Conservation Commission
Regular MeetingTaunton, MA · January 14, 2019
Minutes
Minutes of the Taunton Conservation Commission January 14, 2019
Present: Chair Steven Turner, Vice Chair Debra Botellio, Commissioners Marla Isaac, Luis
Freitas, Jan Rego, and Matthew Haggerty. Absent: Commissioner Richard Enos.
Motion to approve the minutes of December meeting, DB, second MH, so voted.
Certificate of Compliance:
1. Woodbine Street (Roadway), Coute/Brownstone Realty Group, LLC, (COC), SE73-2671
Field report states that his filing was for the improvement and extension of Woodbine Street,
which included a 100 foot diameter cul-de-sac at the end of the road. A detention basin is
constructed at the end of the cul-de-sac with an overflow that directs extraordinary stormwater
amounts to the City’s stormwater system on Oak Avenue. The work on the road has been
completed in significant compliance to the order of conditions issued on 10/18/16. MR
recommends that the TCC issue a COC for this project. Motion to approve COC, DB, second MI,
so voted.
2. 36 Woodbine Street, (Lot 7), Coute/Aspen Property Holdings, LLC, (COC), SE73-2680
Field report states that this filing was for the proposed construction of a single family home with
driveway, rear deck, attached garage, utilities, and associated grading within the 100 foot buffer
zone of a BVW. This lot was part of the existing skating rink lot which was razed prior to
construction of Lots 6, 7, and 8. The lawn is not stable and the loam used is full of glass
particles. There is also evidence of siltation/erosion into the street from the front yard. The
deck was not built and the house is smaller 31’ x 28’ compared to 42’ x 30’. The house is 38.8
feet from the rear property line and 75 feet from the wetland. There is a shed, set up on sona
tubes, in the backyard that was not permitted and was not part of the original filing. The shed
will either need to be taken down or the owner must file for a shed permit in addition to a
Request for Determination with the Conservation Commission. MR recommends that the TCC
continue this filing to the May 20, 2019 hearing date so that the contractor has time to re-loam
and re-seed the lawn areas and give the new owner time to file the RDA with the TCC and file
for a shed permit with the Planning and Conservation Department. Nick Dufresne and Chris
Coute present. Motion to continue to May 20, 2019, DB, second MI, so voted.
3. 24 Woodbine Street, (Lot 6), Coute/Aspen Property Holdings, LLC, (COC), SE73-2681
2681 Field report states that this filing was for the construction of a single family home with
driveway, utilities, and associated grading within the 100 foot buffer zone of a BVW. This lot is a
portion of the existing skating rink which was razed prior to construction of Lots 6, 7, and 8. The
original plan called for a 34’ x 28’ home with no deck. The existing structure is 42’ x 28’ and has
a 12’ x 12’ deck attaches to the southeasterly corner of the house. The driveway is now on the
easterly side of the house rather than the westerly side. The lawn areas are unstable with
evidence of siltation/erosion into the street from the front yard/driveway area. The
southeasterly lawn area is also in poor shape. The loam used has a high concentration of glass
particles. In addition, construction debris and leftover concrete were dumped behind the
property line within NHESP area. This is a flagrant violation and must be cleaned immediately!
MR recommends that this filing be continued to the May 20, 2019 hearing date in order to give
the contractor time to re-loam and re-seed the lawn areas. All debris must be removed from
the rear of the property by the end of January 2019 and to be inspected by the Conservation
Agent for approval. Letter read into the record from Chris Coute’s partner. Motion to continue
to May 20, 2019, DB, second MI, so voted.
