Conservation Commission
Regular MeetingTaunton, MA · February 12, 2018
Minutes
Minutes of the Taunton Conservation Commission February 12, 2018
Present: Chair Steven Turner, Vice Chair Debra Botellio, Commissioners Luis Freitas, Marla
Isaac, Jan Rego, and Matthew Haggerty. Absent: Richard Enos.
Motion to approve the minutes of 12/11/17 and 1/22/18, DB, second MI, so voted.
Certificate of Compliance
1. 30 Mozzone Blvd., Commonwealth Alternative Care, Inc., (COC), SE73-2696 Field
report states that this project was for the redevelopment of a portion of an existing
building zoned as industrial use, to include the construction of additional parking and
stormwater BMPs. The site work was done on the east half of the building and the
wetland is located along the south and east of the building, along the edge of the
existing pavement. The parking lot was reconfigured and pavement along the eastern
edge was removed and replaced with a grass swale and stone filter berm. All work has
been completed in significant compliance to the order of conditions issued on 5/2/17.
MR recommends that the TCC issue a COC for this project. Motion to approve, DB,
second MI, so voted.
2. High Street, Young, (COC), SE73-2575 Field report states that this filing was for the
construction of a storage building and gravel access driveway within the 200 foot
riverfront area of the Mill River. No work was ever started on this project; therefore,
MR recommends that the TCC issue a COC to close this filing. Motion to approve, DB,
second LF, so voted.
Continued Public Hearing
1. Run Brook Circle, Aspen Properties Group, LLC, (ANRAD), SE73-2727 Motion to
continue to 3/12/18, DB, second LF, so voted.
2. Caswell Street, Dutra, (ANRAD), SE73-2730 Field report states that this filing is for an
approval of delineations of wetland resource areas at Caswell Street (110-84), which is a
12 acre lot located on the east side of Caswell Street and accessed between #397 and
401 Caswell Street. It abuts airport property to the southeast and cranberry bogs to the
northeast. On 10/23/17 MR requested that this be continued so that she could walk the
wetland area of concern between wetland A and C. The wetlands were delineated by
Karon Skinner on 12/2/16. Please reference MR’s report of 10/19/17 to review the
wetland descriptions. MR wrote that it looked as if there was a connection/channel
between Wetlands “A” and “C” from WFA18 and WFA19 to WFC2 and WFC3, especially
during heavy rain events. MR met the owner on 11/9/17 and reviewed the area with
him. Upon that second review, MR recommends that the TCC issue an ORAD and
approve the wetlands as depicted on the plan dated 11/8/16 as follows: WF1-WF20,
WFB1-WFB5 with WFB6 for reference purposes only, WFA1-WFA31, and WFC1-WFC10.
Frank Gallagher present for the applicant who is out of the country. He believes the
applicant did speak with some abutters but not positive. Motion to issue an ORAD, DB,
second MI, so voted.
3. 117 Summer Street, Cambra, (NOI), SE73-2745 Field report states that this filing is for
the excavation and removal of oil-impacted soil, groundwater and oil. This site is
located on the southerly side of Summer Street at the corner of Summer Street and
Ingell Street. It is on the banks of the Mill River and there was an historic oil release at
the site on 12/30/03. There have been no permanent closure with the DEP as of this
date. The applicant has hired Stantec Consulting Services to implement measures to
achieve regulatory closure. Stantec will work with an environmental contractor who will
remove material within the impacted areas by constructing a trench that will be
excavated down to groundwater level and into the water table. The material will be
stockpiled, with clean soils separated from oil-impacted soils. The trench will then be
backfilled with crushed stone, a filter fabric will then be installed over the stone, and
vertical wells will be installed to allow future monitoring/oil removal. The area will be
backfilled to current grade. The applicant estimates that the work will occur over a 4
day period and that 150 yards/225 tons of impacted soil will be disposed of offs site at
an approved facility. The groundwater and oil will be pumped into a 10,000 gallon on
site frac tank. The tank will also be used for recovery of water and oil from the trench
following completion of the trenches. Once all work has been completed, a RAM Plan
will be submitted to DEP outlining the remediation activities. A turbidity curtain will be
installed along the bank of the Mill River in addition to a siltation barrier along the
proposed areas of excavation. The work as proposed will ensure that the impacted
areas are safe and will receive continued monitoring even after closure. MR
recommends that the TCC approve this project and issue an order of conditions to
include the attached special conditions. Jeff S present for the applicant. He is the LSP
that will be on site or one of his associates at all times. They are covered under his
license to be there on site monitoring. He stated they will let MR know when they
begin, they watch the weather before deciding. This helps them to have a few days of
favorable weather when doing this type of project. They will contact MR when barriers
go up too. Motion to approve with special conditions 1, 2, 3, 4, 5, 10, 19, 21, 25, 26, and
27, DB, second MI, so voted.
