City Council Meeting
Regular MeetingTopeka, KS · November 27, 2012
Agenda
A Capital City Serving You
www.topeka.org
City Council Agenda
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
November 27, 2012
6:00 PM
Mayor: William W. Bunten
Councilmembers
Karen A. Hiller District No. 1 Chad Manspeaker District No. 6
John Alcala District No. 2 Robert E. Archer District No. 7
Sylvia E. Ortiz District No. 3 Andrew P. Gray District No. 8
Denise Everhart District No. 4 Richard Harmon District No. 9
Larry Wolgast District No. 5
City Manager: Jim Colson
Addressing the Council: No person shall address the Council during a Council
Meeting, unless they have notified the City Clerk by 5:00 P.M. on the day of any
Council Meeting of their desire to speak on a specific matter on the published
meeting agenda or during the public comment portion of the Council Meeting.
This limitation shall not apply to items added during the course of a meeting.
The Council does not take action with respect to any subject not on the agenda
unless added to the agenda by a two-thirds vote of the Council
Persons addressing the City Council will be limited to four (4) consecutive minutes of
public address on a particular agenda item. Debate, question/answer dialogue or
discussion between Councilmembers will not be counted towards the four (4) minute
time limitation. The Chair may extend time with the unanimous consent of the Council
or the Council by affirmative vote of five (5) members may extend the four (4) minute
limitation.
Persons will be limited to addressing the City Council one (1) time on a particular
matter unless otherwise allowed by an affirmative vote of five (5) members of the City
Council.
Citizens wishing to offer Public Comment may sign up by phoning the City Clerk’s
office at 368-3940.
To make arrangements for special accommodations please call 785-368-3940. A 48-
hour advance notice is preferred.
The Federal Communications Commission (FCC) has adopted use of the 711 dialing code
for access to Telecommunications Relay Services (TRS). TRS permits persons with a
hearing or speech disability to use the telephone system via a text telephone (TTY) or other
device to call persons with or without such disabilities. To reach the City Clerk’s office using
the TRS, please dial 711.
(Agendas are available on Thursday afternoon in the City Clerk’s office, 215 SE 7th – Room
166 and on the City’s web site at http://www.topeka.org)
Back Print
INVOCATION:
PLEDGE OF ALLEGIANCE:
1. PROCLAMATIONS:
"World AIDS Awareness Day"
2. PRESENTATIONS:
"None scheduled at this time."
3. ROLL CALL:
4. CONSENT AGENDA:
A. MINUTES of the regular meeting of November 20, 2012
B. APPLICATIONS:
5. UNFINISHED BUSINESS:
A. Project Budget and Resolution - Street Improvement Project No. T-601020.02
ATTACHMENTS
A PROJECT BUDGET in the amount of $4,000,000 and A RESOLUTION
introduced by Interim City Manager Daniel R. Stanley, relating to and
authorizing Improvement Project No. T-601020.02, which provides for street
improvements to South Kansas Avenue between 7th Street and 9th Street, as
more specifically described herein, all pursuant to Section A12-1 of the Code of
the City of Topeka. (Council District No. 1)
(This item was deferred from the Council meeting of July 17, 2012. The City Manager
intends to withdraw this item from the agenda as it has changed significantly. The
new project budget and resolution will be considered as item 6A under New
Business.)
6. NEW BUSINESS:
A. Project Budget and Resolution - Street Improvement Project No. T-601020.02 -
New Proposal ATTACHMENTS
A PROJECT BUDGET in the amount of $8,448,032 and A RESOLUTION
introduced by City Manager Jim Colson, relating to and authorizing
Improvement Project No. T-601020.02, which provides for street improvements
to South Kansas Avenue between 6th Street and 10th Street, as more
specifically described herein, all pursuant to Section A12-1 of the Code of the
City of Topeka. (Council District No. 1) (Deferred from the meeting of July 17,
2012.)
(Approval would authorize improvements to the South Kansas Avenue corridor to be
funded by general obligation bonds, half cent retailers' sales tax, utility operating
funds and private sector contributions. The project is included in the City's 2011-2013
Capital Improvement Program.)
