on landfill matters including, but not limited to: a. Regulatory compliance b. Maintenance or operational challenges c. Landfill engineering and design services d. Plan of Operations modifications e. Waste Phasing Plan f. Capping and closure sequence, timing, preparation and cost estimates g. Risk prevention Landfill Management Supplement to SEH Master Agreement Page 2 Point of Contact: Darienne McNamara, Environmental Regulatory Manager 1316 North 14th Street #200 Superior WI 54880 715‐395‐7506 (office) 715‐817‐6967 (mobile) mcnamarad@ci.superior.wi.us Invoicing: Monthly invoices must include a summary report of activities for the billing period, including current and upcoming major work items. Fees: Contract not to exceed $55,000.00 in 2021 calendar year. If monthly invoice exceeds $4,000 summary report for the billing period must include description of which major work items accounted for the exceedance. Provide list of hourly rates for personnel involved with contract tasks. Landfill Management Supplement to SEH Master Agreement Page 3 RENEWAL OF THE JOINT POWERS AGREEMENT BETWEEN SANITARY BOARD OF THE WESTERN LAKE SUPERIOR SANITARY DISTRICT (“BOARD”) AND THE CITY OF SUPERIOR (“CITY”) FOR HOUSEHOLD HAZARDOUS WASTE Pursuant to Section 4, “Term of Agreement” for the Joint Powers Agreement dated December 5, 2018 by and between the Sanitary Board of Western Lake Superior Sanitary District, a political subdivision of the state of Minnesota (the “BOARD”), and the City of Superior, Wisconsin, a Wisconsin municipal corporation, (the “CITY”) , the City hereby agrees and accepts the Board’s request to exercise a one (1) year extension for the period of January 1, 2022 through December 31, 2022. All other terms and conditions remain in full force and effect. IN WITNESS WHEREOF, the Parties have signed this renewal. ATTEST: Sanitary Board of Western Lake Superior Sanitary District 2626 Courtland Street Duluth, MN 55806 ______________________________________ _______________________________ Tim Lundell, O&M Supervisor – Solid Waste Marianne Bohren, Executive Director ATTEST: CITY OF SUPERIOR, WISCONSIN _____________________________________ _______________________________ Jim Paine, Mayor Camila Ramos, City Clerk _____________________________________ _______________________________ Ashley Puetz, Finance Director Frog Prell, City Attorney *Approved at the City Council Meeting: Environmental Services Division Public Works Department Phone: (715) 394-0392 Ext. 1034 ES Director Fax: (715) 394-0406 Steve Roberts E-mail: robertss@ci.superior.wi.us 51 E 1st Street Website: www.ci.superior.wi.us Superior, WI 54880 Memorandum DATE: November 8, 2021 TO: Members of the Public Works Committee FROM: Steve Roberts RE: ESD Director’s Report for November 2021 PWC 1) Wastewater Treatment Operations a) 117.7 million gallons of treated effluent were discharged from the main wastewater treatment facility in September. 105.3 million gallons of treated effluent were discharged from the main wastewater treatment facility in October. No discharges from combined sewer treatment facilities occurred in September or October. b) Discharged effluent has been compliant with 100% of permit limits since November, 2019. The longest previous period of continuous effluent compliance of 410 days was surpassed on January 4th. 2) Collection System Operations a) No Combined Sewer Overflows (CSOs), or Sanitary Sewer Overflows (SSOs) year-to- date. The most recent SSO occurred in April of 2020 and the most recent wet weather SSO occurred in October of 2018. 3) Update on Parkland Sanitary District (PSD): a) PSD remains under a suspension of discharge due to high levels of hydrogen sulfide resulting from their discharge. b) Over the last month PSD and the City were able to coordinate for a drawdown of an accumulation of stored sewage that had been aerated in the storage by PSD to remove hydrogen sulfide. c) PSD retained MSA engineering and plan is being developed so that PSD will be able to treat for hydrogen sulfide so that PSD and pump sewage to the City sewer system. SR/sr C: Jodi Saylor, Todd Janigo, Chris Carlson, ESD Managers

Agenda

