Conservation Commission
Regular MeetingTaunton, MA · May 1, 2017
Minutes
Minutes of the Taunton Conservation Commission May 1, 2017
Present: Chair Steven Turner, Commissioners Ernest Enos, Richard Enos, Debra Botellio, Luis
Freitas, and Marla Isaac. Vice Chair Neil Kelly was absent.
Motion to approve the minutes from April meeting, DB, second MI, so voted.
Continued Violation
1. 165R Hart Street Email from property owner was read into the record. Fines as of
today $133,500.00, ST would like to continue fining. Motion to continue fines, place a
lien on the property pursuant to the direction and instruction of the City of Taunton Law
Department, have this done as soon as possible, DB, second MI, so voted. Motion that if
anything comes up regarding this property-meaning all boards and commissions across
the board, they are to notify the Conservation Commission immediately so that if the
property changes ownership, the fines and liens will carry on with the property, DB,
second MI, so voted. Motion to ask the DPW to go out and fix the properties on
Briarwood, putting them back to where they were, and check into getting them tied into
the city, both Greenberg and Rego, DB, second MI, so voted.
Public Hearing
1. Winthrop Street (88-120), Hawthorne Development, Inc., NOI, SE73-2694 Field report
states that this filing is for razing the existing buildings (on a lot currently known as
#545) and construction of a duplex on a newly created lot. The construction will also
include decks, driveway, parking, utilities, and associated grading. The wetland line was
approved under file #SE73-2473 and an ORAD issued on 6/9/11 which is still valid under
the Tolling Period until 2018. A siltation barrier is depicted on the plan running along
the 25-foot WPZ and is the limit of work. This duplex is to the west of the proposed
duplex under file SE73-2693. A small portion of this building will fall within the 100-foot
buffer zone. The concrete washout area and dewatering area are located on this lot as
well. Grading on this lot will be 40 feet from the wetland while the easterly corner of
the deck will be 84 feet away. Drywells are proposed to capture roof runoff and
contours will maintain the current slope toward the wetland area. The work as
proposed will not negatively impact the wetland resource area, therefore MR
recommends that the TCC approve this project and issue an order of conditions to
include the attached special conditions. Present Karen Patnaude for the applicant.
Motion to approve with special conditions 1, 2, 3, 4, 5, 7, 8, 16, 17, 19, 21, 25, 26, and
27, DB, second RE, so voted.
2. Winthrop Street (88-121), Hawthorne Development, Inc., NOI, SE73-2693 Field report
states that this filing is for razing the existing buildings (on a lot currently known as
#545) and construction of a duplex on a newly created lot. The construction will also
include decks, driveway, parking, utilities, and associated grading. The wetland line was
approved under file #SE73-2473 and an ORAD issued on 6/9/11 which is still valid under
the Tolling Period until 2018. A siltation barrier is depicted on the plan running along
the 25-foot WPZ and is the limit of work. Grading will be 28 feet from the wetland while
the easterly corner of the deck and home will be 33 feet and 35 feet respectively.
Drywells are proposed to capture roof runoff and contours will maintain the current
slope toward the wetland area. The work as proposed will not negatively impact the
wetland resource area, therefore MR recommends that the TCC approve this project
and issue an order of conditions to include the attached special conditions. DB-no
disturbance? Karen said no. DB-no pools? No. Concrete washout on other lot? Yes.
Motion to approve with conditions 1, 2, 3, 4, 5, 7, 8, 16, 17, 19, 21, 25, 26, and 27, DB,
second EE, so voted.