4. RR (East of Route 140), Mass DOT, (NOI), SE73-2740 Field report states that this filing is
for approval of reconstruction of track infrastructure-track, bridges, and grade crossings-
along the Middleborough Secondary in Taunton as part of the South Coast Rail Project.
Work will occur within bank, BVW, and LUW. The wetland resource areas were
identified by VHB environmental scientists on 9/7/16. BLSF was not flagged but is based
on published FEMA flood elevations. There are 22 wetlands located along this RR ROW.
The Cotley River and Taunton River are the large systems along this segment. On
11/14/17, MR rode the tracks with VHB and MassCoastal to review the wetland
resource areas which are detailed as follows and are for reference purposes only:
Wetlands: TMS-2: forested wetland north of the ROW with 2 intermittent streams,
TMS-3: forested wetland south of the ROW with an intermittent stream, TMS-5:
forested wetland north of the ROW associated with the Cotley River, TMS-6: forested
wetland north of the ROW associated with the Cotley River which transitions to wet
meadow adjacent to the river, TMS-7: wet meadow associated with the Taunton River,
TMS-9: scrub shrub on south side of ROW, TMS-10: emergent wetland with scrub shrub
fringe on both sides of ROW, TMS-11: scrub shrub wetland north and south of ROW
with perennial stream channel culverted under rail. Connected to intermittent channel
adjacent to abandoned cranberry bog on south side of berm, TMS-12: forested wetland
with scrub shrub fringe on north side of ROW. An intermittent stream connects TMS-12
to TMS-13 on the south side of ROW, TMS-13: pond with emergent and scrub shrub
wetland on south side of ROW, TMS-14: forested wetland north of ROW. An
intermittent stream connects TMS-14 to TMS-15 on the south side of ROW. TMS-15:
forested wetland south of the ROW, TMS-16: emergent wetland south of ROW
encompassing a cranberry bog transitioning into forested wetland, TMS-17: forested
wetland north of ROW associated with cranberry bogs. Connected to agricultural
ditches and intermittent streams. Includes a PVP 25438-certifiable vernal pool, RMS-18:
forested wetland south of ROW. Connected to an intermittent stream channel, TMS-21:
isolated forested wetland on north side of ROW includes PVP 25490 certifiable vernal
pool, RMS-7: forested wetland with intermittent stream. Connects to RMS-6 via culvert
under berm, Bank: this rail line crosses 11 streams, four perennial- Cotley River, an
unnamed perennial stream, Richmond Brook, and a perennial tributary to the Taunton
River, TMS-2: 2 intermittent streams between County Street/Route 140 and Route 24,
TMS-3: intermittent stream east of County Street, TMS-5: , TMS-6: Cotley River east of
Route 24, TMS-7: Taunton River north of Red Lane, TMS-10: Richmond Brook east of
Taunton River, TMS-11: unnamed perennial stream south of ROW, east of Taunton
River, TMS-12: intermittent stream north of ROW, east of Taunton River, TMS-13:
intermittent stream south of ROW, east of TMS-11, TMS-14: intermittent stream north
of ROW, west of culvert CV-TA-2, TMS-15: intermittent stream south of ROW, west of
culvert CV-TA-2, TMS-17: intermittent stream north of ROW, west of Taunton-Raynham
line, TMS-18: intermittent stream south of ROW, west of Taunton-Raynham line, TMS-
19: intermittent stream at Taunton-Raynham line, BLSF: based on FEMA flood
elevations, BLSF 17T/:, BLSF 16T: Taunton River between Middleborough Avenue and
Church Street. Elevation 14, BLSF 15T:, BLSF 14T: Cotley River east of Route 24 and
Route 140 intersection. Elevation 22, ILSF: there are six isolated wetlands along this
section of track. Five are small depressions that appear to contain water for limited
periods and do not qualify as ILSFs but are considered IVWs subject to federal
jurisdiction. The sixth is Thatcher’s Pond, a large coastal plain pond, which qualifies as
an ILSF. TMS-1: isolated depression north of the ROW and west of County Street, TMS-
8: isolated scrub shrub wetland on south side of ROW and east of Old Colony Avenue,
TMS-20: isolated forested wetland on north side of ROW and west of Middleboro
Avenue, TMS-21: Thatcher’s Pond, TMS-22: isolated forested wetland and certifiable
vernal pool on south side of ROW, LUWW: this is defined as any land beneath any creek,
river, stream, pond, or lake. The channel beds of intermittent streams are being
considered LUWW per DEP for this application, TMS-2: 2 intermittent streams between
