City Council Work Session
Regular MeetingTumwater, WA · May 28, 2024
Minutes
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 1
CONVENE: 6:00 p.m.
PRESENT: Mayor Debbie Sullivan and Councilmembers Peter Agabi, Michael
Althauser, Joan Cathey, Leatta Dahlhoff, Angela Jefferson Eileen
Swarthout, and Kelly Von Holtz.
Staff: City Administrator Lisa Parks, City Attorney Karen Kirkpatrick,
Community Development Director Michael Matlock, Finance Director
Troy Niemeyer, Police Chief Jon Weiks, Fire Chief Brian Hurley, Water
Resources and Sustainability Director Dan Smith, Parks and Recreation
Director Chuck Denney, and Sustainability Coordinator Alyssa Jones
Wood.
COMMUNITY Director Niemeyer reported the proposal approved by the Council for a
HUMAN SERVICES $25,000 pilot program was originally for mobile home repairs for
PROGRAM – HOME Tumwater residents. Following discussions on the focus of the program,
REPAIRS: staff learned the City cannot limit the program to mobile home repairs and
must include all home repairs for low-income residents to avoid any
conflicts for gifting of public funds.
Staff is seeking guidance prior to initiating the program. Because of the
lack of staff capacity to administer the program, staff contacted some non-
profits to administer the program. Two organizations for consideration
include Habitat for Humanity and Rebuilding Together. Both
organizations have local offices with local volunteers. The organizations
have similar programs and follow the Department of Housing and Urban
Development (HUD) guidelines for income eligibility.
Habitat for Humanity utilizes volunteers and future property owners to
build homes for both small and larger projects. Rebuilding Together has
no specific requirements and focuses on smaller and larger projects. Staff
recommends utilizing an existing contract with Rebuilding Together
through the Community Human Services Program requiring only a
contract amendment for future consideration by the Council.
Councilmember Dahlhoff asked about applicability for seniors because of
the need of seniors in manufactured home parks. Seniors are a federally
protected class. Director Niemeyer said he would follow up with the City
Attorney on the parameters of the program.
Several Councilmembers commented on their support of the proposal.
Councilmember Jefferson asked about the possibility of including veterans
within the program as well.
City Attorney Kirkpatrick advised that based on the parameters of the
budget amendment, the program was intended for senior housing repairs.
At this time, the proposal is to move forward with a senior repair program.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 2
Staff is seeking guidance on which non-profit to select to administer the
program. The program is targeted to low-income seniors.
Director Niemeyer said staff is recommending contracting with
Rebuilding Together. Staff will draft a contract amendment for
consideration by the Council.
The Council requested adding the amendment to Council Considerations
to enable announcement of the program to the community.
MUNIFIN 201 – DEBT: Director Niemeyer said the review is the third in a series of four
educational series focused on debt with a focus on larger projects.
The City last issued substantial debt in 2011 for the golf course with
smaller debt issued in 2019 for fire apparatus.
Debit is borrowed money paid back over time comprised of principal and
an interest component. Borrowing money is typically from a bank to
secure a loan. The City can also seek loans from a bank; however, the
bank loan limit is not sufficient if the project is large. Other loan options
for the City include the state’s Public Works Trust Fund or Clean Water
State Revolving Fund from the Department of Ecology. The programs are
competitive and require an application and selection. If the City qualifies
and was selected, plans and rates would be excellent. Other options
include municipal bonds or local program (non-competitive) requiring a
process with statutory limits. Debt in general is considered good or less
than good. The City has only assumed good debt, such as debt that
increases net worth or assists in generating income in the future. Debt not
considered good decreases net worth or does not generate income, such as
credit card debt or payday loans.
The disadvantage of debt is interest. Benefits of debt includes the ability
to save cash flow instead of using cash for purchasing or building, ensures
reserves are intact, and enables the City to buy now and pay later.
Director Niemeyer described the advantages and disadvantages of saving
money versus assuming debt.
A “matching principle” is fundamentally accrual accounting documenting
revenues generated or the benefit from an asset purchased or constructed
matched to the corresponding expense to ensure accurate financial
reporting and consistencies between accounting periods. Director
Niemeyer shared an example of a fictional project of a $30 million golf
course driving range the department plans to fund by cash. In that scenario
of not using a matching principle and reporting the project on a cash basis,
the financials would reflect a substantial expense in the first year and no
expenses for the next 29 years (assuming a 30-year useful life).
