Planning & Zoning Commission
Regular MeetingTorrington, CT · March 20, 2024
Minutes
CITY OF TORRINGTON
PLANNING AND ZONING COMMISSION
MEETING MINUTES
March 20, 2024
Present: Greg Mele, Chair
Greg Perosino Vice Chair
Diane Carroll, Alternate
Starley Arias, Alternate
Tom Telman, Alternate
Also Present: Jeremy Leifert, AICP; City Planner
Not Present: Donna Greco, Member
Jim Bobinski, Member
Donovan Riley, Member
1. Call to Order:
Chair Greg Mele called the meeting to order at 7:01 p.m. Attendance is by Zoom or
in-person at City Hall Auditorium, Room 218, 140 Main Street, Torrington, CT.
2. Attendance/Announcement:
Chair Mele announced present and seated on the Commission are Commissioners Diane
Carroll, Greg Perosino, Starley Arias (serving remotely) and Greg Mele. Also present is
Commissioner Tom Telman (serving remotely). Also present in the auditorium is Jeremy
Leifert, AICP, City Planner.
3. Minutes for Approval:
a. February 28, 2024
MOTION by Diane Carroll to approve the February 28, 2024 minutes, seconded by Mr.
Perosino, unanimously carried.
4. Public Hearing beginning at 7:00 p.m., March 20, 2024, City Hall Auditorium,
Room 218, 140 Main Street, Torrington, CT
a. Special Exception 23-06
Applicant: AJK, LLC
Location: 637 and 659 Winsted Road
Proposal: Renewal of existing earth excavation permit, Section 6.4
(public hearing continued from February 14, 2024)
At 7:02 p.m., Chair Mele opened the public hearing (continued from February 14, 2024).
Chair Mele announced seated and serving on the Commission for this hearing are
Commissioners Diane Carroll, Greg Perosino, Starley Arias and Greg Mele. Also present
are Tom Telman, Commissioner and Jeremy Leifert, City Planner.
Present representing the applicant AJK, LLC were Wes Clow of AJK, LLC and Dennis
McMorrow, PE, Beach Street, Goshen, CT.
Mr. Leifert reviewed last month we left off with a few questions, one of which is regarding
DEEP stormwater permitting. Wes Clow had provided some information and stated all
the paperwork was submitted to DEEP. Mr. Leifert noted the bond estimates were
received from Zaharek for overall restoration and remaining work on the Elks property.
The third consideration is the waiver to increase the overall acreage of site work from 12.5
acres to 13.1 acres and we needed engineering input on this issue in terms of whether or
not restoration can be done elsewhere on site to offset this increase in overall acreage.
Dennis McMorrow, PE, appeared in person. Mr. Leifert screen shared the site map and
Mr. McMorrow provided details on the acreage and site. Sheet S1 was displayed and
reviewed and details of the site provided by Mr. McMorrow. There won’t be any
additional requests for expansion, as this is the full mine. The access drive and other site
features were reviewed by Mr. McMorrow with additional details shared by Mr. Clow.
Mr. Mele opened the public hearing for comments in favor of the proposal, there were
none.
Mr. Mele opened the public hearing for comments in opposition to the proposal.
Polly Jean Bulkeski, Country Living, Winsted Road, Unit 66 appeared in opposition as she
has much damage to her garage floor and basement. The blasting completely shakes her
building. Her father owned a small quarry, and they never had any problems with
blasting.
Mr. Leifert noted the operation started in 2008 or 2009, and every two years there has been
a renewal.
Ms. Polly Jean Bulkeski stated this project is not safe.
Mr. Dan Fisher, 289 Fairlawn Drive appeared on behalf of the Elks as their leader. Their
first concern is the safety and health of their members and families. They have a rising
star camp during the summer for nine weeks for special needs children, and the general
public is in attendance. The Elks have concerns about blasting, dust and damage. They
did have an incident of fly rock coming onto their property during the summer session of
camp as reported by camp counselors. The camp kids are up against the property lines,
utilize the pond, etc. The Elks do get a 72 hour notice, and they would like a 24 hour
notice and one hour notice as well.