County Street/Route 140 and Route 24, TMS-3: intermittent stream east of County
Street, TMS-5:, TMS-6: Cotley River, TMS-7: Taunton River, TMS-10: Richmond Brook,
TMS-11: unnamed perennial stream south of ROW and east of Taunton River, TMS-12:
intermittent stream north of ROW, east of Taunton River, TMS-13: intermittent stream
south of ROW, east of TMS-11, TMS-14: intermittent stream north of ROW, west of
culvert CV-TA-2, TMS-15: intermittent stream south of ROW, west of culvert CV-TA-2,
TMS-17: intermittent stream north of ROW, west of Taunton/Raynham line, TMS-18:
intermittent stream south of ROW, west of Taunton/Raynham line, TMS-19:
intermittent stream at Taunton/Raynham line, Riverfront Area: Per 310 CMR 10.58
(2)(a)3, this is the area of land between the river’s mean annual high water line outward
from the river and a parallel line located 200 feet away, BLSF TMS-7: Taunton River-
along the Taunton/Raynham municipal line, BLSF TMS-B5: Cotley River-east of Route 24
and Route 140 intersection, Vernal Pool: Along this rail line there were five vernal pools
found to be certifiable during MassDOT’s Vernal Pool Survey: VHB VP23, PVP 25438, PVP
25490, VHB VP7, and GHB BP6. Three of the vernal pools are within 100 feet of the
Middleborough Secondary in Taunton- PVP 25438, PVP 25490, and PVP VHB VP7. All
are located within BVW, Estimated Habitat of Rare Wetlands Wildlife: Portions of the
rail fall within NHESP Estimated Habitat of eastern box turtle. These areas along the RR
ROW are TMS-21, TMS-22, TMS-20, RMS-7, TMS-19, RMS-18, TMS-17, TMS-16, TMS-15,
TMS-14, TMS-13, and TMS-12. Wildlife crossings are proposed as mitigation for the
project. Construction on the Middleborough Secondary includes track improvements to
4.02 miles of the track from the Lakeville town line to the Route 140 rail crossing and
will involve track improvements, track drainage, and installation of signals and
communication systems. Proposed work on certain bridges and culverts qualifies for
being advanced in accordance with the Footprint Bridge exemption, and are not
included within this NOI. The proposed track work consists of constructing new track
structure within the active freight ROW. New track bed, drainage, ditches, ballasts, ties
and new steel rail will be installed and the existing track and ties will be lifted six inches
and new ballast placed beneath the ties. The existing embankments will be modified to
accommodate the new track section, and signal and communication cables will be
installed in a trench located outside the new ballast footprint. Proposes impacts to
wetland resource areas within this portion of the project are as follows: Bank: 6 linear
feet of permanent impact, BVW: none, BLSF: 1,354 square feet of permanent impact,
LUWW: 8 linear feet of permanent impact, Riverfront Area: 78,036 square feet of
temporary impact, no permanent impact. Additional permits required include Water
Quality Certification under 314 CMR 9.00 and Section 401 of the Federal Clean Water
Act, and a Department of the Army Section 404 Permit from the U. S. Army Corps of
Engineers for placement of fill in jurisdictional wetlands. Correspondence from the
Natural Heritage & Endangered Species Program stated that the project “must be
conditioned in order to avoid adverse effects to the resource area habitats of state
listed wildlife species”. NHESP listed five conditions to avoid adverse effects and which
will be included in the attached special conditions. The Division of Fisheries & Wildlife
has been working with the applicant to address potential impacts throughout the
process and will still require review through a formal filing with the Division for
compliance with MESA, and as such is ongoing. The Division anticipates a “Take” of
state listed species may only be permitted if the project and proposed mitigation meet
the standards of a Conservation and Management Permit. MR recommends that the
TCC approve this project and issue an order of conditions to include the attached special
conditions and any additional conditions set by NHESP. Present Tess Paganelli, Randy
Gagnon, Holly Palmgren, Jean Fox. Changes on East, security fencing added, VLSF
elevation at Richmond Brook, no additional impacts but the FEMA elevation is now
listed. Motion to approve with conditions 1, 2, 3, 4, 5, 19, 21, 25, 26, 27, and 28- water
quality cert and 404 permit submitted for the file, NHESP conditions attached must also
be fulfilled, DB, second MI, so voted.