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 3
Essentially, it would create inaccurate financials and a substantial
imbalance between revenue and expenses reflecting a huge loss in one year
and potentially massive profits in future years. The preference is matching
revenue and expense to ensure accurate financial statements and an
appropriate comparison from year-to-year, accurate profit and loss
statements, and the ability to evaluate the performance of the asset. The
City’s accounting process spreads the cost over a period of the useful life
to match revenues and expenses regardless if the transaction was cash or
debt.
Bond financing is typically used for large projects. General Obligation
Bonds are bonds the City issues that are not connected to a specific
revenue source. Examples include maintenance and operations facilities,
a new park, or a new City Hall. Revenue bonds are tied to a specific
revenue source, such as a utility project, a water storage tank, or water
main projects. Those projects can be financed with revenue bonds as it
enables matching revenues to expenses with future users helping to pay
for the project.
The Washington State Constitution guides the City on debt. For non-voted
debt, the City can issue up to 1.5% of the City’s assessed value or
approximately $93 million. Non-voted debt is often considered
councilmatic debt as it does not require voter approval. Seeking debt
above the assessed value, the Council can request a vote by City citizens
to seek up to 2.5% of assessed value with special provisions for parks and
open space and utilities for an additional 2.5%.
Councilmember Dahlhoff asked about any prior debt assumed by the City.
Director Niemeyer replied that in 2011, the City issued debt for major
work to the golf course. The debt was fully paid in 2022.
Councilmember Cathey asked whether obtaining debt essentially increases
taxes. Director Niemeyer said it is dependent upon the project and how
funding for a project is structured. If the City receives sufficient revenue
to cover the debt payment, taxes are not increased.
Councilmember Althauser asked about the level a project should be in
terms of generating revenue that would enable the City to secure a bond
using the revenues to pay down the debt. Director Niemeyer replied that
the City would need to demonstrate through either revenue currently
collected or data and projected revenue that the project would generate
sufficient revenue to pay for the bond payment. For example, it would
likely be difficult for the City to substantiate that the revenue generated
from a community pool would be sufficient to make the bond payment.
Councilmember Althauser asked whether there is a metric as a guide to
identify bonding capacity based on revenue streams. Director Niemeyer
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 4
replied that when the City requests funds using general obligation bonds,
the bonding agency reviews the City’s financials, reserves, and projected
revenues as part of a due diligence review requiring several months to
complete.
Councilmember Agabi asked whether the City’s assessed value is based
on the current or previous year. Director Niemeyer explained that each
fall, the Thurston County Assessor’s Office provides a new assessed value
used for assessing the next year’s property taxes.
Director Niemeyer displayed an example of a repayment schedule for a
$30 million loan for a term of 20 years.
The City also incurs a credit score based on a lettering system. The City
received a Standards and Poor AA rating for the last bond issue. The City
has a good bond rating. When the City paid off a bond in 2022, the bond
rating was removed leaving the City technically with no rating.
Financially, the City is doing well with appropriate reserves and strong
revenue. It likely another debt issuance would generate an AA rating or
possibly higher.
THURSTON Coordinator Jones Wood updated the Council on actions and
CLIMATE accomplishments included in the Thurston County Climate Mitigation
MITIGATION PLAN Plan during 2023 and 2024 regional initiatives the Thurston Climate
IMPLEMENTATION Mitigation Collaborative is pursuing.
UPDATE:
Within the Buildings and Energy Sector, Tumwater completed more LED
lighting retrofits at City facilities, launched an all-electric building
webpage, achieved SolSmart silver designation, and began a Solar +
Storage Feasibility Assessment for City Hall and Tumwater Library.
