Conservation Commission
Regular MeetingTaunton, MA · May 16, 2024
Minutes
Minutes of the Taunton Conservation Commission May 16, 2016
Present: Chair Steven Turner, Vice Chair Neil Kelly, Commissioners Marla Isaac, Ernest Enos, Renwick
Chapman, and Luis Freitas. Commissioner Debra Botellio was absent.
Motion to approve minutes of the April meeting, LF, second MI, so voted.
Continued Certificate of Compliance
1. 700 Joseph Warner Blvd., Saint-Gobain Performance Plastics Corp., (COC), SE73-2558 Field
report states that this project was for the expansion of the parking lot from 56 spaces to 78 and
a stormwater management system in front along Joseph Warner Boulevard to include sediment
forebays, a water quality swale, and an infiltration basin. The siltation barrier is still up and
there is no indication of siltation into the adjacent wetlands. The swales were repaired and
reseeded and are now stable. MR recommends that the TCC issue a COC for this project.
Motion to continue, 6/20/16, NK, second RC, so voted.
2. 155 Duffy Drive, Butterfield, (COC), SE73-2464 Motion to continue to 6/20/16, MI, second LF,
so voted.
Certificate of Compliance
1. 28 General Cobb Street, Browne, (COC), SE73-2542 Field report states that this project was for
the installation of a 24’ diameter above ground pool within the riverfront area of Cobb Brook
but exempt from the Rivers Protection Act as the lot was in existence prior to 1996. All work has
been done in significant compliance to the order of conditions issued on 7/18/13. MR
recommends that the TCC issue a COC for this project. Motion to approve, RC, second NK, so
voted.
Public Meeting
1. County Street, City of Taunton/DPW, (RDA), DSE-1125 Field report states that this filing is for
the proposed replacement of the water main within County Street from Williams Street to
Linden Street and along Mozzone Boulevard to the intersection of County Street. Associated
wetlands were delineated on 3/17/16. MR reviewed the wetland delineations on 5/9/16. The
following areas were flagged: Wetland 1A- flags 1A-1 to 1A-24 and unnamed perennial stream
(running from north to south through a culvert under County Street between houses #197 to
#231 on the south side and between #210 and the Riverway on the north side (flags 1B-1 to 1B-
12). Wetland 2A-1 to 2A-7 across from Mozzone Boulevard at the intersection of County Street.
Both wetland areas are considered palustrine forested wetlands with wetland 2 containing areas
of palustrine scrub-shrub wetland. MR is in agreement with the placement of the flags. This
work is part of a larger water main project that falls outside conservation jurisdiction. Within
jurisdiction, there will be 1,100 linear feet of new 12-inch ductile iron pipes replacing the
existing water main between Linden and Williams Streets. This segment will pass 1 ½ feet under
the existing culvert which constitutes the stream crossing. There will be no impact to the culvert
base or its foundation. A segment of water main along Mozzone Boulevard to County Street will
also be replaced in the same manner. Sediment from the trenching activity will be backfilled
daily at the end of each workday. All trenched areas will be repaved at the end of the
replacement work. Approximately 750 square feet of work will occur within the WPZ on County
Street between Williams Street and Linden Street, while 2,065 square feet of work will occur
within the 100-foot buffer zone. Approximately 1,050 square feet of work will be within the
100-foot Riverfront Area while another 1,050 square feet of work will occur in the outer
Riparian Area. There will be no work within the WPZ at Mozzone Boulevard, but approximately
390 square feet of work will be within the 100-foot buffer zone. These disturbed areas are all
currently existing pavement and will not change the characteristics of the area. This project is
considered an exempt activity under 310 CMR 10.02(2)(a)(2)- “activities conducted to maintain,
repair or replace, but not substantially change or enlarge an existing and lawfully located
structure or facility used in the service of the public and used to provide electric, gas, water,
sewer, telephone, telegraph and other communication services, provided said work utilizes the
best practical measures to avoid or minimize impacts to wetland resource areas outside the
footprint of said structure or facility”. MR recommends that the TCC approve this project and
issue a negative determination (B.2.). MR also recommends that the wetland delineation be
approved for reference purposes only. Please include the attached special conditions. Amanda
present from Tighe & Bond. Motion to issue a negative determination with special conditions1,
2, 3, 5, 6, 14, 18, and 19, RC, second NK, so voted.
