Special City Council Meeting and Workshop
Special MeetingTerrell, TX · March 2, 2021
Agenda
AGENDA
Special City Council Meeting and
Workshop
5:00 PM - Tuesday, March 2, 2021
City Council Chambers, 201 E. Nash Street, Terrell, TX
Mayor Rick Carmona
Council Members
District 2 - Grady Simpson
District 3 - Mayrani Velazquez
District 4 - Charles Whitaker
District 5 - Tim Royse
City Manager Mike Sims
NOTICE IS HEREBY GIVEN that the Terrell City Council will conduct a Special City Council
Meeting and Workshop at 5:00 p.m. on Tuesday, March 2, 2021, at Terrell City Hall located at
201 East Nash Street. The meeting is open to the public with limited seating in the Council
Chambers. Recommendations of the CDC regarding social distancing will be practiced during
the course of the public meeting to slow the spread of the Coronavirus (COVID-19).
If you choose not to attend in person and you wish to submit public comments, email
support@cityofterrell.org and title the email ”Public Comment”. All public comments submitted
by 12:00 pm on Tuesday, March 2, 2021 will be provided to the City Council members and
read into the record for the Tuesday, March 2, 2021 City Council Meeting.
Page
1. CALL TO ORDER
2. INVOCATION
3. PLEDGE TO AMERICAN FLAG AND TEXAS FLAG.
4. MAYOR AND COUNCIL COMMUNITY RECOGNITION AND EVENTS
5. HEAR REMARKS FROM VISITORS.
Page 1 of 41
This time is set aside on the agenda to invite any person to address the
Council on issues not subject to a public hearing. Routine administrative
matters are best discussed with the appropriate City Staff before
bringing them to the Council. Prior to the meeting, please complete a
"Citizen Participation Form" and present it to the City Secretary. In
accordance with the Texas Open Meetings Act, Section 551.042, the
City Council cannot discuss, consider, or take action on matters not
listed on the agenda. Speakers should limit their comments to 3
minutes and are asked to speak into the microphone provided,
identifying themselves for the record. The total amount of time set aside
for this place on the agenda is 15 minutes. Comments of a personal
nature directed at the Council or Staff are inappropriate.
6. DISCUSSION ITEMS
6.1. Discuss Engineering/Utilities Department Strategic Plan. 3 - 41
Engineering-Utilities presentation
7. ADJOURN INTO EXECUTIVE SESSION IN ACCORDANCE WITH
SECTION 551 OF THE TEXAS GOVERNMENT CODE TO DISCUSS
THE FOLLOWING:
Section 551.071 Consultation With Attorney Regarding Pending or
Contemplated Litigation.
Section 551.072 Deliberations Regarding Real Property.
8. ADJOURN.
I, the undersigned authority, do hereby certify that the above NOTICE OF MEETING of the
Governing Body of the City of Terrell is a true and correct copy of said NOTICE, which has
been posted on the front OUTDOOR BULLETIN BOARD CABINET FOR AGENDAS of the
Terrell City Hall, Terrell, Texas, a place convenient and readily accessible to the General
Public and on the website at cityofterrell.org, and which has been continuously posted for a
period of seventy-two (72) hours prior to the date and time said meeting was convened.
Posted Friday, February 26, 2021 –5:00 p.m.
_______________________________________
Dawn Steil, City Secretary
This facility is wheelchair accessible and accessible parking spaces are available. Requests for accommodations
or interpretive services must be made 48 hours prior to this meeting. Please contact the City Secretary’s office at
972-551-6600 for further information. Braille is not available.
Council Reserves the Right to Adjourn into Executive Session to Seek Legal Counsel on a Matter Which the
Canon of Legal Ethics Demands to Preserve the Attorney-Client Privilege Pursuant to Section 551.071(2) of the
Texas Government Code.
Page 2 of 41
ITEM 6.1.
ENGINEERING /
UTILITIES
1
Strategic Plan – FY22, 23, 24
Page 3 of 41
2/24/2021
SUMMARY OF PROJECTS ITEM 6.1.