PUBLIC WORKS COMMITTEE MEETING September 2, 2021 GOVERNMENT CENTER ROOM 204 Members Present: Ruth Ludwig, Nick Ledin, Jenny Van Sickle Members Absent: Keith Kern Also Present: Todd Janigo, Chris Carlson, Shelley Nelson, Ryan Gundstrom, Brent Fennessey, Councilor Van Sickle called the meeting to order at 5:00 pm. 1. Approval of the August 5, 2021 meeting minutes. MOTION by Ludwig, second by Ledin and carried to approve the minutes from the August 5, 2021 meeting. 2. Councilor Ludwig a. Discussion about Community Composting Two years ago the City went through the green infrastructure audit that triggered us to make some changes in our composting ordinance. This started thoughts of starting a City wide program. Councilor Ludwig reached out to WLSSD to do a tour of their composting program in Duluth. Due to COVID, it could not be done this last year. Our landfill is coming to a close within several years. Ludwig believes it is time for us as a City to become more proactive and get our citizens involved in this. Yard waste could be composted instead of going into the landfill. A tour of WLSSD will be a good start to see how they operate their facilities. A tentative date of September 17th around 9am has been set to tour their facility. Lindsey Graskey joined virtually at 5:02pm Ludwig just read that San Francisco just started a compost system and 80% of their organic material is now composted. There are different ways to do this, including incentives for citizens.. Lt. Trone joined virtually at 5:10pm 3. Councilor Ledin a. Continued discussion regarding traffic calming efforts at 58th Street and Baxter Avenue. Lt. Trone stated that traffic counts for that area were upwards of 3500 cars per day, depending on the day, traffic, and traffic speeds. There are concerns about vehicle speeds due to no stop signs until John Avenue, heading westbound. Installing a stop sign to break the traffic pattern would be appropriate in this area. Councilor Van Sickle asked if the Police Department has any ideas of what increased enforcement has and could look 1 Pubic Works Committee Meeting September 2, 2021 like. While Lt Trone does not yet have data for the traffic stops, there were area squads assigned. He did not see a an increase in citations. Although the presence of officers has likely slowed people down. Councilor Ledin spent time going door to door chatting with residents along 58th St. The main feedback was that speeders seem to be coming from Tower Avenue towards the golf course. There were also concerns that cars are passing in this stretch. Numerous residents talked about seeing this happen along the double yellow lines. Residents do not seem open to other traffic calming methods besides stop signs. Ledin would support a 4- way stop in that area. He would also like to see fog lines on 58th from Tower to Weeks and any other traffic calming methods that might help. The Public Safety Committee met and discussed raising awareness through social media. Lt. Trone will work on making that happen. MOTION by Ledin, second by Ludwig and carried to hold this item in committee until the next Public Works Committee meeting. b. Consider adding a 4-way stop at North 58th Street and Baxter Avenue. MOTION by Ledin, second by Ludwig and carried to approve adding a 4-way stop at N 58th Street and Baxter. 4. Councilor Fennessey a. Remove Calendar Parking on B Hayes Court between Elm Avenue and Hill Avenue from April 1 to October 31. Councilor Fennessey discussed the area around Court B in Hayes Court. It is significantly wider than the other courts. It ends up being a through way for drivers. The Police Department is going to work on extra enforcement. One of the suggestions that could make the road feel smaller is to remove calendar parking. It would only be for the summer months to still give Public Works crews the opportunity to clear both sides of the street. Even with cars parked on both sides, there is still a wide lane. This would help make it seem more residential to help drivers be aware and slow down. MOTION Ledin, second by Ludwig and carried to approve removing Calendar Parking from B Hayes Court between Elm Avenue and Hill Avenue from April 1 to October 31 each year. b. Support Resolution compelling the railroad to repair the crossings at East 5th Street and Hill Avenue. Councilor Fennessey discussed the rough state of this railroad crossing. Public Works has reached out to the railroad multiple times to have this repaired. The Office of the Commissioner of Railroads (OCR) can compel the railroad to undertake the repair. A resolution passed by the City Council is a required step in the OCR process. Councilor Fennessey supports this next step to get the railroad to repair the crossing. MOTION by Ledin, second by Ludwig and carried to approve a Resolution 2 Pubic Works Committee Meeting September 2, 2021 compelling the railroad to repair the crossings at East 5th Street and Hill Avenue. 