General Government Committee
Regular MeetingTumwater, WA · August 9, 2023
Minutes
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Michael Althauser and Councilmembers Joan Cathey and
Leatta Dahlhoff.
Staff: City Attorney Karen Kirkpatrick, Community Development
Director Michael Matlock, Finance Director Troy Niemeyer, Fire
Chief Brian Hurley, Planning Manager Brad Medrud,
Communications Manager Ann Cook, and Housing and Land Use
Planner Erika Smith-Erickson.
APPROVAL OF MINUTES:
GENERAL
GOVERNMENT
COMMITTEE,
JULY 12, 2023:
MOTION: Councilmember Dahlhoff moved, seconded by Councilmember
Cathey, to approve the minutes of July 12, 2023 as published. A
voice vote approved the motion unanimously.
ENTERPRISE RESOURCE Director Niemeyer briefed members on the status of transitioning to
PLANNING SYSTEM the Enterprise Resource Planning (ERP) system.
UPDATE:
The first module of Financials and Productivity was activated on
April 1, 2023. The installation was on schedule and within budget.
Prior to the initiation of the second and third modules, staff
discovered the pace of implementation was too overwhelming
because additional resources were lacking to assist in transitioning to
the new system. The transition has created some stress, burnout, and
some turnover by staff. The next installation module is Payroll and
HR. Staff anticipates some additional challenges that likely will
delay implementation of the module.
Director Niemeyer reviewed the project timeline as initially adopted.
The process began in early 2022. Following installation of Payroll
and HR, the Utility Billing module is scheduled next for installation.
The project was initiated in 2017-2018 when the City began
exploring options to meet City needs. Since then, the City has
experienced a turnover in personnel directly involved in the
installation of the new system, as well as the loss of a Database
Administrator, and several Finance Directors. An Accounting
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 2
Supervisor position was replaced several times over the last several
years, as well as the City’s Senior Accountant who retired.
Implementation of the HR module encountered some setbacks with
the departure of the Administrative Services Director, the HR
Manage, who is scheduled to retire at the end of September, and
another position. The loss of personnel has encumbered the
transition planned for October 2023 for HR and Payroll. The two
modules cannot be split and installed separately as they are
interrelated, which will necessitate a delay as the City fills the
positions.
Other challenges include the loss of institutional knowledge as
employees leave the City. Institutional knowledge is important as
staff builds and implements the system because it requires process
decisions, configuration decisions, and decisions inherent in the
operation of the system. When employees leave the City, their
background and knowledge are no longer available to the project.
Additionally, the project team has experienced a number of vendor
issues. The vendor is also experiencing turnover of personnel with
many new employees joining the company. The vendor, in some
cases, oversold and under-delivered some actions involving the
importation of data from the old system to the new system as well as
the proposed project timeline.
Director Niemeyer reviewed a graph on the status of implementation
with actual times that often involved much more time than indicated
by the vendor. Initially, the City intended assigning 1.5 FTEs as
project managers. The project management work has increased
substantially. Some risks identified by the Project Manager include
employee turnover, vendor’s lack of experienced staff, and allocation
of time by existing City staff.
Staff proposes a change to the timeline adjusting the activation of the
Payroll and HR module to March/April 2024. Instead of overlapping
phases during implementation, staff proposes implementation of
only one module at a time to reduce stress on staff and ensure a
smoother transition.
Director Niemeyer responded to questions about the status of the
Financial module. The Financial module is operational except for
several components that have been delayed. Employees provided
feedback as they learned how to operate the new system. Four other
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 3
system modules for installation include Payroll/HR, Utility Billing
Phase 3, Intergov (permitting system), and Enterprise Asset
Management. All system modules are interconnected with the
Financial module.
Director Niemeyer reported the original project cost was
approximately $2 million, which included staff time and project
management. The actual contract amount with Tyler Technologies
was $891,000. Phase 1 costs were under budget by $20,000. Staff
anticipates achieving similar results for Phase 2 as the vendor has
reduced onsite visits. Staff recommends reallocating the savings
from Phase 1 of $20,000 to Phase 2.