PROJECT LOCATION AMOUNT
12-02 Pass-Through Toll Projects $34,700,000
13-01 CDBG Grant - Bachelor Creek $800,000
13-02 Impact Fees/CIP Report 2014 $125,000
13-03 Water Conservation/ Drought Plan 2014 $75,000
14-02 Airport T Hanger Improvements $1,000,000
14-04 Utility Improvements, Pay As You Go, Phase 4 $1,500,000
14-06 Airport Utility Improvements $250,000
14-07A STEP Grant - Hwy 34 Lighting Improvements $800,000
14-07B STEP Grant - West Grove Sidewalk, Drainage $400,000
15-02 WW Sys Prioritization Study Phase 2 $185,000
15-03, 15-04 Utility Improvements, Pay As You Go, Phase 5 $500,000
15-05 Wayfinding Signs $25,000
16-02 Kings Creek WWTP 2016 Improvements $430,000
16-03 Monument Signs $150,000
16-04 Ninth St. EST Removal $150,000
16-05 Lakes MHMR Drainage/Pavement Improvements $700,000
Page 4 of 41
16-06 Alley S. Medora/S. Rockwall Water/WW Mains $475,000
16-07 W. Moore at Chamber Water/WW Mains $650,000
16-10 Water & WW Point Repairs $320,000 2/24/2021 2
SUMMARY OF PROJECTS ITEM 6.1.
PROJECT LOCATION AMOUNT
New Police Facility $12,500,000
16-12 Water/Sewer Repairs at Various Locations $310,000
16-13 Drainage Improvements - E. Moore / Rochester & 34 $175,000
17-04 Ninth @ Musser Drainage Project $350,000
17-06 CR 305 Alignment Plan and Floodplain Study $135,000
17-11 Town North Sidewalk Improvements $80,000
18-03 FM 148 12 Inch Water Main Replacement $145,000
18-04 Griffith Avenue Improvements $5,500,000
18-05 2017 Drainage Masterplan $550,000
18-07 Kings Creek WWTP Phase 1 Design $343,250
19-03 Rosehill Road Improvements $1,100,000
19-08 Impact Fee Update 2018 $65,000
19-10 WWTP Phase 1 Construction $4,436,000
19-05 Airport Runway Improvements $2,200,000
19-17 Skyline Drive Drainage Improvements $230,000
19-14 Kings Creek WWTP Phase 2 Design $1,400,000
Page 5 of 41
19-13 N Alley Water / Sewer Design $210,000
19-12 Hwy 80/205 Utility Relocations Design $240,000
2/24/2021 3
Total Cost Since 2002 = $118,431,530
ITEM 6.1.
TWDB PROJECTS – LOAN STATUS
Resolution 882, approved by Council in February
2018
⮚ $24.55 M for Wastewater Projects
⮚ $7.385 M for Water Projects
⮚ Total = $31,935,000
Page 6 of 41
2/24/2021 4
ITEM 6.1.
TWDB PROJECTS – TOTAL AUTHORIZED
Wastewater Water
WWTP, Phase 1 $ 3,750,000
WWTP Phase $15,000,000 Poetry Elevated Tank $4,000,000
North Alley $ 790,000 North Alley $ 790,000
South Alley $ 950,000 South Alley $ 950,000
Utility Relo Hwy 80/205 $ 230,000 Utility Relo 80/205 $1,645,000
Market Center LS $ 1,830,000
Main Replacements $ 2,000,000
TOTALS $24,550,000 $7,385,000
Page 7 of 41
2/24/2021 5
ITEM 6.1.
TWDB OVERALL STATUS
LOAN UNDER
AMOUNT CONTRACT SPENT
▪ CWSRF 2019 $5,275,000 $4,962,500 $3,700,000
▪ CWSRF 2020 $6,000,000 $3,300,000 $2,500,000
▪ DWSRF 2019 $1,700,000 $ 192,500 $ 140,000
$12,975,000 $8,455,000 $6,340,000
ADDITIONAL LOANS FY21 ESTIMATED AT $4 MILLION
Page 8 of 41
2/24/2021 6
ITEM 6.1.