Mr. Fisher stated he has thirty years of experience in blasting. The previous blaster on
this site gave proper notice. Over the last several years, the applicant moved further into
the property. They no longer have a seismograph placed on their dam as was agreed upon
in 2011 and to the best of his knowledge, it has not been there since 2018 when Bay State
took over the blasting.
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 2 of 10
Mr. Fisher is requesting a seismograph be placed on the dam closest to their property line
if this project is approved. By law, this must be done. During the nine week summer
camp, the Elks is requesting blasting only on Fridays for nine weeks while camp is in
session. Prior to camp opening, the counselors are usually there for one week setting up
and training. He will get exact dates for this activity. Not blasting during camp activity
will be a lesser chance of someone getting hurt or killed.
The Elks wants a representative to come to the property on blast day to make sure the
property is clear, and this is a very fair request considering the close proximity. The Elks
have not been getting new site plans as agreed upon. There are concerns about
encroachment and nothing has been done. Also, fencing is not required, but for the safety
of everyone, fencing is important as some children from camp wander off, and there is a
50 foot or so bench, when a six foot fall can kill someone.
Mr. Fisher voiced additional concerns about the seismograph. A third party should be
handling the seismograph as this is a conflict of interest. In 2005, Mr. Richard Hosley
provided a report about blasting damage to neighbors. This needs to be rewritten as the
blasts have increased, and these blasts are occurring in an urban area. He would like to
see a new blast plan, which will benefit everyone, all neighbors and businesses and AJK
LLC as well.
Mr. Fisher noted in 2014 the dam was rated in fair condition, since then it has been
downgraded further. Later studies show further damage, and it is now considered to be a
hazard and the Elks are working with the State of CT to get it back into compliance.
There is a leak on the left side where a lot of the blasting was done. Mr. Fisher will
provide the report to this Commission.
Planning and Zoning Commissioners posed questions, which were answered by Mr.
Fisher. Many people use their site for parties, and there is a potential for people to walk
off their site to the quarry. He noted O&G has put up fencing around their critical quarry
areas. Signs should be put up by AJK LLC. Mr. Fisher noted a dirt biker went into the
quarry located at the O&G Prospect, CT site.
Mr. John Melroy, President and Treasurer of the Country Living Condo Assoc. appeared.
He spoke at the last meeting. They seem to be developing cracks in their condos, and
blasting has been getting more severe. He thinks the problem lies with the blasting
company and asked for more information, insurance certificate, etc. They have not been
notified properly, so that they can properly notify their condo owners. He agreed a third
party should operate the seismograph and Mr. Melroy wants an assessment of the cracks
that are appearing.
Mr. Perosino stated he is not happy the way this operation has proceeded over the years,
and items required to be done are not being taken care of.
Mr. Mele reviewed all the concerns and details of deficiencies. Mr. Perosino requested
the seismograph be put back through a third party. Mr. Mele inquired about blasting only
on Fridays during camp. Mr. Clow could not provide an answer to that due to many
variables with blasting demands. Mr. Mele noted the magnitude of the charges, and
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 3 of 10
questions followed about the pounds of blasting. Mr. Fisher returned to the podium and
provided additional blasting details and statistics (7:55 p.m.).
Mr. Mele inquired about fencing. Mr. Clow stated signs are not a problem, but fencing
will be tricky. Maybe they could come up with snow fencing. Mr. Leifert responded this
would be a visual barrier.
Mr. Mele noted the requests of the neighbors are not unreasonable, and for integrity, the
seismograph should be handled by a third party. Mr. Fisher reviewed his experiences
with blasting notifications.
Mr. Leifert reviewed that there are regulations that must be adhered to, and one of them is
a 72 hour notice, and a 24 hour notice can be requested. Mr. Leifert stated for the record
that we have our requirements that must be adhered to, while working with particular
neighbors to address their concerns.
Mr. Arias asked for clarification as far as distance for notifications, Mr. Leifert responded
one half mile radius from this site. Mr. Arias noted he has received reports that blasting
can be felt up on Commercial Blvd. clearly, so something has changed. Seismograph
locations were discussed.
Mr. Leifert read previous conditions of approval from past applications at this site.
