Conservation Commission
Regular MeetingTaunton, MA · August 15, 2016
Minutes
Minutes of the Taunton Conservation Commission August 15, 2016
Present Chair Steven Turner, Vice Chair Neil Kelly, Commissioners Marla Isaac, Debra Botellio,
and Luis Freitas.
Absent: Commissioner Ernest Enos
Motion to table the minutes of July until the 9/12/16 meeting, DB, second MI, so voted.
Certificate of Compliance
1. 84 Blue Grass Circle, GAF Engineering, (COC), SE73-2589 (CON’T) Field report states
that this project was for the construction of a single family home with deck, driveway,
and associated grading. The rear of the house, deck and roof drain infiltration system
fall within the 100 foot buffer zone of a BVW and 200 foot Riverfront Area which were
delineated prior to the road build out. MR inspected this site for the third time on July
25th and found that the eroded areas are stable and that there does not seem to be any
migration of soil further into the buffer zone. MR recommends that the TCC issue a COc
for this filing. Motion to approve, DB, second MI, so voted
2. 580 Winthrop Street (101-18&19), Manheim New England, (COC), SE73-2077 Field
report states that this filing was for a proposed sewer connection to Winthrop Street.
This project was never started and the Applicant wishes to close the filing. MR
recommends that the TCC issue a COC for this project. Motion to issue COC, DB, second
NK, so voted.
3. 590 Somerset Ave, Heritage Operating, L.P. d/b/a Metro Lift Propane, (COC), SE73-
2273 Field report states that this project was for the construction of a 24’ x 48’ modular
building, sheds and storage tanks for propane, and associated parking, drainage,
fencing, and utilities within 100 feet of a BVW and 200’ of Cobb Brook. A Riverfront
Enhancement Plan to manage the invasives along Cobb Brook was also included in the
plan. MR visited the site on August 9th and found that the work has been completed in
significant compliance to the order of conditions issued on 8/8/07 except for the
riverfront improvements. The original plan was to remove the invasive species and plan
wetland vegetation in order to improve the corridor along Cobb Brook. Japanese
knotweed is persistent along the banks of Cobb Brook. There is a cleared area around
the perimeter of the fence but there is no non-invasive wetland vegetation along the
corridor of the river as originally proposed. MR recommends that the applicant review
the plans created by the botanist and remove the invasives and replant native species
along the brook. MR recommends that this filing be continued to next June, date to be
determined. Motion to continue to June 2017, date to be determined, DB, second MI,
so voted.
Public Meeting
1. 14 Downing Drive, Martin, (RDA), DSE-1134 Field report states that this filing is for a
proposed 12/ x 16’ deck to be attached to the left side of the existing home with two
steps at the front and two steps to the backyard. The wetlands are located in the rear of
the property and area clearly defined by a drop in elevation from the upland area. The
steps and deck will be 29- and 32- feet from the wetland edge. All work will be done by
hand. The work as proposed will not negatively impact the wetland, therefore MR
recommends that the TCC approve the project and issue a negative determination to
include the attached special conditions. Sandra Martin present, homeowner. DB all
done by hand? Yes and sonar tubes with cement inside. Motion to issue a negative
determination with conditions1, 2, 3, 4, and 14, DB, second MI, so voted.
2. 852 Burt Street, Arruda, (RDA), DSE-1135 Field report states that this project is for a
septic system repair to include removal of the existing system per Board of Health
specifications, installation of the new septic tank and soil absorption system, and
associated grading. The BVWs were flagged by SFG Associated, inc. on July 11, 2016.
The BVW is located along the rear property line and flag series 1 through 5 were
installed. MR is in agreement with the delineation. A siltation barrier is depicted at
least 52 feet from the BVW. Grading and the new septic tank fall within 55 feet of the
wetland. The new SAS will be on the south side (left) of the house and will be 72 feet
from the wetland. The project as proposed will not negatively impact the BVW,
therefore MR recommends that the TCC approve this project and issue a negative
determination with the attached special conditions. Brad Fitzgerald present. Motion to
issue a negative determination with conditions 1, 2, 3, 4, 14, 18, and 19, DB, second MI,
so voted.
Continued Public Hearing
1. Duffy Drive, TLC Development/Tutsch, (NOI), SE73-2645 Motion to continue to
9/12/16, DB, second MI, so voted.
2. Phyllis Road, TLC Development/Tutsch, (NOI), SE73-2646 Motion to continue to
9/12/16, DB, second MI, so voted.