Continued Amendment
1. 295 Broadway, Tucan, (Amend), SE73-2358 Karen Patenuade present for the applicant. The did
go through the site plan review and it was said some work was not complete, drainage needs to
be done, clean up the area. The applicant agrees not to start work until drainage is done. MR
must be notified or will issue an enforcement order and issue tickets. Motion to approve with
conditions 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 15, 16, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28-the
infiltration system must be constructed immediately, 29-Conservation agent must be notified
prior to construction of the infiltration system, 30-a signed stamped affidavit from a certified
engineer must be submitted once the underground infiltration system has been built verifying it
meets stormwater standards, RC, second NK, so voted.
Continued Public Hearing
1. Phyllis Road, TLC Development/Tutsch, (NOI), SE73-2646 Field report states that this project is
for the construction of a single family home, driveway, utilities, grading, and a culvert to
continue the link of an intermittent stream with the wetland. On Tuesday, 5/3/16, some of the
commissioners and MR met with the engineer, Brian Dunn, and homeowners to discuss their
concerns about the project and walk the property. The driveway, retaining wall and guardrail
are all within the 25-foot WPZ but do not cause any permanent alterations to the wetland. Mr.
Dunn submitted a revised plan addressing additional changes to address the neighbors’
concerns. The revised plan, dated 5/10/16, now shows a six foot tall stockade fence and 5-6
foot tall arborvitaes along the driveway, then along the tree line in the rear of the proposed
house. This measure will create privacy for the neighbors and new owners and create a screen
for oncoming headlights. The boulder retaining wall in the front of the house was changed to a
block retaining wall. MR recommends that the TCC approve this project and issue an order of
conditions to include the attached special conditions. MR also recommends that the wetland
delineation be approved as enumerated in the previous field report. Brian Dunn present for the
applicant. RC has concerns with Mr. Matteson property. Fence will have room under it? 1 inch,
it TCC wants can do 6 inches. RC would like the gap to be 6 inches at the bottom of the fence.
RC pivot house? Brian can’t deck would be into the setback, now a zoning issue puts house
closer to other abutter. RC not concerned with that, concerned with the wetlands. RC said
pivot house, bring deck to the setback line that’s best for him. Brian said still closer to abutter,
trying to address environmental as well as abutter concerns. RC minimize depth of excavation
by switching water and sewer lines. Brian but still have to build wall so in there anyway. MI
asked to be shown the retaining wall? Drainage? Salt on driveway? All shown, will not use salt.
Abutters spoke: 1. Nelia & Manuel Ellias-Phyllis Rd. they had concerns with snow removal and
where it will be placed. They think they have room for storage in the circle. Who should they
call if there is a problem? There shouldn’t be, plenty of upland storage. They are also upset
because when they bought they were told it was wetlands and there would be no building there
and now this. Brian said no researched at registrar of deeds and it is buildable. RC what type of
fence? Stockade. RC wouldn’t vinyl be less maintenance. Brian depends on how its cared for.
