1. Call to Order:
Chair Greg Mele called the meeting to order at 7:00 p.m. Attendance by Zoom or
in-person at City Hall Auditorium, Room 218, 140 Main Street, Torrington, CT.
2. Attendance/Announcement:
Chair Mele announced present at City Hall and serving this evening are Commissioners
Greg Perosino, Donna Greco, Jim Bobinski and Greg Mele. Present and serving via
zoom are Commissioners Diane Carroll, Donovan Riley and Tom Telman. Also present
is City Planner Jeremy Leifert.
3. Minutes for Approval:
a. 4/19/23
MOTION by Mr. Perosino to approve the 4/19/23 minutes, seconded by Ms. Greco,
unanimously carried.
4. Public Hearing beginning at 7:00 p.m., May 10, 2023 City Hall Auditorium, Room
218, 140 Main Street, Torrington, CT
a. Special Exception 23-03 and Site Plan 1446
Applicant: Haynes Aggregates – Torrington LLC and O&G Industries, Inc.
Location: 3217 Winsted Road and 3345 Winsted Road
Proposal: 6.4 Earth Excavation and accessory retail sales
(continued from 4-19-23)
Chair Mele opened the public hearing at 7:02 p.m. and stated serving on the Commission
this evening will be Commissioners Greg Perosino, Donna Greco, Jim Bobinski and Greg
Mele. Present and serving via zoom are Commissioners Diane Carroll, Donovan Riley
and Tom Telman. Also present is City Planner Jeremy Leifert.
Kenneth Hrica, PE and licensed Land Surveyor in Connecticut appeared via zoom
representing the applicants. Present at City Hall representing the applicants are Adam
Peters from Haynes Aggregates, Richard Warren from O&G, and Peter Herbst, Esq.
Present via zoom is Patrick Haynes of Haynes.
Mr. Hrica stated the applicants are not proposing anything new in this application, it is a
two year renewal application to continue mining. The applicant has extended the 400 foot
buffer to Burr Mountain Road to 600 feet, a 50 percent increase in the buffer area. This is
the 12th year of the renewal process.
Mr. Hrica screen shared site maps and the overall mining plan.
Richard Warren of O&G Industries, Inc. appeared as co-applicant. This application is a
repeat of the last permit renewal in 2020/2021. The application is for a combined use of
the properties, instead of two sets of operations. They are not asking for more blasting or
processing than what was approved with the last application. There will be no greater
height or depth than the last approval.
Mr. Warren noted the concerns that were raised, and blasting documents were submitted
with the application. Details were given regarding the Federal Blasting Regulations, and
they have not exceeded those federal limits. Mr. Warren said they are willing to place
monitoring equipment in place, especially related to concerns surrounding the water lines
at Lakeridge.
Mr. Warren outlined details of blast operations, monitoring, locations of blasts etc. Calls
are made to neighbors who have requested such notices. Mr. Warren is the contact person
at O&G, and a complaint log is generated. He was surprised at the concerns shown, as
they have not received any calls after the blasts. Concerns were raised about trucking,
traffic and Mr. Warrant will monitor that more closely. If necessary, they will set up a
queuing area of site. O&G wants to be a good neighbor.
Per Mr. Warren, as an active mining operation, they have random unannounced
inspections from mine safety bureaus and monitoring. Neither location on this
application has ever received a citation for dust, noise, etc. They are required to also meet
State and Federal guidelines as well as local regulations. Mr. Warren is available for any
questions.
Mr. Mele noted the trucking vehicles are staging at the gate prior to 7:00 a.m. opening.
Some are private truck owners, not the applicants. Mr. Warren will address this, keeping
trucks out of the travel path.
Mr. Bobinski stated there should be a plan in place to present to this Commission to
address concerns. This is only talk, not facts. Mr. Bobinski noted another issue
regarding the Lakeridge water lines. Lakeridge should have documentation to show how
the damage occurred.
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 2 of 9
Mr. Telman inquired if it was outside contractors or O&G / Haynes who are queuing.
Adam Peters of Haynes Aggregates stated Haynes does not do any trucking in Torrington
and Richard Warren of O&G stated O&G would not send trucks to idle at the gate, as they
are close enough to get there on time for opening. These must be outside contractors, and
the traffic is market driven.
Discussion following on queuing traffic on Winsted Road.
Patrick Haynes of Haynes Aggregates addressed the queuing concerns. They did not
realize there was an issue, and they are willing to work with the City for a resolution.