Mr. Clow agreed to silt fencing and installation of signage.
At 8:09 p.m. Chair Mele declared the public hearing continued to April 17, 2024.
5. Public Hearing beginning at 7:00 p.m., April 17, 2024, City Hall Auditorium,
Room 218, 140 Main Street, Torrington, CT
a. Proposal Zoning Regulation Amendment
Applicant: City of Torrington Board of Education and Torringford Volunteer
Fire Department
Proposal: Amend Section 5.15 Sign Regulations; add digital signage on
City owned property
Mr. Mele noted the public hearing will be held on April 17, 2024.
6. Old Business:
a. Discussion: Shelter Regulations
MOTION by Mr. Mele to move this item to the end of the agenda, seconded by Ms.
Carroll, unanimously carried.
7. New Business:
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 4 of 10
a. Site Plan 1491
Applicant: George T. Ruwet
Location: 1703 East Main Street
Proposal: New area for equipment storage
George T. Ruwet, applicant, appeared via zoom.
Mr. Leifert read his memo to the Commission dated March 20, 2024. Mr. Leifert stated
Site Plan 926 at this location expired in 2014. Extensions would have been given, and
then by Statute the Site Plan would have expired in 2018. Mr. Ruwet inquired where he
could find this information, and Mr. Leifert responded Connecticut State Statutes Section
8-2.
Mr. Ruwet had questions about the curbing that is being required, as it will cause run off
issues and will cause problems with the grass. The site has been this way for 30 years and
he would like to not have any curbing there. It will cause a problem in the winter with
freezing.
Impervious surface was discussed, and Mr. Leifert noted a curb could be installed with
gaps to allow stormwater runoff. The gap could be anywhere from five inches to a foot
and a half; this could be accomplished with a minor modification afterwards. We do not
want to totally eliminate curbing from this plan. Mr. Ruwet stated he does not agree
with this, as truckers drive over his curbing and he cannot babysit the drivers. Mr. Leifert
responded curbing is required on all landscaped islands.
Mr. Mele and Mr. Leifert suggested materials such as asphalt, concrete or mountable
curbing. Mr. Leifert will send examples of spaced curbing to Mr. Ruwet.
Mr. Perosino emphasized the regulations require curbing, and spacing can be done to
allow water flow.
Mr. Ruwet asked for the temporary pallet storage to be approved. Mr. Leifert responded
it cannot be in the buffer area, and that is the whole point of the buffer. Mr. Ruwet can
maintain access to the building, the whole 25’ buffer does not need to be maintained. The
grass can be cut, and the vegetative buffer needs to be maintained. The buffer area and
trees were reviewed.
MOTION by Ms. Carroll to approve Site Plan 1491
Applicant: George T. Ruwet
Location: 1703 East Main Street
Proposal: New area for equipment storage
With the following conditions and recommendations:
1. The applicant shall install additional curbing as indicated on the plans or provide an
acceptable bond amount to the City Planner within 60 days of this approval.
2. The applicant shall remove any and all equipment or other storage from within the
landscaped areas and the 25-foot residential buffer areas within 60 days of this approval
and notify the City Planner of any new zoning compliant exterior storage locations
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 5 of 10
3. Except as necessary to protect and maintain buildings or safety, the buffer areas shall
remain in a natural state. This includes cessation of any mowing, vehicle access or
vegetation removal except as necessary for routine building maintenance access.
4. The two handicapped accessible parking spaces near building “A” and building “B” shall
be marked and signs installed as indicated on the plans
5. The applicant shall follow comments of Nate Nardi-Cyrus, Assistant Planner outlined in
his February 22, 2024 email to the City Planner and correct all outstanding identified
violations within 60 days of this approval.
6. In accordance with section 8.4.3 and 8.4.6 of the zoning regulations, the following shall be
submitted to the City Planner:
a. Two paper copies of the full approved final site plan sheet including the surveyor’s
stamp and chairman’s signature box
b. One mylar copy of the full approved final site plan sheet for filing with the City
Clerk in accordance with section 8.4.3.P of the zoning regulations. The mylar sheet
shall bear a chairman’s signature box, a copy of the approval letter from the
commission, a surveyor’s seal and live ink stamp.
c. Mylar sheets shall be filed by the applicant with the City Clerk after the signature
of the Chairman
7. The Cease and Desist order issued by Assistant Planner Nate Nardi-Cyrus on August 14,
2023 shall remain in effect until the property is brought into full compliance with the
conditions of this approval.
