PUBLIC WORKS COMMITTEE MEETING
November 4, 2021
GOVERNMENT CENTER ROOM 204
Members Present: Nick Ledin, Jenny Van Sickle, Ruth Ludwig
Members Absent: Keith Kern
Also Present: Todd Janigo, Chris Carlson, Jodi Saylor, Shelley Nelson, Thor Trone,
Councilor Van Sickle called the meeting to order at 5:00 pm.
1. Approval of the September 2, 2021 meeting minutes.
MOTION by Ludwig, second by Ledin and carried to approve the September 2, 2021
meeting minutes.
2. Councilor Ledin
a. Continued discussion regarding traffic calming efforts at 58th Street and Baxter
Avenue. (held from 9/2/21)
Councilor Ledin has had some discussions with residents in the area and they do not
seem to be receptive to traffic calming efforts in this area. He said at this time, there
is no need to continue discussions.
Lt Trone did give an update on some traffic data the Police Department collected.
During the time they collected this data, officers logged 7 hours and 5 minutes of
targeted time in this area. This is logged time where they put in at least 15 minutes of
monitoring traffic and running radar in the area. This does not include any drive-by
they may have made. The Officers that patrol this area believe that, other than
commuter traffic, things have slowed down due to the change in seasons and not
having as much traffic going to the golf course or ball fields, as well as the
completion of E 2nd Street projects.
3. Public Works
a. 3rd Quarter Fleet Vehicle Auction Removals (no action needed)
This was the auction of a 1995 Trail King Trailer. Public Works received $20,600 for
this sale.
b. Request approval for the Annual Contract Extension with Tire Aggregate LLC for
Tire Recycling.
This is for the landfill. With the WLSSD loads that are received at the landfill, tires
are sometime brought in. The Street Department Crews also sometimes pick up tires
that have been left around the City in various areas such as ditches. The landfill will
take tires from the public for a fee and we then contract with Tire Aggregate LLC to
pick them up on a regular basis.
MOTION by Ledin, second by Ludwig and carried to approve the Annual
Contract Extension with Tire Aggregate LLC for Tire Recycling.
1 Pubic Works Committee Meeting
November 4, 2021
c. Request approval for the Landfill Consultant contract with SEH Inc. for 2022.
SEH has been contracted to work with the landfill for quite some time. They do
things like volume surveys, fill plan efficiencies, air permitting and more. The landfill
has greatly reduced that amount that we need them by hiring Cathy to do a lot of the
testing and monitoring, but we still have the need to have some of the bigger things
completed. The contract has averaged less than $55K over the last three years. SEH
tracks our permits and lets us know when things are due. They follow a schedule to
keep up with certain services as well as help with some on-call type situations as
needed.
MOTION by Ludwig, second by Ledin and carried to approve the Landfill
Consultant contract with SEH Inc. for 2022.
d. Request approval for the Renewal of Joint Powers Agreement with WLSSD for
Household Hazardous Waste.
This is a contract we have had for quite a few years. The cost of the City starting its
own program was looked at and it was pretty expensive so we started bringing items
that we can’t accept to WLSSD. It is $45 per drop off. WLSSD invoices the City and
the City uses the recycling fees to cover these payments.
MOTION by Ledin, second by Ludwig and carried to approve the Renewal of
Joint Powers Agreement with WLSSD for Household Hazardous Waste.
e. Recommendation to Purchase three Cab & Chassis/Dump Body, Plow & Wing
These units are similar to what we already have. We try to purchase them a few at a
time and try to minimize the parts we have to keep on hand by purchasing same or
very similar units. The three older units will be sold at auction as these enter the
rotation.
MOTION by Ludwig, second by Ledin and carried to approve the Purchase of
three Cab & Chassis/Dump Body, Plow & Wing.
4. ESD Director’s Report - Received and filed.
5. Public Works Director’s Report
a. The signal on 105 and Tower Avenue is nearing completion. Janigo saw the railroad
out there working on building their bungalow today. Once that is done and all of their
stuff is connected, electricians have to come in and do the full interconnect. Signals
will be turned on and tested on November 11th. As long as testing goes well, it
should be operational that evening.
b. Parkland had another run today. Things are going well. They have hired MSA as a
consultant and are working through their process. The odor has been gone since it
was shut down. There is a data logger in the manhole where Parkland comes in and
we have been logging and watching that carefully. With the changes they are making,
everything should fall into place. We are looking at a data logger on the power pole
near there so we can be constantly checking it. This would send us an alarm when
something is wrong and we will have the ability to turn their system off.
