City Council Work Session
Regular MeetingTumwater, WA · January 14, 2025
Minutes
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 1
CONVENE: 6:00 p.m.
PRESENT: Mayor Debbie Sullivan and Councilmembers Peter Agabi, Michael
Althauser, Joan Cathey, Leatta Dahlhoff, Angela Jefferson, Eileen
Swarthout, and Kelly Von Holtz.
Staff: City Administrator Lisa Parks, City Attorney Karen Kirkpatrick,
Finance Department Director Troy Niemeyer, Community Development
Department Director Michael Matlock, Transportation and Engineering
Department Director Brandon Hicks, IT Department Director Lance
Inman, Water Resources and Sustainability Department Director Dan
Smith, Deputy Community Development Department Director Brad
Medrud, Communications Manager Jason Wettstein, Housing and Land
Use Planner Erika Smith-Erickson, Associate Planner Dana Bowers, and
Deputy City Clerk Tracie Core.
Others: Marc Daily, Thurston Regional Planning Council.
2025 LONG RANGE Deputy Director Medrud reported that the request is for approval to
PLANNING WORK schedule the 2025 Long Range Planning Work Program on the Council’s
PROGRAM: January 21, 2025 consent calendar following a follow-up discussion on
any proposed changes or questions pertaining to the Council’s review of
the work program on December 10, 2024. Since then, the General
Government Committee discussed some of the issues addressed by the
Council about scheduling the urban forestry amendments as a work item.
Based on feedback from the committee, staff moved the update of the
tree preservation ordinance as a work item in the 2025 work program
replacing and deferring the review of the multifamily tax exemption
program to 2026 because the program sunsets on December 31, 2026.
Councilmember Althauser commented that based on the General
Government Committee’s discussion, members agreed to present the
recommendation to the Council because the multifamily tax exemption
program does not expire until the end of 2026 affording time to work on
amendments to the tree preservation code.
The Council agreed to place the proposed 2025 Long Range Planning
Work Program on the Council’s consent calendar at the January 21, 2025
meeting.
SERVICE PROVIDER Deputy Director Medrud requested placement of the Service Provider
AGREEMENT WITH Agreement with the Dispute Resolution Center on the January 21, 2025
THE DISPUTE Council consent calendar. Staff recommends approval of the proposed
RESOLUTION CENTER service provider agreement.
FOR THE TENANT AND
LANDLORD Staff has been working with the Dispute Resolution Center on tenant
MEDIATION PROJECT landlord mediation following direction by the Council as a potential
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 2
AND CONFLICT action to address tenant protections. The Council approved a scope of
RESOLUTION work with the project initiated in 2023. The original budget allocation
RESOURCE LINE: for the project was $50,000 annually. In fall 2024, as part of the Human
Services Program funding discussion, the Council approved a second
component of a conflict resolution resource line as part of the same
contract based on available funding to cover the cost. The initial service
provider agreement for the landlord tenant mediation project expired at
the end of 2024. Staff drafted a new service provider agreement
combining both functions of conflict resolution and the landlord tenant
mediation project as one contract. Funding for conflict resolution is
$10,000 for the biennium. Tenant and landlord mediation is funded at
$40,000 for the biennium based on invoicing received by the City for
mediations performed by the Dispute Resolution Center.
Councilmember Dahlhoff asked about any examples of success stories
because several residents indicated the Dispute Resolution Center was
not able to assist in mediating disputes in manufactured home parks.
Deputy Director Medrud advised of the importance of relying on the
performance of the Dispute Resolution Center over the next year. An
evaluation on outcomes and progress will follow at the end of the year
serving as a check-in point to assess whether the service has been
successful.
Deputy Director Medrud responded to questions as to the details of the
process when a tenant and a landlord are engaged in a disagreement. He
explained that the agreement also includes conflict resolution, a separate
service performed by the Dispute Resolution Center and funded by the
City and other jurisdictions. Landlord and tenant mediation is a
Tumwater-specific program for residents. Residents contact the Dispute
Resolution Center for assistance. Funds provided to the Dispute
Resolution Center for the service are to offset the costs of that service.
The program is intended to encourage residents to use the program to
assist them in remaining in their homes.