5. RR (West of Route 140), Mass DOT, (NOI), SE73-2741 Field report states that this filing
is for approval of reconstruction of track infrastructure-track, bridges, and grade
crossings along the New Bedford Main Line and portions of the Middleborough
Secondary in Taunton, and construction of a new commuter rail station as part of the
South Coast Rail project. Track work will include track improvements, culvert
replacements, track drainage, and installation of signals and communications systems.
The proposed East Taunton Station will include a new platform, associated track
improvements including culvert replacement, parking facilities, and stormwater
drainage features. There will be 1.3 miles of track improvements on this line. Work will
occur within bank, BVW, and LUW. The wetland resource areas were identified by VHB
environmental scientists on 9/9/16. On 11/14/17, MR rode the tracks with VHB and
MassCoastal to review the wetland resource areas which are detailed as follows and are
for reference purposes only: BVWs: There are 16 wetlands within the ROW west of
Route 140. Seven wetlands (TS-1 through TS-7) are not in the ROW but are adjacent to
the proposed East Taunton Station site, TCM-7East: forested wetland north of
Middleborough Secondary and west of new Bedford ROW, TCM-10West: forested
wetland south of North Wye track, west of New Bedford ROW, TCM-9A: forested
wetland south of North Wye track, east of New Bedford ROW, TCM-9B: forested
wetland east of TCM-9A, southeast of Quad Graphics siding track, west of New Bedford
track siding at Cotley Junction, TCM-12: red maple swamp with emergent wetland
components east of ROW, north of Route 24, TCM-13: red maple swamp, TCM-11B:
forested wetland connected to TCM-14 under West Stevens Street, north of Stevens
Street, east of ROW, BKCM-5: red maple swamp bordering unnamed perennial stream.
South of Stevens Street, east of ROW, TS-1: forested wetland with an intermittent
stream in manmade channel. Adjacent to proposed East Taunton Station, TS-3: forested
wetland west of Industrial Drive along northern edge of proposed Taunton Station, TS-6:
forested wetland east of Industrial Drive along northern edge of proposed Taunton
Station property, Bank: this rail line crosses one intermittent stream, TCM-9A:
intermittent stream south of Middleborough Secondary and west of New Bedford ROW,
TCM-9B: intermittent stream south of Middleborough Secondary and east of New
Bedford ROW, TS-2: bank of intermittent stream at the proposed East Taunton Station.
Manmade channel culverted beneath Industrial Drive, TS-4: open water pond east of
Industrial Drive on proposed East Taunton property, TS-7: open water pond on the
proposed East Taunton station property, BKCM-5: intermittent stream east of New
Bedford Main ROW at Berkley town line, ILSF: there are two isolated wetlands along this
section of track (TMS-7 west and TS-5). Neither is large enough to meet the definition
of ILSF but both are subject to federal jurisdiction as IVWs, LUWW: this is defined as any
land beneath any creek, river, stream, pond, or lake. The channel beds of intermittent
streams are being considered LUWW per DEP for this application, TMC-10 WEST: , TCM-
9A: intermittent stream south of Middleborough Secondary and west of New Bedford
ROW, TCM-9A/9B: intermittent stream south of Middleborough Secondary and east of
New Bedford, TS-4: open water pond to the east of Industrial Drive on the proposed
Taunton Station property, TS-7: open water pond on the proposed Taunton Station
property, Riverfront Area: Per 310 CMR 10.58 (2)(a)3, this is the area of land between
the river’s mean annual high water line outward from the river and a parallel line
located 200 feet away. There are no perennial streams associated with this project.