CURRENT UCR
▪ AMI Project $200,000
▪ CDBG Grant Administration $ 40,000
▪ CDBG Project Design $115,000
▪ Boone Street Water / Sewer $ 50,000
▪ Pay As You Go $215,000
▪ Development Partnerships $345,000
▪ WWTP Phase 1 Inspections $ 25,000
▪ June Harrisse Water Design $211,000
Page 9 of 41
2/24/2021 7
ITEM 6.1.
CURRENT UCR (CONTINUED)
▪ Bachelor Creek (Hwy 80 Utility) $250,000
▪ CR305 Terrell RV Park Sewer $200,000
▪ N. Frances ROW Acquisition $100,000
▪ Paving Repairs (xfer to CIP) $100,000
▪ Maintain Retail Water Mains $254,000
Total = $2,105,000
Page 10 of 41
2/24/2021 8
ITEM 6.1.
CURRENT UCR (CONTINUED)
▪ Pay As You Go
▪ Boone Street
▪ Washington Street
▪ Sixth Street
▪ Retail Water Mains
▪ Boone Street
▪ Washington Street
▪ 1801 N Frances
▪ E. Moore - Design of 10” Water
Page 11 of 41
2/24/2021 9
ITEM 6.1.
ADDITIONAL PROJECTS
▪ Elmo Dam Rehabilitation - $15 Million Construction Cost
Estimate
▪ Temple Street Paving Improvements
▪ N Blanche Street
▪ Stormwater/Sanitary Sewer Alignment Study
▪ Paving, Drainage
▪ Stormwater –
▪ Colquitt at Lovers Drainage
▪ Colquitt at Bachelor Creek Drainage
▪ Drainage – Ninth to Grace
Page 12 of 41
2/24/2021 10
ITEM 6.1.
ADDITIONAL FUNDING NEEDS
▪ WWTP Phase 2 $4,000,000 FY22
▪ Highway 205 Utility Relocations
▪ Bachelor Creek Sewer $3,500,000 FY22-23
▪ 20” Water Main $ 750,000 FY22-23
▪ 16” Water Main Along Hwy 205 $ 800,000 FY23
▪ June-Harrisse Water Main $1,200,000 FY22
▪ E. Moore 10” Water Main $1,200,000 FY22
▪ Westside Pump Station Upgrade $4,000,000 FY22
Page 13 of 41
2/24/2021 11
ITEM 6.1.
GRANT PROJECTS
▪ Awarded Project
▪ CDBG 2019 - $500,000. Notified November 2020. Award
design March 2021. Sewer main in N. Blanche, High Street
and N. Delphine
▪ Grant Applications:
▪ GLO CDBG-MIT Grant – Drainage Projects - $7,000,000
▪ Submitted October 2020
▪ TDA, CDBG Grant - Water Project, Highway 205 - $350,000
▪ Submission by April 2021
Page 14 of 41
2/24/2021 12
ITEM 6.1.
CURRENT DEVELOPMENTS
▪ Camden Homes (N. Frances)
▪ Woodlands (Rosehill Road / Windsor)
▪ Venture Apartments
▪ Crossroads –
▪ GM Dealerships
▪ Outparcels
▪ Pad Sites
▪ La Quinta Hotel
Page 15 of 41
2/24/2021 13
FUTURE OR POTENTIAL DEVELOPMENTS / ITEM 6.1.
SERVICE AREAS
▪ Downtown Square – Utilities, Drainage, Street
Improvements
▪ Terrell Assisted Living - Creekside
▪ Venture Apartments Phase 2
▪ Builders First Source Expansion
▪ Greater Texas Land Resources (1132 Acres) South of IH-20
▪ Lawrence WSC (partial)
▪ Rosehill SUD (partial)
▪ Brushy Creek Corridor
Page 16 of 41
2/24/2021 14
ITEM 6.1.
UPCOMING STUDIES
▪ Complete Streets
▪ Highway 80 (Moore Avenue) – Bowser to Dellis
▪ Adelaide Street – E. High to Rochester
▪ South Alley
▪ Rochester – SH 34 to S. Frances Street
▪ Quiet Zones – UPRR, 16 Crossings
Page 17 of 41
2/24/2021 15
ITEM 6.1.