Next steps include feedback from the committee and conceptual
approval for a contract amendment with the vendor for a briefing to
the Council for final approval of the amendment. Council approval
is required to reallocate the savings from the first module to the
second module. Director Niemeyer requested delegation of authority
for any adjustment in the timeline or to issue a change order.
City Attorney Kirkpatrick advised members that if they support
granting some authority to the Finance Director for future
amendments, the committee should approve the Finance Director
making changes as long as the budget amount is not increased.
MOTION: Councilmember Dahlhoff moved, seconded by Councilmember
Cathey, to recommend approval of providing flexibility on the
timelines for the modules, as well as some flexibility of up to
$20,000 while remaining within the budget as presented for the
Council’s future consideration. A voice vote approved the motion
unanimously.
HAZARDS MITIGATION Planner Smith-Erickson briefed members on the Tumwater Annex
PLAN FOR THE and its relationship to the Hazards Mitigation Plan for the Thurston
THURSTON REGION Region.
UPDATE:
Because the region is susceptible to multiple natural hazard events of
earthquakes, landslides, storms, floods, wildland fires, and other
hazards destructive and costly to communities, the region developed
the 2023 Hazards Mitigation Plan for the Thurston Region as a
region-wide strategy to minimize the impacts of natural disasters.
Federal hazard mitigation requirements are outlined in the Disaster
Mitigation Act of 2000, which require jurisdictions to adopt a
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 4
federally approved Hazards Mitigation Plan to apply for or to receive
federal mitigation assistance program grants. Federal mitigation
planning requires the plan to be updated and reapproved every five
years. The current Hazards Mitigation Plan was substantially
updated in 2017. Staff is working with the Hazard Mitigation
Workgroup and Thurston Regional Planning Council (TRPC) to
update the plan. The Tumwater Annex addresses actions the City
would take to address hazards commonly present throughout the
City.
Hazard mitigation is considered any action that reduces or eliminates
long-term risks to life and property. The 2023 Hazards Mitigation
Plan for the Thurston Region and the Tumwater Annex contain the
City’s strategies for preparedness, response, and recovery. Staff has
been meeting with the Tumwater Fire Department, Water Resources,
Parks and Recreation, Transportation and Engineering, and
Communications to identify initiatives to include in the plan.
Hazard mitigation saves lives and reduces property losses,
safeguards critical community lifelines, assists community members
recover more quickly, and it reduces short- and long-term impacts to
the economy and the environment while also reducing the costs of
disaster recovery and reconstruction.
City staff and over 20 local agencies in Thurston County are working
together on the plan. The workgroup meets monthly. Currently, the
workgroup is in the public engagement phase. A website for the plan
contains information on open houses, a survey for the community,
and a copy of the 2023 Hazards Mitigation Plan for the Thurston
Region, and Tumwater’s Annex Plan. Plan adoption is scheduled to
begin in December 2023.
The project manager for the plan is TRPC serving as the liaison
between the jurisdictions, Thurston County, federal government, and
state government. The 2023 Hazards Mitigation Planning
Workgroup membership includes representatives from each plan
partner and regulatory partners (FEMA, Washington Emergency
Management Division, and TRPC).
Staff identified hazards to address and the initiatives to prioritize by
utilizing a hazard risk rating model. TRPC contracted with Tetra
Tech to complete the model and provide data to the workgroup. Each
community’s risk to a particular hazard varies based on several
factors of probability, location, and sum of impacts on population,
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 5
property, and the economy. The project examines hazard areas
overlap with residents, homes, businesses, and other structures
across Thurston County communities to identify an overall risk
score. The scores are ranked low, medium, and high for each risk.
The higher score warrants greater attention from the community to
commit to actions that help protect vulnerable assets from future
hazards.