8. Modifications for curbing to be worked out with City Planner.
MOTION seconded by Ms. Carroll, unanimously carried.
b. Special Exception 24-01 and Site Plan 1494
Applicant: AJ Resources LLC
Location: 2285 Winsted Road (Assessor Map 244 Map 001 Lot 007)
Proposal: Earth Excavation, Section 6.4 (set public hearing date)
MOTION by Mr. Perosino to set a public hearing date of April 17, 2024, seconded by Mr.
Telman, unanimously carried.
c. Resubdivision
Applicant: Fluturim Rizvani, HPVM Motel LLC
Location: 367 & 391 – 395 Winsted Road
Proposal: Two Lot Resubdivision (set public hearing date)
MOTION by Ms. Carroll to set a public hearing date of April 17, 2024, seconded by Mr.
Perosino, unanimously carried.
d. Site Plan 1493
Applicant: Torrington Historical Society
Location: John Brown Road (Assessor Map 213 Block 003 Lot 010)
Proposal: Parking lot for six cars for public access to John Brown Birthplace
Trails
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 6 of 10
Mr. Mark Linehan, 2335 Newfield Road, Torrington, CT appeared before the Commission
representing the applicant. Mr. Leifert provided background details, this plan was
reviewed by Paul Kundzins, City Engineer. Mr. Linehan noted Mr. Kundzins is requiring
a 15” culvert, which the Torrington Historical Society will do.
Mr. Leifert read his memo to the Commission dated March 20, 2024.
MOTION by Ms. Carroll to APPROVE Site Plan 1493
Applicant: Torrington Historical Society
Location: John Brown Road (Assessor Map 213 Block 003 Lot 010)
Proposal: Parking lot for six cars for public access to John Brown Birthplace Trails
with the following conditions:
1. The applicant shall address comments of Paul Kundzins, City Engineer in his February 27,
2024 email to the City Planner regarding new culvert size and location for the driveway
installation
2. A zoning permit is required prior to alteration of the site
3. The commission waived the requirement for submission and filing of an engineered site
plan due to the nature and location of the project In accordance with section 8.4.4 of the
zoning regulations
Motion seconded by Mr. Perosino, unanimously approved.
Mr. Linehan thanked Jeremy Leifert, Nate Nardi-Cyrus and the Planning and Zoning
Commission for their assistance on this project.
e. Resubdivision
Applicant: Robert Bombardieri
Location: 505 University Drive
Proposal: Two Lot Resubdivision (set public hearing date)
MOTION by Mr. Perosino to set a public hearing date of April 17, 2024, seconded by Ms.
Carroll, unanimously carried.
f. Special Exception 24-02 and Site Plan 1495
Applicant: Lelah Campo
Location: 232 Klug Hill Road
Proposal: Two Day Special Event – 6.13b. public or private event intended
primarily for gatherings, entertainment or amusement
(set public hearing date)
MOTION by Mr. Perosino to set a public hearing date of April 17, 2024, seconded by Ms.
Carroll, unanimously carried.
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 7 of 10
g. Site Plan 1430 Modification
Applicant: Greenstone Investments, LLC; Lelah Campo
Location: 232 Klug Hill Road
Proposal: Modifications to previously approved recreational vehicle park
Mr. Ryan McEvoy of SLR Consulting, 99 Realty Drive, Cheshire, CT appeared via zoom
representing the applicant. Mr. McEvoy screen shared site maps. Future Phase V new
office has been relocated within the curbed driveway and the change was made to
accommodate the enlargement of the recreational pond.
Mr. Leifert asked for calculations of the size/acreage of the pond. Mr. McEvoy explained
the landscaping and beach area to be constructed, referring to site plans, and the pond will
be topped off. Mr. Leifert is looking for surface acreage of the pond for the record.