Councilmember Swarthout said that although she is appreciative of the
ability for tenants to have the resource, she is concerned about rent
increases many residents have experienced. She questioned the ability of
the program to assist residents experiencing an increase in rent. Deputy
Director Medrud said the issue of rent increases would likely be
addressed by the Legislature as legislators have introduced upwards of
630 bills on the docket with one bill specifically addressing capping rent
increases to 7% plus other noticing requirements. Legislation could be
adopted later in the year enabling an avenue for the City to address rent
increase issues. In terms of issues surrounding the sale of manufactured
home parks, the state enacted notification requirements for the sale of
parks requiring a 70-day notice prior to a sale closing. The notice
requirement does not speak to the identity of the purchaser or their
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 3
location. Unless existing funds are immediately available, the sale of an
existing manufactured home park is difficult to address. Manufactured
home parks are considered at the same level of protection as other
tenants in the City. Notification is required for a variety of actions, such
as a rent increase or tenants that have been asked to leave regardless of
whether the home is an apartment or located within a manufactured home
park. Based on the City’s discussions with residents of different
manufactured park communities, many are paying lower rents and the
opportunity to move to another housing unit is likely limited.
Councilmember Cathey said she was asked whether an action by a
landlord stays on a tenant’s record, such as taking advantage of dispute
resolution services. Deputy Director Medrud said the activities by the
Dispute Resolution Center are not considered court procedures and are
not officially recorded. The names of people involved in the process are
treated confidentially.
City Attorney Kirkpatrick affirmed Deputy Director Medrud’s
explanation as the Dispute Resolution Center process is one method to
help avoid having any information listed on an individual’s credit report.
Councilmember Dahlhoff said feedback from residents from two
manufactured home parks spoke to retaliation. She asked how the
Dispute Resolution Center can involve both entities to address issues as
well as any provisions to eliminate retaliation. Retaliation is often a
limiting factor for residents for engagement because many believe they
will be subjected to retaliation. Deputy Director Medrud said retaliation
is not addressed in the service provider agreement with the Dispute
Resolution Center. It could be considered a civil matter between the
tenant and the landlord.
City Attorney Kirkpatrick noted that although retaliation is not covered
in the agreement, the City included language in the new code addressing
retaliation.
Councilmember Von Holtz inquired as to whether the agreement
addresses landlords that often take retaliatory actions. City Attorney
Kirkpatrick advised that the agreement does not cover those
circumstances because the program is a voluntary program providing a
resource to residents to help avoid escalating issues with their landlords.
The issue is important as the City implements provisions within the code
regarding landlord-tenant issues.
Mayor Sullivan affirmed the placement of the provider service agreement
on the Council’s consent calendar at the January 21, 2025 meeting.
WORK THE THURSTON Marc Daily, Executive Director, Thurston Regional Planning Council
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 4
REGIONAL PLANNING (TRPC), briefed the Council on TRPC planning activities.
COUNCIL DOES THAT
IMPACTS THE CITY OF TRPC is an independent organization serving the region for over 55
TUMWATER: years. TRPC is a voluntary organization of cities, towns, Thurston
County, tribal nations, school districts, and other special purpose districts
that work and plan together on issues that cross jurisdictional boundaries.
A major component of the work is state and federal funding funneled to
the region through TRPC for transportation projects. TRPC’s
Transportation Policy Board and TRPC render decisions on where
federal funds should be allocated locally. In December, TRPC
completed its largest call for projects and programmed approximately
$20 million for local transportation projects. Tumwater received some
funding for the largest project funded during the last call for projects of
approximately $2.6 million for the next phase of the Deschutes Valley
Trail for construction.
TRPC also serves as the region’s clearinghouse for data on the region.
Over 70 topics are included in the publication, The Profile, specific to the
county and individual jurisdictions on population, employment, housing,
and environment, etc.
