City Council Meeting

Regular Meeting

Topeka, KS · November 27, 2012

Agenda

Agenda

A Capital City Serving You www.topeka.org City Council Agenda Council Chambers 214 SE 8th Street Topeka, Kansas 66603 November 27, 2012 6:00 PM Mayor: William W. Bunten Councilmembers Karen A. Hiller District No. 1 Chad Manspeaker District No. 6 John Alcala District No. 2 Robert E. Archer District No. 7 Sylvia E. Ortiz District No. 3 Andrew P. Gray District No. 8 Denise Everhart District No. 4 Richard Harmon District No. 9 Larry Wolgast District No. 5 City Manager: Jim Colson Addressing the Council: No person shall address the Council during a Council Meeting, unless they have notified the City Clerk by 5:00 P.M. on the day of any Council Meeting of their desire to speak on a specific matter on the published meeting agenda or during the public comment portion of the Council Meeting. This limitation shall not apply to items added during the course of a meeting. The Council does not take action with respect to any subject not on the agenda unless added to the agenda by a two-thirds vote of the Council Persons addressing the City Council will be limited to four (4) consecutive minutes of public address on a particular agenda item. Debate, question/answer dialogue or discussion between Councilmembers will not be counted towards the four (4) minute time limitation. The Chair may extend time with the unanimous consent of the Council or the Council by affirmative vote of five (5) members may extend the four (4) minute limitation. Persons will be limited to addressing the City Council one (1) time on a particular matter unless otherwise allowed by an affirmative vote of five (5) members of the City Council. Citizens wishing to offer Public Comment may sign up by phoning the City Clerk’s office at 368-3940. To make arrangements for special accommodations please call 785-368-3940. A 48- hour advance notice is preferred. The Federal Communications Commission (FCC) has adopted use of the 711 dialing code for access to Telecommunications Relay Services (TRS). TRS permits persons with a hearing or speech disability to use the telephone system via a text telephone (TTY) or other device to call persons with or without such disabilities. To reach the City Clerk’s office using the TRS, please dial 711. (Agendas are available on Thursday afternoon in the City Clerk’s office, 215 SE 7th – Room 166 and on the City’s web site at http://www.topeka.org) Back Print INVOCATION: PLEDGE OF ALLEGIANCE: 1. PROCLAMATIONS: "World AIDS Awareness Day" 2. PRESENTATIONS: "None scheduled at this time." 3. ROLL CALL: 4. CONSENT AGENDA: A. MINUTES of the regular meeting of November 20, 2012 B. APPLICATIONS: 5. UNFINISHED BUSINESS: A. Project Budget and Resolution - Street Improvement Project No. T-601020.02 ATTACHMENTS A PROJECT BUDGET in the amount of $4,000,000 and A RESOLUTION introduced by Interim City Manager Daniel R. Stanley, relating to and authorizing Improvement Project No. T-601020.02, which provides for street improvements to South Kansas Avenue between 7th Street and 9th Street, as more specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka. (Council District No. 1) (This item was deferred from the Council meeting of July 17, 2012. The City Manager intends to withdraw this item from the agenda as it has changed significantly. The new project budget and resolution will be considered as item 6A under New Business.) 