3. 30 Mozzone Blvd., Brewer/Commonwealth Alternative Care, Inc., NOI, SE73-2696
Field report states that this project is for the redevelopment of a portion of an existing
building zoned as industrial use, to include the construction of additional parking and
stormwater BMPs. Work will fall within the 100-foot buffer zone of a BVW which was
flagged on 1/10/14 by Sabatia, Inc. using flags WF1 to WF17 and originally approved
under DEP file # SE73-2569. The wetland edges remain the same and MR recommends
that the delineation be approved again. Prior to the issuance of a building permit, the
applicant will be required to close out file #2569 with a COC stating that work had not
been completed. The site work will be done on the east half of the building, which is
currently vacant, and qualifies as a Redevelopment project under 310 CMR 10.05 (6)(k)
to (q). the wetland is located along the south and east of the building, along the edge of
the existing pavement. A railroad spur, which is significantly higher in elevation, runs
along the southern portion of the property. The BVW along the eastern property line
runs to a drain which has an outfall into a wetland system at the end of Mozzone
Boulevard at County Street. This runoff is untreated before entering the drainage
system. The applicant will be reconfiguring the parking lot and in so doing will be
removing pavement along the eastern edge and replacing it with a grass swale and
stone filter berm, thus increasing pervious surface on site and providing stormwater
attenuation. The runoff will be captured in deep sump catch basins and the grassed
channel before being conveyed to the sediment forebay of the detention basin to be
constructed along Mozzone Boulevard. This system will maximize TSS (total suspended
solids) removal and improve water quality to water channeled to the wetland. A
siltation barrier is depicted and is considered the limit of work. As the existing
pavement is at the edge of the BVW, work will fall within the 25-foot WPZ. An O&M
Plan is included in the filing and should remain as part of the documentation. The
stormwater structures will be inspected every two years by the applicant and a report
sent to the TCC office. Accumulated silt and sediment will be removed four times a year
for the sediment forebay or more frequently if the depth exceeds six inches.
Accumulated silt and sediment will be removed from the deep sump catch basins at the
same rate. Any accumulated trash and litter shall be removed on a monthly basis. The
driveway and parking areas will be swept at least once a year. Snow will be stockpiled
within and around areas that drain into the stormwater management system as
practicable. The slopes, embankments, and bottom of the extended detention basin
shall be mowed at least twice a year. The basins will also be inspected for invasive
species, and if discovered, shall be removed mechanically (by hand). Use of chemicals
will not be used. The work as presented should pose no negative impact to the adjacent
wetlands, but rather improve the quality of water leaving the site with the addition of
impervious surfaces and stormwater structures. MR recommends that the TCC approve
this project and issue an order of conditions to include the attached special conditions.
MR also recommends that the wetland delineation be re-approved. Present Rich Riccio
for the applicant. DB all in existing building? Yes, all the same except changes Rich
mentioned. MR less intrusive. Motion to approve with special conditions 1, 2, 3, 4, 5, 7,
8, 9, 11, 16, 17, 18, 19, 20, 21, 25, 26, 27, and 28-an O&M plan should be part of the
deed, MI, second LF, so voted.
4. Hamlen Street (77-331), Nadeau, NOI, SE73- Motion to continue to June 22, 2017, DEP
# should be in by then, DB, second MI, so voted.
Other Business
1. Friends of Boyden. Motion to get 3 bids for a timed gate that will open and shut at set
times and lock, DB, second RE, so voted.
2. Bridge at Boyden. Motion to have MR look into general funds and get information on
repairing the bridge, DB, second MI, so voted.
3. Cobb Brook. A wall is collapsing at the side of a garage on an abutters property. MR
notified them, address is 470 Cohannet Street. They cannot afford to fix it. The garage
and driveway will be compromised if the wall collapses. If the wall does fall it will slow
the brook as well.
Motion to adjourn, DB, second MI, so voted. Meeting ended at 7:30p.m.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
15 Summer Street
Annex Building
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Neil Kelly, Vice Chair
Debra Botellio
Ernest Enos
Richard Enos
Luis Freitas
Marla Isaac
AGENDA
May 1, 2017
Maxham School, 141 Oak Street, Taunton, MA 02780
6:30 P.M.
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES
CONTINUED VIOLATION:
1. 165R Hart Street
PUBLIC HEARING:
1. Winthrop Street (88-120), Hawthorne Development, Inc., NOI, SE73-2694
2. Winthrop Street (88-121), Hawthorne Development, Inc., NOI, SE73-2693
3. 30 Mozzone Blvd., Brewer/Commonwealth Alternative Care, Inc., NOI, SE73-2696
4. Hamlen Street (77-331), Nadeau, NOI, SE73-
OTHER BUSINESS:
4/24/2017