Vernal Pool: along this rail line there are four vernal pools within 100 feet of the RR
ROW-VHB VP3, VHB VP6, PVP 25399, and PVP 25398. Estimated Habitat of Rare
Wetlands Wildlife: this project does not fall within NHESP Estimated Habitat of Rare
Wildlife. Construction on the Middleborough Secondary and New Bedford Main Line
include track improvements as follows: new track bed, drainage, ditches, ballast, ties,
new steel rail, and installation of signals and communication systems. Proposed work
on certain bridges and culverts qualifies for being advanced in accordance with the
Footprint Bridge exemption, and are not included within this NOI. The proposed track
work along the Middleborough Secondary consists of lifting the existing track and ties
up 6 inches and placing new ballast under, the existing embankments will be modified
to accommodate the new track cross section including side drainage ditches an ballast
side slopes, and signal and communication cables will be installed in a trench located
outside the new ballast footprint. Work through Cotley Junction and the New Bedford
Main line will include replacing the existing ballast with new, replacing the sub-ballast
with new material to meet current specifications, ties will be completely replaced with
timber ties, the existing jointed rail will be replaced with new 132 pound continuously
welded rail, modifying existing embankments to accommodate the new track cross
section, installation of signal and communication cables in a trench outside the new
ballast footprint, and retaining walls will be installed in three locations to minimize
impacts to BVW. The work on the proposed East Taunton Station will consist of
construction of a new platform, track improvements, parking facilities, culvert
replacement, and drainage features. The station will be located on 4.8 acres and will
include a 3.4 acre paved parking lot to accommodate 363 vehicles. The side slopes
surrounding the parking lot will be graded to meet the roadway and station elevation.
Access to the site will be from Route 140 with an additional 1000 foot access road
connected to the existing 800 foot road that leads to Quad Graphics. This road will be
30 feet wide with a 5 foot concrete sidewalk along the north side of the drive. The
station’s stormwater management system will include three infiltration basins, two bio-
retention areas with stone check dams, three sediment forebays, a retaining wall, and
three overflow stone swales. The stormwater system is outside the wetland resource
areas. Proposed impacts to the wetland resource areas within this portion of the
project are as follows: Bank: 1.015 linear feet of permanent impact and 66 linear feet of
temporary impact, BVW: 4,230 square feet of permanent impact and 0 square feet of
temporary impact, LUWW: 5,219 square feet of permanent impact and 178 square feet
of temporary impact. This project will result in 4,230 square feet of loss of BVW within
four wetlands. The applicant is proposing mitigation of 5,200 square feet within the
ROW acquisition at Cotley Junction, east of the Quad Graphics Siding. The site will
connect to wetland TCM-9B on the east side of the ROW. In addition to the plantings
and wetland seed mix, wildlife habitat will be established within the replication area.
These features will include a creation of hummock and hollow microtopography, use of
large boulders, fallen logs and woody debris. The construction of the mitigation area
will be supervised by a wetland scientist. Additional permits required include Water
Quality Certification under 314 CMR 9.00and Section 401 of the Federal Clean Water
Act, and a Department of the Army Section 404 Permit from the U.S. Army Corps of
Engineers for placement of fill in jurisdictional wetlands. MR recommends that the TCC
approve this project and issue an order of conditions to include the attached special
conditions. Motion to approve with special conditions 1, 2, 3, 4, 5, 6, 8, 9, 11, 14, 19, 20,
21, 25, 26, 27, 28-water quality cert and 404 permit submitted for file, DB, second LF, so
voted.
Public Hearing
1. 490 Winthrop Street, Tutsch/Winthrop Street, LLC, (NOI), SE73-2746 Field report
states that this filing is for the construction of a 40 unit mixed use residential
apartment/commercial complex with grading, drainage, stormwater, management,
landscaping, and utilities which fall within the 100 foot buffer zone of a BVW located
across Winthrop Street. There will be 36 apartments and four commercial units. The
only part of the project within the buffer zone is a portion of the parking lot and site
preparation area along Winthrop Street. No work falls within the 100 foot buffer zone
in the rear of the site. This is considered a redevelopment project under 310 cMR
10.05(6)(k) through (q), and is defined to include the following projects: (a) maintenance
and improvement of existing roadways including widening less than a single lane, adding
shoulders correcting substandard intersections, improving existing drainage systems
and repaving; (b) development, rehabilitation, expansion and phased projects on
previously developed sites provided the redevelopment results in no net increase in
impervious area; and (c) remedial projects specifically designed to provide improved
stormwater management such as projects to separate storm drains and sanitary sewers
and stormwater retrofit projects. The BVW across Winthrop Street was originally
flagged in 2010 (flags K1 to K14) and refreshed by MLB Land Development on 2/6/18.