2 Pubic Works Committee Meeting
November 4, 2021
c. Budget – our Landfill budget, which includes collection, disposal and recycling and
the ESD will be going to the next Finance Committee meeting.
d. Belknap/Tower intersection - Now that you can no longer go to and from Duluth on
the Blatnik, those vehicles are being funneled to the Bong Bridge. There is an
engineer working in our system on traffic signal timing to keep things moving with
the added usage. Lt. Trone said the Police Department has issued 70-80 tickets on the
Belknap viaduct due to speeders. With the system being worked on, it is not backing
up as much. The engineer added some dedicated left turns in places and by using little
changes like that, it helps clear up traffic. It seems to be working well right now and
we will continue to monitor it. We will also have the engineer work with us when the
project is complete to get things back to a more normal flow and hopefully even
make some improvements on that.
e. Bagged leaf pickup is happening through November 12th.
f. The Street Department is currently excavating alleys and should be done in the next
2-3 weeks. These alleys will be paved next year.
g. The Crews are working on getting winter equipment ready for the season.
h. Public Works had hoped to bring three Ford Escape Hybrids to the committee
meeting, however, due to sourcing we are not sure when we will be able to get
pricing. With changes to CIP, some things were moved around and we plan to start
with the three admin vehicles first.
i. The Parks Crew is working on clearing the sidewalks of trees and bushes to ensure
there is a clear route for the new sidewalk clearing program. It will be very important
for us to stick to the route, especially this year while we are learning. The crew will
not be able to do special requests. At the end of this first season, we will look at other
pieces that people tell us about (i.e. – kids walk on the other side of where sidewalks
are being cleared) so please keep track of that so adjustments can be made next year.
Ledin said that with lights going on at 105 and Tower, Bryant Elementary would like
to see the change on the safer route from 60th to 61st. Lt Trone has spoken with the
Principal as well and will connect again after the lights are actually on.
Van Sickle asked about how the garbage pickup adjustment is going. From a
customer standpoint, it seems to be going well after the first couple of pickups.
Drivers are working on adjusting which truck gets what area. When the change was
made, we had very good can counts but we did not have the weight of each so we
may have to adjust to make the weight more equal so drivers are making less trips to
the Landfill.
E 2nd – working through final punch list but we have not signed off on that. Likely in
the spring. DOT will do the actual sign off on it, but usually they give us some say in
that.
Councilor Van Sickle adjourned the meeting at 5:49 p.m.
The next Public Works Committee meeting will be held December 2, 2021 at 5 p.m. in Room
204 of the Government Center.
Minutes submitted to the Council Meeting of November 16, 2021.
3 Pubic Works Committee Meeting
November 4, 2021
Sold Asset Report
Superior, WI
Date range: 01 Jul 2021 ‐ 31 Jul 2021
Inventory ID Description VIN/Serial Type Sold Amount Auction End Date
Street366 1995 Trail King TK100‐HDG 50‐ton Low‐Boy Trailer SM108290 USD $20,600.00 25‐Jul‐21
$20,600.00
AMENDMENT III TO THE
SERVICE AGREEMENT
By and Between
The City of Superior
And Tire Aggregate, LLC
The City of Superior, a Wisconsin municipal corporation (City), located at 1316 North 14th
Street, Superior, Wisconsin, and Tire Aggregate, LLC (Contractor), an limited liability
corporation, are parties to a services agreement for tire recovery services at the City Landfill
dated January 1, 2019 and amended January 1, 2020 and January 1, 2021. The parties hereby
wish to amend the Agreement, effective as of January 1, 2022, as follows:
Term:
The term of this agreement shall be from the date of the agreement through December 31, 2022.
This Agreement may be renewed annually for additional one year periods, as agreed upon by both
parties in writing.