Mr. McEvoy responded the pond will be approximately 160 feet by 200 feet,
approximately 16,000 square feet which is approximately one-third of an acre.
The parking for the new office building will be for employees and RV’s will continue past
this location to the temporary office. Mr. McEvoy said there is no intention of having
RV’s stack up in this area, in response to questions from Mr. Mele and Mr. Perosino.
Going back to Phase I, Mr. McEvoy explained the golf cart storage area, a new wrap
around porch, the dumpster relocation area, and playground area. There is no change in
the number of campground sites, but they have been reorganized a bit for traffic flow, Mr.
McEvoy referred to site maps.
There is no change to stormwater or septic systems or fundamental access around the
property. Site grading around the pond was clarified on the map by Mr. McEvoy.
Mr. McEvoy stated that is a summary of major changes. This is presently two parcels,
and a condition is that lots are combined or lot line changes made so that all improvements
are located on one lot. A lot line revision is included with the package (noted on map by
Mr. McEvoy).
Mr. Mele inquired if this recreational vehicle park will still be designated as KOA. Mr.
McEvoy was unsure of the status of that KOA designation.
Mr. Leifert read his memo to the Commission dated March 20, 2024.
MOTION by Ms. Carroll to APPROVE Site Plan 1430 Modification
Applicant: Greenstone Investments, LLC; Lelah Campo
Location: 232 Klug Hill Road
Proposal: Modifications to previously approved recreational vehicle park
With the following conditions and recommendations:
All conditions stated in the initial approval of February 15, 2023 and modifications
approved April 19, 2023 and August 16, 2023 remain in effect except as noted below.
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 8 of 10
1. Per comments by the Assistant Planner Nate Nardi-Cyrus, the final plan set for filing shall
(1) eliminate the beach are near the pond on the plans pending future wetlands approval,
(2) include the location and grades of construction access/maintenance driveway including
a provision for access gating and signage and (3) update the tree line on the plans to reflect
conditions on site
2. The applicant shall add a note on the area of the pond to the final plan set
3. Each phase shall be completed in its’ entirety prior to opening for operation
4. Revisions to existing zoning and grading permits are required prior to alteration or use of
the site for the modified areas, with the exception of those activities previously authorized
under existing zoning and grading permits outside of the modified areas
5. In accordance with section 8.4.3 and 8.4.6 of the zoning regulations, the following shall be
submitted to the City Planner:
a. Two paper copies of the full approved final plan set including the engineer’s stamp and
chairman’s signature box on the title page.
b. One mylar copy of each site plan sheet IN, GR-1 and GR-2 and GR-3 for filing with
the City Clerk in accordance with section 8.4.3.P of the zoning regulations. The mylar
sheets shall bear a chairman’s signature box, a copy of the approval letter from the
commission, an engineers’ seal and live ink stamp.
c. Mylar sheets shall be filed by the applicant with the City Clerk after the signature of
the Chairman and prior to the approval of modified zoning or grading permits to begin
construction or site work.
Motion seconded by Mr. Perosino, unanimously carried.
*********
6. Old Business:
a. Discussion: Shelter Regulations
Mr. Leifert has put together a rough draft, for the first look at proposed regulations. He
has reviewed what other towns and other states are doing. Mr. Leifert reviewed his rough
draft, and would like one more meeting to go over the draft prior to setting a public
hearing, with a June public hearing as a possibility. Mr. Leifert is also available to speak
with Commission members individually regarding the draft wording.
*******
8. Correspondence:
a. Zoning and Blight Violation update
The violation updates had been distributed to Commission members.
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 9 of 10
b. Mr. Leifert noted there is a training session on April 22, 2024 at the regularly
scheduled Zoning Board of Appeals meeting; the agenda will be sent to Planning and
Zoning Commission members. There will be a presenter from the Connecticut Bar
Association.
9. Adjournment:
MOTION by Ms. Carroll to adjourn at 9:31 p.m., seconded by Mr. Perosino, unanimously
carried.
Torrington Planning and Zoning Commission
Minutes – March 20, 2024
Page 10 of 10
Get email alerts for Torrington
A daily email when new agendas and minutes are posted.