4. 40 Woodbine Street (Lot 8), Coute/Aspen Property Holdings, LLC, (COC), SE73-2682
2682 Field report states that this filing was for the proposed construction of a single family
home with driveway, rear deck, attached garage, utilities, and associated grading with the 100
foot buffer of a BVW. This was one of three lots within the former skating rink area and within
NHESP jurisdiction. The lawn is not stable and the loam used is full of glass particles. There is
also evidence of siltation/erosion into the street from the front yard. The deck location is on the
westerly side of the house and a poured concrete slab was put in by the new owner at the rear
easterly corner. Both the deck and slab are 26 feet from the rear property line. The slab is 85
feet from the wetland and the deck is 92 feet away. The new owner also installed a stockade
fence along the property lines. MR recommends that this filing be continued to the May 20,
2019 hearing date in order to give the contractor time to re-loam and re-seed the lawn areas.
Motion to continue to May 20, 2019, DB, second LF, so voted.
5. 48 Woodbine Street (Lot 9), Coute/Aspen Property Holdings, LLC, (COC), SE73-2724
Field report states that this filing was for the construction of a single family home with garage,
deck, driveway, utilities, and associated grading. This property is on the southerly side of the
cul-de-sac and the property falls within the NHESP Restriction Boundary. The boundary was
depicted on the original two plans but is missing on the As-Built plan. The lawn is not stable and
the loam is full of glass particles. There is evidence of erosion into the roadway. The deck is
designed differently than the original plan making it farther from the NHESP boundary at 10 feet
(rather than 6 feet) and is 23.2 feet from the rear property line rather than the original 26 feet.
The house is set back an additional foot from the front property line and two feet farther from
the edge of the cul-de-sac. MR recommends that the filing be continued to the May 20, 2019
hearing in order to give the contractor time to re-loam and re-seed the yard and a revised As-
Built showing the NHESP Restricted Boundary is to be submitted. A permanent condition that
no additional structures are to be built within the NHESP Restricted Area shall be placed on the
deed. Motion to continue to May 20, 2019, As-Built Plan be redone including NHESP restricted
boundary and addition of a permanent condition that states no additional structures are to be
built within the NHESP area to be placed on the deed, DB, second MI, so voted.
6. 49 Woodbine Street, (Lot 1), Coute/Aspen Property Holdings, LLC, (COC), SE73-2725
Field report states that this filing was for the construction of a single family house with garage,
deck, utilities, and associated grading within 100 feet of a wetland and in close proximity to a
NHESP restricted area. The lot is on the northerly side of the cul-de-sac and a treed buffer along
the westerly property line was required by the TCC. The lawn is not stable and the loam used is
full of glass particles. The trees “planted” as a buffer will not survive as all of the root balls are
above ground as a result of improper planting. The As-Built plan does not show the NHESP
Restriction Boundary that was depicted on the original two plans. The house is 22 feet rather
than 26 feet from the rear property line and the deck is 18 feet (rather than 10.9 feet) from the
NHESP Restricted Boundary. MR recommends that this filing be continued to the May 20, 2019
hearing in order to give the contractor ample time to re-loam and re-seed the yard and replant-
replace the buffer trees. A revised As-Built showing the NHESP Restricted Boundary must also
be submitted. A permanent condition that no additional structures are to be built within the
NHESP Restricted Area shall be placed on the deed. Motion to continue to May 20, 2019, As-
Built Plan be redone including NHESP restricted boundary and addition of a permanent
condition that states no additional structures are to be built within the NHESP area to be placed
on the deed, DB, second MI, so voted.
7. 57 Short Street, DaSilva, (COC), SE73-2603 The field report states that this filing was for the
installation of septic systems, driveway and turnaround, and yard grading in connection to the
construction of two single family homes. Changes from the original to the As-Built include a
larger home 62’ x 39’ (proposed was 64’ x 24’), a 12’ x 14’ deck (proposed 12’ x 14’), and the
addition of an 8’ x 25’ porch (none proposed). All areas are stable and work has been
completed in significant compliance to the order of conditions issued on 1/15/15. The changes
to the dimensions mentioned above do not come closer to the wetland and there is no
indication of infringement into the wetlands. MR would recommend that the owner place
splash pads under the roof drains to decrease erosion to the lawn and patios. MR recommends
that the TCC issue a COC for this project. Motion to continue to February 11, 2019, have
homeowner and/or builder present, DB, second JR, so voted.