This Agreement may be terminated by either party without cause upon thirty (30) days written
notice to the other. In the event of termination, Contractor shall be paid only for services
performed up to date of termination.
Services and Fees:
Contractor shall provide services at the rate of two hundred twenty dollars per ton ($220.00 per
ton), inclusive of all taxes, fees and applicable expenses. Such payment shall be full
compensation for work performed or services rendered and for all labor, materials, supplies,
equipment, fuel, and incidentals necessary to complete the work. Fuel surcharge will be as
follows: for every $0.25/gallon increase above $3.15/gallon price at the Kwik Trip in Scanlon,
Minnesota, there will be a 5% increase per ton. The price is read on the first of the month and
that price sets the rate of increase for the entire month.
Changes to services and/or fees must be agreed upon by both parties and acknowledged in an
amendment signed by both parties.
All other terms and conditions of this Agreement remain in full force and effect.
IN WITNESS WHEREOF, the parties have signed the Amendment as of the date first written
above.
ATTEST: Tire Aggregate, LLC
By:______________________________
David M. Chmielewski, President
ATTEST: City of Superior
_________________________________ ________________________________
Mayor City Clerk
_________________________________ ________________________________
Finance Director City Attorney
Provision has been made to
pay the liability that will
accrue under this Agreement.
*Approved by the City of Superior Common Council on
Landfill Consultant Supplement to the Master Agreement
Between
The City of Superior and
Short, Elliot, Hendrickson, Inc.
The City of Superior, a municipal corporation existing by and under the authority of the laws of the State
of Wisconsin (hereinafter referred to as ‘City’) and Short, Elliot, Hendrickson, Inc., a Minnesota
corporation located in Duluth, MN, (hereinafter referred to as ‘Consultant’) are parties to a Master
Agreement dated March 1, 2016, Amendment I dated January 1, 2017, Amendment II dated January 1,
2018, Amendment III dated January 1, 2019, Amendment IV dated January 1, 2020, and Amendment V
dated January 1, 2021, for Professional Engineering Services to be provided to the City of Superior.
Both parties desire the following amendments:
Term:
The City and the Consultant do hereby agree to the supplement as per the term outlined through
December 31, 2022.
Scope:
Add the scope of work indicated per the attached Exhibit A.
In Witness Whereof, the parties, intending to be legally bound have executed this agreement on the day
and year set forth above.
On behalf of: Short, Elliot Hendrickson, Inc.
__________________________________ ______________________________________
Bob Ellis, Principal Matt Bolf, Principal
CITY OF SUPERIOR, WISCONSIN
__________________________________ ______________________________________
Mayor City Attorney
__________________________________ ______________________________________
Finance Director City Clerk
Provision has been made to
pay the liability that will
accrue under this contract
Supplement approved at the __________________, Common Council meeting.
Landfill Management Supplement to SEH Master Agreement
Page 1
Exhibit A: Landfill Consultant
2022 Scope of Work
1. Air Permit
Coordinate DNR inspections and compliance reporting required under landfill air permit. Advise on
matters of air permit compliance including, but not limited to: monitoring schedules, methods and
results; maintenance and repair of landfill equipment as it relates to air permit compliance (ex. gas
extraction wells, flare); and identify critical timelines and reporting requirements within the air
permit and state statute.
2. Technical Assistance with Landfill Environmental Monitoring
Upon request, provide technical assistance to City landfill staff on environmental monitoring,
including but not limited to: sampling methodology, monitoring equipment troubleshooting, DNR
submittal timelines and formats, data interpretation, and statutory requirements. City will provide
SEH an electronic copy of monitoring results within 14 days of each monitoring event (to be sent to
Brian Kent unless otherwise directed by SEH).
3. Surface Emission Scan
Conduct surface emission scan in October, with follow‐up scans if necessary to obtain compliance.
Provide documentation to City within 30 days of completion. City will submit results to DNR.
4. Annual Gas Sampling for Total Reduced Sulfur and VOC’s
Collect one landfill gas sample from flare and submit to lab for analyzing total reduced sulfur and
VOC’s. Provide results to City upon receipt from lab. City will submit results to DNR with other
monitoring data.
5. Volume Surveys
Conduct two volume surveys: one during the first quarter and one during the last quarter of 2021.