6. NEW BUSINESS: A. Project Budget and Resolution - Street Improvement Project No. T-601020.02 - New Proposal ATTACHMENTS A PROJECT BUDGET in the amount of $8,448,032 and A RESOLUTION introduced by City Manager Jim Colson, relating to and authorizing Improvement Project No. T-601020.02, which provides for street improvements to South Kansas Avenue between 6th Street and 10th Street, as more specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka. (Council District No. 1) (Deferred from the meeting of July 17, 2012.) (Approval would authorize improvements to the South Kansas Avenue corridor to be funded by general obligation bonds, half cent retailers' sales tax, utility operating funds and private sector contributions. The project is included in the City's 2011-2013 Capital Improvement Program.) B. Applications - Retail Cereal Malt Beverage and Scrap Metal Dealers License APPROVAL of Retail Cereal Malt Beverage and Scrap Metal Dealers License Applications. Voting Requirement: Majority vote of the Governing Body, including the Mayor. (Pursuant to K.S.A. 41-2702, Retail Cereal Malt Beverage License application must be approved by the Governing Body prior to the issuance of the license. Pursuant to TMC 5.170.040 and L. 2011, Ch. 86, Section 2, Scrap Metal Dealer applications have to be approved by the governing body prior to issuance of registration.) 7. MISCELLANEOUS: - 8. PRESENTATIONS BY THE CITY MANAGER, MAYOR AND MEMBERS OF THE COUNCIL: - 9. PUBLIC COMMENT: - 10. ADJOURNMENT: - A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #1 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #2 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: "World AIDS Awareness Day" POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #3 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: "None scheduled at this time." POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #4 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #5 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #6 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #7 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 November 7, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: Randy Speaker/Shawn DOCUMENT #: P. Bruns SECOND PARTY/SUBJECT: Street Improvement PROJECT #: T-601020.02 Kansas Ave between 7th and 9th Streets CATEGORY/SUBCATEGORY 020 Resolutions / 004 Public Improvements CIP PROJECT: Yes ACTION OF COUNCIL: 5/15/12 Defer 2 Months JOURNAL #: 7/17/12 Defer 4 Months PAGE #: DOCUMENT DESCRIPTION: A PROJECT BUDGET in the amount of $4,000,000 and A RESOLUTION introduced by Interim City Manager Daniel R. Stanley, relating to and authorizing Improvement Project No. T-601020.02, which provides for street improvements to South Kansas Avenue between 7th Street and 9th Street, as more specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka. (Council District No. 1) (This item was deferred from the Council meeting of July 17, 2012. The City Manager intends to withdraw this item from the agenda as it has changed significantly. The new project budget and resolution will be considered as item 6A under New Business.) POLICY ISSUE: N/A STAFF RECOMMENDATION: Approve the Project Budget and Resolution as presented. BACKGROUND: This project consists of improvements to South Kansas Avenue between SW 7th Street and SW 9th Street and will also include utility and median work from SW 4th Street to SW 7th Street and SW 9th Street to SW 11th Street as funds allow. A project budget for $1,000,000 was approved by City Council on July 19, 2011, for Phase 1 of the project. The Phase 1 budget provided for a conceptual design of the Kansas Item Avenue#8 improvements from 4th Street to 11th Street and also funds median and utility work from 7th Street to 9th Street. In addition, $600,000 has been set aside from the 2011 City-Wide Half Cent Sales Tax Program for milling and overlaying Kansas Avenue from 4th Street to 10th Street. The project is included in the 2012 CIB and 2013 CIB under the title "Capitol District Project" for $2,000,000 each year. BUDGETARY IMPACT: Project Budget: $4,000,000.00 SOURCE OF FUNDING: General Obligation Bonds or any other lawfully available funds. ATTACHMENTS: Debt Service Resolution Project Budget Item #8 Attachment number 1 \nPage 1 PROJECT BUDGET Project No. T- 601020.02 S. Kansas Avenue Improvements LOCATION: S. Kansas Avenue between SW 7th Street and SW 9th Street DESCRIPTION OF PROJECT: This project will provide for