Extension:
1. 24 Laneway Street, Dutzmann, (EXT), SE73-2636 Field states that this filing is for the
construction of a single family home and garage to replace the original home destroyed by a
fire. The applicant is requesting a three year extension to the order of conditions issued on
2/25/16. The applicant is wishing to sell the property as he and his wife will be moving to Maine
in May after his job ends in Boston. MR recommends that the TCC approve the request and
issue a three year extension to end on 2/25/22. Ingo Dutzmann present. Motion to grant an
extension for 3 years, DB, second LF, so voted.
Public Hearing:
1. Massasoit State Park, Straub/MA DCR, (NOI), SE73-2776 Massasoit State Park, SE73-2776
Field report states that this project is an Ecological Restoration Limited Project 310.CMR
10.53(4)(5) with the applicant seeking to control invasive and nuisance aquatic vegetation, algae
blooms, and eutrophication in Middle Pond after the completion of the Middle Pond Beach
Maintenance Project through the combined use of herbicides, hand harvesting, and algaecides.
NHESP has determined that the project as proposed will occur within the habitat of the
Plymouth Gentian, a species of Special Concern. They further state that a portion of the project,
as currently proposed, be conditioned in order to avoid a prohibited take of the state listed
species 321 CMR 10.18(2)(a). The following condition must be met to avoid a prohibited take:
-“The drawdown elevation shall be achieved outside the period from July 1 to September 1 to
avoid changing the hydraulic conditions required by Plymouth Gentian..:
The above condition will be added to the Special Conditions for the Order of Conditions.
Invasives within the project location include common reed, purple loosestrife, Eurasian milfoil, and
fanwort. Excessive algal growth will also be treated. DCR will utilize multiple management techniques
to control the spread of the non-native invasive aquatic species. These techniques include using
herbicides, hand harvesting, and algaecides.
A. Proposed Herbicides (The Herbicide Product Labels are found in Attachment C of the project
submittal):
Fluridone (Sonar): This is a systemic herbicide applied either in liquid or pellet form that inhibits the
formation of carotene in affected plants, resulting in rapid deterioration of chlorophyll, thus leading to
starvation of the entire plant. This is a slow-acting herbicide resulting in gradual plan dieback and
minimizes the risk for marked decreases in dissolved oxygen levels in waterbodies. This is the only
herbicide effective on fanwort and can also be used to control Eurasian milfoil. Fluridone applied to the
approved concentration rate has not been found to be toxic to waterfowl and wildlife (Washington State
Department of Health (WSDOH), 2000). No adverse effects were observed on crayfish, bass, bluegill,
catfish, long neck soft-shell turtles, frogs, water snakes, and waterfowl from the use of 0.1 to 1.0 ppm of
fluridone during field experiments (Arnold 1979, McCowen et al, 1979). Fluridone is not considered to be
a carcinogen or mutagen and is not associated with reproductive or developmental effects in test
animals (WSDOH, 2000). No adverse human health effects are anticipated due to exposure to fluridone
under the expected conditions of use.