Current work underway includes:
• Supporting Comprehensive Plan Periodic Updates within the
region:
− TRPC adopted updated housing allocations in December
− TRPC completed a Land Capacity Analysis
− TRPC identified adequate capacity in Tumwater and in urban
growth area to accommodate housing need
− Scope Countywide Planning Policy changes in late 2025
• Habitat Conservation Plan Support:
− To account for the impacts of gopher soils on development,
TRPC is updating assumptions in the 2021 Buildable Lands
Report
− Will assess the effects of the Bush Prairie Habitat Conservation
Plan
− Model three future (20 years) land use scenarios using different
density assumptions provided by Tumwater
− Prepare memo summarizing assumptions and results to support
Comprehensive Plan Update
• Comprehensive Plan Transportation Element Consistency
Review:
− As the Regional Transportation Planning Organization
(RTPO), TRPC will determine whether the Transportation
Element reflect the principles established in the Regional
Transportation Plan
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 5
− Determine whether the Transportation Element is
consistent with the adopted Regional Transportation Plan
− Determine whether the Transportation Element
implements and is consistent with the Land Use Element
− TRPC and jurisdictional staff developed 14-criteria
review checklist
− In December 2024, TRPC provided a preliminary
consistency review of Olympia’s Transportation Element
• Stormwater Retrofit Strategy
− A partnership with Tumwater, Olympia, Lacey, Thurston
County, TRPC, and Washington Department of Ecology
− EPA-funded project to create a toolkit for prioritizing
areas for stormwater retrofit to benefit water quality,
salmon habitat, and ecosystem functions
− Literature review and best practices report outlining
policies and procedures to support retrofit implementation
− Retrofit Implementation Strategy, including priority
project specifics process for ongoing regional retrofit
planning
• High-Capacity Transportation Study:
− Express business and vanpool are existing high-capacity
options that could be enhanced
− Not sufficient density in the region for the foreseeable
future to support light rail
− Household and employment densities are marginal for
commuter rail
− Any high-capacity transportation expansion will require
additional transportation revenue and more collaboration
between agencies in the Puget Sound region
• Emergency Detour Route Study:
− Study will evaluate different detour routes for the region
and consider different scenarios of closure by using the
transportation model to determine outcomes in different
areas during a closure. One closure that could affect
Tumwater significantly is closure of Interstate 5 at U.S.
Highway 101. Modeling will identify areas in the
transportation system that creates problems when the
region experiences a freeway closure. A consultant will
complete some operational analysis to identify ways to
operate the system differently at specific locations through
either infrastructure improvements or other types of
improvements. The study is scheduled for completion in
2026.
• Regional Safety Action Plan:
− Federal Safe Streets grant monies fund the development
of the action plan. Trends for death and serious injury
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 6
from traffic accidents are increasing especially for
pedestrians and bicyclists. The action plan will explore
areas within the region experiencing repeated safety issues
to develop strategies to reduce the number of incidents.
Lacey and Thurston County also received federal funds
and have initiated planning specific to each area. TRPC
will combine the work from Lacey and Thurston County
and build from the information to benefit the entire
region.
• Update of Regional Transportation Plan:
− Plan is updated every five years with the update scheduled
for completion in July 2025 with a draft plan issued in
April 2025.
• Regional Trails Plan:
− Plan was completed in 2024 and includes a number of
actions TRPC is tasked to complete. TRPC is seeking
funding sources. Funding was awarded through the call
for projects process for 2028 through 2032. However,
work on the plan should be initiated sooner with TRPC
actively seeking other funding sources.
• Martin Way Corridor:
− The Martin Way corridor is part of the strategy completed
as part of the Capitol Way/Capitol Boulevard review
through Olympia and Tumwater to develop a vision for
how major corridors should function within the region.
− TRPC is working with the Cities of Olympia, Lacey, and
Tumwater, Thurston County, and Intercity Transit to
identify the location and construction of up to 10
additional pedestrian crossings along Martin Way.
• Regional Bicycle Connectivity:
− In late 2025, TRPC will begin working on the strategy for
bicycle connectivity to identify gaps and safety issues in
the region’s bicycle network.
Mayor Sullivan and the Council thanked Mr. Daily for providing an
update on important work affecting the region.
RESOLUTION R2025-001 Director Hicks reviewed the draft resolution and changes in project
TRANSPORTATION eligibility for the Transportation Benefit District (TBD).
BENEFIT DISTRICT
SOLUTION: The Tumwater TBD was established by the City Council in 2014 and
approved by voters in 2015 to fund the TBD by an increase in sales tax.