The City of Tumwater conducted an online community survey to
inform the community about the multijurisdictional plan update. The
survey was available from June 6, 2022 through July 31, 2022. The
survey included 12 questions specific to perceived risks and
preferred mitigation activities in Tumwater. Tumwater received 55
responses. Earthquake was rated the highest concern by respondents
followed by climate change, wildfire, extreme heat, severe storms,
flooding, and other hazards.
Earthquake is the highest ranking risk with a score of 36. The plan
does not address sea level rise. TRPC is working with the City of
Olympia to address sea level rise. Survey respondents ranked severe
weather as a medium risk followed by tsunami, which ranked zero to
low. Although volcano/lahar was ranked zero to low the Tumwater
Annex addresses volcano/lahar because of the Mount St. Helen’s
eruption and the substantial amount of ash fall experienced by the
City. Survey respondents ranked wildfire as a medium risk.
Councilmember Cathey inquired about the lack of including climate
change despite being ranked as the second most important risk
according to respondents in Tumwater. Planner Smith-Erickson
explained that within the Tumwater Annex, severe storm or weather
incidents are addressed. The plan addresses reducing heat island
affects, extreme heat, and wildfires. However the plan does not
specifically speak to climate change partly because Tetra Tech did
not specifically identify climate change.
Manager Medrud added that the scope for defining hazards was
based on guidelines from FEMA. Staff recognizes climate change
has multiple affects across the community. Those issues are captured
in other risks pertaining to sea level rise, severe weather, and
wildfires. While not necessarily identified separately, the plan
addresses climate change through other identified risks.
Councilmember Cathey recommended that for the benefit of
respondents, it would be important for climate change to be
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 6
addressed in the plan as it would be difficult to calculate how climate
change is tied to the effects of other risks.
Planner Smith-Erickson acknowledged the request.
Planner Smith-Erickson reviewed the correlation between the
regional and local plan. The regional plan contains goals and
objectives applicable county-wide with an overall risk assessment for
all identified hazards. Tumwater City Council is responsible for
adopting the 2023 Hazards Mitigation Plan for the Thurston Region
as well as the Tumwater Annex containing specific City initiatives.
The Tumwater Annex addresses compliance with National Flood
Insurance, which is required for FEMA approval.
Councilmember Cathey asked whether the City has ever experienced
a flood. Manager Medrud advised that the City experienced severe
flooding on the brewery property, Pioneer Park, and the golf course
approximately 10 years ago.
Planner Smith-Erickson added that the 2017 plan includes historical
events of identified hazards mapped in the City. The 2023 update
consider historical events and adds any new additional information
specific to natural hazard events since the last update in 2017.
Planner Smith-Erickson reviewed the primary contents of the plan:
• Community Profile & Capability
Assessment
• Risk Assessments – risks exist where
vulnerable assets intersect with hazards
City of Tumwater mitigation initiatives (actions):
Currently adopted
Completed
New
Future land use plans, zoning, and development
regulations
Draft Mitigation Initiatives – Earthquake
• Risk Ranking – High Four actions
proposed:
Conduct a voluntary non-structural earthquake readiness
inspection for all critical facilities on an annual basis
(2017 HMP)
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 7
Have a professional engineer or otherwise qualified
professional to assess infrastructure for earthquake
vulnerability (2017 HMP)
Include retrofitting/replacement of critical system
elements in Capital Improvement Plan (LOTT)/Capital
Facilities Plan (City) (2023 Proposed)
Install auxiliary generator to power City main well/water
supply (2023 Proposed)
Draft Mitigation Initiatives – Wildfire
Risk ranking- Medium Five
actions proposed:
Establish fire breaks and routine maintenance on
Tumwater Hill adjacent to City property, the newly
created City park, and the elementary school (2017
HMP)
Adopt the Washington Wildland-Urban Interface Code
(WWUIC), International Building Code (IBC) and
International Residential Code (IRC) to meet WUI
requirements (2023 Proposed)
Update the City of Tumwater map to show wildland
urban interface map layers to coincide with the 2023
Building Code Update (2023 Proposed)
Routinely inspect the functionality of fire hydrants (2023
Proposed)
Develop a vegetation management plan, incorporating
proper species selection, planting, and maintenance
practices into landscape code updates (2023 Proposed)
Councilmember Cathey asked for an update on the status of the
City’s review of the Washington Wildland Urban Interface Code.