Within 30 days of the survey, a report shall be provided to the City including: plan sheet showing
updated contours, fill rate, compaction rate, remaining volume capacity, remaining life span of the
landfill, and estimated total volume in place.
6. General Landfill Consultation
Upon request, advise on landfill matters including, but not limited to:
a. Regulatory compliance
b. Maintenance or operational challenges
c. Landfill engineering and design services
d. Plan of Operations modifications
e. Waste Phasing Plan
f. Capping and closure sequence, timing, preparation and cost estimates
g. Risk prevention
Landfill Management Supplement to SEH Master Agreement
Page 2
Point of Contact:
Darienne McNamara, Environmental Regulatory Manager
1316 North 14th Street #200
Superior WI 54880
715‐395‐7506 (office)
715‐817‐6967 (mobile)
mcnamarad@ci.superior.wi.us
Invoicing:
Monthly invoices must include a summary report of activities for the billing period, including current and
upcoming major work items.
Fees:
Contract not to exceed $55,000.00 in 2021 calendar year. If monthly invoice exceeds $4,000 summary
report for the billing period must include description of which major work items accounted for the
exceedance.
Provide list of hourly rates for personnel involved with contract tasks.
Landfill Management Supplement to SEH Master Agreement
Page 3
RENEWAL OF THE
JOINT POWERS AGREEMENT
BETWEEN
SANITARY BOARD OF THE
WESTERN LAKE SUPERIOR SANITARY DISTRICT (“BOARD”)
AND
THE CITY OF SUPERIOR (“CITY”)
FOR HOUSEHOLD HAZARDOUS WASTE
Pursuant to Section 4, “Term of Agreement” for the Joint Powers Agreement dated
December 5, 2018 by and between the Sanitary Board of Western Lake Superior
Sanitary District, a political subdivision of the state of Minnesota (the “BOARD”), and
the City of Superior, Wisconsin, a Wisconsin municipal corporation, (the “CITY”) , the
City hereby agrees and accepts the Board’s request to exercise a one (1) year extension for
the period of January 1, 2022 through December 31, 2022.
All other terms and conditions remain in full force and effect.
IN WITNESS WHEREOF, the Parties have signed this renewal.
ATTEST: Sanitary Board of Western Lake Superior Sanitary District
2626 Courtland Street
Duluth, MN 55806
______________________________________ _______________________________
Tim Lundell, O&M Supervisor – Solid Waste Marianne Bohren, Executive Director
ATTEST: CITY OF SUPERIOR, WISCONSIN
_____________________________________ _______________________________
Jim Paine, Mayor Camila Ramos, City Clerk
_____________________________________ _______________________________
Ashley Puetz, Finance Director Frog Prell, City Attorney
*Approved at the City Council Meeting:
Environmental Services Division
Public Works Department
Phone: (715) 394-0392 Ext. 1034 ES Director
Fax: (715) 394-0406 Steve Roberts
E-mail: robertss@ci.superior.wi.us 51 E 1st Street
Website: www.ci.superior.wi.us Superior, WI 54880
Memorandum
DATE: November 8, 2021
TO: Members of the Public Works Committee
FROM: Steve Roberts
RE: ESD Director’s Report for November 2021 PWC
1) Wastewater Treatment Operations
a) 117.7 million gallons of treated effluent were discharged from the main wastewater
treatment facility in September. 105.3 million gallons of treated effluent were discharged
from the main wastewater treatment facility in October. No discharges from combined
sewer treatment facilities occurred in September or October.
b) Discharged effluent has been compliant with 100% of permit limits since November,
2019. The longest previous period of continuous effluent compliance of 410 days was
surpassed on January 4th.
2) Collection System Operations
a) No Combined Sewer Overflows (CSOs), or Sanitary Sewer Overflows (SSOs) year-to-
date. The most recent SSO occurred in April of 2020 and the most recent wet weather
SSO occurred in October of 2018.
3) Update on Parkland Sanitary District (PSD):
a) PSD remains under a suspension of discharge due to high levels of hydrogen sulfide
resulting from their discharge.
b) Over the last month PSD and the City were able to coordinate for a drawdown of an
accumulation of stored sewage that had been aerated in the storage by PSD to remove
hydrogen sulfide.
c) PSD retained MSA engineering and plan is being developed so that PSD will be able to
treat for hydrogen sulfide so that PSD and pump sewage to the City sewer system.
