6:00pm ST opened meeting.
Motion to approve February 8, 2021 minutes. JR, second DB.
Cont. Public Meeting:
Winthrop Street. Applicant requested a continuance in order to revise plan. DB, second RE to
continue to April 12, 2021. So moved.
Public Meeting:
Crystal Lane Lot 5 (portion of 21-60). Greg Bunavicz, Engineer, Borderland Engineer, Inc. DB
motion to open. Lot 5 is at the end of cul-de-sac. About 19 acres which has the detention basin
for the whole subdivision and has an easement. Lot slopes down toward the basin and then
wetland. Erosion control line approved for the subdivision and did not change. The house and
septic system are outside the buffer zone. Within the buffer zone is minor grading. DB, second
MH issue Negative Determination with Special Conditions 1-4, 6, 14, 15, 18, 19, 21 – deed
stating responsible party to maintain the detention basin. So moved.
Amendment:
82 Ingell Street. James Dorsey, owner, Rick Charon, Engineer, Charon Associates, Inc. The
Applicant has moved the proposed building closer to the street, revised the parking area and
compensatory storage, requiring an Amendment. The proposed building has been moved closer
to Ingell Street and the parking area has been revised. There are 5 proposed compensatory flood
storage areas to recoup the fill needed for the construction of the new building that will be placed
in the flood zone. This will result in a net increase in flood storage capacity on the site. There is
also a reduction in parking spaces and revision of the parking area that results in a decrease in
total paved parking area of 7.6%. LF, second DB issue Amendment. So moved.
Extension:
82 Ingell St. James Dorsey, owner, Rick Charon, Engineer, Charon Associates, Inc. The
Applicant has moved the building closer to the street, decreased parking, and added
compensatory storage and as this filing expires on March 27, 2021, the Applicant has requested a
3-year Extension recommended by DEP, even though we are in a Tolling period due to the
pandemic. This Extension to the Order of Conditions will expire on March 27, 2024. JB, second
JR, issue 3-year Extension. So moved.
Continued Public Hearing:
16 Park Street. Scott Carter, owner, Stevie Carvalho, Engineer, Farland Corp. NOI. This is for
the construction of a 3-story, 23,000 self-storage building with 60 parking spaces. All work is
outside the 25-foot WPZ. This is a redevelopment project with decrease in impervious area. On
the revised plan they provided information on the proposed retaining walls. Not much area for
snow storage, especially with the owner’ plan to enclose the entire area with chainlink fencing at
the edge of pavement. The parking area can provide temporary storage but the owner plans to
have the snow removed from the paved surfaces. ST asked about snow removal – Scarvalho: In
large storm events he will truck it out, in small events he can place on the landscape areas and a
few parking spaces. DB asked about chemicals? SCarter: Environmentally friendly. DB –
anything being stored outside? SCarter: No, that’s a condition from Planning Board. DB – what
about policing trash? SCarter: Will have on-site employees every day. We don’t want a dumpster
on site. DB - Gated? SCarter: Yes fully gated with cameras and alarms and restriction on times to
enter – not a 24 hr. facility. ST: What are the times? SCarter: Either 7-9 or 7-7. DB - 7 days a
week? SCarter: Yes. We won’t have employees on site 7 days, probably not Sundays. DB
concerned with people throwing trash in the river. SCarter agrees. Will have it monitored. They
will know what units were used to narrow down any offenders. Could hire someone to monitor
the facility. DB asked MR if she could add as a condition that someone monitors the trash. LF –
familiar with the area. Neighborhood in disrepair and glad something is going there. Who did the
cleanup here? Have you reached out and talked to the neighbors? SCarter: I’ve been there a
number of times and talked with people that have asked questions about it. People are happy to
see something going there. LF- Did you have to do any cleanup? SCarter: Yes, we’ve cleaned up
the whole site. Environmental? Oh yes. Put riprap along the river. Have an AUL filed. Went thru
all that before buying property. ST- 21E done? SCarter: I believe so, I think we went above and
beyond a 21E. MR: can I add in? A 21E was done a number of years ago under a filing Resource
Controls did, and Lopes took the product. The AUL is on file with DEP. ST: I think this will be a
site for sore eyes. A good project and you will be a good neighbor. MH – Will the fence be along
the edge of the river? SCarter: carried all the way around. Scarvalho: will be a tall fence and
trash will be contained within the site. MR: Clarification – the fence will be around the perimeter
of the parking area, not along the edge of the river, correct? Scarvalho: that is right. Along the
perimeter of the pavement. JB: Regarding the Special Conditions – SC30 should state that snow
storage is to be removed from site for large storm events, 3” or more. Only environmentally
friendly chemicals to be used on parking areas. Field Report read. And add a Special Condition
to have area policed for trash. DB, motion to approve with additional Special Conditions #30,
#31, and #32, second MH. So moved.