The ILSF (flags B0 to B120) was flagged on 4/29/15 by LSC Environment Consulting. MR
reviewed both lines and agrees with the flag placement. All flags are for reference
purposes only. The sewer tie-ins, water tie-ins, and curb cuts occur within Winthrop
Street. Three landscaping islands with grading, two dura slope channels and catch
basins, drainage, and parking are also within the 100 foot buffer zone. The plan shows
siltation barriers surrounding the entire site (sheet c-6.0) and marked as the LOD. All
disturbed areas will be stabilized with landscaping and seed mix. A final landscaping
plan, showing trees, shrubs, and seed mix should be submitted to the Conservation
Office for the file. Stormwater management structures include a detention basin in the
rear of the property, four water quality structures (oil/water separators), and three sub-
surface systems. Roof run-off will be directed to the sub-surface Cultec systems with
the westerly (1) and central sub surface system (2) directed to Water Quality Structures
#1 and #2 respectively and then to the detention basin. Water Quality Structure #2 will
also capture stormwater from the dura slope channel and catch basin #1 at the westerly
entrance and direct it to the central sub-surface system. The run-off from the dura
slope channel at the easterly entrance will be directed to the easterly sub-surface cultic
system (3) along the roof and driveway runoff, and then to the detention basin. The
detail for the outlet control structure of the detention basin and seed mix for the
detention basin were not included and should be submitted to the Commission for the
file. MR recommends that the TCC approve this project and issue an order of conditions
to include the attached special conditions. Brian Dunn present with John Sayjack. They
are getting rid of the existing drainage which is connected to Mass Highway. No
comments from DEP. DB tearing up Winthrop Street for drainage? No cutting it off at
property line, will not go across Winthrop, just remain on the property itself. 36 units,
32 residential and 4 commercial (800 square feet). 98 parking spaces, equals out to
more than 2 per unit. Snow removal will go to the landscaped areas or be taken off site.
ZBA was in favor of this project too. Motion to approve with special conditions 1, 2, 3,
4, 5, 6, 7, 8, 9, 11, 15, 17, 19, 20, 21, 24, 25, 26, 27, 28-a final landscaping plan showing
trees shrubs and seed mix to be submitted, 29-the detail for the outlet control structure
of the detention basin and seed mix for the basin are to be submitted for the file, DB,
second MI, so voted.
2. Plain Street (107-32), Aspen Property Holdings, LLC, (NOI), SE73-2747 Field report
states that this filing is for the construction of a single family home with attached
garage, septic system, utilities, and associated grading as well as wetland delineation
confirmation. This lot is on the northeast side of Plain Street just before Sydney’s Way
(on the left). The rear of the property abuts the railroad tracks and berm in the rear.
When MR visited the site on 1/5/18, the site was very wet with many pockets of
standing water, due to the rain and melting snow. MR reviewed the wetland
delineation which was conducted by Earth Services Corp. on 10/11/17. There are two
areas where the land rises sharply, one is at the rear by the railroad tracks and the other
encompasses wetland Series B, separating the numbered series 4 through 10 and meets
local parameters for a protected ILSF. MR is in agreement with the placement of the
flags as follows: Flags 4 to 10, B1 to B12, and A1 to A4 (ILSF). Currently the property
gently slopes to the northwest toward the unlettered wetland (#4-#10). The applicant
proposes to grade the driveway from elevation 114 to elevation 111 and grade up three
feet for the house, with the top of foundation at elevation 118. The house will be 54
feet from the ILSF and the garage will be located 54 feet from the unlettered wetland.
The groundwater elevation at the leaching field location is 110.5. Wetland B is at
elevation 107-108 and will be 10 feet lower than the top of elevation of the leaching
field. The lowest point of the leaching field 114.58 which is 4.8 feet above groundwater
and 7 feet above wetland B. grading will be 25 feet from Wetland B at its closest.