SR/sr
C: Jodi Saylor, Todd Janigo, Chris Carlson, ESD Managers
Agenda
PUBLIC WORKS COMMITTEE MEETING
September 2, 2021
GOVERNMENT CENTER ROOM 204
Members Present: Ruth Ludwig, Nick Ledin, Jenny Van Sickle
Members Absent: Keith Kern
Also Present: Todd Janigo, Chris Carlson, Shelley Nelson, Ryan Gundstrom, Brent Fennessey,
Councilor Van Sickle called the meeting to order at 5:00 pm.
1. Approval of the August 5, 2021 meeting minutes.
MOTION by Ludwig, second by Ledin and carried to approve the minutes from the August
5, 2021 meeting.
2. Councilor Ludwig
a. Discussion about Community Composting
Two years ago the City went through the green infrastructure audit that triggered us to
make some changes in our composting ordinance. This started thoughts of starting a City
wide program. Councilor Ludwig reached out to WLSSD to do a tour of their composting
program in Duluth. Due to COVID, it could not be done this last year. Our landfill is
coming to a close within several years. Ludwig believes it is time for us as a City to
become more proactive and get our citizens involved in this. Yard waste could be
composted instead of going into the landfill. A tour of WLSSD will be a good start to see
how they operate their facilities. A tentative date of September 17th around 9am has been
set to tour their facility.
Lindsey Graskey joined virtually at 5:02pm
Ludwig just read that San Francisco just started a compost system and 80% of their
organic material is now composted. There are different ways to do this, including
incentives for citizens..
Lt. Trone joined virtually at 5:10pm
3. Councilor Ledin
a. Continued discussion regarding traffic calming efforts at 58th Street and Baxter Avenue.
Lt. Trone stated that traffic counts for that area were upwards of 3500 cars per day,
depending on the day, traffic, and traffic speeds. There are concerns about vehicle speeds
due to no stop signs until John Avenue, heading westbound. Installing a stop sign to
break the traffic pattern would be appropriate in this area. Councilor Van Sickle asked if
the Police Department has any ideas of what increased enforcement has and could look
1 Pubic Works Committee Meeting
September 2, 2021
like. While Lt Trone does not yet have data for the traffic stops, there were area squads
assigned. He did not see a an increase in citations. Although the presence of officers has
likely slowed people down.
Councilor Ledin spent time going door to door chatting with residents along 58th St. The
main feedback was that speeders seem to be coming from Tower Avenue towards the
golf course. There were also concerns that cars are passing in this stretch. Numerous
residents talked about seeing this happen along the double yellow lines. Residents do not
seem open to other traffic calming methods besides stop signs. Ledin would support a 4-
way stop in that area. He would also like to see fog lines on 58th from Tower to Weeks
and any other traffic calming methods that might help. The Public Safety Committee met
and discussed raising awareness through social media. Lt. Trone will work on making
that happen.
MOTION by Ledin, second by Ludwig and carried to hold this item in committee
until the next Public Works Committee meeting.
b. Consider adding a 4-way stop at North 58th Street and Baxter Avenue.
MOTION by Ledin, second by Ludwig and carried to approve adding a 4-way stop
at N 58th Street and Baxter.
4. Councilor Fennessey
a. Remove Calendar Parking on B Hayes Court between Elm Avenue and Hill Avenue from
April 1 to October 31.
Councilor Fennessey discussed the area around Court B in Hayes Court. It is
significantly wider than the other courts. It ends up being a through way for drivers. The
Police Department is going to work on extra enforcement. One of the suggestions that
could make the road feel smaller is to remove calendar parking. It would only be for the
summer months to still give Public Works crews the opportunity to clear both sides of the
street. Even with cars parked on both sides, there is still a wide lane. This would help
make it seem more residential to help drivers be aware and slow down.
MOTION Ledin, second by Ludwig and carried to approve removing Calendar
Parking from B Hayes Court between Elm Avenue and Hill Avenue from April 1 to
October 31 each year.
b. Support Resolution compelling the railroad to repair the crossings at East 5th Street and
Hill Avenue.