B. Applications - Retail Cereal Malt Beverage and Scrap Metal Dealers License
APPROVAL of Retail Cereal Malt Beverage and Scrap Metal Dealers License
Applications.
Voting Requirement: Majority vote of the Governing Body, including the Mayor.
(Pursuant to K.S.A. 41-2702, Retail Cereal Malt Beverage License application must be
approved by the Governing Body prior to the issuance of the license. Pursuant to
TMC 5.170.040 and L. 2011, Ch. 86, Section 2, Scrap Metal Dealer applications have
to be approved by the governing body prior to issuance of registration.)
7. MISCELLANEOUS:
-
8. PRESENTATIONS BY THE CITY MANAGER, MAYOR AND MEMBERS OF
THE COUNCIL:
-
9. PUBLIC COMMENT:
-
10. ADJOURNMENT:
-
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #1
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #2
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
"World AIDS Awareness Day"
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #3
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
"None scheduled at this time."
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #4
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #5
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #6
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #7
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
November 7, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: Randy Speaker/Shawn DOCUMENT #:
P. Bruns
SECOND PARTY/SUBJECT: Street Improvement PROJECT #: T-601020.02
Kansas Ave between
7th and 9th Streets
CATEGORY/SUBCATEGORY 020 Resolutions / 004 Public Improvements
CIP PROJECT: Yes
ACTION OF COUNCIL: 5/15/12 Defer 2 Months JOURNAL #:
7/17/12 Defer 4 Months
PAGE #:
DOCUMENT DESCRIPTION:
A PROJECT BUDGET in the amount of $4,000,000 and A RESOLUTION introduced by Interim City
Manager Daniel R. Stanley, relating to and authorizing Improvement Project No. T-601020.02, which
provides for street improvements to South Kansas Avenue between 7th Street and 9th Street, as
more specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka.
(Council District No. 1)
(This item was deferred from the Council meeting of July 17, 2012. The City Manager intends to withdraw
this item from the agenda as it has changed significantly. The new project budget and resolution will be
considered as item 6A under New Business.)
POLICY ISSUE:
N/A
STAFF RECOMMENDATION:
Approve the Project Budget and Resolution as presented.
BACKGROUND:
This project consists of improvements to South Kansas Avenue between SW 7th Street and SW 9th Street
and will also include utility and median work from SW 4th Street to SW 7th Street and SW 9th Street to SW
11th Street as funds allow. A project budget for $1,000,000 was approved by City Council on July 19, 2011,
for Phase 1 of the project. The Phase 1 budget provided for a conceptual design of the Kansas Item
Avenue#8
improvements from 4th Street to 11th Street and also funds median and utility work from 7th Street to 9th
Street. In addition, $600,000 has been set aside from the 2011 City-Wide Half Cent Sales Tax Program for
milling and overlaying Kansas Avenue from 4th Street to 10th Street.
The project is included in the 2012 CIB and 2013 CIB under the title "Capitol District Project" for $2,000,000
each year.
BUDGETARY IMPACT:
Project Budget: $4,000,000.00
SOURCE OF FUNDING:
General Obligation Bonds or any other lawfully available funds.
ATTACHMENTS:
Debt Service
Resolution
Project Budget
Item #8
Attachment number 1 \nPage 1
PROJECT BUDGET
Project No. T- 601020.02
S. Kansas Avenue Improvements
LOCATION:
S. Kansas Avenue between SW 7th Street and SW 9th Street
DESCRIPTION OF PROJECT:
This project will provide for improvements on S. Kansas Avenue
between SW 7th Street and SW 9th Street and will also include utility
and median work from SW 4th Street to SW 7th Street and SW 9th Street
to SW 11th Street as funds allow.
