City Council
Regular MeetingTroy, NY · October 5, 2021
Minutes
Minutes of the
TROY CITY COUNCIL
FINANCE WORKSHOP
October 6, 2021
6:00 P.M.
Due to the ongoing COVID-19 crisis and pursuant to NYS legislation S.50001/A.40001, this
meeting was remotely via videoconference.
The meeting was called to order at 6:06 p.m. by Council President Mantello.
Pledge of Allegiance
Roll Call: The roll being called, the following answered to their names: Council Member Gulli,
Council Member Ashe-McPherson, Council Member Steele, Council Member Cummings,
Council Member Zalewski, Council Member McDermott, Council President Mantello, Chair.
In attendance were Mayor Patrick Madden, Deputy Mayor Monica Kurzejeski, and Comptroller
Andrew Piotrowski.
Shadrach Treat from Siemens gave a presentation on the status of facility and lighting
improvements in the City of Troy.
Comptroller Piotrowski gave an update on the status of the City’s bonded projects.
Adjournment
The meeting adjourned at 7:31 p.m.
A video recording of this meeting is on file at the City Clerk's office.
EPC Progress Report for City of
Troy Phase 1, 2, & 3
Where People, Process, and Technology Converge to Create
an Adaptable Environment
Appendix A
October 5th, 2021 usa.siemens.com/totallycities
Multi-Phase Project Overview
Project Goals
Leverage Savings for Infrastructure Improvements
Interconnect Street Lights for Safety & Future Technologies
Develop a Roadmap for Scalable Smart City Initiatives
Focus on Infrastructure Improvements for Fire Stations
Improve Efficiency & Comfort for all Buildings
Revitalize Aging Equipment
Provide Mechanical/Electrical/Automation Services
Provide Project in a Fiscally Responsible Manner
Key Highlights Value Notes:
Project Value $ 15,385,007.00 Self-funded from Savings, Avoided Costs, and Incentives
Guaranteed Annual Energy Savings $ 453,022.00 Previous Utility Budget $638,670.00
National Grid Service Fee Annual Savings $ 938,951.00 Previous Annual Payment to NG for Street Light Maintenance
Change Orders/Additional Expenses $ 0.00 Turnkey Design Build Project
Building/Scope Percent Complete Building/Scope Percent Complete
Police Station 100% DPW Buildings 50%
Court House 100% Parking Garages 100%
Fire Stations 99% Street Lighting 0%
Appendix A
Page 2
EPC Phase 1 - Facility Improvement Measures
Police Station - $2,049,641.00
• Improve Holding Area Make Up Air System – Complete 3/26/2021
• Remove and replace existing 100% outside air unit with new indirect natural gas fired
rooftop unit
• Remove and replace (1) packaged 15-ton roof mounted condensing unit
• Install New High Efficiency Boiler – Complete 3/26/2021
• Remove Dietrich hot water boiler and install condensing boiler and boiler pump
• Remove and Replace (46) Fan Coil Units – Complete 3/26/2021
• LED Lighting Upgrades – Complete 9/15/2020
• BMS System Upgrade & Add Controls for New Equipment – Complete 3/12/2021
• Replace 50-Ton Chiller – Complete 3/26/2021
• Remove and replace existing failing Trane Unit
Appendix A
Page 3
EPC Phase 1 - Facility Improvement Measures
Court House - $845,283.00
• Replace Roof Top Unit (RTU-1) – Completed 3/26/2021
• Zone ducted distribution system – Completed 11/12/2020
• Install (42) Supply air dampers in branch duct work with controls
• LED Lighting Upgrades – Completed 9/15/2020
• Integrate to BMS System to control new equipment – Completed 3/26/2021
Parking Garages – 5th Avenue & State Street - $196,134.00
• LED Lighting Upgrades - Completed 9/15/2020
DPW Buildings – Main Building - $290,518.00
• LED Lighting Upgrades - Completed 9/15/2020
• Roof Replacement and Radiant Heat (last garage bay) – Completed 9/30/2020
Appendix A
Page 4
EPC Phase 1 - Facility Improvement Measures
Fire Stations - $3,089,622.00
• LED Lighting Upgrades At All (6) Stations – Completed 9/15/2020
• Replace (5) Existing Roofs With EPDM Synthetic Roofing – Completed 3/31/2021
• Station #’s – 2,3,4,5, DPW Garage
• Excludes Canal Street Station #6 – Historic Building
• Siemens to work with architect to determine cost to replace
• Replace Windows At All (6) Fire Stations – Completed 3/31/2021
• Station #’s – 1,2,3,4,5
• Fire Station #1 Lansingburgh – Replace (1) RTU – Completed 3/26/2021
• Remove and replace (1) packaged rooftop gas fired unit
• Fire Station #2 Bouton Road– Replace (1) RTU’s – Completed 3/26/2021
• Remove and replace (2) packaged rooftop gas fired units
• Fire Station #5 Central Station – Fluid Cooler – Completed 3/26/2021
• Remove and replace fluid cooler located in the 2nd floor mechanical room
• Install energy recovery unit ventilation system
• Fire Station #4 North Street – Install New 50-55KW Generator – Completed 9/30/2021
• Canal Ave Fire Station – Install New Generator – Target 10/14/2021
• Everything installed & ready for factory startup
Appendix A
Page 5
EPC Phase 2 - Facility Improvement Measures
Street Light LED Conversion - $3,313,809.00
• Completed Investment Grade Audit of Street Lighting Inventory – Completed 12/31/2019
• Reconcile Utility Bill Inventory – Completed 7/7/2020
• Reconciled National Grid Inventory against Siemens audit
• Validated existing wattage & pole condition
• PSC Approval to Acquire Street Lights – Completed 9/9/2021
• City Acquisition of Street Lights – Target – 10/15/2021