Diquat dibromide (diquat, Reward): This is a quick working herbicide that interrupts the
photosynthesis process resulting in dieback of leaf and stem cell. It is effective on Eurasian milfoil but
not on fanwort. According to PIP (Pesticides Information Profile), when diaquat is applied to open water,
it disappears rapidly because it binds to suspended particles in the water. Diquat dibromide is a
moderately toxic chemical (EPA, 1988). It may be fatal to humans if swallowed, inhaled, or absorbed
through the skin (Chevron Chemical Company, 1986). Diquat dibromide is acutely toxic when it is
absorbed through the skin and the possibility for poisoning increases with repeated exposure…the
demonstrated toxicity of this compound is sufficient to raise serious human health concerns (Office of
Pesticide Programs, 1986). Diquat dibromide also causes eye irritation Direct or excessive inhalation of
diquat dibromide spray mist or dust may result in oral or nasal irritation, nosebleeds, headaches, sore
throat, coughing, and symptoms similar to those from ingestion of diquat (Chevron Chemical Company;
1986, Hayes, W. J., 1982). Diquat dibromide ranges from moderately toxic to practically nontoxic to
birds (Office of Pesticide Programs, 1986) and is slightly toxic to fish. Its toxicity to fish and food
organisms on which fish survive, has been reported in many studies. Some species of fish may be
harmed, but not actually killed, by sublethal levels of diquat dibromide. Oxygen can become depleted in
diquat treated water by decaying aquatic plants.
Glyphosate (Rodeo, AquaPro, ShoreKlear)/imazapyr (Habitat): Glyphosate is a non-selective systemic
herbicide and is effective in controlling common reed and purple loosestrife and has no activity in the
surrounding soil or water. It is usually formulated as an isopropylamine salt. According to PIP,
Glyphosate is only slightly toxic to wild birds (Forest Service, 1984). Glyphosate is practically non-toxic to
fish in the Rodeo formulation, but is highly toxic in the Roundup formulation. In water, glyphosate is
strongly absorbed to suspended organic and mineral matter and is broken down primarily by
microorganisms also. Its half-life in pond water ranges from 12 days to 10 weeks. Glyphosate may be
extensively metabolized by some plants while remaining intact in others (The Herbicide Glyphosat,e
Grossbard, E. and D. Atkinson, Editors, 1985). Once in the plant tissue, the chemical is translocated
throughout the plant, including to the roots. Glyphosate translocates to the plant’s rhizome (starch
storage) and so treatment of stunted immature plants in subsequent years does not provide effective
systemic control. The combined use of glyphosate and imazapyr following the first year of treatment
may be followed to improve long term control. DCR’s management plan includes using a combination of
fluridone and diquat dibromide for controlling fanwort and Eurasian milfoil to be applied early in the
growing season (late spring, early summer) over the course of one day. Follow up treatments may occur
later in the summer or during the next growing season depending on effectiveness and plant regrowth.
Long term control typically requires consistent reapplication to the same beds over several years. Public
access to Middle Pond will be restricted on the day of treatment as standard practice. The pond will
also be posted by the applicator prior to treatment in accordance with the label requirements and the
License to Apply Herbicides to Water of the Commonwealth (BRP WM 04).
B. Harvesting:
DCR is also seeking approval to control invasive plants through the uses of hand harvesting, which can
be used for small areas as a follow-up to herbicide treatment or where herbicides were not able to be
applied. Hand harvesting has the advantage of keeping the desirable native plants while removing the
nuisance and invasive plants. Harvesting may include wading, snorkeling, or SCUBA diving. Hand
harvesting aims to remove the entire plant, including roots, thus preventing re-growth. Pulled plants
and fragments will be disposed of by removing them from the pond and composting them to prevent
material from re-entering the water.
C. Algaecides:
Excess plant matter may be present in the water following hand harvesting and herbicide treatment,
leading to decomposing plant matter which is associated with algal blooms due to nutrients released
during decomposition. There is also reduced competition for light, creating ideal conditions for algal
bloom production. Algal blooms, which contain potentially toxic cyanobacteria, are a particular concern
in Middle Pond due to its function as a public swimming beach. If a bloom would occur, an algaecide
treatment would provide rapid control of the developing algae. Algaecides are primarily copper or
aluminum based and result in almost immediate control of a broad spectrum of planktonic and
filamentous algae. The algaecides would only be used at Middle Pond if recommended by a Certified
Lake Manager and applcied by a Massachusetts licensed herbicide applicator. All of the proposed
herbicides and algaecides have been approved for use in Massachusetts waters by Massachusetts
Department of Agricultural Resources and MassDEP. Products will only be applied within the pond;
therefore, there will be no impact to vegetation growing in BVW, Inland Bank, BLSF, or buffer zone
areas. MR recommends that the TCC approve the project and issue a Order of Conditons to include the
attached special conditions. Alex Patterson from DCR present. DB asked if this will be toxic to the birds?