Within the Transportation and Land Use Sector, Tumwater began the
Comprehensive Plan Periodic update to include a new Climate Change
Element. The Transportation and Engineering Department completed
preliminary engineering for traffic signal controller and detection
upgrades, continued construction of the three roundabouts at Trosper Road
and Capitol Boulevard, identified the right-of-way required for the X
Street roundabouts, began the design of the Linwood Avenue Sidewalk
project, and secured school Safe Routes grant funding for the 2nd Avenue
Pedestrian and Bicycle Improvement project. The Green Team completed
an internal Fleet Electrification Plan estimating the replacement of 66
vehicles with electric vehicles (EV) and creating a roadmap for fleet EV
charging and gasoline consumption reduction. The information helped the
City receive a grant from the Department of Commerce to fund 10 EV
chargers for fleet use. The Council approved the new state Energy Code
establishing requirements for EV charging, EV ready, and EV capable for
any new development.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 5
Within the Water and Waste Sector, the City completed an Investment
Grade Audit of City facilities. The audit identified $4.5 million of
efficiency retrofits and installations that could improve the City’s
operations and reduce emissions by 114.8 metric tons annually. Staff is
requesting some funding for some of the projects in the City’s next budget
cycle. Efforts under the audit will assist the City in meeting the
requirements of the Clean Building Performance Standards established by
the state. Three different compost-related initiatives in 2023 included
composting at some City events, composting at City facilities, and
incorporating the purchase of compost in some capital and landscaping
projects.
The City of Tumwater led efforts to improve the proposed Washington
Wildland-Urban Interface Code. In 2023, the City began efforts to update
three sections of City codes related to trees, which will be restarted in
August as the Wildland-Urban Interface Code was clarified. The City
received a grant from the Department of Nature Resources (DNR) to
complete an inventory of trees on City properties. Staff continued efforts
in the development of the Habitat Conservation Plan.
Progress in 2023 within the Cross-Cutting Sector included updating the
City’s Sustainability webpage and hosting six interns from The Evergreen
State College Center for Climate Action and Sustainability.
The Thurston Climate Mitigation Collaborative is comprised of the four
jurisdictions (cities of Lacey, Olympia, Tumwater, and Thurston County).
Work has progressed on two regional initiatives involving the Residential
Home Energy Score Model Ordinance and the Residential Energy
Efficiency and Electrification Campaign. Both initiatives will be
presented to the Council at the end of the year or early next year for
consideration.
The Collaborative is drafting a model ordinance requiring U.S.
Department of Energy home energy scores at the time of listing real estate.
The home energy score is a standardized asset-based rating system for
home efficiency that considers the structure of the home as opposed to
occupant behavior. Similar ordinances have been adopted by many other
local governments in the Pacific Northwest and across the country. The
ordinance would include subsidies for low and moderate-income
households to promote participation.
Step 1 of the Home Energy Score Model Ordinance is in progress with the
development of a memo of policy concepts by the Thurston Climate
Mitigation Collaborative staff team with recommendations for review by
the Community Advisory Workgroup for feedback. The workgroup is
comprised of approximately 15 community members with different lived
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 6
experiences to provide insight and to improve recommendations moving
forward.
Councilmember Cathey commented on the number of renters living in the
City and the difficulty of including renters in different types of programs
or landlords not conducive to the programs. She asked how staff
anticipates including that segment of the housing population within the
goals of the programs. Coordinator Jones Wood advised of several types
of approaches, such as the website for the Green Building Registry where
tenants can review the home energy score of their residential unit.
However, home energy scores are not applicable to stacked multifamily or
manufactured homes at this time. Efforts are planned to expand the
program after the Department of Energy expands its program by adding
different types of structures. At this time, renters of stacked multifamily
units and manufactured homes are not included in the program, but plans
are in progress to include those types of housing units.
Residential homes recently listed for sale are required to provide a home
energy score to enable potential buyers to access the information on the
website. However, for existing rental homes, owners are not required to
obtain a home energy score for the property unless the owner lists the
home for sale. It is also possible for property owners to obtain loans
through the Washington State Housing Finance Corporation for special
energy loans to finance some improvements in addition to the mortgage,
as well as a Fannie Mae energy-related home mortgage product to help
finance energy improvements identified in a home energy score audit.
The next step is stakeholder engagement with the City of Olympia
contracting through competitive solicitation for a consultant to facilitate
six focus groups of different stakeholders. Following the work of the
Community Advisory Workgroup, the policy memo, and the focus groups
on the draft model ordinance, staff will present the draft to the City Council
for feedback.