improvements on S. Kansas Avenue between SW 7th Street and SW 9th Street and will also include utility and median work from SW 4th Street to SW 7th Street and SW 9th Street to SW 11th Street as funds allow. SOURCE OF FUNDS: General Obligation Bonds COST ESTIMATE: G.O. Bonds Construction: $3,180,000.00 Design: $300,000.00 Construction Inspection & Staking: $300,000.00 Administrative Fees: $35,000.00 Right-of-Way $0.00 Contingency Amount: $50,000.00 Temp. Notes & Cost of Issuance: $135,000.00 Total: $4,000,000.00 11/21/2012 Attachment number 2 \nPage 1 GO Bond Cost of Project PROJECT: T-601020.02 Interest rate 4.00% 20 Cost of Issuance 2.00% Temp Note interest 1.500% Principal $3,864,700 Plus Temp Note Interest $57,971 Plus Cost of Issuance $77,294 Total Project Budget $3,999,965 Annual Debt Service $294,324 Annual Debt Service as Percent of Total 7.4% Total Debt Service (principal and interest) $5,886,488 Difference Project Cost and Total Debt Servivce $1,886,523 GO Bonded Indebtedness as of December 2011 $160,655,000 Heartland Park STAR Bonds $9,855,000 College Hill TIF $5,605,000 2011 Temporary Notes that Finance Future GO Bond projects $15,230,000 Total Indebtedness $191,345,000 Plus Project $195,344,965 5/9/2012 Attachment number 3 \nPage 1 1 RESOLUTION NO. ____________ 2 3 4 A RESOLUTION introduced by Daniel R. Stanley, Interim City Manager, 5 authorizing Improvement Project No. T-601020.02 which 6 provides for improvements to S. Kansas Avenue, as more 7 specifically described herein, all pursuant to Section A12-1 of 8 the Code of the City of Topeka. 9 10 BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS, that it 11 finds the following described public improvement to be necessary and in the public interest 12 and does hereby authorize, pursuant to Section A12-1 of the Code of the City of Topeka, 13 Improvement Project No. T-601020.02 with a project budget summarized herein and fully 14 set forth on the attachment hereto: 15 A. GENERAL NATURE OF IMPROVEMENT: 16 17 This project will provide for improvements on S. Kansas Avenue between th th 18 SW 7 and SW 9 Streets and will also include utility and media work from 19 SW 4th Street to SW 7th Street and SW 9th Street to SW 11th Street as funds 20 allow. 21 22 B. ESTIMATED OR PROBABLE COST: 23 24 $4,000,000.00 25 26 C. APPORTIONMENT OF COSTS: 27 28 General Obligation Bonds or any other lawfully available funds 29 30 ADOPTED and APPROVED by the City Council on _________________________. 31 CITY OF TOPEKA, KANSAS 32 33 34 35 ___________________________________ 36 William W. Bunten, Mayor 37 ATTEST: 38 39 40 41 ________________________________ 42 Brenda Younger, City Clerk IMPROV.PRJ\T-601020 02 5/9/12 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 November 19, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: Shawn Bruns/Mike DOCUMENT #: Teply SECOND PARTY/SUBJECT: South Kansas Avenue PROJECT #: T-601020.02 Improvements CATEGORY/SUBCATEGORY 020 Resolutions / 004 Public Improvements CIP PROJECT: Yes ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: A PROJECT BUDGET in the amount of $8,448,032 and A RESOLUTION introduced by City Manager Jim Colson, relating to and authorizing Improvement Project No. T-601020.02, which provides for street improvements to South Kansas Avenue between 6th Street and 10th Street, as more specifically described herein, all pursuant to Section A12-1 of the Code of the City of Topeka. (Council District No. 1) (Deferred from the meeting of July 17, 2012.) (Approval would authorize improvements to the South Kansas Avenue corridor to be funded by general obligation bonds, half cent retailers' sales tax, utility operating funds and private sector contributions. The project is included in the City's 2011-2013 Capital Improvement Program.) POLICY ISSUE: This project will replace aging public infrastructure and encourage further development in Downtown Topeka. STAFF RECOMMENDATION: Staff is requesting that the Council