The program has added a substantial amount of funding for City streets
in excess of $19.2 million enabling the City to leverage the funds to
obtain additional grants resulting in a total funding package of $25
million over the ten-year period.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 7
Prior to 2015, the City’s pavement maintenance program was funded at
only approximately $200,000 each year, street conditions in the City
were degrading quickly, and pavement conditions were arguably the
worst among the four largest jurisdictions in Thurston County.
Following the collection of TBD funding, pavement management
improved. The City was awarded a large pavement maintenance grant to
complete significant work on Tumwater Boulevard, Capitol Boulevard,
Old Highway 99, and other National Highway System routes. Overall,
while the City was able to address some of the larger problems in the
City, other streets in good condition continued to degrade slowly.
Sales tax revenue for the TBD continued to grow rapidly with a large
increase in 2020. The TBD funds were used to leverage even more grant
funds and pavement conditions improved. A significant amount of grant
funding was also received in 2023.
The City’s mantra, “promises made promises kept,” was the message to
voters when asked to approve the TBD. The City added an annual
pavement maintenance project to both the Transportation Improvement
Program and the Capital Facilities Plan to meet the requirements to
utilize TBD funds. As part of the information presented to voters in
2014, a map was developed of needed improvements.
Director Hicks displayed a new map depicting improvements completed
to date with most of the map covered. Most of the street segments not
completed to date will be completed with this summer’s pavement
maintenance project and other TBD funded projects that are currently
being designed for construction next year. The few segments that will not
be complete using TBD funds will be reconstructed by development in
the near future, are awaiting completion of utility projects, or were
determined to have not degraded enough to warrant maintenance work. .
The City’s Street Saver Program is a software program that rates
Citywide pavement ratings every few years based on data collected from
inspection of the streets. The program produces a report identifying the
order of projects to complete to receive the greatest cost benefit. City
staff inspect roads and review any logged complaints or requests from
the public.
Councilmember Swarthout commented on her surprise as to how
Tumwater roads were rated poor in recent work by TRPC as part of the
detour program compared to other roads in other jurisdictions. She asked
whether the work considered all Tumwater streets or only specific roads
in the City. Mr. Daily explained that the research was not related to
pavement condition.
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 8
Director Hicks added that TRPC collected data several years ago on
Tumwater street conditions. The results rated City roads as in mid-
condition compared to other jurisdictions. Information was collected
from the City on the level of funding required to maintain the system. At
that time, the City experienced a significant gap between available
funding and required funds to maintain the system.
Mr. Daily noted that data utilized by TRPC are provided by each
jurisdiction for pavement conditions.
Director Hicks reviewed accomplishments achieved by the TBD over the
last ten years:
• Street maintenance completed on more than 100 lane miles
(approximately 40% of the entire street system)
• Used over 50,000 tons of asphalt
• Replaced more than 100 curb ramps to improve accessibility for
all users
The Council is scheduled to consider Resolution No. R2025-001. Most
of the language in the resolution is similar to the resolution adopted by
the Council in 2015. The resolution authorizes a ballot measure for the
April 22, 2025 election for renewing the current 0.2% sales tax for the
TBD. Renewal of the TBD requires a simple majority affirmative vote
of City voters.
Because of a change in language to increase the eligibility of projects
funded by the TBD, a public hearing is required. The proposed change is
to add stand-alone sidewalk projects and projects included in the City’s
ADA Transition Plan as eligible projects for use of TBD funds.
Currently, $200,000 is dedicated to fund the Sidewalk Program. Adding
the sidewalk program as a TBD eligible program increases funding and
allows the City to utilize TBD funds as match for additional grants.
Director Hicks reviewed a list of proposed TBD project types if the TBD
is renewed:
• All pavement preservation/maintenance and sidewalk projects
included in the Transportation Improvement Program or
Transportation Capital Facilities Plan
• Typical project types:
− Annual pavement maintenance projects
− Repaving portion of large non-pavement maintenance
transportation projects
− Stand-alone sidewalk projects
• Priority areas
− Paving and Sealing
o Residential streets that are not generally eligible for
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 9
grants
o Roadway repairs and sealing to prepare for overlays
o Very poor condition streets (Antsen Street, 83rd
Avenue, Irving Street, etc.)
o Mill and inlay or chip seal for arterials and collectors
with surfacing 20 years or older
− Pedestrian Improvements
o Priority improvements in the ADA Transition Plan
o Sidewalk Program enhancement
o Accessibility barriers in the vicinity of, but outside the
limits of other projects
The proposal to fund the TBD of 0.2% sales tax ensures all people who
shop in Tumwater are paying a fair share of the transportation system.