5. Public Works a. Sidewalks 101 (Ryan G) A goal of the committee is to provide education on Public Works’ programs and processes. The intention of this presentation was to address FAQs regarding the sidewalk program. Councilor Van Sickle asked that this portion of the meeting be recorded so it can be shared with others. Carlson introduced Ryan Gundstrom. Gundstrom manages the sidewalk program. He helps set the priorities each year, works with the contractors, and performs inspections during construction. Carlson shared the importance of sidewalks within a City. If you travel anywhere, at some point you use a sidewalk. They provide an essential transportation network within a City. Currently, we have 895,754 feet of sidewalks within the City. This equates to 170 miles of sidewalk or 2,559 blocks (at 350’ per block). Fennessey left the meeting at 5:32 For every resident in the City, there is roughly 33 feet of sidewalk. Every 2 years, our sidewalks are rated on a scale of 1 – 4 with 4 being the best and 1 being the worst condition. An excellent sidewalk will be smooth, have no hazards, and is ADA compliant. Even a good sidewalk will sometimes drop down in ratings it if is not ADA compliant. There are several criteria used when determining what sidewalks are prioritized for construction each year. 1. Ratings. Currently there are roughly 30% rated excellent, 21% good, 34% fair, and 15% poor. 2. Importance of the sidewalk – what function does it serve? Some tools used are Safe Routes to School (put together in 2003 by the MIC), the Active Transportation Plan (ATP), City Clearing Routes for snow, and available funding. We have two types of funding – Capital Improvement Plan (CIP) which can be used anywhere and Community Development Block Grant (CDBG) which are state dollars allocated to benefit low to moderate income households. These dollars can only be used in certain areas (largely census based, Planning Department manages those dollars). CDGB dollars are approximately $240K each year. We are unique in that we don’t assess for sidewalks/street repairs/sewers. All funding comes from CIP, CDBG, Grants, etc. In the last 10 years, the City has spent $7.3M on sidewalks through various funding sources. That is around 21% of our sidewalk network. The City is on an approximately 50-year replacement cycle and spends roughly $13-14K per block. All requests for sidewalk replacement in different parts of the City are put on a list. Some are very urgent and are completely immediately. Others are less urgent and are deferred. This list is another consideration of what sidewalks are completed each year. If contracting will be in the area, we try to take care of all requests in that area. Some areas are patched to take care of trip hazards until a sidewalk can be replaced. There is more area to cover with CIP funding than CDBG. The city tries to follow a rotation around the city to ensure that all areas of the city are being addressed. This year was Billings Park, 3 Pubic Works Committee Meeting September 2, 2021 last year South end, next year will be East End. The last 3 years the city was able to take advantage of the expansions in the CDBG eligible areas to complete more work in the UWS area. The process to have a sidewalk removed is similar to the city’s alley petitions. Residents have to petition all neighbors and have a majority agree before it will be considered. The city then has a checklist that has to be completed to ensure it meets removal criteria. Resident’s that will be affected by new sidewalks are notified by letter to let them know that it will be happening and when. Lindsey Graskey left the meeting around 6pm. If the City were to replace the entire sidewalk network, it would cost around $34.6M. Current funding puts the city replacement cycle at approximately 55-65 years. When sidewalks are redone, finishing/seeding is also included. It will take a couple of years to fully grow in. In the seedbank and soil, weeds will grow first so have to get those cut back to allow grass to grow. Councilor Ludwig suggested educating residents on how to take care of the new sidewalks and grass plantings. This information could potentially be added to the letters residents receive notifying them of the work. Gundstrom let Committee members and Councilors know that if they get