Alex Patterson stated that no in this dosage amount. In these percentages it will not be toxic to birds.
Motion to approve with special conditions 1, 2, 25, 26, 27, and 28-Per NHESP drawdown elevation shall
be achieved outside 7-1 to 9-1 to avoid changing the hydraulic conditions regulated by Plymouth
Gentian, and DCR stated that this will not be toxic to any of the birds in the area, DB, second MI, so
voted.
2. 1000 County Street, McArthur/MADOT Hwy Div., (ANRAD), SE73-2777 This filing has been
submitted for approval of a wetland delineation which was flagged by Kimberly Degutis, Jacobs
Engineering, on August 9 and 13, 2018. This area was previously flagged in 2012 for the MassDOT road
widening project and in 2015 for the proposed new interchange exit as part of the First Light project.
This area is not an NHESP area, ACEC, or flood zone. There are no vernal pools within the area. Two
wetlands were flagged within the project site. There is one intermittent stream that flows between the
two areas but the top of bank was not flagged. Wetland A is an extensive Palustrine Forested/Scrub
Shrub was flagged using flags marked WFA 1 to WFA 91. Dominate vegetation includes red maple, with
highbush blueberry, and sweet pepperbush in the understory, and cinnamon fern, royal fern, and skunk
cabbage in the herbaceous layer. This wetland also includes a newly created mitigation site that has
been stressed due to recent drought conditions. Wetland C is a small Palustrine forested wetland
dominated by red maples, with an understory of white pine and highbush blueberry, and a colony of
Common reed. There are areas of ponded water and saturation near the surface throughout this
wetland and appears to be fed by the unnamed tributary of the Cotley River to the northwest. This
wetland is connected to Wetland A via culvert underneath a previously constructed road bed. The
delineator used flags WFC1 to WFC15 to mark this area. MR walked the project area on 12/11/18 with
Kim Deguits, Jacobs Engineering, Andrea Coates, MassDOT, Susan McArthur, MassDOT, and Corey
Beckwith, MassDOT. MR recommends that the TCC approve the delineation and issue an ORAD.
Present Andrea Coates and Kimberly Deguits. Motion to issue ORAD, DB, second MH, so voted.
3. 1361 Middleboro Ave., Martel/MA DCR, (NOI), SE73-2779 Field report states that this filing is
for the proposed rehabilitation of the Big Bearhole Pond Dam, located within Massasoit State Park, and
under the auspices of the DCR. The dam is classified as an intermediate size, high hazard potential
structure. The dam is approximately 250 feet long, 17.5 feet high, with a hydraulic height of 9 feet. The
dam was rated in poor condition based on recent visual inspections by Weston & Sampson and in a
follow up inspection report by Fuss & O’Neill, Inc. in 2016. The deficiencies include:
-Brush, trees, and woody vegetation cover the up- and downstream slopes and abutments;
-The upstream slope is unprotected and over-steepened;
-Eroded footpaths are located on the upstream slope;
-Small trees and vegetation are growing through the grouted riprap on the downstream slope in some
areas;
-Seepage through the downstream riprap near the toe of slope on both sides of the discharge channel;
-Seepage through open joints in the discharge channel walls near the end of the box culvert;
-Based on model simulations, there is less than 1 foot of available freeboard during spillway design
flood.