Public Hearing:
Tremont St. (Assessor’s Lot 60-37). Bruce Webb, Ecosystem Solutions, Inc. (Peer Reviewer);
Bob & Kathy Jacques, owner; John DeSousa, Engineer. ANRAD. BW: Reviewed delineation on
March 4, 5, & 8. Found quite a few issues throughout. Reviewed the lines and found that
numerous flags were atop hydric soils, questions with flag locations and wondered if these were
fresh delineations or attempt to refresh previous delineations. Numerous flags were 10+ feet
apart and saw remnants of older flags nearby. There were no wetland data forms in the filing,
and there were no soil cores done. Many flags had one location on the plan but an entirely
different location on the plan. Accuracy of the delineation is called into question. I put up many
revised flags which were over 30 feet from their flags. Seems as if other wetland indicators were
not used. Recommend that a fresh delineation be performed to make sure the wetlands are
accurately indicated. This is a very high value wetland that borders on the Segreganset River
which is a cold water fishery. There is Estimated Habitat, Priority Habitat, Riverfront Area, and
there are Potential Vernal Pools. JD: We had requested that when they went out we would have
walked the line with him. I knew there would be questions. The original delineation was done by
Pare Engineering, a few years ago. We tried to keep the flags in the original locations. Used GPS
used to locate the flags. Did an instrument survey to locate flags. Shared screen. JB can we get a
copy of the report. MR: I sent it out this morning, JB not seeing it, found it. Back to JD: A1 is
short of the property, we did extend the line to the property line. Continues talking about the
delineation. I’m certain the flags are positioned where they should be. BW: May I interject? A1-
A5 to cartpath, but in the field they are in the woods and A8 is at the cartpath. Not exactly
accurate. JD: Confident where we have the flags is where the wetland is. BW: I respectfully
disagree. What methodology was used to extend the line? JD: Looking at E21, we just extended
it to the property line- I disagree with you as to where it should go. Talks about the knoll in the
field and then gave it up to wetland. ST: Let me interrupt. John are you thinking you need to go
back out there? JD: well, I know we’ll have to go back out there. I haven’t seen the relocation of
the flags. I wish I had been notified when he was out there. I never got the report until earlier
today. BW: I apologize that the report was late – we had a really busy week and I finished this up
on the weekend. ST: Mr. DeSousa should have been notified when you were out there and that
the report should have been delivered sooner. Why wasn’t the applicant asked to go out there
with you. ST recommends that this be continued for a month and that John and Brandon meet at
the site to review the line. JB I was okay with the 7 day response with such a detailed letter is
acceptable. I would like limits of NHESP put on plan. Motion to continue to 4.12.2021 DB,
second JB, so voted.
Crystal Lane Lot 6. Greg Bunavicz. Construct SFH within the 100-foot buffer of a BVW. GB
discussed plan – 30k sf with 22.8k upland. Septic will be in front. All work outside the 50-foot
buffer. Erosion control just beyond 50 foot buffer. The septic and driveway are outside the buffer
zone. DB: no work/grading within the 50 feet. GB: that’s correct. ST read Field Report. Motion
to issue an Order of Conditions w/ Special Conditions 1-5, 7, 9, 17, 19, 21, 24-27, JR, second JB.
Cameron Ave. (ANRAD). Tony DeFrias, Koska Eng. SFH lot on corner of Cameron Ave. and
Arnold St. Proposing a SFH with septic in the front with City water. There was an ILSF flagged
for Katherine Drive back in 2007. When they were out there they have not seen any evidence of
an ILSF on this property. Drainage patterns may have changed since the construction of
Katherine Dr. We are showing the limits of the ILSF. Only doing lawn within 25 feet. JB:
Michele, will they need to come back to us with an RDA? MR: No, and this will be addressed in
my Field Report. Only jurisdictional under our By-Law – protected but not protected by a buffer
zone. Can the septic field be turned? Waiting to go before BOH until after this hearing. If the
Commission wants us to turn the system it is not an impossible task. ST: Michele your thoughts
on that? MR: Either way is fine, Steve. MR reads Field Report. TD: we can probably turn the
system. JB: if you could rotate the system just 90 degrees you’d b able to gain some distance.
