1. Call to Order and Approval of B.O.C. Minutes: Mayor Kilway called the meeting to order
at 8:19 p.m.
2. Adoption of BOC Minutes, April 11, 2024: Mollie Gilbride moved to adopt the Minutes
of the April 11, 2024, B.O.C. meeting; seconded by Megan Raber. Vote to approve: 5/0.
3. Consideration and approval of Change Order #1 to TK Excavating & Grading for the
Elton Avenue Storm Sewer Replacement for an increase of $13,122.10. This will
increase the total contract to $60,399.52. The original project was approved by
Council in Ord. 2024-26. Mike Rorar: $13,122.10 was caused by an issue with the gas
line. Megan Raber moved to approve seconded by Mollie Gilbride. Vote to approve 5/0.
4. Consideration and approval of Change Order #2 to TK Excavating & Grading for the
Elton Avenue Storm Sewer Replacement for an increase of $4,298.36. This will
increase the total contract to $64,697.88. The original project was approved by
Council in Ord. 2024-26. Mike Rorar: This was due to a catch basin that had the wrong
window size cut and the contractor had to do the additional work. It was needed for a
60” pipe and the window was cut at 44”. Megan Raber moved to approve seconded by
Mike Rorar. Vote to approve 5/0.
5. Consideration and approval of Change Order #4 to ProQuality Demolition. This is for
the Demolition of 89 E Howe Road for a 170-day extension of time to June 17, 2024,
due to weather. The original project was approved by Council in Ord. 2023-41. Mollie
Gilbride moved to approve seconded by Megan Raber. Adam Bozic: Is that the DD site?
Mike Rorar: yes. Vote to approve 5/0.
6. Consideration and approval of Change Order #8 to Northeast Ohio Trenching Service,
Inc. for the Howe Road Improvements Phase 2 for a price increase of $2,427.88. This
will increase the total contract to $783,784.75. The original project was approved by
Council in Ord. 2023-75. Megan Raber moved to approve seconded by Mollie Gilbride.
Further Discussion: Mike Rorar: This is in the dog park section, and we realized there is
no access on the back side. There are gates in the front but nothing if we had to get
something through the fence to the wetlands. They are not temporary, it says
temporary, but they are panels in the fence instead of gates. That way if someone goes
out, we don’t have to lock it. They are removable panels. Mayor Kilway: The word
temporary means that they are removeable panels. Mike Rorar: Yes. Vote to approve
5/0.
7. Consideration and approval of Change Order #9 to Northeast Ohio Trenching Service,
Inc. for the Howe Road Improvements Phase 2 for a price increase of $2,221.28. This
will increase the total contract to $786,006.03. The original project was approved by
Council in Ord. 2023-75. Mike Rorar: This is to make the sinks compliant. The pipe that
was being used probably would have worked if it was going through a 4” wall but it
didn’t make the sinks stick out far enough, so we had to do an access panel in the center
blocks to make the pipe work. Megan Raber moved to approved seconded by Mollie
Gilbride. Further Discussion: Adam Bozic: It that an afterthought from a plumber’s
perspective? Mike Rorar: I couldn’t figure that out. It should have been ADA compliant.
I’m not sure why the pipe was the way it was. Vote to approve 5/0.
8. Additional Items: Mike Rorar: I will be bringing a deduction change order of maybe
$1000 next time.
9. Adjournment: Millie Gilbride moved to adjourn, seconded by Adam Bozic. The meeting
was adjourned at 8:25 p.m.
Agenda
Board of Control
Agenda
Thursday, May 9, 2024, 7:30 p.m. Mayor’s Conference Room
1. CALL TO ORDER
2. ADOPTION OF MINUTES – April 11, 2024
3. Consideration and approval of Change Order #1 to TK Excavating & Grading for the Elton
Avenue Storm Sewer Replacement for an increase of $13,122.10. This will increase the
total contract to $60,399.52. The original project was approved by Council in Ord. 2024-
26.
4. Consideration and approval of Change Order #2 to TK Excavating & Grading for the Elton
Avenue Storm Sewer Replacement for an increase of $4,298.36. This will increase the
total contract to $64,697.88. The original project was approved by Council in Ord. 2024-
26.
5. Consideration and approval of Change Order #4 to ProQuality Demolition. This is for the
Demolition of 89 E Howe Road for a 170-day extension of time to June 17, 2024, due to
weather. The original project was approved by Council in Ord. 2023-41.
6. Consideration and approval of Change Order #8 to Northeast Ohio Trenching Service,
Inc. for the Howe Road Improvements Phase 2 for a price increase of $2,427.88. This
will increase the total contract to $783,784.75. The original project was approved by
Council in Ord. 2023-75.
7. Consideration and approval of Change Order #9 to Northeast Ohio Trenching Service,
Inc. for the Howe Road Improvements Phase 2 for a price increase of $2,221.28. This
will increase the total contract to $786,006.03. The original project was approved by
Council in Ord. 2023-75.