Mr. Mele opened the hearing for public comments in favor of the proposal, there were
none.
Mr. Mele opened the hearing for public comments in opposition to the proposal.
Susan Matz of 300 Cliffside Drive, Torrington appeared. At the last meeting, she asked
for a copy of the environmental study and she has not received one. It seems absurd to
her that one has not been done. Mr. Leifert stated there is not such a report/study in the
City Hall files. Mr. Hrica stated none of the City regulations require an environmental
study, and State and Federal regulations do not require an environmental study. The
study is not done because it is not required.
Ms. Matz stated CT Department of Environmental and Energy Protection (DEEP) said
they were surprised such a study is not done. Discussion followed, and Ms. Matz did not
have the name of the person she spoke to at DEEP with her.
Sigmund (last name inaudible) of 441 Evergreen Road, Lakeridge, appeared and stated he
has lived there since 1988, and they get calls from Haynes prior to a blast, and it has been
relatively quiet during the blast as they listen for it. How many more renewals will
occur? Will there be a restoration, and what are their obligations?
Mr. Warren responded both applicants maintain a restoration bond with the City of
Torrington which are submitted with the applications. The end of the life of the mine is
not determined at this point. Mr. Warrant stated there is at least another ten years of work
at the quarry, and they work under market conditions which affect both the life span and
activity at the mine. If they were to work the mine more, that would increase the truck
traffic.
Ms. Matz stated it was “Alex” she spoke with at CT DEEP, who referred her back to the
City of Torrington.
Mr. Leifert does not interpret the text that such a study is required. If it was required, it
would be at the City level. Mr. Leifert pointed out an environmental impact study is not
required by the City of Torrington, and this application is a Special Exception, and it is at
the discretion of the Planning and Zoning Commission.
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 3 of 9
Amy Hill of 98 Starks Hill Road, Torrington appeared and stated she had a water test
done, and results are not back yet. She took a soil sample near the damaged wall her
father spoke about. Her soil sample came up toxic at her college study lab. She received
a truckload of soil from Haynes approximately two years ago. She is thinking about
sending another soil sample for testing. Ms. Hill said she is appreciative of the person
who comes to their house before a blast, so she can prepare her son with headphones. She
is hoping an environmental study and air quality study can be done on the soil and rock
that was delivered to her house. Mr. Perosino inquired of the origin of the soil.
Discussion followed.
Mr. Peters of Haynes stated crushed rock and processed material was delivered to Ms. Hill
2.5 to 4 years ago. It is virgin material, and was provided to be a good neighbor. It is not
uncommon for metallic material to be found in processed rock. He stated materials
coming out of the mountain are constantly being tested and certified for various properties,
as the product is used for many applications.
Nancy Siegelstein, 431 Trails End Drive, Lakeridge, appeared and questioned the depth
and floor level of the quarry.
Mr. Warren responded the plans show the depth of the mine and they plan not to go past
what is on the plans. If they decided to go further, it would require a new plan and
application before this Commission.
Mr. Hrica zoomed in on site maps and plans and provided explanations of the plans, the
50 foot green line elevations. Elevation in the quarry is 750 feet in the quarrying area,
sloping to 745 to 740 and then 735 to provide adequate drainage. The depth of the quarry
is not below the Winsted Road grade.
Carol Pfeifer of Lakeridge appeared and stated she sees nothing but a big hole in the
mountain, it is very unattractive and dust is flying everywhere. There are 474 doors at
Lakeridge, lots of people, and they pay much in taxes, and they don’t want to look at this,
along with the dust and noise.
The map presented on zoom by Mr. Hrica was reviewed and further explanations provided
by Mr. Hrica. Mr. Warren reviewed the time line of the permit and the continuing
excavation process and buffering.
Walt (last name inaudible), 460 Evergreen Road, referred to soil samples taken by the
neighbor, and is stunned there should be facts provided of sampling by OSHA. There are
no studies. There should be scientific information presented before a plan is approved.
Mr. Warren reiterated they are routinely and randomly tested for dust and noise. As for
sampling material, they are required under DOT regulations to maintain certain standards,
and there is testing that is done which is not required as part of this application.
Mr. Haynes stated materials are regularly tested for many factors. This is virgin rock
material, and there are no contaminates in it. If there were, they would know about it.
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 4 of 9
This is the same material that runs up and down Winsted Road. There are no fact based
known contaminants at the Haynes or O&G properties. Testing has occurred so many
times over the years.