The proposed work to improve the dam and address the above deficiencies includes:
-Remove all trees, woody vegetation, and stumps from the up-and downstream slopes and within 20
feet of the abutments;
-Regrade the upstream slope to 1.5:1 or flatter and armor with riprap;
-Re-grout the downstream riprap as needed;
-Install drainage along both sides of the discharge channel walls;
-Repair the open joints in the discharge channel walls near the box culvert;
-Clear debris from the outlet structure;
-Replace the existing timber stoplogs with aluminum stoplogs;
-Construct a timber framed platform above the outlet structure;
-Raise the crest up to 2 feet;
-Relocate the metal access gate to the left abutment.
A cofferdam will be used to isolate the work area on the upstream slope and facilitate dewatering so
that the work can be completed in the dry. A bypass pipe will convey flow from Big Bearhole Pond over
the dam crest and outfall downstream of the dam to allow normal streamflow and conditions
downstream of the work area. Resource areas within the work zone include BVW, Riverfront Area,
LUW, and 100 year Flood Zone. The BVW and MAHW to the perennial stream and to Big Bearhole Pond
were delineated by Weston & Sampson on 4/3/17 using the following flags: BVWA1-BVWA5
(southeasterly BVW), BVWB1-BVWB5 (northeasterly BVW), MHWA1-MHWA11 (Big Bearhole Pond0,
MHWB1-MHWB5 (westerly side of perennial stream), and MHWC1-MHWC6 (easterly side of perennial
stream). There are no good proposed impacts to the BVWs, but work will occur within the 100 foot
buffer zone. The applicant estimates that 1,290 square feet of LUW will be temporarily impacted of
which 1,150 square feet is associated with the area that will be dewatered and regraded upstream of
the dam. The remaining 140 square feet of LUW impacts will be downstream of the dam. There will be
no work within the stream channel. A temporary crossing (cribbing) of the stream will likely occur to
allow transport of equipment from one side of the stream to the other. The stream channel
downstream of the work area will be protected from siltation either by a silt curtain or sand bag check
dam across the channel downgradient of the work area. There is about 34,750 square feet of riverfront
area within the limit of work and impacts within this area include:
-Temporary construction staging area and access road;
-new pavement, guardrails, curbs, etc.; and
-Loam and seed with minor grade changes.
There will be no impacts to flood storage area, no loss to flood storage, and compensatory storage
mitigation is not required within the 100 year flood zone. The work as proposed will address safety
issues regarding the dam condition, creating a safe environment for park users as well as areas
downstream of the dam. MR recommends that the TCC approve this project and issue an order of
conditions to include the attached special conditions. Timothy Blair and Mel Higgins present. Motion to
approve the project and issue an order of conditions with special conditions 1, 2, 3, 5, 6, 7, 19, 25, 26,
and 27, MH, second DB, so voted.
4. 0 & 2318 Bay Street, Gulf Resources, Inc., (ANRAD), SE73-2780 Field report states that this filing is
seeking approval for a wetland delineation performed by Robert Gray, Sabatia, Inc. on May 10, August 2,
and November 5, 2018. Both sides of the BVW, which includes an intermittent stream, were delineated
using flags marked BVW1 to BVW22, and WF2-1 to WF2-14. MR reviewed the wetland lines on
12/18/18, and she agrees with the placement of the flags. The intermittent stream was running when
MR visited the site. The property is bounded on the southerly side by Interstate 495 and on the
westerly side of Bay street. The BVW is a wooded deciduous swamp with red maples dominating the
canopy, and the intermittent stream most likely receives stormwater runoff from Route 495. The
understory consists of greenbrier, poison ivy, princess pine, blueberry, carex spp. (sedges), and juncus
spp. (rushes). MR recommends that the TCC approve the delineation as follows and issue an ORAD:
Flags BVW3 to BVW22, WF2-2 to WF2-11, with flags BVW 1 & 2, and WF2-1, WF2-12, 13, & 14 for
reference purposes only. Motion to approve ORAD, MI, second LF, so voted.