move to approve the Project Budget and Resolution as presented. BACKGROUND: Council has deferred action on Phase 2 of the South Kansas Avenue Improvement Project from their meetings on May 15, 2012 and on July 17, 2012. Phase 1 of this project was approved by the City Council in the amount of $1,000,000 on July 19, 2011, to provide for a conceptual design of improvements to the South Kansas Avenue downtown corridor and#9 Item to also provide for median and utility work. At this point, $208,000 out of the original $1,000,000 Phase 1 Project Budget has been spent on the conceptual design work. Approval is requested for a new Phase 2 Project Budget of $8,448,032 to provide for improvements to South Kansas Avenue between SW 6th Street and SW 10th Street. The proposed improvements for Phase 2 will include increasing the sidewalk widths to 24 feet on both sides of South Kansas Avenue and reducing the number of traffic lanes to three lanes. This project will include final design, inspection, utility improvements, lighting, and removal and replacement as necessary of existing sidewalks, medians, crosswalks, curbs, gutters, and pavement. Private Sector Contributions will fund enhancements to include pocket parks, information kiosks, and bronze statues. Funding of the project is proposed from $3,759,000 of General Obligation Bonds, $1,050,000 of Half Cent Retailers' Sales Tax Funds, $950,000 Utility Operating Funds, $888,032 from the 2014 CIP and $1,801,000 of Private Sector Contributions. Construction is expected to start in the 700 and 800 blocks of South Kansas Avenue in 2014 followed by the 600 and 900 blocks in 2015. At the time of construction no vehicular access will be available during the approximately 4 months. Pedestrian access will be available throughout construction. BUDGETARY IMPACT: Project Budget: $8,448,032 The project is included in the City's 2011-2013 Capital Improvement Program for $2,000,000 in both 2012 and 2013 for a total of $4,000,000 to be funded by General Obligation Bonds. SOURCE OF FUNDING: $3,759,000 - General Obligation Bonds $1,050,000 - Half Cent Retailers' Sales Tax $ 950,000 - Utility Operating Funds $1,801,000 - Private Sector Contributions $ 888,032 - 2014 CIP $8,448,032 - TOTAL ATTACHMENTS: Resolution Project Budget Debt Service Information Sheet Item #9 Attachment number 1 \nPage 1 1 RESOLUTION NO. ____________ 2 3 A RESOLUTION introduced by Jim Colson, City Manager, authorizing 4 Improvement Project No. T-601020.02 which provides for 5 improvements to S. Kansas Avenue, as more specifically 6 described herein, all pursuant to Section A12-1 of the Code of 7 the City of Topeka. 8 9 BE IT RESOLVED BY THE COUNCIL OF THE CITY OF TOPEKA, KANSAS, that it 10 finds the following described public improvement to be necessary and in the public interest 11 and does hereby authorize, pursuant to Section A12-1 of the Code of the City of Topeka, 12 Improvement Project No. T-601020.02 with a project budget summarized herein and fully 13 set forth on the attachment hereto: 14 A. GENERAL NATURE OF IMPROVEMENT: 15 16 This project will provide for improvements on S. Kansas Avenue between 17 SW 6th Street and SW 10th Street to include final design, inspection, utility 18 improvements, lighting, and removal and replacement as necessary of 19 existing sidewalks, medians, crosswalks, curbs, gutters and pavement. 20 Private sector contributions will enhance this downtown corridor by adding 21 amenities to the area. 22 23 B. ESTIMATED OR PROBABLE COST: 24 25 $8,448,032.00 26 27 C. APPORTIONMENT OF COSTS: 28 29 Utility Operating Funds $ 950,000.00 30 31 General Obligation Bonds or 32 any other lawfully available funds $3,759,000.00 33 34 Citywide Half Cent Special Purpose Retailers’ Sales Tax $1,050,000.00 35 36 Private Sector Contributions $1,801,000.00 37 38 2014 CIP $ 888,032.00 39 40 TOTAL: $8,448,032.00 41 42 IMPROV.PRJ\T-601020 02 Revised 11/21/12 Attachment number 1 \nPage 2 43 44 ADOPTED and APPROVED by the City Council on _________________________. 