Amendment
1. Briggs Street (Lot 6), Clarewood Homes, Inc., (AMEND), SE73-2642 Field report states
that this project is for the construction of a single family home with attached garage,
deck, utilities, and associated grading, and is on the north side of Briggs Street with
Silver Street (paper street) along the eastern property line. After starting work the
contractor found that the soils could not support a foundation so an amended plan was
submitted. The house will now be approximately 57 feet further back on the lot, closer
to the wetland. The corner of the house will be 44 feet from the BVW with the deck and
stairs 51 feet away. There will be no basement-the garage will be at elevation 31.5 and
the top of foundation will be at 34.0. a siltation barrier is depicted 26 feet from the
wetland with grading coming within 29 feet of the BVW. The swale remains the same-
except that no catch basin is shown at the front of the property line per the City
Engineer. The washout areas remain the same. The driveway is now on the right side of
the house and the rear deck is on the left side. The contractor has spoken with abutters
regarding the changes and the reasoning behind those changes. The amended work
should not impact the wetland or adjacent properties. MR recommends that the TCC
approve this project and issue an amended order of conditions to include the same
conditions as the original order. Karen Patenaude present for the applicant. There is a
basement, it is a raised ranch. When they began to dig for the foundation they
encountered muck and it would not sustain a foundation so they moved it further back
and found better soil. Motion to issue an amendment as per the most recent plan, NK,
second LF, so voted.
Public Hearing
1. 27 Bennett Street Extension, Lopes, (NOI), SE73-2666 Field report states that this filing
is for the construction of a 14’ x 28’ deck on a concrete slab and a 12’ x 16’ shed. The
wetlands were originally approved under DEP# SE73-2397 and the flags were re-hung by
Earth Services Corp. on July 20, 2016. A siltation barrier is depicted on the plan at least
26 feet from the BVW and will be the limit of work. No work will occur within the 25
foot WPZ. The concrete slab will be 43 feet from the BVW while the proposed shed will
be 45 feet away. The work as proposed should not negatively impact the wetland or
adjacent properties therefore MR recommends that the TCC approve the project and
issue an order of conditions to include the attached special conditions. MR also
recommends that the commission approve the wetland delineation as follows: flags
FL#4 – FL#5, with FL#1 – FL#3, and FL#6 – FL#7 for reference purposes only. David and
Melissa Lopes present. Motion to approve with conditions 1, 2, 3, 4, 5, 19, 21, 25, 26,
and 27, NK, second LF, so voted.
2. 1619 Somerset Ave. (Lot 79B), Malloch Group, Inc., (NOI), SE73-2666 Field report
states that this filing is for the proposed construction of a single family home with
attached garage, driveway, 12’ x 16’ shed, utilities, and associated grading. An existing
shed will be razed in the construction process. The BVW located along the northerly
property line were delineated by J. Avizinis of Natural Resource Service, Inc. in April of
2016. MR reviewed the line and is in agreement with the placement of the flags. This
property was divided in May of this year. A siltation barrier is depicted on the plan at
least 25 feet from the BVW and will be the limit of work. No work will occur within the
25 foot WPZ. The shed will be at least 45 feet from the BVW while the corner of the
garage will be within 313 feet. Grading in the rear falls within 30 feet of the wetland
line. The home will have a foundation elevation of 40, with the basement at 32.50. the
proposed grades and location of the house should not negatively impact the existing
home or other adjacent properties or the BVW. MR recommends that the TCC approve
this project and issue an order of conditions to include the attached special conditions.
MR also recommends that the TCC approve the wetland delineation as follows: Flags
WFA-1 to WFA-9. Change plans to say Bristol County, not Plymouth County-DB. Motion
to approve with change noted and conditions 1, 2, 3, 4, 5, 8, 17, 19, 21, 24, 25, 26, and
27, NK, second DB, so voted.
3. 207 Hart Street, Poelart/Bristol-Plymouth Regional Technical School District, (NOI),
SE73-2669 Field report states that this filing is for the proposed expansion of two
parking lots within the Bristol Plymouth Regional Technical High School campus. In
addition, three stormwater management systems will be built, and an isolated wetland
will be filled and replicated 2:1. The project will be within currently forested land. The
wetlands were delineated by Environmental Consulting & Restoration, LLC (ECR) on
3/10/16. The flagged wetlands, Bordering and Isolated, are located in the southern
section of the property that abuts 1000 County Street (Mass Highway). ECR had flagged
wetlands within the property in 2014. The isolated wetland flags were reflagged from
the earlier delineation. From east to west the wetland are as follows:
System H: Flags H-1 to H-11. This is an isolated wetland system outside any proposed
construction on site.
System J: Flags J-1 to J-61. This system is the largest flagged system and is located in the
southeast corner of the property. The proposed replication will be connected to this
system between flags J-29 to J-38. Stormwater Basin C will be to the north of flags J-40
to J-52 and will receive stormwater flow from the proposed parking lot to its north.
System I: Flags I-1 to I-8. This isolated wetland, 1,165 square feet, is within the far west
proposed parking lot and will be filled and replicated. The majority of the proposed
Stormwater Basin B is within this wetland system. This stormwater system will receive
discharge from the westerly proposed parking lot.
System K: Flags K-4 to K-18. This wetland is southwest of the first propsed parking lot
and south of Stormwater Basin A. Basin A will receive stormwater sheet flow from the
easterly parking lot via a paved swale that directs flow to a water quality swale prior to
entering the Basin. There is a berm in front of the paved swale that should be
eliminated.
System L: Flags L-1 to L-5. This is a small wetland connected to a larger system (M) and
which does not seem to have a connection to system K.