5. Preservation Drive (49-27), Aspen Properties, LLC, (NOI), SE73-2780 Preservation Drive (49-27),
SE73-2781 Field report states that this filing is for the construction of a single family home with septic
system, driveway, deck, utilities, and associated grading. The wetlands were delineated by Brad Holmes,
Environmental Consulting & Restoration, LLC on 2/21/18 using pink/black flagging material marked B1
to B27 (northerly limit of the BVW). The entire site is within the 100 foot buffer zone of the BVW. The
site is not within NHESP habitat and is not within an ACEC. A portion of the site is within an area
mapped as BLSF according to FEMA maps. The flood plain limit is missing from the plan as well as a
depiction of the entire lot. MR visited the site on 12/26/18 to walk the line. MR is in agreement with
the placement of the flags. The site is flag and at the end of the cul-de-sac with the wetlands
surrounding the property on three sides. The wetlands are at elevation 106, and the test pits hit
groundwater between elevation 105.2 and elevation 105.7. The proposed house is 42’ x 28’ with a
garage under (floor at elevation 107.5). The entire constructed area will be raised 8 feet above
surrounding properties and roadway. This is roughly 10,874 square feet of area, and approximately
43,650 cubic feet of additional material. Even though stormwater will be directed toward the wetland
to the rear, the stormwater in front is directed to the edge of the cul-de-sac. There is no stormwater
structure to carry heavy rainfall away from the road’s edge prior to heading to the wetland, just a swale.
This could be problematic in large storm events. The septic system will be located in the front as it
needs to be at least 50 feet from the wetland, and through necessity, the recharge chambers will be 4.1
feet above groundwater level (elev. 109.80). There is no other viable location for the system. The plan
shows two retaining walls, a 90 foot long wall along the northeasterly property line and a 39 foot long
one along the northwesterly side of the driveway. Because there is a 7 foot rise in elevation, MR is
concerned with the integrity of the wall. There is no detail of the wall at this time, but MR has put in a
request for that detail. Because the slope along the westerly side of the proposed house is at a 41%
slope, MR recommends drywells for roof leaders to decrease the erosion factor. A siltation barrier is
shown on the plan as the limit of work and will be 4 feet from the BVW to the east and 15 feet from the
BVW to the west. MR recommends that the siltation barrier be extended to the front property line
along the easterly retaining wall. Approximately 1,020 square feet of the clearing of trees and brush
along the southwesterly work zone falls within the 25 foot WPZ, while 1,600 square feet of clearing is
along the easterly (driveway) side of the project. MR recommends that the project consume less of the
25 foot WPZ than proposed, where possible. Unless the following are received prior to the meeting, MR
recommends that this filing be continued to February 11, 2019: A revised plan showing:
-the entrie lot (can be small scale plan);
-Flood Plain;
-retaining wall detail;
-siltation barrier running to cul-de-sac along easterly side;
-25-foot WPZ;
-depict drywells and detail on plan.
If the TCC chooses to approve this filing, MR recommends that the attached special conditions be
included.Nick Dufrene present. Discussion was had over the property, what type of retaining wall is to
be put in. The Commission would prefer to see what materials will be used for the wall prior to
approving it. Public Input: 1. Gerald Croteau 570 Tremont Street. Dr. Croteau said this was created in
2002, he bought his land in 2003, and moved in, in 2004. He stated there was excess water at the end of
the cul-de-sac. 2. Dave Pina 86 Heritage Way. He is concerned about the wall being put in with the
water situation as it is right now. Mr. Pina said the lefthand corner of the site they are discussing
tonight, has a lot of water in that spot. Will this retaining wall stop that from coming over into his
property? Again it was asked if there is water at the end of this street? Lynne Pina stated yes there is.