RC prefers vinyl. 2. Kurt Matteson does not want a stockade fence or arborvitaes, would rather
see headlights. 3. Mr. Padelford 80 Duffy Drive, regarding snow plowing, there is no way they
can move that much snow with a regular truck so how will this be done. He also stated that the
site is land locked so how will they gain access currently? Brian Dunn says this is not true. He
says access means frontage and both lots are owned by the same person and they have frontage
so they do have access. It is a buildable lot, subdivision approved this in the 60’s. These are all
zone and planning issues not TCC stated Mr. Dunn. Mr. Padelford asked MR is they could view
her files. She said yes just not really sure where this file would be located. It could have been in
the fire, it could be in her office. Mention was made of fill out there but MR and RC said if done
before the WPA then nothing can be done. Padelford brought forth a plan that states this
particular lot is not buildable. Dunn disagrees say they have an NOI with an order of conditions
so this has no bearing, the agent, zoning, etc all say it is buildable. Going back 30 years has no
bearing on this project and on issue an order of conditions. Brian Dunn requests a month to
look into this. 4. Theresa Young 79 Duffy Drive, concerned with water after the trees are
removed. She already has water in the basement with sump pumps running. Brian said the
grading pitched away from her property. Yes less trees do take up less water. 5. 75 Duffy Drive,
water constantly in the basement. This will increase with this house going in, it is too much
work for him. TLC will relocate the sheds that are over property line. ST does understand the
abutters issues. Brian said the house being built is higher for this reason. DB sent a letter that
was read into the record. Stated that sand would be used not salt. Brian asked that this be
closed and approved and there will be a $50,000 insurance bond. Sayack present with Dunn
said they have done what abutters asked, done all they can for TCC, let’s move forward. Motion
to continue to June 20, 2016, LF, second NK, so voted.
Public Hearing
1. Pinehurst Street (Lot 1B), Couto/Pinehurst Properties Development, LLC, (NOI), SE73-2656
Field report states that this filing is for the proposed construction of a single family home with
10’ x 12’ deck, attached garage, driveway, utilities, and associated grading within the 100 foot
buffer of a BVW. Flags FLA1 through FLA16 were approved under DEP file SE73-2620. Flags
ESC17 to ESC34 were delineated by Earth Services Corp. on 12/4/15. MR walked the line and
agrees with the placement of the flags. A siltation barrier is depicted at least 25 feet from the
wetland. *At flag 14, the WPZ line is at 24 feet rather than 25 feet while the siltation barrier is
at 25 feet. Grading falls within 26 feet of the wetland. Grading meets the proposed grade at
the adjacent lot (Lot 4, 91-285) and is level with the street surface. The grading shows
descending slopes to the right of the house that lead to the wetland while the grading in front
slopes to the front of the garage and then off to the left of the house. MR was concerned that
this could lead to stormwater collecting at the front of the garage entrance, but after discussing
it with the engineer it seems that it will go off to the left of the house without collecting. The
grades match the grades of Lot 4 so that stormwater flows to the wetland and not the house.
The plan shows that the dewatering area and concrete washout area are outside the buffer
zone. Roof runoff connects to drywells. The work as proposed should not negatively affect the
wetland or adjacent properties. MR recommends that the TCC approve this project and issue an
order of conditions to include the attached special conditions. MR also recommends that the
wetland line not previously reviewed be approved as follows: flags ESC17-ESC21, ESC29-ESC34,
and for reference purposes only, flags ESC18-ESC28. Present Karen Patenaude and Chris Coute.
Motion to approve with conditions 1, 2, 3, 4, 5, 8, 9, 17, 19, 21, 24, 25, 26, and 27, RC, second
NK, so voted.
2. N. Walker Street (Lot 4C), Lima, (NOI), SE73-2651 Field report states that this is one of two lots
created under Form J plan and approved under Zoning and Planning. Lot 4C is for a 28’ x 42’
house with 24’ attached garage, 12’ x 14’ deck, septic system, utilities, and grading within the
100 foot buffer zone of a BVW. The wetland delineation was approved and issued an ORAD on
2/24/16. A siltation barrier is depicted on the plan, dated 4/4/16, and is at least 26 feet from
the BVW and is considered the limit of work. The closest disturbance to the wetland will be
grading at 33 feet while the garage will be 60 feet from the edge of the wetland. Grading will
channel stormwater to the rear of the property toward the BVW. Dewatering and concrete
washout areas will be outside the buffer zone in the southwest corner of the property. Drywells
for roof runoff are depicted on the plan. The work as proposed should not negatively impact
the adjacent wetlands or neighboring properties, therefore MR recommends that the TCC
approve this project and issue an order of conditions to include the attached special conditions.
Karen Patenaude present. Motion to approve with conditions 1, 2, 3, 4, 5, 8, 9, 17, 19, 21, 24,
25, 26 and 27, RC, second NK, so voted.