Councilor Fennessey discussed the rough state of this railroad crossing. Public Works
has reached out to the railroad multiple times to have this repaired. The Office of the
Commissioner of Railroads (OCR) can compel the railroad to undertake the repair. A
resolution passed by the City Council is a required step in the OCR process. Councilor
Fennessey supports this next step to get the railroad to repair the crossing.
MOTION by Ledin, second by Ludwig and carried to approve a Resolution
2 Pubic Works Committee Meeting
September 2, 2021
compelling the railroad to repair the crossings at East 5th Street and Hill Avenue.
5. Public Works
a. Sidewalks 101 (Ryan G)
A goal of the committee is to provide education on Public Works’ programs and
processes. The intention of this presentation was to address FAQs regarding the sidewalk
program. Councilor Van Sickle asked that this portion of the meeting be recorded so it
can be shared with others.
Carlson introduced Ryan Gundstrom. Gundstrom manages the sidewalk program. He
helps set the priorities each year, works with the contractors, and performs inspections
during construction. Carlson shared the importance of sidewalks within a City. If you
travel anywhere, at some point you use a sidewalk. They provide an essential
transportation network within a City.
Currently, we have 895,754 feet of sidewalks within the City. This equates to 170 miles
of sidewalk or 2,559 blocks (at 350’ per block).
Fennessey left the meeting at 5:32
For every resident in the City, there is roughly 33 feet of sidewalk. Every 2 years, our
sidewalks are rated on a scale of 1 – 4 with 4 being the best and 1 being the worst
condition. An excellent sidewalk will be smooth, have no hazards, and is ADA
compliant. Even a good sidewalk will sometimes drop down in ratings it if is not ADA
compliant.
There are several criteria used when determining what sidewalks are prioritized for
construction each year.
1. Ratings. Currently there are roughly 30% rated excellent, 21% good, 34% fair, and
15% poor.
2. Importance of the sidewalk – what function does it serve? Some tools used are Safe
Routes to School (put together in 2003 by the MIC), the Active Transportation Plan
(ATP), City Clearing Routes for snow, and available funding. We have two types of
funding – Capital Improvement Plan (CIP) which can be used anywhere and Community
Development Block Grant (CDBG) which are state dollars allocated to benefit low to
moderate income households. These dollars can only be used in certain areas (largely
census based, Planning Department manages those dollars). CDGB dollars are
approximately $240K each year. We are unique in that we don’t assess for
sidewalks/street repairs/sewers. All funding comes from CIP, CDBG, Grants, etc.
In the last 10 years, the City has spent $7.3M on sidewalks through various funding
sources. That is around 21% of our sidewalk network. The City is on an approximately
50-year replacement cycle and spends roughly $13-14K per block.
All requests for sidewalk replacement in different parts of the City are put on a list. Some
are very urgent and are completely immediately. Others are less urgent and are deferred.
This list is another consideration of what sidewalks are completed each year. If
contracting will be in the area, we try to take care of all requests in that area. Some areas
are patched to take care of trip hazards until a sidewalk can be replaced. There is more
area to cover with CIP funding than CDBG. The city tries to follow a rotation around the
city to ensure that all areas of the city are being addressed. This year was Billings Park,
3 Pubic Works Committee Meeting
September 2, 2021
last year South end, next year will be East End. The last 3 years the city was able to take
advantage of the expansions in the CDBG eligible areas to complete more work in the
UWS area.
The process to have a sidewalk removed is similar to the city’s alley petitions. Residents
have to petition all neighbors and have a majority agree before it will be considered. The
city then has a checklist that has to be completed to ensure it meets removal criteria.
Resident’s that will be affected by new sidewalks are notified by letter to let them know
that it will be happening and when.
Lindsey Graskey left the meeting around 6pm.
If the City were to replace the entire sidewalk network, it would cost around $34.6M.
Current funding puts the city replacement cycle at approximately 55-65 years.
When sidewalks are redone, finishing/seeding is also included. It will take a couple of
years to fully grow in. In the seedbank and soil, weeds will grow first so have to get those
cut back to allow grass to grow. Councilor Ludwig suggested educating residents on how
to take care of the new sidewalks and grass plantings. This information could potentially
be added to the letters residents receive notifying them of the work.