SCHEDULE OF KEY PROJECTS
Mar 21 Sep 21 Mar 22 Sep 22 Mar 23 Sep 23 Mar 24 Sep 24
Market Center LS
Utility Relo Hwy 80/205
N. Alley
S. Alley
WWTP Phase 2
Highway 205 Utility Relo
June-Harrisse Water Main
Poetry Elevated Storage Tank
AMI Project
CDBG - Blanche / Delphine
Sewer
Temple Street Paving
Brushy Creek Study
Downtown Square Study
Page 18 of 41
Quiet Zone Study
Complete Streets Evaluation
2/24/2021 16
Construction Design Study
ITEM 6.1.
STORMWATER FUND
Revenue
$1,400,000
$1,200,000
10-1-20 = $6.65
$1,000,000
10-1-18 = $5.65
$800,000
10-1-15 = $3.75
$600,000
$400,000
10-1-11 = $1.00
$200,000
Page 19 of 41
$0
FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21
2/24/2021 17
ITEM 6.1.
SUMMARY OF PROJECTS COMPLETED
▪ Since inception, approximately $2,800,000 spent on
drainage improvement projects
▪ Approximately $1,250,000 on 20 “small projects”
▪ Annual Maintenance by Public Service Department
▪ Additional work the last few years:
▪ Completed Drainage Masterplan $550,000
▪ Various Flood Studies/Consultants $ 50,000
Page 20 of 41
2/24/2021 18
ITEM 6.1.
FY21 STORMWATER PROJECTS
Project Budget
▪ Colquitt @ Lovers $ 75,000
▪ Colquitt @ Bachelor Creek $ 75,000
▪ 9th to Grace (Evaluation) $ 75,000
▪ Boone @ West End $ 75,000
Total = $300,000
Page 21 of 41
2/24/2021 19
ITEM 6.1.
• SP28 Colquitt and Lovers
Page 22 of 41
1 20
ITEM 6.1.
21
2/24/2021
Page 23 of 41
Ninth to Grace Drainage Study ITEM 6.1.
Page 24 of 41
22
ITEM 6.1.
23
Airport Capital
Page 25 of 41
ITEM 6.1.
Planned Projects
Project Budget TxDOT City
Masterplan, Business Plan,
Zoning Ordinance $ 400,000 $ 320,000 $ 80,000
Development Partnerships $1,900,000 $ 900,000 $1,000,000
Hangar and Aprons $3,000,000 $1,125,000 $1,875,000
Page 26 of 41
24
ITEM 6.1.
Planned Projects (Cont)
Project Budget TxDOT City
Lighting, Fencing, Weather
Station Improvements $3,175,000 $2,857,500 $ 317,500
New Fuel Farm $ 500,000 $ 0 $ 500,000
Drainage Improvements $ 575,000 $297,000 $ 245,000
Totals = $9,550,000 $5,499,500 $4,017,500
Page 27 of 41
25
ITEM 6.1.
26
2/24/2021
EQUIPMENT
Page 28 of 41
ITEM 6.1.
UTILITY DEPARTMENT - EQUIPMENT
▪ Replace Dump Trucks (Coordinate with Streets)
▪ Replace Backhoe
▪ Replace Skid Steer Loader
▪ Shoring Equipment
▪ Vac Trailer
▪ Main Line TV Camera
▪ Compactor (Backhoe Attachment)
▪ Add “Low-boy” Trailers for Backhoe Hauling
Page 29 of 41
2/24/2021 27
ITEM 6.1.
SOFTWARE CONSIDERATIONS
Page 30 of 41
2/24/2021 28
ITEM 6.1.
UPGRADES
▪ Billing Software
▪ After AMI system upgrade complete in FY22
▪ Coordinate with financial software upgrade
▪ Work Management Software – review benefits of using
one City-wide software
▪ Direct link to Municipal Development Permits
▪ Utility and Public Services Work Order / Citizen
Requests
▪ Document preservation – Scan plans, specs, records
▪ ESRI / Map Accessibility
Page 31 of 41
2/24/2021 29
ITEM 6.1.
30
2/24/2021
BUDGET
Page 32 of 41
ITEM 6.1.