TD: I can take a look at turning it. PUBLIC IMPUT: Jim Donovan, 24 Cameron Ave. They are
talking about changing the septic system. Is it a raised system? TD: It will be higher than the
road and the house will also be at the same level so it won’t look like a raised system. JD: Will it
face Cameron? TD: the house will face Arnold St. and it will be between the house and Arnold
St. T: Michele, can you put that up on the screen? Plan shown on screen and ST explains what he
is seeing. JD: worried about runoff. Would they put a drain in the street? ST: Any runoff into the
street? TD: There will be runoff onto Arnold but not a significant amount going to either street.
JD: if major runoff will the City put a drain in the street. ST: Call Michele and we would see that
the builder put in a drain. Don LaPointe, 11 Cameron Ave. Concerned about runoff. When they
put in Katherine Dr. there was more runoff and everyone is using sump pumps all the time. Will
there be more runoff. JB: This will be reviewed by City Eng. They cannot create more runoff
than what comes there now. City Eng. May say that the roof may need to go into drywell.
Doesn’t see any of that happening. Didn’t find any groundwater down to 144 inches. DP: I’m
putting in a new septic – mine failed because of Katherine Dr. I’m being forced to put in a new
system. Concerned about additional water. No catch basin at end of the street. ST recommends
that this be continued for a month. Michel to get in touch with City Eng. And visit the site again.
TD: the City Eng. Did go out there with Michele. Can empathize with what the neighbors and
this is an old neighborhood with older rules. Now the codes have changed and systems are now
raised. ST: I want to make sure I spoke to every neighbor. It seems that these neighbors have not
been met. That’s my recommendation. I recommend that you talk to these people. JB would like
plan to go the Eng. for his approval. DB: Motion to continue this filing to April 12th and to have
MR and City Eng. visit site and that plan gets sent to Eng.
2 & 8 Galleria Mall Drive. (ANRAD) Todd Moray, Beals Assoc., Mike Wurtsbaugh, Portman
Ind’l, Matthew Costa, Beals Assoc. TM: discussed the project – got the original plan of the mall
with the wetlands. We delineated the wetlands in between snowstorms. Went out to delineate and
found that it was already done but we do not know by whom. We walked the entire flagged area
and added flags to correct some areas we felt should have been included. About a 3.5 mile
delineation. Wetlands are at the toe of slope with many steep slopes. Showed his screen and
discussed the various wetland systems. We are not going beyond the existing pavement/footprint.
ST: read Field Report. ST: excited about this project. This applicant has been very professional
and did research on the Portman Group – they do a lot of community activities. JB: Echoes ST’s
comments. Looks forward to the PB presentation. Motion to issue ORAD by JR, second by DB.
So voted.
66 Foxhill Dr. Evan Watson, Joe Marques. EW: shares screen and discusses project. Add
addition to home, no additional clearing or grading on site. Erosion control is shown and all work
is outside 25 feet. No file number as of yet. ST: I think I would approve this, and make a motion
to approve this pending the receipt of the number. Approve pending the DEP# and continue to
the May 17th hearing. LF makes motion to include the Special Conditions 1-5, 19, 21, 25-27, MH
seconds. 5:1 (D. Botellio) So moved.
CONTINUED VIOLATION
41 Godfrey St. Brian Whicher, Property Manager, John Griffin, Owner. JG: Address was
incorrect, just got the letter this past week. Not sure exactly what is going on. Nothing
immediately jumped out at us. Fenced in and very step on the other side. Would be helpful if we
could go out there and work with them to rectify the situation. MR: when I was out there at 24
Knight St. there were small chunks of asphalt, 5 gallon tubs, and much had fallen into the stream.