Manager Medrud advised that staff continues to meet with state
agencies and local jurisdictions to determine how to address the new
requirements in the code. Staff has not received any input indicative
of any change in the requirements from the Washington Building
Code Council. Staff is working on preparing an updated mapping of
the City to assist in identifying areas that may or may not be affected
by the code. At this time, he is not confident it would be possible to
change the requirements for defensible space around buildings. The
Legislature instructed the Building Code Council to pursue the
amendments in 2019. The State Building Code Council updated the
Washington Administrative Codes (WACs) based on that direction.
The new code becomes effective October 29, 2023. Further work by
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 8
staff is pending the resolution of another larger issue surrounding the
energy code, which might move the deadline to some degree as the
changes are tied together.
Draft Mitigation Initiatives – Severe Storm/Weather
• Risk ranking- Medium Four actions
proposed:
Inspect all trees within falling distance of the four
Cityowned critical facilities to determine if they pose
a hazard to the facility or operation of the facility
during a storm (2017
HMP)
Reduce heat islands by implementing urban forestry
code updates (2023 Proposed)
Modify land use and environmental regulations to
support vegetation management activities that
improve reliability in utility corridor (2023 Proposed)
Assess feasibility of installing solar power and battery
storage at City Hall and Tumwater Library
(secondary emergency operations center) (2023
Proposed)
Councilmember Cathey asked about the remaining two critical City
facilities. Planner Smith-Erickson said the last two critical facilities
are likely the two fire departments in addition to the library and City
Hall.
Councilmember Cathey commented that the recent adoption of the
Washington Wildland-Urban Interface Code speaks little about the
role of trees and vegetation play in reducing the effects of climate
change. Based on conversations with some legislators, there has
been some pushback on the new requirements. Her concern is how
the new requirements affect other City plans.
Planner Smith-Erickson said the public process includes online open
house and survey opportunities until August 25, 2023 at
www.trpc.org/hazards. Materials on the website enable viewing the
regional plan initiatives as well as Tumwater’s initiatives and provide
feedback and participate in the survey for the initiatives. As of the
previous day, the website has received three responses on
Tumwater’s plan. During the Thurston County Fair, she promoted
the 2023 Hazards Mitigation Plan for the Thurston Region with the
public and to advertise the City’s plan to solicit feedback. Another
public comment period is scheduled from September 25, 2023
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 9
through October 8, 2023. All 22 proposed initiatives are included in
the survey.
The next step is completion of the draft Tumwater Annex by
September 15, 2023. On September 23, 2023, the Emergency
Preparedness Expo is scheduled affording another public outreach
opportunity to educate and inform the public about the update, the
initiatives, and hazard preparedness. On October 16, 2023 the 2023
Hazards Mitigation Plan for the Thurston Region and the Tumwater
Annex will be submitted to Washington Emergency Management
and by November, the City will submit the regional plan and the
Tumwater Annex to FEMA for a completeness review.
A January 2024 work session and public hearing is scheduled with
the Planning Commission followed by a February, March 2024
presentation of the plan to the City Council for consideration. Work
is ongoing with City departments to finalize draft actions, conducting
public engagement and outreach, and updating the hazard profiles
and risk assessments.
PRELIMINARY DOCKET Planner Smith-Erickson briefed members on the 2023 Annual
FOR 2023 ANNUAL Development Code Housekeeping Amendments Preliminary Docket
HOUSEKEEPING and a request to the Council to include the amendments as the final
AMENDMENTS: docket for consideration during the September 5, 2023 Council
meeting.
During 2022 and 2023, staff compiled information on minor
housekeeping amendments to the Tumwater Municipal Code (TMC)
to be considered in 2023. The proposed amendments are intended as
minor corrections to the City’s development regulations.