SOURCE OF FUNDS:
General Obligation Bonds
COST ESTIMATE: G.O. Bonds
Construction: $3,180,000.00
Design: $300,000.00
Construction Inspection & Staking: $300,000.00
Administrative Fees: $35,000.00
Right-of-Way $0.00
Contingency Amount: $50,000.00
Temp. Notes & Cost of Issuance: $135,000.00
Total: $4,000,000.00
11/21/2012
Attachment number 2 \nPage 1
GO Bond Cost of Project
PROJECT: T-601020.02
Interest rate 4.00%
20
Cost of Issuance 2.00%
Temp Note interest 1.500%
Principal $3,864,700
Plus Temp Note Interest $57,971
Plus Cost of Issuance $77,294
Total Project Budget $3,999,965
Annual Debt Service $294,324
Annual Debt Service as Percent of Total 7.4%
Total Debt Service (principal and interest) $5,886,488
Difference Project Cost and Total Debt Servivce $1,886,523
GO Bonded Indebtedness as of December 2011 $160,655,000
Heartland Park STAR Bonds $9,855,000
College Hill TIF $5,605,000
2011 Temporary Notes that Finance Future GO
Bond projects $15,230,000
Total Indebtedness $191,345,000
Plus Project $195,344,965
5/9/2012
Attachment number 3 \nPage 1
1 RESOLUTION NO. ____________
2
3
4 A RESOLUTION introduced by Daniel R. Stanley, Interim City Manager,
5 authorizing Improvement Project No. T-601020.02 which
6 provides for improvements to S. Kansas Avenue, as more
7 specifically described herein, all pursuant to Section A12-1 of
8 the Code of the City of Topeka.
9
10 BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS, that it
11 finds the following described public improvement to be necessary and in the public interest
12 and does hereby authorize, pursuant to Section A12-1 of the Code of the City of Topeka,
13 Improvement Project No. T-601020.02 with a project budget summarized herein and fully
14 set forth on the attachment hereto:
15 A. GENERAL NATURE OF IMPROVEMENT:
16
17 This project will provide for improvements on S. Kansas Avenue between
th th
18 SW 7 and SW 9 Streets and will also include utility and media work from
19 SW 4th Street to SW 7th Street and SW 9th Street to SW 11th Street as funds
20 allow.
21
22 B. ESTIMATED OR PROBABLE COST:
23
24 $4,000,000.00
25
26 C. APPORTIONMENT OF COSTS:
27
28 General Obligation Bonds or any other lawfully available funds
29
30 ADOPTED and APPROVED by the City Council on _________________________.
31 CITY OF TOPEKA, KANSAS
32
33
34
35 ___________________________________
36 William W. Bunten, Mayor
37 ATTEST:
38
39
40
41 ________________________________
42 Brenda Younger, City Clerk
IMPROV.PRJ\T-601020 02 5/9/12
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
November 19, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: Shawn Bruns/Mike DOCUMENT #:
Teply
SECOND PARTY/SUBJECT: South Kansas Avenue PROJECT #: T-601020.02
Improvements
CATEGORY/SUBCATEGORY 020 Resolutions / 004 Public Improvements
CIP PROJECT: Yes
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
A PROJECT BUDGET in the amount of $8,448,032 and A RESOLUTION introduced by City Manager
Jim Colson, relating to and authorizing Improvement Project No. T-601020.02, which provides for
street improvements to South Kansas Avenue between 6th Street and 10th Street, as more
specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka.
(Council District No. 1) (Deferred from the meeting of July 17, 2012.)
(Approval would authorize improvements to the South Kansas Avenue corridor to be funded by general
obligation bonds, half cent retailers' sales tax, utility operating funds and private sector contributions. The
project is included in the City's 2011-2013 Capital Improvement Program.)
POLICY ISSUE:
This project will replace aging public infrastructure and encourage further development in Downtown
Topeka.
STAFF RECOMMENDATION:
Staff is requesting that the Council move to approve the Project Budget and Resolution as presented.
BACKGROUND:
Council has deferred action on Phase 2 of the South Kansas Avenue Improvement Project from their
meetings on May 15, 2012 and on July 17, 2012.
Phase 1 of this project was approved by the City Council in the amount of $1,000,000 on July 19, 2011, to
provide for a conceptual design of improvements to the South Kansas Avenue downtown corridor and#9
Item to
also provide for median and utility work. At this point, $208,000 out of the original $1,000,000 Phase 1
Project Budget has been spent on the conceptual design work.