It is hard to see from your property. JG: is 24 Knight St on the other side? MR: It is to the rear of
your property and there is quite a bit of land. You won’t see the house, Cobb Brook and the pond
are immediately behind your property, the house is further to the south. ST: there is a lot of trash
in the area not just from your site. It is an important resource area. JG: willing to work with the
commission. ST: let your tenants know not to dump. MR would you like to go out with John and
Brian? MR: Yes and I would like to get in touch with the owner at 24 Knight St. so that we could
actually see the issues. LF: How long has this been going on? MR: I was made aware of it this
year when I did the violation – late January. ST: saw some pictures today and it looks like this
has been happening for a long time. Lilah Medeiros, 24 Knight St. ST: would like to meet with
you to go out and see the issues. LM: A lot of people can’t see down there. It’s been a big
problem to me. Not sure how we can take care of this – it is expensive to clean this up. ST: Not
heard any specifics regarding the issues here. LM: Mentioned this at Planning Board and ZBA
when the new houses were put in. I have a lot of strange things happening out here. (goes into
detail). Talks about the otters and other wildlife. I would be happy to meet with them. Motion to
continue to May 17th DB, second JB. So voted.
Other Business:
4 Couch St. This was approved a month ago for an addition. They had to place a deck and stairs
for 2nd means of egress and a minor change but closer to the wetlands. The deck will be on sona
tubes. Just wanted to bring this by the Commission – you have given me the authority to approve
minor changes, but this seemed a bit special for you to approve this second means of egress.
Motion to approve JB, second LF. So voted.
Request for 2 desks. Made a motion to buy new desks for new office. ST signed off on it. All
okay with expenditure.
Access to Snake River by TRWA. JB: there should be some spaces. ST. Would like to see a plan.
DB: Whose property is it? MR: City property. DPW will help with clearing area
Adjourn DB, JR 9:07pm.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
Office: 1298 Cohannet Street
Mailing: 15 Summer Street
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Debra Botellio, Vice Chair AGENDA*REVISED 3/10/21
Joshua Borden
Richard Enos March 15, 2021
Luis Freitas City Hall, 15 Summer Street,
Matthew Haggerty Taunton, MA 02780
Jan Rego 6:00 P.M.
The Conservation Commission meeting will be held via Zoom. To view the meeting you can go to
the City website, click on municipal network, then click live, and then click play.
https://taunton.vod.castus.tv/vod
Abutters: To provide abutter input for the public hearings. Dial 774-406-5261 once the
Conservation Commission asks for public input on the matter you are interested
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES
CONTINUED PUBLIC MEETING:
1. Winthrop Street (Assessor’s Lot 88-115), Dumont Holdings Taunton, LLC, RDA, DSE-1258
-construction of a 2,520 sf wholesale building with a 68,275 sf gravel storage area
PUBLIC MEETING:
1. Crystal Lane Lot 5 (Assessor’s Lot portion of 21-60), Taunton Land Co., LLC, RDA, DSE-1259
-for construction of a SFH
AMENDMENT:
1. 82 Ingell Street, Dorsey/Dorsey Realty, LLC, AMEND, SE73-2322
-to move proposed building closer to the street, revise parking, & compensatory flood storage
EXTENSION:
1. 82 Ingell Street, Dorsey/Dorsey Realty, LLC, EXT, SE73-2322
-three year extension requested
CONTINUED PULIC HEARING:
1. 16 Park Street, Carter/Pathmark Management, NOI, SE73-2892
-for construction of 3 story, 23,000 sf self-storage building with 60 parking spaces
PUBLIC HEARING:
1. Tremont Street (Assessor’s Lot 60-37), Jacques, ANRAD, SE73-2895
-for resource area delineation
2. Crystal Lane Lot 6 (Assessor’s Lot portion of 21-60), Endriunas/Taunton Land Co., LLC, NOI, SE73-2896
-for construction of a SFH
3. Cameron Avenue (Assessor’s Lot 53-68), White, ANRAD, SE73-2897
3/10/2021
-for resource area delineation
4. 2 & 8 Galleria Mall Drive, Wurtsbaugh/Portman Industrial, ANRAD, SE73-2898
-for resource area delineation
5. 66 Foxhill Drive, Marques, NOI, SE73-
-for construction of an addition to existing house & conversion of existing lawn
CONTINUED VIOLATIONS:
1. 41 Godfrey Street
-dumping trash, yard waste & asphalt into stream & wetlands
OTHER BUSINESS:
4 Couch Street revised plan – addition of deck and stairs for 2nd means of egress
Request for 2 desks – Conservation
3/10/2021
Get email alerts for Taunton
A daily email when new agendas and minutes are posted.