The second regional initiative underway is the Residential Energy
Efficiency and Electrification Campaign, a multi-pronged approach with
step 1 completed of a web-based information hub at
www.wa.switchison.org. The website is hosted and financed by Thurston
County, City of Olympia, Pierce County, City of Tacoma, City of Seattle,
and King County for the benefit of all Washington residents to obtain
information on ways to electrify a home and sources of energy contractors.
Additionally, the program includes an advisory support service to assist
residents navigate the process of electrifying equipment in homes. The
initiative will be promoting home electrification and possibly
supplementing federal and utility incentives and offer turnkey installations
for low to moderate-income homeowners. State funding is available for
up to 150% of area median income to replace different equipment.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 7
Staff was recently informed that the City received an award of $477,540
to support the program. More information will be released following the
granting agency formally announcing the award later in the week.
Other climate actions progress not tied to a strategy in the Thurston
Climate Mitigation Plan include:
• Supporting the Tumwater Tree Board
• Adding rechargeable battery recycling at “Clean Up Drop Off”
Event
• The City’s Climate Disclosure Project (CDP) score increased from
“C” to “B” in 2023
• The Tumwater Tree Board distributed 100 native plants and 50
packets of native wildflower seeds to the community during Arbor
Day in 2023
• The Tumwater Green Team adopted environmental purchasing
requirements for City operations
Councilmember Dahlhoff inquired as to whether any discussions have
focused on shifting purchasing to carbon-neutral furniture or preferences
for manufacturers and/or distributors of products to address the carbon
footprint as well. Coordinator Jones Wood said that at this time, those
issues have not been addressed; however, future activities would be added.
Additionally the environmental purchasing policy is phased and after 2025
it was important to align product cost increases with the new budget
request. Additional phasing could be explored in the future. The team is
considering toxics and supporting local sources as shipping is a major
component of a product's carbon footprint.
Councilmember Swarthout inquired about program resources for recycling
equipment replaced with new energy efficiency equipment. Coordinator
Jones Wood advised that the program currently does not offer information
for recycling used appliances. Bulk waste is accepted by the Thurston
County HazoHouse at the county landfill. Older appliances in working
condition could be donated to Habitat for Humanity or other nonprofit
organizations. It is also possible to break down appliances to recyclable
parts to reduce waste. She added that she plans to explore options.
Councilmember Cathey recommended inviting the interns separately to
attend a future work session to share information about their efforts in
different program areas. Coordinator Jones Wood said she is attending the
Center for Climate Action and Sustainability at The Evergreen State
College to recap work of the interns and the different projects. The first
project for the City was the completion of climate change impact-focused
review of the street tree list and a separate intern project conducting
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 8
surveys and interviews and learning how to perform grounded theory
qualitative research with the City’s highest residential water volume users.
URBAN FORESTRY Coordinator Jones Wood updated the Council on the status of
MANAGEMENT implementation actions in the Urban Forestry Management Plan.
PLAN
IMPLEMENTATION Of all the actions scheduled in the Urban Forestry Management Plan, 80%
UPDATE: of the actions are on track or in progress with only 20% of actions delayed
mostly because of the delay in amending City urban forestry codes.
The Urban Forestry Management Plan includes five concepts with the first
focusing on “Grow.” Work is underway on revisions and updates to the
three sections of codes for street trees, tree and vegetation protection, and
landscaping. The review of updates to the codes will be reinitiated in
August during a joint meeting of the Tree Board and the Planning
Commission.
Staff completed an evaluation of the size and diversity of trees on City-
owned properties. Multiple meetings have been held with the Tree Board
and stormwater staff to address actions of creating a relationship between
stormwater and the Tree Board. The first action was a joint field trip
visiting potential stormwater sites for planting. The Tree Board completed
an initial review of non-regulatory programs and incentives to increase the
canopy. At the Arbor Day celebration this year at Historical Park, all
plants were distributed before the end of the event, which is a first.
Normally, plants are left over after the event.
The next concept of the Urban Forestry Management Plan is “Protect.” In
February, Transportation and Engineering, Water Resources and
Sustainability, and Parks operations staff attended four-hour training on
principles of urban forestry by DNR staff. The Tree Board reviewed non-
regulatory programs and incentives to protect existing canopy.
In 2023, the City launched the Heritage Tree Story Map and completed a
tree inventory of City properties to assist in identifying tree trimming
needs of existing trees and priorities.
“Manage”: is the next concept in the Urban Forestry Management Plan.