3. N. Walker Street (Lot 4D), Lima, (NOI), SE73-2652 Field report states that this is one of two lots
created under a Form J plan and approved by Zoning and Planning. Lot 4D is for a 28’ x 42’
house with 24’ x 26’ attached garage, 12’ x 14’ deck, septic system, utilities, and grading within
the 100 foot buffer zone of a BVW and an ILSF. The wetland delineation was approved and
issued an ORAD on 2/24/16. A siltation barrier is depicted on the plan, dated 4/4/16, and is at
least 25 feet from the ILSF and is considered the limit of work. The closest disturbance to the
wetland will be grading at 29 feet while the deck will be 41 feet from the BVW and 32 feet from
the ILSF. A retaining wall is proposed along the front right side of the proposed house. The
septic system will be located in the front of the property and 77 feet from the ILSF. Dewatering
and concrete washout areas will be outside the buffer zone in the southwest corner of the
property. Drywells for roof runoff are shown on the plan. The work as proposed should not
negatively impact the adjacent wetlands or neighboring properties, therefore MR recommends
that the TCC approve this project and issue an order of conditions to include the attached
special conditions. Karen Patenaude present. Motion to approve with conditions 1, 2, 3, 4, 5, 8,
17, 19, 21, 24, 25, 26, and 27, RC, second MI, so voted.
4. 233 Scaddings Street, Mason, (NOI), SE73-2653 Field report states that this project is for the
proposed paving of an existing gravel driveway on the left side (north) of the house leading to
an existing garage, and to cut and remove (not stump) 13 trees that are dead or dying and
endangering the Applicant’s child (many large limbs have fallen from these trees). This house
has been in existence since 1955 and is grandfathered from the WPA, TCC Bylaws, and Rivers
Protection Act. The wetland is to the north of the existing gravel drive and at its closest is 33
feet away. The closest tree proposed to be cut is 26 feet from the edge of the wetland. The
applicant will be planting a variety of trees and shrubs to replace the trees that will be removed.
The work as proposed will not negatively impact the adjacent wetland, therefore MR
recommends that the TCC approve the project and issue an order of conditions to include the
attached special conditions. Shannon and Matt Mason present. Briggs Nursery is helping them
with a planting plan. A consultant will come out to house to help with design. They will bring
plan to MR when finished so she can approve. Motion to approve with special conditions 1, 2, 3,
4, 5, 19, 21, 25, and 27, also make sure plan is brought to MR and approved before construction,
RC, second NK, so voted.
5. 80 Rama Street, Anderson-Martin, (NOI), SE73-2655 Board of Health said today to use the
higher which is actually the lower, 40 x 16 instead of 40 x 10. Motion to approve with special
conditions 1, 2, 3, 4, 5, 8, 9, 17, 19, 21, 25, 26, and 27, RC, second MI, so voted.
6. Woodbine Street, Rose-Nixon, (ANRAD), SE73-2654 Present Nick Dufrene engineer and Chris
Coute property buyer. In that triangle area to get the building down, may not go into the
wetland. Already flagged onto another property. MI asked if MR went out? RC no approve as
is then when file NOI, they’ve been warned by MR better find out where line is. Abutter: Juanita
Gallagher 145 Winthrop Street, letter with her that she is in a hazardous waste site. Why would
they build there, do they know the history? Yes but that is not the purpose of this meeting.
Chris said these lots are outside the disposal site. Map by Geosyntec to check the disposal area,
they were hired by the city. The left side of Woodbine Street was checked and tested clean.
Gallagher told by DEP that nothing could be done out there until it was all cleaned up. Coute his
lots are not in the disposal site. Hired Sage Environmental, did 4 wells behind the rink, all came
back clean. RC asked to move along. Motion to move this along, not part of the Anrad, RC,
second LF, so voted. Abutter: Kara Claudio 39 Bellevoir Ave, concerned about water, animals,
and any other endangered species out there. MI said yes there are endangered species out
there. Natural Heritage must be notified MR stated. Motion to approve the ANRAD, RC, second
LF, so voted.