The proposal is not a sales tax increase but a renewal of the current 0.2%
portion of the sales tax with no change in the current sales tax rate in the
City.
The TBD provides a method of funding sidewalks and roadway
maintenance and distributes the cost to all users of the system, maintains
the current rate of 0.2% of sales tax, and leverages the ability for the City
to secure other grant funds. Staff forecasts the TBD would generate $35
million over the next ten years if voters approve renewing the TBD.
TBD monies can be used to leverage multimodal and capacity grants and
improve and maintain roadway conditions.
Director Hicks reviewed the steps for seeking renewal of the TBD. The
Council is scheduled to consider the resolution to certify a ballot
proposition on January 21, 2025 following a public hearing. Deadline
for submittal of the Resolution to Thurston County is February 21, 2025.
Between February and March, the Council selects opposing and
supporting committees for the ballot measure. Staff will develop an
informational mailer for the April 22, 2025 election.
City Administrator Parks explained that at this time, staff is not aware of
any other measures included on the ballot. She offered to follow-up with
the Thurston County Auditor.
2025 CITY COUNCIL City Administrator Parks requested feedback on the Council’s preference
MEETING SCHEDULE to establish the timeline for the annual recess in August 2025. Because
AND SUMMER RECESS: the 2025 calendar includes five Tuesdays in July, the Council has the
ability to recess for three weeks if the recess is scheduled during the first
two weeks in August. However, if the recess is during the first two
weeks in August, the Council would not have a business meeting for five
weeks whereas the recess during the last two weeks in August would
result in four weeks between business meetings (August 5 through
September 2, 2025).
TUMWATER CITY COUNCIL WORK SESSION
MINUTES OF VIRTUAL MEETING
JANUARY 14, 2025 Page 10
Councilmembers shared their respective preferences and selected the first
two weeks in August for the Council recess.
MAYOR/CITY City Administrator Parks reported the next Tumwater Youth Program
ADMINISTRATOR’S event is scheduled on Friday, January 17, 2025 at Bush Middle School
REPORT: from 7 p.m. to 10 p.m. featuring a dodge ball tournament.
A community center workshop was held on Monday, January 13, 2025.
An update on the project for the Council is scheduled at the January 28,
2025 work session.
City Hall will be closed on Monday, January 20, 2025 in observance of
Martin Luther King Day.
Mayor Sullivan thanked Councilmember Jefferson for attending the
chamber meeting in her absence.
Mayor Sullivan encouraged Councilmembers to attend local events in
honor of Martin Luther King Jr.
ADJOURNMENT: With there being no further business, Mayor Sullivan adjourned the
meeting at 7:39 p.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
CITY COUNCIL WORK SESSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, EOC, 311 Israel Rd. SW,
Tumwater, WA 98501
Tuesday, January 14, 2025
6:00 PM
1. Call to Order
2. Roll Call
3. 2025 Long Range Planning Work Program (Community Development Department)
4. Service Provider Agreement with the Dispute Resolution Center for the Tenant and Landlord
Mediation Project and Conflict Resolution Resource Line (Community Development Department)
5. Work the Thurston Regional Planning Council does that impacts the City of Tumwater (Executive
Department)
6. R2025-001 Transportation Benefit District Solution (Transportation & Engineering Department)
7. 2025 City Council Meeting Schedule and Summer Recess (Executive Department)
8. Mayor/City Administrator's Report
9. Adjourn
Meeting Information
All Councilmembers will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/89424134025?pwd=XcjLNaJnLX1rvAkgFTEiuN8gtTyCYN.1
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 894 2413 4025 and Passcode
339799.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
4:00 p.m. the day of the meeting. Comments are submitted directly to the Councilmembers and will not
be read individually into the record of the meeting.
Post Meeting
Video of this meeting will be recorded and posted on our City Meeting page: https://tumwater-
wa.municodemeetings.com.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City’s ADA Coordinator
directly, call (360) 754-4129 or email ADACoordinator@ci.tumwater.wa.us. For vision or hearing