TAUNTON PLANNING BOARD MINUTES
Meeting held at 15 Summer Street, City Hall, in the Chester R. Martin Municipal Council
Chambers
*************************************************************************************
DATE: February 1, 2024
BOARD MEMBERS: Anthony Abreau, Chairman George Moniz
John Reardon Kelly Dooner
Manuel Spencer, Clerk Brian Carr
Dennis Ackerman, Vice Chairman
ADVISORS: Kevin Scanlon, City Planner
Michael Patneaude, City Engineer
__________________________________________________________________________
Roll Call: Dooner, Reardon, Abreau, Ackerman, Moniz. Meeting opens at 5:30 PM City Engineer Mike
Patneaude also present.
Kelly made motion to approve minutes of January 4, 2024 and amended minutes of 12-7-23, seconded
by Dennis. All in favor.
Gracey Estates – Request to release lots 3, 4, 5, 6, 7, 9, 10, and 13 - holding 0 surety
John Garanito and Jeff Tallman were invited into the enclosure. Dept. comments were read from City
Planner, City Engineer and outside consultant Greenman-Pedersen Inc. John stated he’s here tonight for
release of some lots but the outside consultant brought up some issues relative the paving. John states they
used reclaimed asphalt which must be approved by the P.B His contractor placed 3 inches of reclaimed
pavement borrow in lieu of the processed gravel noted on the approved subdivision plans. The outside
consultant informed the developer and contractor they needed to get planning board approval prior to use.
GPI received the gradation test results on 12-27-23 a week after the roadways were approved. W.W. Cole
Eng. Inc. obtained the material sample on the day of paving. It’s unknown if the sample was taken from the
bottom 9” of processed gravel or the top 3” of reclaimed pavement borrow. SW Cole did not provide
specifications in their report of Gradation that might indicated which layer of material the sample was taken.
The same did not pass and now GPI is recommending 5 cores be obtained in the existing paved areas. John
states his contractor has used this many times and it is been fine. Jeff states he would suggest releasing lots
and seeing how the road holds up and if needed they will fix it before road acceptance. John is confident the
road is built in a quality manner. They have 14 lots so they will be constructing houses for a few years and
after all that with the construction trucks driving over roadway they will see how it holds up. Chairman
Abreau stated he personally thinks they jumped too quick with the paving in the winter. They were told not to
pave and they went ahead and did it. He is not comfortable releasing any lots until we know the roadway is
acceptable to protect the City. He stated there was another subdivision who did same thing and they had to
rip road up. Dennis stated he would follow the City Engineer’s recommendation. Mike stated the outside
consultant is the one who oversee this per the planning board approval. He recommends following the
outside consultant’s recommendation. George stated he’s familiar with the reclaimed pavement and he
thinks it will be alright and he has no problem releasing lots tonight. He states its standard in construction.
John stated he remembers Bella Rose and they had to do testing. He also agrees with Tony in continuing to
March meeting. John stated he will do whatever the Board wants.
Dennis made motion to continue the request for lot release to next month and follow the outside
consultant recommendation and do the core testing, seconded by George. All in favor.
Massasoit Estates - Map 11,Lot 112- Request to change of community type septic system to municipal
sewer – Need to determine if minor or major change
Brian Dunn, MBL Land Development & Permitting was invited into the enclosure. Brian stated he
submitted a letter on behalf of Steven Figueiredo for Massasoit Estates with regard to the change in sewer
They have been approved to bring sewer down Middleboro Avenue so they want to change the subdivision to
municipal sewer. They are also requesting to remove the easement requirements. They will be starting the
sewer in the spring. Dennis is aware the developer has a signed agreement for sewer with City and in his
opinion this is a major change. The public has a right to know of the change and how it’s designed.
Chairman Abreau agrees it’s a major change and the abutters need to know. City Engineer agrees it’s a
major change and he points out there will be new plans that need to be recorded.
John made motion to find the change is a major change which requires a public hearing, seconded by
Kelly. All in favor.
Public Meeting - Site Plan Review – 12 Porter St. (prop. ID 65-208, 65-209, 65-219, 65-220, 65-221)
for the construction of a residential brownfield development with 5 multifamily buildings with a total
of 28 units, with 2 of the existing buildings to be restored, submitted by 12 Porter Street Development,
LLC
PB member George Moniz recused, left meeting at 5:56 PM .Atty. Edmund Brennan, David Clymens, owner, and
Greg Driscoll, P.E and Amanda Langer, Site Designer, II from JDE Civil Engineers were invited into the enclosure.