Approval is requested for a new Phase 2 Project Budget of $8,448,032 to provide for improvements to South
Kansas Avenue between SW 6th Street and SW 10th Street. The proposed improvements for Phase 2 will
include increasing the sidewalk widths to 24 feet on both sides of South Kansas Avenue and reducing the
number of traffic lanes to three lanes. This project will include final design, inspection, utility improvements,
lighting, and removal and replacement as necessary of existing sidewalks, medians, crosswalks, curbs,
gutters, and pavement. Private Sector Contributions will fund enhancements to include pocket parks,
information kiosks, and bronze statues.
Funding of the project is proposed from $3,759,000 of General Obligation Bonds, $1,050,000 of Half Cent
Retailers' Sales Tax Funds, $950,000 Utility Operating Funds, $888,032 from the 2014 CIP and $1,801,000
of Private Sector Contributions.
Construction is expected to start in the 700 and 800 blocks of South Kansas Avenue in 2014 followed by the
600 and 900 blocks in 2015. At the time of construction no vehicular access will be available during the
approximately 4 months. Pedestrian access will be available throughout construction.
BUDGETARY IMPACT:
Project Budget: $8,448,032
The project is included in the City's 2011-2013 Capital Improvement Program for $2,000,000 in both 2012
and 2013 for a total of $4,000,000 to be funded by General Obligation Bonds.
SOURCE OF FUNDING:
$3,759,000 - General Obligation Bonds
$1,050,000 - Half Cent Retailers' Sales Tax
$ 950,000 - Utility Operating Funds
$1,801,000 - Private Sector Contributions
$ 888,032 - 2014 CIP
$8,448,032 - TOTAL
ATTACHMENTS:
Resolution
Project Budget
Debt Service
Information Sheet
Item #9
Attachment number 1 \nPage 1
1 RESOLUTION NO. ____________
2
3 A RESOLUTION introduced by Jim Colson, City Manager, authorizing
4 Improvement Project No. T-601020.02 which provides for
5 improvements to S. Kansas Avenue, as more specifically
6 described herein, all pursuant to Section A12-1 of the Code of
7 the City of Topeka.
8
9 BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS, that it
10 finds the following described public improvement to be necessary and in the public interest
11 and does hereby authorize, pursuant to Section A12-1 of the Code of the City of Topeka,
12 Improvement Project No. T-601020.02 with a project budget summarized herein and fully
13 set forth on the attachment hereto:
14 A. GENERAL NATURE OF IMPROVEMENT:
15
16 This project will provide for improvements on S. Kansas Avenue between
17 SW 6th Street and SW 10th Street to include final design, inspection, utility
18 improvements, lighting, and removal and replacement as necessary of
19 existing sidewalks, medians, crosswalks, curbs, gutters and pavement.
20 Private sector contributions will enhance this downtown corridor by adding
21 amenities to the area.
22
23 B. ESTIMATED OR PROBABLE COST:
24
25 $8,448,032.00
26
27 C. APPORTIONMENT OF COSTS:
28
29 Utility Operating Funds $ 950,000.00
30
31 General Obligation Bonds or
32 any other lawfully available funds $3,759,000.00
33
34 Citywide Half Cent Special Purpose Retailers’ Sales Tax $1,050,000.00
35
36 Private Sector Contributions $1,801,000.00
37
38 2014 CIP $ 888,032.00
39
40 TOTAL: $8,448,032.00
41
42
IMPROV.PRJ\T-601020 02 Revised 11/21/12
Attachment number 1 \nPage 2
43
44 ADOPTED and APPROVED by the City Council on _________________________.
45 CITY OF TOPEKA, KANSAS
46
47
48
49 ___________________________________
50 William W. Bunten, Mayor
51 ATTEST:
52
53
54
55 ________________________________
56 Brenda Younger, City Clerk
IMPROV.PRJ\T-601020 02 Revised 11/21/12
Attachment number 2 \nPage 1
PROJECT BUDGET
Project No. T- 601020.02
S. Kansas Avenue Improvements
LOCATION:
S. Kansas Avenue between SW 6th Street and SW 10th Street
DESCRIPTION OF PROJECT:
This project will provide for improvements on S. Kansas Avenue between SW 6th Street and SW 10th Street to include
final design, inspection, utility improvements, lighting, and removal and replacement
as necessary of existing sidewalks, medians, crosswalks, curbs, gutters and pavement. Private sector contributions will
enhance this downtown corridor by adding amenities to the area.