Nick Dufrene said they typically just use earth and grade out, here they will use a wall, its actually the
best case scenario. ST asked why they are building up? There is high groundwater there. ST house will
be at regular level and raised septic in the back? It is a foundation and will sit on the ground, no digging
down. MH footings all on existing ground level and fill brought in for the front, correct? Nick said yes
that is right. Dave Pina wants to know how far down the retaining wall will go into the ground? Nick
said wall will rise up and level out before it drops back down. Stacked blocks with some rebarb type to
keep it together. 5 feet at its highest point. MH asked why stacked blocks and not poured? Poured is
more expensive and does not look as nice. JR wall will be locked together so it doesn’t fall over right?
Nick said yes that is all part of the standard design. MI size of blocks? Depends on the company that
they use. Nick said each company uses different size blocks, some have rebard, some lock. MR
connected underground? Yes structural engineer will determine how that will work. DB wall is in TCC
jurisdiction so they have a right to know what will be used, the structure of it, and how it is tied in. 3.
Michael Costa and Danielle White 572 Tremont Street. They are worried due to the amount of water
that they currently get. Will they end up with more, how will this affect them? LF is worried about the
Pina’s, he would like to go out there again to walk the site and he wants more information on the wall
structure before he feels he can make a decision on this. DB agrees. ST spoke with Chris Coute of Aspen
Properties. He wants him to work with the neighbors and speak with them regarding their concerns.
Motion to continue to 2/11/19, applicant needs to have met with neighbors and get TCC a plan detailing
the retaining wall structure before the meeting, MH, second MI, so voted.
Other Business:
1. Tinkergarten Request. Motion to approve it, get us the certificate of insurance as soon as
possible, DB, second MH, so voted.
2. Snake River waterway and land. Motion to refer to the Law Dept. and City Council, ST, second
LF, so voted.
3. Bass Fishing Tournament. Motion to approve the tournament on 8/10/19, 530am-3pm, DB,
second MI, so voted.
4. TRWA 6/9/19 River Fest. Motion to approve, DB, second ST, so voted.
Motion to adjourn, DB, second ST, so voted. Meeting ended at 8:50pm.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
Office: 1298 Cohannet Street
Mailing: 141 Oak Street
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Debra Botellio, Vice Chair AGENDA
Richard Enos
Luis Freitas January 14, 2019
Matthew Haggerty Temporary City Hall, 141 Oak
Marla Isaac Street, Taunton, MA 02780
Jan Rego 6:30 P.M.
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES
CERTIFICATE OF COMPLIANCE:
1. Woodbine Street (Roadway), Coute/Brownstone Realty Group, LLC, (COC), SE73-2671
2. 36 Woodbine Street (Lot 7), Coute/Aspen Property Holdings, LLC, (COC), SE73-2680
3. 24 Woodbine Street (Lot 6), Coute/Aspen Property Holdings, LLC, (COC), SE73-2681
4. 40 Woodbine Street (Lot 8), Coute/Aspen Property Holdings, LLC, (COC), SE73-2682
5. 48 Woodbine Street (Lot 9), Coute/Aspen Property Holdings, LLC, (COC), SE73-2724
6. 49 Woodbine Street (Lot 1), Coute/Aspen Property Holdings, LLC, (COC), SE73-2725
7. 57 Short Street, DaSilva, (COC), SE73-2603
EXTENSION:
1. 24 Laneway Street, Dutzmann, (EXT), SE73-2636
PUBLIC HEARING:
1. Massasoit State Park, Straub/MA DCR, (NOI), SE73-2776
2. 1000 County Street, McArthur/MADOT Hwy Div., (ANRAD), SE73-2777
3. 1361 Middleboro Ave, Martel/MA DCR,(NOI), SE73-2779
4. 0 & 2318 Bay Street, Gulf Resources, Inc., (ANRAD), SE73-2780
5. Preservation Drive (49-27), Aspen Properties, LLC, (NOI), SE73-2781
OTHER BUSINESS:
1. Donation of Snake River waterway and land, Robert Taylor
2. Use of Taunton River Boat Ramp for Bass Fishing Tournament
3. Tinkergarten request
11/12/2024
Get email alerts for Taunton
A daily email when new agendas and minutes are posted.