Siltation barriers are shown on the plan and will be at least 20 feet from the wetland (B).
the barrier will be the limit of work. MR recommends that the TCC approve this filing
and issue an order of conditions to include the attached special conditions. MR also
recommends they approve the wetland delineation as described above. Nick Dufrene
and Chris Coute present. Did 17 test pits and this was the only spot they could get it to
pass. DB any issues with getting out to the leaching field? Nick no its all upland and the
area will be loamed and seeded. DB basement? No walk out so not digging down.
Motion to approve with special conditions1, 2, 3, 4, 5, 8, 9, 16, 17, 19, 21, 24, 25, 26, and
27, MI, second JR, so voted.
Continued Violation
1. 39 Cortland Place. Applicant not ready, was told to be back at the meeting on 3/12/18
by ST.
Other Business
1. MACC Conference. Motion to approve, DB, second MI, so voted.
2. Signs for Ernie and Neil. MR looked into ideas, likes the more rustic look, put them on a
pole, each sign pointing to the field or meadow with the names on it. Motion to have
this ready to go for the March meeting, DB, second JR, so voted.
3. Boyden Gate. ST would prefer a motion made that the gate be closed by the last person
leaving the office each day. MR not reasonable to lock the gate at 4pm. People are in
there and she is not going to look for people before she leaves. Weekends it is locked
by the police. LF for the next 2-3 months have a sign up notifying everyone that the
gate will be locked at an earlier time. This gives them time to get used to the earlier
closing. DB thinks it will give undesirables notice to go in there and have their fun even
earlier than now. JR rent a big spotlight, get a sign warning of the change in times for
the gate and give them time to adjust. ST we will be liable if something happens out
there and the gate was left unlocked. MH can we see if Marilyn has someone to just run
down there at dusk and shut and lock the gate? We can look into it but she has said she
does not have the staff. MR street parking is also a safety issue. It’s very narrow there.
MI it is on us if the gate is being left open and people are able to get in. Motion to
continue this to 3/12/18, have TCC get ideas to come back with on what to do regarding
closing up the park at night, LF, second DB, so voted.
4. Friends of Boyden. Request to be reimbursed for all of their things that were in the
shed that was taken down. Building Department is handling this, trying to get some of
the items replaced. Pam from F of B came by at one point when the shed was still
standing, MR told her it all needed to be removed. It never was apparently. Keith from
the Building Department is taking care of this.
5. Council of Public Properties. A Taunton family would like to donate 7 acres of land on
Glebe Street, on the Three Mile River. Motion to send this to the Committee on Public
Properties and the City Solicitor to ask their opinion on this, DB, second ST, so voted.
Motion to adjourn, DB, second LF, so voted. Meeting ended at 7:45pm.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
Office: 1298 Cohannet Street
Mailing: 141 Oak Street
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Debra Botellio, Vice Chair AGENDA
Richard Enos
Luis Freitas February 12, 2018
Marla Isaac Temporary City Hall, 141 Oak
Jan Rego Street, Taunton, MA 02780
6:30 P.M.
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES - DECEMBER 11, 2017 & JANUARY 22, 2018
CERTIFICATE OF COMPLIANCE:
1. 30 Mozzone Blvd., Commonwealth Alternative Care, Inc., (COC), SE73-2696
2. 220 High Street, Young, (COC), SE 73-2575
CONTINUED PUBLIC HEARING:
1. Run Brook Circle, Aspen Properties Group, LLC, (ANRAD), SE73-2727
2. Caswell Street, Dutra, (ANRAD), SE73-2730
3. 117 Summer Street, Cambra, (NOI), SE73-2745
4. RR (East of Route 140), Mass DOT, (NOI), SE73-2740
5. RR (West of Route 140), Mass DOT, (NOI), SE73-2741
PUBLIC HEARING:
1. 490 Winthrop Street, Tutsch/Winthrop Street, LLC, (NOI), SE73-
2. Plain Street (107-32), Aspen Property Holdings, LLC, (NOI), SE73-
CONTINUED VIOLATION:
1. 39 Cortland Place
OTHER BUSINESS:
1. MACC Conference
2/6/2018
Get email alerts for Taunton
A daily email when new agendas and minutes are posted.