System M: Flags M-1 to M-8. This wetland is located on the northwest side of the
driveway and connects to System L through a culvert.
The plan shows straw wattles as the siltation barrier and will be the limit of work. Two
versa-loc retaining walls will be constructed to the north of each new parking lot with
landscaping per the Zoning Ordinance. In addition a retaining wall with chain link fence
will be constructed along the westerly side of the far easterly lot. The majority of the
proposed work is within the 100 foot buffer zone and a large portion falls with the 25
foot WPZ. The city engineer states that the aisle widths can be decreased from 24’ to
22’. This would decrease the amount of impervious area and impacts on the resource
areas. The city engineer also states that the current inlet grates will not be able to
accommodate the proposed runoff and recommends multiple grates. Overall this
project should not impact the resource areas, especially if the above recommendations
are followed. MR recommends that the TCC approve the plan and issue an order of
conditions to include the attached special conditions. MR also recommends that the
TCC approve the wetland resource areas as outlined above. ST understands what city
engineer says but what does the applicant want re: the aisles? They would like to
remain at 24’. Agree to double grates for each inlet. Will remove berm. ST how many
more parking spots now? They will be gaining 150 more spots. Motion to approve with
the plan submitted and the addition of multiple grates, with special conditions 1, 2, 3, 4,
5, 6, 7, 9, 11, 14, 19, 21, 25, 26, and 27, and 28-snow storage to remain in the same spot
as it has been stored, NK, second LF, vote taken 3-2, motion carries.
DB and MI stepped down
4. Route 24 & 140 Interchange, Mashpee Wampanoag Tribal Gaming Authority, (NOI),
SE2668 Motion to continue to September 12, 2016, no quorum, NK, second LF, so
voted.
DB and MI back
Motion to go out of order to hear #2 under Violations, NK, second, MI, so voted.
Violations
1. 383 & 387 Tremont Street. Pile of loam is right at the edge of the wetlands at 383. Lots
of work was done out there, MR did not approve all that work. At the time, 8 years ago
when MR checked this site over online it showed no wetland, GIS wasn’t working right.
MR did speak with them last year. LF remove loam, ST grass to wetlands, MR take care
of the wetlands. They did not come in with a plan, only have copy of septic and garage
permit at home. MR they never came before TCC because GIS showed no wetlands,
wasn’t working properly at the time. ST stabilize slope, spread loam by hand, seed it
and use no fertilizer or chemicals. DB vote to remove violation but does not want to see
them here again. Motion to remove violation contingent upon them not being here for
another violation, remove and spread loam by hand, no chemicals on the lawn, DB,
second NK, so voted.
Motion to revert to the regular order of business to hear 165R Hart Street, DB, second MI, so
voted.
2. 165R Hart Street. MR met with Shawn, cleaned up the basins, siltation barriers are up,
and tree has been removed. DPW and MR met with him last week. Today MR gets a
call from Debbie Carr, she was with Fred Cornaglia, all work needs to stop immediately.
DPW was not onsite for water, has no idea who did the work, no permits, was it done
right? Now no work on Briarwood Drive. Motion to continue to 9/12/16, report from
DPW explaining what is going on out there, Shawn is to be present at the meeting on
September 12th, ST, second DB, so voted.
Motion to adjourn, DB, second NK, so voted. Meeting ended at 7:45p.m.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
15 Summer Street
Annex Building
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Neil Kelly, Vice Chair
Debra Botellio
Ernest Enos
Luis Freitas
Marla Isaac
AGENDA
(Revised 8.11.16)
August 15, 2016
Maxham School, 141 Oak Street, Taunton, MA 02780
6:30 P.M.
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES
CERTIFICATE OF COMPLIANCE:
1. 84 Blue Grass Circle, GAF Engineering, (COC), SE73-2589 (CON’T)
2. Winthrop Street (101-18&19), Manheim New England, (COC), SE73-2077
3. 590 Somerset Ave., Heritage Operating, L.P. d/b/a Metro Lift Propane, (COC), SE73-2273
PUBLIC MEETING:
1. 14 Downing Drive, Martin, (RDA), DSE-1134
2. 852 Burt Street, Arruda, (RDA), DSE-1135
CONTINUED PUBLIC HEARING:
1. Duffy Drive, TLC Development/Tutsch, (NOI), SE73-2645
2. Phyllis Road, TLC Development/Tutsch, (NOI), SE73-2646
AMENDMENT:
1. Briggs Street (Lot 6), Clarewood Homes, Inc., (AMEND), SE73-2642
PUBLIC HEARING:
1. 27 Bennett Street Extension, Lopes, (NOI), SE73-2667
2. 1619 Somerset Ave. (Lot 79B), Malloch Group, Inc., (NOI), SE73-2666
3. 207 Hart Street, Poelaert/Bristol-Plymouth Regional Technical School District, (NOI), SE73-
4. Route 24 & 140 Interchange, Mashpee Wampanoag Tribal Gaming Authority, (NOI), SE73-
VIOLATION:
1. 165R Hart Street (CON’T)
2. 383 & 387 Tremont Street