45 CITY OF TOPEKA, KANSAS 46 47 48 49 ___________________________________ 50 William W. Bunten, Mayor 51 ATTEST: 52 53 54 55 ________________________________ 56 Brenda Younger, City Clerk IMPROV.PRJ\T-601020 02 Revised 11/21/12 Attachment number 2 \nPage 1 PROJECT BUDGET Project No. T- 601020.02 S. Kansas Avenue Improvements LOCATION: S. Kansas Avenue between SW 6th Street and SW 10th Street DESCRIPTION OF PROJECT: This project will provide for improvements on S. Kansas Avenue between SW 6th Street and SW 10th Street to include final design, inspection, utility improvements, lighting, and removal and replacement as necessary of existing sidewalks, medians, crosswalks, curbs, gutters and pavement. Private sector contributions will enhance this downtown corridor by adding amenities to the area. SOURCE OF FUNDS: General Obligation Bonds , Half Cent Retailers' Sales Tax, Utility Operating Funds, and Private Sector Contributions. COST ESTIMATE: Description of Improvement Estimated Cost Payer Source of Funds Infrastructure Water Line Replacement and Fiber Optics Conduit $375,000 COT Utility Operating Funds Storm Sewer Improvements $575,000 COT Utility Operating Funds Lighting and Electrical Service $600,000 COT GO Bonds Sidewalks Improvements (Colored Concrete) $860,000 COT GO Bonds Existing Brick Sidewalk Refurbishment $60,000 COT GO Bonds Median Replacement $170,000 COT GO Bonds Mid-Block Crosswalks $80,000 COT GO Bonds Intersection Crosswalks $187,000 COT GO Bonds Cutback Parking Improvements $450,000 COT GO Bonds Project Traffic Control $200,000 COT GO Bonds Design, Inspection and Bond Financing Fees $1,152,000 COT GO Bonds Street Pavement Improvements $825,000 COT 1/2 Cent Sales Tax Curbs and Gutters Improvements $225,000 COT 1/2 Cent Sales Tax Total Infrastructure $5,759,000 Private Pedestrian Enhancements Information Kiosks $60,000 Private Bronze Topekans $600,000 Private Bronze Plaques $60,000 Private Bronze State Animals $56,000 Private Crosswalk Structures $225,000 Private Pocket Parks $800,000 Private Total Pedestrian Enhancement $1,801,000 2014 Pedestrian Enhancements Guard Hand Rails $13,080 COT 2014 CIP Park Benches and Seating $52,800 COT 2014 CIP Curbs and Landscape Curbs $100,036 COT 2014 CIP Softscape (Mulch, Irrigation, Landscape and Trees) $141,836 COT 2014 CIP Street and Walk Light Poles $378,720 COT 2014 CIP Trash/Recycle Bins $42,560 COT 2014 CIP Planters (Corner) $60,000 COT 2014 CIP Planters (Center Island) $20,600 COT 2014 CIP Planters (Walk) $78,400 COT 2014 CIP Total 2014 Pedestrian Enhancements $888,032 Total Estimated Project Costs $8,448,032 Utility Operating Funds $950,000 GO Bonds $3,759,000 Special 1/2 Cent Sales Tax $1,050,000 2014 CIP $888,032 11/21/2012 Attachment number 3 \nPage 1 GO Bond Cost of Project PROJECT: T-601020.02 Interest rate 3.50% Number of Years 20 Cost of Issuance 2.00% Temp Note interest 1.500% Principal $3,759,000 Plus Temp Note Interest $56,385 Plus Cost of Issuance $75,180 Total Project Budget $3,890,565 Annual Debt Service $273,744 Annual Debt Service as Percent of Total 7.0% Total Debt Service (principal and interest) $5,474,887 Difference Project Cost and Total Debt Servivce $1,584,322 GO Bonded Indebtedness as of May 2012 $161,130,000 Heartland Park STAR Bonds $9,855,000 College Hill TIF $5,605,000 2011 Temporary Notes that Finance Future GO Bond projects $15,230,000 Approved, not Included in GO Bond Issue or Temporary Notes--City Projects $10,566,448 Approved, not Included in GO Bond Issue or Temporary Notes--Special Assessment Projects $4,195,923 Total Indebtedness $206,582,371 Plus Project $210,472,936 11/21/2012 Attachment number 4 \nPage 1 INFORMATION SHEET PROJECT NO. T-601020.02 S. Kansas Avenue – 6th Street to 10th Street General Nature of Improvement: Phase 2 of this project will provide for improvements on South Kansas Avenue between SW 6th Street and SW 10th