requests, let him know, especially if it is big hazard. He can at least get some patches done right away. Homeowners can also let us know. Gundstrom can be reached via phone: (715) 395-7300 or email gundstromr@ci.superior.wi.us. b. Freightliner/Aerial Boom - Recommendation to Purchase The City has been working on this for 4-5 years trying to figure out what exactly we need. This is what our tree crew uses when trimming and putting up lights, etc. It requires annual inspection and has safety ratings that go along with it. Twenty three years is getting up there in age and it requires more to keep it going. With age and requirements to keep operable we believe it is time to replace it. MOTION by Ludwig, second by Ledin and carried to approve the purchase of the Freightliner/Aerial Boom. 6. ESD Director’s Report Received and filed 7. Public Works Director’s Report a. Janigo yielded to Chair to give a report on the Blatnik Bridge. Councilor Van Sickle serves on the Project Advisory Committee for the Blatnik Bridge. Their first meeting was September 2020. There are around 100 stakeholders with 8 subcommittees. The Bridge was constructed in 1958 and opened in 1961, so 60 years ago. In 2008 was the first emergency gusset repair and then in 2016 another emergency 4 Pubic Works Committee Meeting September 2, 2021 gusset and cable repair took place. The load rating was reduced in 2016 and again in 2019. The Blatnik Bridge is largely operated and overseen by Minnesota with Wisconsin as a supporting partner and the opposite is true of the Bong Bridge. The Committee has held a couple of public virtual input meetings and in May, the public participate in alignment screening based on a couple of options that the Committee had come up with. Options were everything from do not build all the way to tunnels and more. This shows the public that all options are being considered. As a result of the alignment screening, there was a 41 page tech memo with the results. In terms of the timeline, 2020-2024 a lot of environmental evaluations will be done, making determinations based on the preferred alternative. In 2024-2026 they will be working on the preliminary design, 2026-2028 the final design will be created with construction happening 2028-2031. Director Janigo shared that since May people have been working on a lot of utilities – drawings, water lines, electric, etc. They are already digging to see what the piers look like. There are 3 primary structures – MN Approach, WI Approach, and the main span. The critical link is the main span. The cost will be different depending on what is done. They will be looking at what the life cycle is of the WI span and MN span as opposed to the main span and is there justification to do the whole thing. The MIC role in passing that resolution was to greenlight federal funding. You can see all of the meetings and documents. There is a lot of information there on bridge building and all that entails. Our two Public Safety Chiefs are part of the Advisory Council because of the safety factor and the amount of time police and fire spend on bridge. People can go to the Minnesota Department of Transportation’s website under the Blatnik Bridge project to give feedback on areas of the bridge. b. Director Janigo has been working on the odor issue at Parkland. Parkland has been getting better. We are still seeing spikes occasionally. We are getting to point where we will need to lean on them harder to get them to do what they need to do. c. Finished up sidewalk program for 2021. d. Currently working on our annual alley pave petitions. A Public Hearing will be set at the next Council meeting for September 21, 2021. e. Scope for Hammond Avenue – have received pricing and are negotiating. f. Opening for an Engineering Tech as Dave Pollock moved to a new position at ESD. Councilor Van Sickle adjourned the meeting at 6:38 p.m. The next Public Works Committee meeting will be held October 7, 2021 at 5 p.m. in room 204 of the Government Center. Minutes submitted to the Council Meeting of September 21, 2021. 5 Pubic Works Committee Meeting September 2, 2021 Sold Asset Report Superior, WI Date range: 01 Jul 2021 ‐ 31 Jul 2021 Inventory ID Description VIN/Serial Type Sold Amount Auction End Date Street366 1995 Trail King TK100‐HDG 50‐ton Low‐Boy Trailer SM108290 USD $20,600.00 25‐Jul‐21 $20,600.00

Get email alerts for Superior

A daily email when new agendas and minutes are posted.

Report an issue with this meeting