SOURCE OF FUNDS:
General Obligation Bonds , Half Cent Retailers' Sales Tax, Utility Operating Funds, and Private Sector Contributions.
COST ESTIMATE:
Description of Improvement Estimated Cost Payer Source of Funds
Infrastructure
Water Line Replacement and Fiber Optics Conduit $375,000 COT Utility Operating Funds
Storm Sewer Improvements $575,000 COT Utility Operating Funds
Lighting and Electrical Service $600,000 COT GO Bonds
Sidewalks Improvements (Colored Concrete) $860,000 COT GO Bonds
Existing Brick Sidewalk Refurbishment $60,000 COT GO Bonds
Median Replacement $170,000 COT GO Bonds
Mid-Block Crosswalks $80,000 COT GO Bonds
Intersection Crosswalks $187,000 COT GO Bonds
Cutback Parking Improvements $450,000 COT GO Bonds
Project Traffic Control $200,000 COT GO Bonds
Design, Inspection and Bond Financing Fees $1,152,000 COT GO Bonds
Street Pavement Improvements $825,000 COT 1/2 Cent Sales Tax
Curbs and Gutters Improvements $225,000 COT 1/2 Cent Sales Tax
Total Infrastructure $5,759,000
Private Pedestrian Enhancements
Information Kiosks $60,000 Private
Bronze Topekans $600,000 Private
Bronze Plaques $60,000 Private
Bronze State Animals $56,000 Private
Crosswalk Structures $225,000 Private
Pocket Parks $800,000 Private
Total Pedestrian Enhancement $1,801,000
2014 Pedestrian Enhancements
Guard Hand Rails $13,080 COT 2014 CIP
Park Benches and Seating $52,800 COT 2014 CIP
Curbs and Landscape Curbs $100,036 COT 2014 CIP
Softscape (Mulch, Irrigation, Landscape and Trees) $141,836 COT 2014 CIP
Street and Walk Light Poles $378,720 COT 2014 CIP
Trash/Recycle Bins $42,560 COT 2014 CIP
Planters (Corner) $60,000 COT 2014 CIP
Planters (Center Island) $20,600 COT 2014 CIP
Planters (Walk) $78,400 COT 2014 CIP
Total 2014 Pedestrian Enhancements $888,032
Total Estimated Project Costs $8,448,032
Utility Operating Funds $950,000
GO Bonds $3,759,000
Special 1/2 Cent Sales Tax $1,050,000
2014 CIP $888,032
11/21/2012
Attachment number 3 \nPage 1
GO Bond Cost of Project
PROJECT: T-601020.02
Interest rate 3.50%
Number of Years 20
Cost of Issuance 2.00%
Temp Note interest 1.500%
Principal $3,759,000
Plus Temp Note Interest $56,385
Plus Cost of Issuance $75,180
Total Project Budget $3,890,565
Annual Debt Service $273,744
Annual Debt Service as Percent of Total 7.0%
Total Debt Service (principal and interest) $5,474,887
Difference Project Cost and Total Debt Servivce $1,584,322
GO Bonded Indebtedness as of May 2012 $161,130,000
Heartland Park STAR Bonds $9,855,000
College Hill TIF $5,605,000
2011 Temporary Notes that Finance Future GO
Bond projects $15,230,000
Approved, not Included in GO Bond Issue or
Temporary Notes--City Projects $10,566,448
Approved, not Included in GO Bond Issue or
Temporary Notes--Special Assessment Projects $4,195,923
Total Indebtedness $206,582,371
Plus Project $210,472,936
11/21/2012
Attachment number 4 \nPage 1
INFORMATION SHEET
PROJECT NO. T-601020.02
S. Kansas Avenue – 6th Street to 10th Street
General Nature of Improvement: Phase 2 of this project will provide for improvements on South
Kansas Avenue between SW 6th Street and SW 10th Street to include final design, inspection, utility
improvements, lighting, and removal and replacement as necessary of existing sidewalks, medians,
crosswalks, curbs, gutters, and pavement. Private sector contributions will enhance this downtown
corridor by adding amenities to the area.