KEY BUDGET CONSIDERATIONS
▪ Salary Increases Competitive with the Market (Compensation
Plan)
▪ NTMWD Treated Water Costs and Contract Restructure
▪ Debt Service Impacts
▪ System Growth / Increase in Customers
▪ Maintain Cash Expenses (UCR, O&M Accounts)
▪ Continue to review Indirect Costs
▪ Review other revenue sources (TIF, Grants)
▪ Increase Reserves
Page 33 of 41
2/24/2021 31
ITEM 6.1.
LIKELY RATE INCREASES
▪ Water
▪ Average 5% to 6% over the next 3 years
▪ Sewer
▪ Average 4% to 6% over the next 3 years
Page 34 of 41
2/24/2021 32
ITEM 6.1.
33
2/24/2021
PERSONNEL
Page 35 of 41
ITEM 6.1.
ANTICIPATED RETIREMENTS
▪ City Engineer Summer 2023
▪ Assistant City Engineer March 2024
Page 36 of 41
2/24/2021 34
ENGINEERING /
ITEM 6.1.
UTILITIES
ORG CHART CITY
ENIGINEER
STEVE
ROGERS
UTILITY
ASSISTANT CITY BILLING Project Project Admiistative
ENGINEEER GIS Analyst
SUPERIVSOR Manager Manager Assistant
RHONDA Kris Walker
MIKE MIKEKSA Mike Shook Tony Stark Christy Norris
THOMPSON
Water/WW WWTP Utility Billing
Superintendent Chief Operator Clerk
Dick Boyd Gil Acuna Minnie McElroy
Utility Billing
Water Quality Distribution WW Collection Pretreatment
Clerk
Crew Leader Crew Leader Crew Leader Coordinator
Dustin Starr Jeff Foster Xavier Willaims Roxanna Dela-
Vacant
Cruz
Equipment Equipment
Plant Operator Plant Operator
Operator Operator
Tommie Johnny
Richard Shawn
Tidmore Anderson
Jackson Reitenbach
Maintenance Maintenance
Plant Operator Plant Operator
Worker Worker
Garry Burden Caleb Loden
Connie Green Henry Rattler
Maintenance Maintenance
Plant Operator Worker Worker Plant Opeator
Vacant Shuan Chante Albert Elliott
Retirements within 3 years
Rutkowski Hedgeman
Maintenance
Maintenance
Retirements within 5 years
Plant Operator Worker Plant Operator
Worker
Jeff Lewis Terrace Jonathan Reed
Walter Moss
Hawkins
Page 37 of 41
Customer
Service / Meter
24/7 Response –
Reader
Linus Clark Water/Sewer
2/24/2021 35
ITEM 6.1.
RECOMMENDATIONS
▪ FY22: Initiate a Succession Plan for Transitioning
City Engineer Position
▪ FY22: Evaluate Succession Plan for Transitioning
Assistant City Engineer Position
▪ Review other likely retirements and determine
succession plan for critical positions or
Departments for operational continuity
Page 38 of 41
2/24/2021 36
ITEM 6.1.
ENGINEERING DEPARTMENT GOALS
# Goal Status
3.1.1 Continue implementation of ESRI software to Water System
make online mapping available completed; others On-
going
3.1.2 Continue efforts to GPS system inventory and On-going
update accuracy of maps
3.1.3 Initiate digital scanning of plans and records Pending
3.1.4 Develop and implement succession plan City Pending
Engineer position
3.1.5 Continue to progress all TWDB and other On-going
projects
Page 39 of 41
3.1.6 Initiate construction on New Terrell City Lake Pending
Dam project
2/24/2021 37
ITEM 6.1.
UTILITY DEPARTMENT GOALS
# Goal Status
3.2.1 Develop succession plan for vacancies Under review
created by retirement
3.2.2 Provide licensing training and training to On-going
develop for new employees
3.2.3 Complete transition to an Automated Contract award pending;
Meter Infrastructure (AMI) system and begin installation FY21
replace all meters and complete by
summer of 2022
3.2.4 Continue efforts in root control of priority On-going
mains to reduce blockages and backups
to customers
3.2.5 Identify avenues to reduce cost of On-going
water/sewer services to customers while
Page 40 of 41
building reserves
3.2.6 Increase capacity of wastewater treatment In Progress
2/24/2021 38
ITEM 6.1.
39
2/24/2021
Discussion
Page 41 of 41