(inaudible name) of 427 Trails End Drive, Torrington appeared and stated it is
unconscionable there is no environmental study showing any faults near Lakeridge or any
other residential area.
Nancy Siegelstein of Lakeridge doesn’t want a flat area, or a Costco, they want the trees
and the mountains back.
Mr. Warren stated they can plan a planting process plan if it is required.
Marc Dworkin, 460 Evergreen Drive, Torrington inquired if there is a bond, and if it is
enough for restoration. Mr. Mele responded they have an adequate bond in place.
Mr. Warren stated they have a $383,000 bond in place for reclamation purposes, and they
need enough land to continue operations.
Marc Dworkin of Lakeridge asked how do we know how much bonding is necessary,
referring to the $383,000 bond. Perhaps it should be made so onerous that they will lose
millions of dollars.
Mr. Leifert responded that is not allowed by law, and the City can only ask for what it
costs to restore the property. An estimate for restoring the property was submitted by the
applicant and was reviewed and approved by the City’s Engineering Department. Mr.
Dworkin wanted independent sources to provide estimates.
Susan Matz of Lakeridge inquired about inflation on the restoration bond. She inquired if
this was done 20 years ago. Mr. Leifert responded the restoration bond is reviewed and
renewed every two years to current standards.
Ron Berg, 179 Ledge Drive, Torrington, pointed out that radon is a natural gas that is toxic
that is found in virgin rock.
Arthur (last name inaudible) of 427 Trails End stated he moved here away from the toxic
landfills on Long Island. The restoration plans need to be better. This restoration could
be an eyesore.
Mr. Warren referred to the reclamation plan. Nothing can be done without this
Commission’s approval.
Carol Pfeifer of Lakeridge stated this is all very vague, $383,000 in today’s market is
nothing. They will be digging for ten more years and we’ll be dead by then. You can’t
even buy a house for that much. We should have more information and facts, not just
talk. They have legitimate concerns.
Mr. Peters of Haynes responded these are not vague plans, they are engineered,
documented, and it’s public information.
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 5 of 9
Mr. Leifert stated these plans have been posted on the City’s website for the last two
months as a public document. Mr. Leifert inquired about the agencies that do the testing.
Mr. Peters stated the majority of the testing is done by the CT Department of
Transportation. Intricate testing is done, and operations would be stopped if the CT DOT
identified a problem, and 80 percent of their materials go to CT DOT.
Mr. Perosino inquired if this testing is available. Mr. Peters responded this information is
not their information, it is third party, CT DOT.
Mr. Leifert stated there is a lane this Planning and Zoning Commission stays in, and if
there was an issue, this application would not be in front of us now. MNSHA, DEEP,
OSHA and City of Torrington look at this operation, and it is monitored by a multitude of
organizations.
Inaudible comments from audience.
Mr. Leifert explained each agency has their own regulations, and this Planning and Zoning
Commission has their own regulations to follow. He indicated the unidentified speaker in
the audience is free to contact any other agency. This Commission does not require
anything that is out of their purview.
Amy Hill, 98 Starks Hill Road, asked where the results are from all the other agencies.
Mr. Peters noted those individual agencies have that information, and Haynes Aggregates
has never failed any testing.
Mr. Leifert reiterated anyone may contact these various agencies.
Patrick Haynes stated there is public information the CT DOT website. No one is being
intentionally vague, testing is a broad and vague statement. Mr. Haynes referred to stone
material that is being used at the new Torrington High School construction site. If
material is deemed acceptable, they do not hear about it.
Comments from rear of auditorium, inaudible.
Mr. Peters noted there are many differences between OSHA and the MSHA, the mining
oversite safety agency. MSHA focuses on mining and supersedes OSHA.
Nancy Siegelstein questioned the location of the quarries in relation to Lakeridge.
Mr. Leifert noted on the displayed map the quarry locations, and Lakeridge location
(audience comments inaudible). The applicants and Planning and Zoning Commission
reiterated that environmental studies are not required. There are 248 acres of land on the
subject sites per Mr. Warren, and the mining operation is 26.9 acres for Haynes an d 30.5
acres for O&G. Site details and map were reviewed. Lakeridge is half a mile away, and
Patrick Haynes noted there is significant buffer between the quarry operation and Burr
Mountain Road.
(Name inaudible) commented on the importance of soil samples.
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 6 of 9
Mr. Peters of Haynes stated they are in compliance with all requirements and regulations.