Background: Phase 1 of this project was approved by the City Council in the amount of $1,000,000 on
July 19, 2011, to provide for conceptual design of improvements to the South Kansas Avenue downtown
corridor and to also provide for median and utility work. At this point, $208,000 out of the original
$1,000,000 Phase 1 Project Budget has been spent on the conceptual design work.
Approval is requested for a new Phase 2 Project Budget of $8,448,032. Council has previously deferred
action on Phase 2 of the South Kansas Avenue Improvement Project from their meetings on May 15,
2012, and July 17, 2012.
The proposed improvements for Phase 2 will include increasing the sidewalk widths to 24 feet on both
sides of South Kansas Avenue and reducing the number of traffic lanes to three lanes. Private sector
contributions will fund enhancements to include pocket parks, information kiosks, and bronze statues.
Construction is expected to start in the 700 and 800 blocks of South Kansas Avenue in 2014 followed by
the 600 and 900 blocks in 2015. While under construction no vehicular access will be available.
Pedestrian access will be available throughout construction.
CIP Year: The project is included in the City’s 2011 - 2013 Capital Improvement Program for $2,000,000
in both 2012 and 2013 for a total of $4,000,000 to be funded by General Obligation Bonds.
Project Budget: The requested Project Budget is $8,448,032.00
Source of Funding:
$3,759,000 – General Obligation Bonds
$1,050,000 – Half Cent Retailers’ Sales Tax
$1,801,000 – Private Sector Contributions
$ 950,000 – Utility Operating Funds
$ 888,032 – 2014 CIP
$8,448,032 – Total
Council District: 1
Project Administration:
Engineering Division -- Shawn Bruns
Project Schedule:
Design: 2013
Construction: 2014 – 7th Street to 9th Street
2015 – 6th Street to 7th Street and 9th Street to 10th Street
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: Brenda Younger DOCUMENT #:
SECOND PARTY/SUBJECT: Applications PROJECT #:
CATEGORY/SUBCATEGORY 006 Communication / 005 Other
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
APPROVAL of Retail Cereal Malt Beverage and Scrap Metal Dealers License Applications.
Voting Requirement: Majority vote of the Governing Body, including the Mayor.
(Pursuant to K.S.A. 41-2702, Retail Cereal Malt Beverage License application must be approved by the Governing
Body prior to the issuance of the license. Pursuant to TMC 5.170.040 and L. 2011, Ch. 86, Section 2, Scrap Metal
Dealer applications have to be approved by the governing body prior to issuance of registration.)
POLICY ISSUE:
None
STAFF RECOMMENDATION:
Approve the licenses.
BACKGROUND:
Pursuant to K.S.A. 41-2702 as amended, license applications for retail cereal malt beverage must be approved by
the governing body prior to issuance of the license.
BUDGETARY IMPACT:
None
SOURCE OF FUNDING:
N/A
ATTACHMENTS:
No Attachments Available
Item #10
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #11
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #12
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #13
A Capital City Government Working For You
www.topeka.org
Council Action Form
Council Chambers
214 SE 8th Street
Topeka, Kansas 66603
October 16, 2012
Back Print
DATE: November 27, 2012
CONTACT PERSON: DOCUMENT #:
SECOND PARTY/SUBJECT: PROJECT #:
CATEGORY/SUBCATEGORY
CIP PROJECT: No
ACTION OF COUNCIL: JOURNAL #:
PAGE #:
DOCUMENT DESCRIPTION:
POLICY ISSUE:
STAFF RECOMMENDATION:
BACKGROUND:
BUDGETARY IMPACT:
SOURCE OF FUNDING:
ATTACHMENTS:
No Attachments Available
Item #14
Get email alerts for Topeka
A daily email when new agendas and minutes are posted.