Street to include final design, inspection, utility improvements, lighting, and removal and replacement as necessary of existing sidewalks, medians, crosswalks, curbs, gutters, and pavement. Private sector contributions will enhance this downtown corridor by adding amenities to the area. Background: Phase 1 of this project was approved by the City Council in the amount of $1,000,000 on July 19, 2011, to provide for conceptual design of improvements to the South Kansas Avenue downtown corridor and to also provide for median and utility work. At this point, $208,000 out of the original $1,000,000 Phase 1 Project Budget has been spent on the conceptual design work. Approval is requested for a new Phase 2 Project Budget of $8,448,032. Council has previously deferred action on Phase 2 of the South Kansas Avenue Improvement Project from their meetings on May 15, 2012, and July 17, 2012. The proposed improvements for Phase 2 will include increasing the sidewalk widths to 24 feet on both sides of South Kansas Avenue and reducing the number of traffic lanes to three lanes. Private sector contributions will fund enhancements to include pocket parks, information kiosks, and bronze statues. Construction is expected to start in the 700 and 800 blocks of South Kansas Avenue in 2014 followed by the 600 and 900 blocks in 2015. While under construction no vehicular access will be available. Pedestrian access will be available throughout construction. CIP Year: The project is included in the City’s 2011 - 2013 Capital Improvement Program for $2,000,000 in both 2012 and 2013 for a total of $4,000,000 to be funded by General Obligation Bonds. Project Budget: The requested Project Budget is $8,448,032.00 Source of Funding: $3,759,000 – General Obligation Bonds $1,050,000 – Half Cent Retailers’ Sales Tax $1,801,000 – Private Sector Contributions $ 950,000 – Utility Operating Funds $ 888,032 – 2014 CIP $8,448,032 – Total Council District: 1 Project Administration: Engineering Division -- Shawn Bruns Project Schedule: Design: 2013 Construction: 2014 – 7th Street to 9th Street 2015 – 6th Street to 7th Street and 9th Street to 10th Street A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: Brenda Younger DOCUMENT #: SECOND PARTY/SUBJECT: Applications PROJECT #: CATEGORY/SUBCATEGORY 006 Communication / 005 Other CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: APPROVAL of Retail Cereal Malt Beverage and Scrap Metal Dealers License Applications. Voting Requirement: Majority vote of the Governing Body, including the Mayor. (Pursuant to K.S.A. 41-2702, Retail Cereal Malt Beverage License application must be approved by the Governing Body prior to the issuance of the license. Pursuant to TMC 5.170.040 and L. 2011, Ch. 86, Section 2, Scrap Metal Dealer applications have to be approved by the governing body prior to issuance of registration.) POLICY ISSUE: None STAFF RECOMMENDATION: Approve the licenses. BACKGROUND: Pursuant to K.S.A. 41-2702 as amended, license applications for retail cereal malt beverage must be approved by the governing body prior to issuance of the license. BUDGETARY IMPACT: None SOURCE OF FUNDING: N/A ATTACHMENTS: No Attachments Available Item #10 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #11 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #12 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #13 A Capital City Government Working For You www.topeka.org Council Action Form Council Chambers 214 SE 8th Street Topeka, Kansas 66603 October 16, 2012 Back Print DATE: November 27, 2012 CONTACT PERSON: DOCUMENT #: SECOND PARTY/SUBJECT: PROJECT #: CATEGORY/SUBCATEGORY CIP PROJECT: No ACTION OF COUNCIL: JOURNAL #: PAGE #: DOCUMENT DESCRIPTION: POLICY ISSUE: STAFF RECOMMENDATION: BACKGROUND: BUDGETARY IMPACT: SOURCE OF FUNDING: ATTACHMENTS: No Attachments Available Item #14

Get email alerts for Topeka

A daily email when new agendas and minutes are posted.

Report an issue with this meeting