Gundstrom let Committee members and Councilors know that if they get requests, let
him know, especially if it is big hazard. He can at least get some patches done right away.
Homeowners can also let us know. Gundstrom can be reached via phone: (715) 395-7300
or email gundstromr@ci.superior.wi.us.
b. Freightliner/Aerial Boom - Recommendation to Purchase
The City has been working on this for 4-5 years trying to figure out what exactly we
need. This is what our tree crew uses when trimming and putting up lights, etc. It requires
annual inspection and has safety ratings that go along with it. Twenty three years is
getting up there in age and it requires more to keep it going. With age and requirements
to keep operable we believe it is time to replace it.
MOTION by Ludwig, second by Ledin and carried to approve the purchase of the
Freightliner/Aerial Boom.
6. ESD Director’s Report
Received and filed
7. Public Works Director’s Report
a. Janigo yielded to Chair to give a report on the Blatnik Bridge.
Councilor Van Sickle serves on the Project Advisory Committee for the Blatnik Bridge.
Their first meeting was September 2020. There are around 100 stakeholders with 8
subcommittees. The Bridge was constructed in 1958 and opened in 1961, so 60 years
ago. In 2008 was the first emergency gusset repair and then in 2016 another emergency
4 Pubic Works Committee Meeting
September 2, 2021
gusset and cable repair took place. The load rating was reduced in 2016 and again in
2019. The Blatnik Bridge is largely operated and overseen by Minnesota with Wisconsin
as a supporting partner and the opposite is true of the Bong Bridge. The Committee has
held a couple of public virtual input meetings and in May, the public participate in
alignment screening based on a couple of options that the Committee had come up with.
Options were everything from do not build all the way to tunnels and more. This shows
the public that all options are being considered. As a result of the alignment screening,
there was a 41 page tech memo with the results. In terms of the timeline, 2020-2024 a lot
of environmental evaluations will be done, making determinations based on the preferred
alternative. In 2024-2026 they will be working on the preliminary design, 2026-2028 the
final design will be created with construction happening 2028-2031.
Director Janigo shared that since May people have been working on a lot of utilities –
drawings, water lines, electric, etc. They are already digging to see what the piers look
like. There are 3 primary structures – MN Approach, WI Approach, and the main span.
The critical link is the main span. The cost will be different depending on what is done.
They will be looking at what the life cycle is of the WI span and MN span as opposed to
the main span and is there justification to do the whole thing.
The MIC role in passing that resolution was to greenlight federal funding. You can see all
of the meetings and documents. There is a lot of information there on bridge building and
all that entails. Our two Public Safety Chiefs are part of the Advisory Council because of
the safety factor and the amount of time police and fire spend on bridge. People can go to
the Minnesota Department of Transportation’s website under the Blatnik Bridge project
to give feedback on areas of the bridge.
b. Director Janigo has been working on the odor issue at Parkland. Parkland has been
getting better. We are still seeing spikes occasionally. We are getting to point where we
will need to lean on them harder to get them to do what they need to do.
c. Finished up sidewalk program for 2021.
d. Currently working on our annual alley pave petitions. A Public Hearing will be set at the
next Council meeting for September 21, 2021.
e. Scope for Hammond Avenue – have received pricing and are negotiating.
f. Opening for an Engineering Tech as Dave Pollock moved to a new position at ESD.
Councilor Van Sickle adjourned the meeting at 6:38 p.m.
The next Public Works Committee meeting will be held October 7, 2021 at 5 p.m. in room
204 of the Government Center.
Minutes submitted to the Council Meeting of September 21, 2021.
5 Pubic Works Committee Meeting
September 2, 2021
Sold Asset Report
Superior, WI
Date range: 01 Jul 2021 ‐ 31 Jul 2021
Inventory ID Description VIN/Serial Type Sold Amount Auction End Date
Street366 1995 Trail King TK100‐HDG 50‐ton Low‐Boy Trailer SM108290 USD $20,600.00 25‐Jul‐21
$20,600.00
Get email alerts for Superior
A daily email when new agendas and minutes are posted.