Atty. Brennan states the project received ZBA approval for variances for setbacks. They received SP from Council
for multifamily use. This is the old Rhodes Factory and an extensive brownfields cleanup site. They are proposing 28
residential units Greg states this is a brownfield redevelopment site and will have 5 buildings (3 new and 2 existing
building be refurbished) No wetland and or resource area. They have a complete 21D sign off from DEP. They will
have 2 driveways from Porter St and there is plenty room for fire truck. They have 56 parking spaces, an enclosed
dumpster, and future play area. They meet all the parking requirements. They have 3 snow storage areas. Greg
explained the drainage. Currently there is no drainage so this will be an improvement. The site will be serviced by
municipal sewer and water. They will provide landscaping, lawn areas, trees and shrubs. They do have fire truck
access based on a Taunton fire truck. Atty. Brennan stated this site has been a very blighted site and they have
cleaned up the site and will actually have showcase of artifacts. They have the neighborhood support. Dennis is well
aware of the site and asked about the smoke stack? They have 2 and will be keeping one smoke stack. He asked
what protection do you have for the railroad tracks? Greg answered there will be a 7 foot fence around the entire
property as well as an existing brick wall. Dennis asked if they addressed all the concerns in the City Engineer’s
letter and it was answered yes. John asked if they will have a display case for artifacts? They are going to have a
placque on building per the Historic District Commission. They will have them displayed on the property. It was
about how high is the existing brick wall and Amanda answers 8 feet and they will putting up a fence not to exceed 7
feet tall. John asked how big is he dumpster bag? It was answered 10 x10. John asked about recycling bins and they
have not considered that yet. John asked about the sewer line and they will look into the calculation. City Engineer
stated this was brought up at the DIRB and they will work with OECD to researching if any grants are available.
Chairman Abreau asked about the water runoff and it was stated the stormwater will be reduced and they will have
underground infiltration. Chairman Abreau asked about the soils and it was answered some spots are not too great.
Chairman Abreau asked about what they found in the clean up? PCP pipes, lead, asbestos, oil tanks, but they have a
clean bill of health from LSP. Public Input: No one opposed or in favor.
John made motion, seconded by Kelly to approve the SPR with all Dept. comments:
Condition #1) That the plans dated January 8, 2024 shall govern with the following additional conditions;
Condition #2) Lighting shall not illuminate any portion of abutting properties
Condition #3) The site shall be kept clean and clear of debris
Condition #4) Two sets of as-builts shall be submitted upon occupancy for all work on site and shall include
design engineer and land surveyor certification notes stating the development has been built according to the
approved plans. Plans will show all construction of buildings, utilities, grades, setbacks etc
Condition #5) Two sets of updated plans shall be provided that conforms to this decision prior to Building
permit
Condition #6) Compliance with the Municipal Council Special Permit dated December 5, 2023 is required
Condition #7) Addresses shall be established for all units prior to any building permits
Condition #8) Any central mail delivery shall be provided in building #1
Condition #9) That the proposed lots shall be combined via an 81X plan prior to any building permits
being issued
Condition #10) Show all doors and garage doors on the plans
Condition #11) That compliance with ZBA Case # 3741 is required
Condition #12) All sidewalks shall be ADA/ AAB compliant
Condition #13) The sound attenuation fence and the new sections of brick wall shall not exceed seven
feet unless a variance is obtained
Condition #14) The dumpster shall be located on a concrete pad, be enclosed with a 6 foot enclosure,
shall be kept closed at all times and be emptied regularly
Condition #15) A 4 inch fire line and a 2inch domestic water service line from the existing 12 inch city
water main is required unless DPW alters this requirement
Condition #16) The structures located at 12 Porter Street are of historical significant and will need
Historic District approval prior to construction.
Notes
Note 1) DPW permits are required including city licensed contractor, road opening and trench
permits. Plans shall be submitted to DPW for water services, fire service line, gate valves and curb
stops
Note 2) DPW specifications shall apply including backflow devices, pressure testing, materials,
installation, a new water meter with an updated radio frequency unit, inspection and approval and
prior notice is required before any city water work is to be performed and inspections are required
prior to backfilling
Note #3) The petitioner shall refer to the October 22, 2023 letter from the ADA Commission regarding
ADA/ AAB compliance
Vote: 4 in Favor
Anthony Abreau YES
Dennis Ackerman YES
John Reardon YES
Kelly Dooner YES
Manuel Spencer, Jr. absent
Brian Carr absent
George Moniz recused
Documents used as part of meeting were: comments from DIRB, City Engineer, Commission for
Individuals with Disabilities, Historic District Commission, Water Dept. and plans by JDE Civil Engineers,
Meeting adjourned at 6:19 PM