Violations
1. 5 Cape Road. This is the Globe Liquors site. The dumpster is unfenced, trash is on river bank
and in river. Owner/Renter said its always been unfenced, not sure how long it has been that
way, has since he bought it. Board of Health wants it fenced in and locked at all times, and on a
concrete pad moved as far away from the river as possible. It would need to be moved further
away anyway to fit a fence. It’s always unlocked and outsiders have been dumping. RC concrete
pad? MR said it all depends on what Board of Health wants. Also MR said he may need it
dumped more frequently, now its every two weeks. Site is grandfathered from WPA. MR see
what Board of Health requests. May have to file if a concrete pad is needed, owner advised to
check with Board of Health and get back to MR. Motion to dismiss, MR, second LF, so voted.
2. 145 Thrasher Street. Had an animal pen in the wetland. Moved pen from wetland, farm
animals held in pen. They are currently going through zoning. They have goats, pigs, and
chickens. Motion to
Other Business
1. TRWA. May 22, 2016. Motion to approve, NK, second MI, so voted.
2. Use of Boyden. Graduation party 6/11/16. Motion to approve, NK, second MI, so voted.
3. 195 Seekell Street. Cutting trees, hold off still waiting to see who needs to deal with this.
4. Green Pines, 165R Hart Street. Failed to comply with superseding conditions from DEP, did not
notify TCC on commencement of work, silt into wetlands due to poor barrier, rude to city
employees and neighbors. MR told to issue level 3 fines, $50 increasing daily going forward. ST
wants fines started. Motion to start fines, MR will send this out, fines start today, continue this
to 6/20/16, ST, second LF, so voted.
Motion to adjourn, ST, second LF, so voted. Meeting ended at 8:50pm.
Agenda
City of Taunton, Massachusetts
CONSERVATION
COMMISSION
15 Summer Street
Annex Building
Taunton, Massachusetts 02780
Conservation Commissioners
Phone 508-821-1095 Fax 508-821-1665
Steven Turner, Chair
Neil Kelly, Vice Chair
Debra Botellio
Renwick Chapman
Ernest Enos
Luis Freitas
Marla Isaac
AGENDA
May 16, 2016
Maxham School, 141 Oak Street, Taunton, MA 02780
6:30 P.M.
NOTE: FULL TEXT OF ALL PUBLIC NOTICES FOR ALL MEETINGS AND HEARINGS ARE
AVAILABLE FOR PUBLIC REVIEW.
APPROVAL OF MINUTES - 3/28/16 & 4/11/16
CONTINUED CERTIFICATE OF COMPLIANCE:
1. 700 Joseph Warner Blvd., Saint-Gobain Performance Plastics Corp., (COC), SE73-2558
2. 155 Duffy Drive, Butterfield, (COC), SE73-2464
CERTIFICATE OF COMPLIANCE:
1. 28 General Cobb Street, Browne, (COC), SE73-2542
PUBLIC MEETING:
1. County Street, City of Taunton/DPW, (RDA), DSE-1125
CONTINUED AMENDMENT:
1. 295 Broadway, Tucan, (Amend), SE73-2358
CONTINUED PUBLIC HEARING:
1. Phyllis Road, TLC Development/Tutsch, (NOI), SE73-2646
PUBLIC HEARING:
1. Pinehurst Street (Lot 1B), Couto/Pinehurst Properties Development, LLC, (NOI), SE73-
2. N. Walker Street (Lot 4C), Lima, (NOI), SE73-2651
3. N. Walker Street (Lot 4D), Lima, (NOI), SE73-2652
4. 233 Scadding Street, Mason, (NOI), SE73-2653
5. 80 Rama Street, Anderson-Martin, (NOI), SE73-2655
6. Woodbine Street, Rose-Nixon, (AnRAD), SE73-2654
VIOLATION:
1. 145 Thrasher Street
2. 5 Cape Road
OTHER BUSINESS:
5/10/2016
Get email alerts for Taunton
A daily email when new agendas and minutes are posted.