Further discussion followed on the queuing of trucks on Winsted Road. Mr. Jim
Bobinski said he is disappointed with the response of applicants regarding the queuing,
suggesting the gates be opened earlier than 7:00 a.m. if there are numerous trucks queuing
on Winsted Road.
Mr. Greg Perosino stated there was a complaint regarding queuing, but it has not been
defined. It needs to be defined for a proper response from the applicant. The applicants
have stated they were not aware there was a problem with queuing, and now a problem
needs to be qualified and data presented to be defined in order to prepare a response. This
will be addressed but needs to be done intelligently, and he is not ignoring the complaint.
Mr. Mele said he would not have a problem with the gates opening at 6:30 a.m., trucks
entering the site, and work not starting until 7:00 a.m. Further discussion followed on
possible queuing scenarios, which need to be identified first.
Mr. Mele noted concerns need to be considered by both applicants and neighbors, maybe it
will be on Lakeridge to acquire an environmental study.
Mr. Leifert said the City of Torrington has no authority to require the applicant to provide
an environmental study.
Mr. Peters reiterated all the testing data is public information and can be viewed on the
individual agency websites.
(Inaudible name) wanted a better definition of the long term plan of the quarry.
Tom Telman agreed with Greg.
Diane Carroll stated the queuing is an important component, and at certain times of the
year, there will be more activity.
Greg Mele stated these operations have been on-going for many years without any issues
to his knowledge.
Mr. Peters stated they are here to do the right thing and not hide things or do anything
unethical. They are doing what is required, and sometimes going above and beyond that.
Susan Matz said they are not here to put the applicants out of business, but to obtain more
information surrounding the environment.
Mr. Warren offered to give his business card to anyone present and it’s their intent to be a
good neighbor. This is the first time they have heard of some of these issues and
complaints. In summary, he requested that the hearing be closed and suggested they can
post a sign at the site that there will be no truck queuing prior to 7:00 a.m.
Attorney Peter Herbst appeared representing Haynes. He has worked with Haynes for
many applications and has always been impressed with the thoroughness of their
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 7 of 9
operation. Mr. Herbst has also representing O&G on other applications. Neighbors are
listened to, and responded to. As in past years, Mr. Herbst requested this application be
approved. The applicants are regulated by not only this Commission, but State and
Federal agencies as well, and there have never been any violations.
At 8:44 p.m. Chair Greg Mele declared the public hearing closed.
5. Public Hearing beginning at 7:00 p.m., May 24, 2023 City Hall Auditorium, Room
218, 140 Main Street, Torrington, CT
a. Proposed Change of Zone Map
Applicant: Hutton ST 21 LLC
Location: 19 Hillside Avenue and 31 Hillside Avenue
Proposal: Change Zone Map to Local Business, LB (currently R6)
Passed until May 24, 2023.
6. Old Business:
None
7. New Business:
a. Proposed Change of Zone Map
Applicant: 242 South Main Street, LLC
Location: 242 South Main Street
Proposal: Change Zone Map to Local Business, LB (currently R6)
(set public hearing date)
MOTION by Mr. Perosino to set a public hearing date of June 14, 2023, seconded by Ms.
Carroll, unanimously carried.
b. Proposed Change of Zone Map
Applicant: Maria Seymour Brooker Memorial, Inc.
Location: 34 Wilson Avenue
Proposal: Change Zone Map to Downtown District, DD (currently R6)
(set public hearing date)
MOTION by Mr. Perosino to set a public hearing date of June 14, 2023, seconded by Mr.
Telman, unanimously carried.
8. Correspondence:
a. Zoning and Blight Violation update
Torrington Planning and Zoning Commission
Minutes – May 10, 2023
Page 8 of 9
Mr. Leifert noted the Commission has been provided an updated report from Blight
Enforcement Officer Ashley Clement and Assistant City Planner Nate Nardi-Cyrus.
b. Draft regulation amendment discussion:
Section 6.10 – Bed and Breakfast
Section 5.18 – Outdoor Dining
Mr. Leifert provided Commission members with draft proposed regulation changes, to
clean up the regulations and clarify definitions. Discussion ensued on various changes
and definitions.
MOTION by Mr. Perosino to set a public hearing date of June 28, 2023, seconded by Ms.
Greco, unanimously carried.
9. Adjournment:
MOTION by Mr. Perosino to adjourn at 9:04 p.m., seconded by Ms. Greco, unanimously
carried.