The tree inventory includes a maintenance plan to help prioritize, schedule,
and estimate the costs of tree maintenance on City properties. A Park staff
member is pursuing ISA Arborist certification and three staff members in
Transportation and Engineering and Water Resources and Sustainability
are interested in pursuing certification as well. The City’s only certified
arborist retired recently from the Parks and Recreation Department.
Staff and the Tree Board distribute resources to residents and business
owners on proper tree care. An element of the tree code updates includes
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 9
a review of the approved street tree list to account for lessons learned from
other jurisdictions, information from DNR, on-the-ground information
from operations staff, and best available science on climate change
impacts on tree species and the ability to adapt to shocks and stressors over
time. Efforts continue on integrating the tree inventory data with the
City’s work order systems to recognize trees as natural assets of the City’s
asset management system. Staff estimated the value of some ecosystems
services provided by City forests.
“Fund” is another concept in the Urban Forestry Management Plan with
more accurate cost estimates identified for funding required to maintain
trees on City properties.
Water Resources and Sustainability is working to establish the nexus
between stormwater and urban forestry with new stormwater permit
requirements for tree canopies to obtain some funds to support urban
forestry. The City received a grant from the U.S. Forest Service to help
fund a full-time urban forester beginning in 2025.
The last concept of the Urban Forestry Management Plan is “Engage.”
One example was during Falls Fest, the City sponsored Carbon Jenga
games teaching participants a simplified carbon cycle and an opportunity
to discuss roles of carbon sinks, such as forests and other ecosystems.
Staff engaged volunteers to conduct the Tree Inventory and Maintenance
Plan project, staff participated in Thurston Climate Action Team’s tree
group during the year, and the City retained Tree City U.S.A. certification
for the 28th consecutive year.
Completion of the Tree Inventory and Maintenance Plan was funded by a
$40,000 grant from DNR and $20,000 from the City’s Tree Fund. The
plan includes:
• Tree Inventory
o Street Trees (existing data)
o City-owned properties
• Analysis of Tree Inventory
• Replacement Value
• Environmental Benefits
• Pets and Pathogens
• Tree Maintenance Needs
• Tree Maintenance Cost
• Priority Planning Analysis
A consultant completed a tree inventory of all City-owned properties
except the golf course. Existing street tree inventory was available from
2018 and updated to reflect tree removals. Large forested areas were
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 10
inventoried using a sample-based approach as opposed to counting trees
individually, due to funding. All other City properties had each tree
assessed and inventoried. The most prevalent species of trees are Norway
maple, Callery pear, and red maple. In natural areas, big leaf maple,
Douglas fir, red alder, and western redcedar were the most prevalent.
Maintaining diversity of both species and age is important. The City
should reduce reliance on species of maple tree to promote greater
resiliency.
The current replacement value of trees on City properties is approximately
$11.9 million accounting for the historical investments over time and not
necessarily ecosystem service values.
Not all ecosystem services can be counted or monetized; however, by
using a tool from the U.S. Forest Service called i-Tree some ecosystem
services can be counted or monetized by examining specific trees, their
proximity to buildings, size, and other parameters to calculate values of
ecosystem services for air pollution, sequestering carbon, storing carbon,
and stormwater interception, etc.
Ecosystem service values annually of inventoried trees in Tumwater
include:
• 2,181 pounds of NO2, SO2, PM 2.5, and 03 are intercepted (value
$5957)
• Sequesters 26.7 tons (24.4 metric tons) (value $548)
• Contributes to the avoidance of more than 829,870 gallons of
stormwater
• To date, trees stored 1,968 tons (1,785 metric tons) of CO2 (Value
$335,667)
• Cultural Ecosystem Services = priceless
Ecosystem service values for natural area trees in Tumwater include:
• 8,733 pounds of NO2, SO2, PM2.5, O3 are intercepted (value
$27,898)
• Sequesters 159.4 tons (144.6 metric tons (value $27,182)
• To date, trees stored 4,002.7 tons (3,631.2 metric tons (value
$685,654)
• Cultural ecosystem services = priceless
Councilmember Dahlhoff asked whether the iTree program could be
demonstrated for the Council and whether it is possible to enter a specific
tree to identify risk assessment and the dollar value and how those metrics
can be compared. Coordinator Jones Wood explained that there are
different iTree tools. One iTree tool assigns ecosystem services values to
individual trees. In terms of risk, the tool does not measure risk. However,
staff is working on ways to incorporate ecosystem values with decision-
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 11
making for land use changes. Staff has initiated some conversations and
plan to meet to begin discussing options in more depth to develop a process
the Council and staff could pursue.