• Begin Install LED Street Lights – Target 12/29/2021
• Equipment lead time 8-10 weeks
• Complete Install LED Street Lights – Target 6/22/2022
Appendix A
Page 6
EPC Phase 3 - Facility Improvement Measures
New Street Light & Traffic Lights LED Upgrade – $645,000.00
• Install 108 New Street Lights – Target – 12/29/2021
• Siemens/City to wire from double in-line fuse to fixture (NG Demarcation Point)
• Upgrade Traffic Lights to LED – Target – 2/11/2022
• Siemens to upgrade 38 intersections to LED
• Intersections provided by City
DPW Buildings - $4,955,000.00
• Construct New Salt Shed – Target – 7/14/2022
• Maintenance Bldg. – Replace DPW Roof & Façade Restoration – Completed 7/30/2021
• Approximately 15,800 sq/ft of roof
• Approximately 1,800 sq/ft of soffit, fascia, and wood deck upgrades
• Repair south, west, and east elevation damage/deterioration
• New DPW Maintenance Building – Target 2/23/2022
Appendix A
Page 7
City Of Troy
Summary of Debt Presentation
All Funds
Appendix B
10/06/2021
1
Overview of Presentation
• Summary of outstanding debt currently by type
• Summary of remaining balances not issued but
authorized
• Plan for the current debt moving forward
Appendix B
2
Types of Debt Currently Outstanding
Description General Garbage Water Sewer Outstanding
Troy MAC X 5,910,258
Serial Bonds X X X 12,065,000
Bond Anticipation Notes X X X 59,502,975
NYS Retirement Loans X 2,789,309
Revenue Anticipation Notes X 3,300,000
Serial Bonds EFC X X 4,052,495
Bond Anticipation Notes EFC X X 10,768,865
Installment Purchase Debt X X 8,630,266
Appendix B
3
Troy MAC
• Current amount outstanding = $5,910,258
• Last payment is 01/15/2022
• Balance outstanding includes bond accretion
– Finance term for adjustment to present value of money
from the date of original issuance
• Recently approved NYS legislation authorizes the
MAC to be closed within the 2022 calendar year
Appendix B
4
Serial Bonds
Description Remaining Balance Final Payment
Frear Park Sprinkler System 815,000 08/01/2028
Vehicles / Seawall 4,970,000 08/01/2034
Vehicles / OCA Facility / Water Tank / Spring Ave. Bridge 5,600,000 08/01/2045
Arbitration Award – Retro Payment 680,000 06/10/2025
• Length of payback period is weighted average of the Period of Probable
Usefulness (“PPU”) of all items included in the Serial Bond
• Seawall payments are offset almost entirely by the FEMA grant received in 2021.
Appendix B
5
Bond Anticipation Notes
• Current amount outstanding = $59,502,975
• Two issuances – January & July
– Tranche issuing philosophy
• January has 59 different items
• July has 29 different items
• Having two issuances leads to times where the amount outstanding
is high due to timing of reimbursements
– Seawall & 2021 FEMA funding
• Unissued authorized bond resolutions
– 2020 Police Capital Plan
• Issuing in January 2022
– Park Improvements. Appendix B
• Issuing in January 2022
– 2021 DPU Capital Plan
6
NYS Retirement Loans
• Current amount outstanding = $2,789,309
• 1 ERS loan & 1 PFRS loan prepaid in 2021
– 1 addition ERS loan proposed to be paid off in
ordinance on 10/07 agenda
• Final payment on all loans is 02/01/2027
assuming no further deferrals
Appendix B
7
Revenue Anticipation Notes
• Issued in November 2020
• Funds were never used and will be paid off in full
November 2021
• Interest earned on monies will be used to offset the
interest expense of the note
Appendix B
8
EFC Debt
• Water Fund & Sewer Fund debt financed through EFC as
short-term debt then converted to long-term debt once the
project is completed
• Short-term debt is currently the Water Line Replacement
Project & the CSO Project
• Debt is reimbursed as invoices are paid by the City
• EFC financing is used when there are grants associated
with the projects which is a requirement Appendix B
9
Installment Purchase Debt
Description Remaining Balance Final Payment
Siemens Energy Improvements – 2012 1,489,094 07/01/2029
Fire Truck – 2012 351,038 03/01/2027
Turnout Gear 211,440 05/20/2025
Siemens Energy Improvements – Phase I 6,358,385 07/10/2040
Golf Course Equipment – 2018 46,330 10/14/2022
Golf Course Equipment – 2021 227,469 08/01/2026
• City considers this to be debt even though is a lease-purchase agreement
• City should consider moving away from this debt moving forward in the future
– Higher interest rates
– New accounting rules from GASB
Appendix B
10
Moving Forward With Current Debt In 2022
• Significant BAN pay-down in 2022 with
– Budget appropriations
– Unused debt proceeds
– Grant reimbursements
• Serial bond conversion of BANs in 2022 in both January & July
– Plan for credit rating review based on consultation with Fiscal Advisors
• Troy MAC closeout
• Continued review of budgetary savings to prepay NYS retirement
loans
Appendix B
11
Agenda
TROY CITY COUNCIL
FINANCE WORKSHOP AGENDA
October 6, 2021
6:00 P.M.
*Due to the current COVID-19 crisis and pursuant to NYS legislation S.50001/A.40001, this
meeting shall be held remotely via videoconference and live-streamed on the City Council’s
YouTube channel. Per City Council rules, there will not be a public forum.
Pledge of Allegiance
Roll Call
Update on Status of Bonded Projects and Siemen’s Projects – Comptroller
Get email alerts for Troy
A daily email when new agendas and minutes are posted.