Coordinator Jones Wood reported big leaf maples provide the highest
value of ecosystem services for the City’s forest on City properties. Big
leaf maples contribute to more atmospheric carbon removal, removal of
air pollutants, avoids runoff, and provides $18 in value per tree annually.
The project assessed a City-owned forest for susceptibility to 44 emerging
and existing pests and pathogens. Approximately 95% of inventoried trees
are susceptible to one of the pests or pathogens.
The consulting arborist spent an average of five minutes assessing each
tree in areas where trees were counted. Based on the inventory and
prevailing wage, there is approximately $3.4 million of needed tree
maintenance work on City properties. The Urban Forestry Management
Plan recommends four-year maintenance cycles for urban and community
forests. Of the required maintenance work, the estimated budget need is
$850,839 every year for the next four years to catch up with deferred
maintenance.
Coordinator Jones Wood displayed a series of maps depicting priority-
planting areas, areas for prioritized planting based on stormwater benefits,
urban heat island effect, environmental health disparity data, and areas
based on a number of census data points for social equity, income, and
unemployment for both private and City-owned properties.
The grant from the U.S. Forest Service provides 50% of the funding for
hiring a full-time urban forester for three years and provides 100% of the
funding for the following:
• Installing ambient air temperature monitoring throughout the City
• Expanding and improving the City’s tree giveaway program
• Conduct 25 tree health assessments each year for residents in
Tumwater living in disadvantaged communities
• Street tree trimming subsidy for residents of Tumwater
disadvantaged communities for properties responsible for street
trees adjacent to private property
Disadvantaged communities are defined from the federal definition of
EPA Inflation Reduction Act Disadvantaged Community. The City’s
match for all programs would be funded by 50% for the urban forester’s
position.
Councilmember Von Holtz cited the City’s efforts on preserving the urban
forest and the irony of the City’s plan to remove a 400-year old tree.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 12
Councilmember Swarthout inquired as to the location of the information
on trees on the City’s website. Coordinator Jones Wood said some
information on trees is located on the Community Development
Department webpage and some is on the Water Resources and
Sustainability Department webpage. The update of the website has been
delayed pending new code changes the City plans to move forward on in
August.
Coordinator Jones Wood addressed questions from the Council and
offered to add the Council to the TreeKepper program to enable access by
the Council. Information is also available at the TreeKeeper website
without an account; however, maintenance recommendations for each tree
would not be available. Information on specific trees in the City can be
obtained by the department managing the tree(s). All information on the
Davis-Meeker oak has been provided to the Council. The lack of tree
plantings in 2023 was because staff was identifying priority-planting
areas. Some willow trees were planted as part of wetland restoration
projects.
In response to an inquiry from Councilmember Cathey as to why the
Davis-Meeker oak tree was not assessed as part of the most current
inventory, Coordinator Jones Wood explained that the inventory did not
include all City street trees as the preexisting 2018 street tree inventory
data were available and grant funds were only sufficient to add to the
inventory. It is likely that in the future, City interns would assist in
updating the inventory. No street trees were included in the in-depth
review as part of the project because of preexisting data. Trees included in
the inventory for the project were located on City properties that were not
street trees in the right-of-way but received assessments for maintenance
needs and identification of primary defects (diseases, pests, etc.). A large
Garry oak near Walmart was treated based on a recommendation by the
City’s contract arborist.
MAYOR/CITY City Administrator Parks reported on the mailing of the 2023 Water
ADMINISTRATOR’S Quality Report to approximately 15,000 households. The report covers
REPORT: the City’s work in 2023 for water quality. This year the report was printed
on 30% recycled paper saving approximately $2,500 in printing costs by
locating a lower-cost printer.
Activities during the summer in Tumwater include a Tumwater Youth
Program Appreciation Dinner on Wednesday, May 29, 2024 from 6:30
p.m. to 8:30 p.m. at Old Town Center. The Council is invited to attend by
RSVP. The Community Development Department is hosting an open
house at City Hall on May 29, 2024 from 7 p.m. to 9 p.m. to share
information and receive comments on the Comprehensive Plan Periodic
Update on the Housing Element.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 13
The Parks and Recreation Department is sponsoring an event as part of the
National Trails Day on June 1, 2024 from 10 a.m. to 1 p.m. at Tumwater
Hill Park to include a leisurely stroll along the ¾-mile trail, sharing of
information on Tumwater’s and the state’s trail systems, a scavenger hunt,
and distributing trash bags to participants to help pick up trash. On June
8, 2024, Tumwater is hosting Dog Days from 10 a.m. to 2 p.m. at Pioneer
Park.
Mayor Sullivan thanked Councilmember Von Holtz for her attendance to
the Memorial Day commemoration on her behalf.
Councilmember Cathey inquired about the status of the sign near the
Davis-Meeker oak tree reporting that the tree had been delisted from the
City’s Heritage Tree Program. City Administrator Parks responded that
the sign was removed and was not intended to be a misstatement but rather
a public notice that had outlived its noticing period for the Historic
Preservation Commission meetings.
Councilmember Cathey inquired about future opportunities for the
Council to discuss or receive an update on the Davis-Meeker oak tree that
enables an opportunity for public comment. City Administrator Parks
advised of the City’s adherence to a legal proceeding regarding the tree.
The Council will receive an update through either an executive session or
another venue. The City Attorney will recommend the process for an
update. Staff is discussing the possibility of a community outreach process
that would include ways to commemorate and honor the history of the oak
tree moving forward when the time is appropriate in lieu of current legal
proceedings in process. The City promotes public comments from the
community at any time. The schedule does not include any meeting or
conversation about the tree outside of the legal process or the community
outreach process under consideration following the conclusion of the legal
proceedings. If changes occur with respect to the legal proceedings, future
actions would be difficult to forecast at this time.
Councilmember Dahlhoff commented on information she received from a
constituent about a joint meeting of the Tree Board, Parks and Recreation
Commission, and the Historical Preservation Commission concerning the
Davis-Meeker oak tree. She asked about the process for notification to the
Council with respect to the joint meeting. Mayor Sullivan eventually sent
an email cancelling the meeting. She assumed the meeting was cancelled
because of the legal process. She asked whether the Council would receive
notification of any joint meeting. City Administrator Parks said the
Council discussed the joint meeting and date during a presentation at a
prior work session. An email notification was sent to the Historic
Preservation Commission, Tree Board, and the Parks and Recreation
Commission announcing the meeting with a follow up announcing the
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
May 28, 2024 Page 14
meeting. However, because of the legal proceeding, the announcement of
the meeting did not occur. For any process moving forward, the Council
will receive notification. The joint meeting was to enable an opportunity
for different subject matter experts in their advisory capacity to the
Council, to provide a platform for the community to provide input for
evaluation by the bodies to submit any recommendation to the City
Council. The Davis-Meeker oak tree is a recognized heritage tree. The
City’s code specifically addresses heritage trees, how trees are listed,
future actions surrounding heritage trees, and an exemption for hazard
trees to secure a permit for removal.
ADJOURNMENT: With there being no further business, Mayor Sullivan adjourned the
meeting at 7:56 p.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
CITY COUNCIL WORK SESSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, EOC, 311 Israel Rd. SW,
Tumwater, WA 98501
Tuesday, May 28, 2024
6:00 PM
1. Call to Order
2. Roll Call
3. Community Human Services Program – Home Repairs (Finance Department)
4. MuniFin 201 - Debt (Finance Department)
5. Thurston Climate Mitigation Plan Implementation Update (Water Resources & Sustainability)
6. Urban Forestry Management Plan Implementation Update (Water Resources & Sustainability
Department)
7. Mayor/City Administrator's Report
8. Adjourn
Meeting Information
All Councilmembers will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/88316264500?pwd=K2lHZHZTZXRnMGo4T1JBUUp1RWpTdz09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 883 1626 4500 and Passcode
786811.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
4:00 p.m. the day of the meeting. Comments are submitted directly to the Councilmembers and will not
be read individually into the record of the meeting.
Post Meeting
Video recording of this meeting will be available within 24 hours of the meeting.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.