TMC 18.60.025(A) establishes a process similar to the one the City
follows for annual Comprehensive Plan amendments. A preliminary
docket of proposed amendments is reviewed by the Planning
Commission for a recommendation to City Council on the final
docket.
The proposed amendments cover the following topics:
• Manufactured Home Parks Required Open Space – clarifies
the requirements for open space standards for development
without division of land
• Undergrounding Utilities Requirements – clarifying new and
existing electrical power, telephone, cable television, fiber
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 10
optics, and other transmission to be installed underground
and establish an appeal process through the Transportation
and Engineering Services Manager
• Town Center Mixed Use Subdistrict First Floor Uses –
clarifying uses allowed on the first floor of commercial and
residential developments along main streets in the Town
Center Mixed Use subdistricts
• Building Heights Over Sixty-Five Feet for Specific Industrial
Uses – establish a Conditional Use Permit process in the
Light Industrial and Heavy Industrial zoning districts for
certain uses with heights exceeding 65 feet.
Staff will review to ensure the proposed amendments are consistent
with the requirements of Growth Management Act and the Tumwater
Comprehensive Plan.
The Planning Commission is scheduled to receive a briefing on
October 24, 2023 and conduct a work session on November 14, 2023
followed by and a public hearing on November 28, 2023.
The City Council will receive a briefing on the amendments on
January 23, 2024 for consideration in February 2024.
Chair Althauser asked whether existing manufactured home parks
are required to allocate 15% for open space. Manager Medrud
explained that the new requirement would only apply if there was a
redevelopment that exceeds the threshold or a new development of a
manufactured home park. Existing uses would not be affected unless
redevelopment of the property occurs beyond current thresholds.
Councilmember Cathey inquired about the current height allowed in
the City. Manager Medrud said building heights in the General
Commercial cannot exceed 65 feet. The amendment applies to
development within the Light Industrial or Heavy Industrial
exceeding 65 feet. The project proponent would need to demonstrate
why the height is necessary and obtain approval through a
Conditional Use Permit process.
In response to questions about existing residential uses abutting
industrial-zoned uses, Manager Medrud identified several areas of
the City that include residential near industrial to include Mottman
Industrial Park, the Beehive Industrial area, and in areas within the
southern area of the City.
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 11
2025 COMPREHENSIVE Manager Medrud reviewed the process for the Comprehensive Plan
PLAN PERIODIC UPDATE – Update.
WORK PROGRAM AND
SCHEDULE: The work program includes an introduction of the update process and
the issues to be addressed, as well as an introduction to state guidance
materials. State guidance materials comprise approximately 750
pages of information that must be addressed as part of the update
process. The review will be presented in smaller increments to the
extent possible.
The update timeline has some flexibility based on new requirements
passed by the Legislature in 2023 that are not included within any of
the guidance materials. The City’s schedule is based on state
requirements. The goal of the update is to provide a document that
is easier for the public to absorb with areas of focus contained in
shorter documents.
The structure of current Comprehensive Plan Elements include:
• Capital Facilities Plan
• Conservation Element
• Economic Development Plan
• Housing Element
• Tumwater Thurston County Joint Plan (not part of update
process)
• Land Use Element
• Lands for Public Purposes Element Parks, Recreation, and
Open Space Plan (not part of update process)
• Shoreline Master Program (not part of update process)
• Transportation Plan
• Utilities Element
• Climate Element (required as of 2023)
The plan includes a number of appendices:
• Neighborhoods
• County-Wide Planning Policies
• Sustainable Thurston Goals and Actions
• Land Use and Housing Survey Results
• Foundational Plans and Documents
• Glossary
• Ordinance No. O2016-012
• 2016 Tumwater Soil Report
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 12
Each of the elements follow a similar structures and include an
introduction with background, a discussion on how each element
meets the 15 growth management goals, and a discussion on how the
element addresses the County-Wide Planning Policies and applicable
Sustainable Thurston policies. A table of plans and foundational
elements will be included.
The second chapter is a technical discussion appropriate for each
element. The update will revise goals, policies, and actions. Staff
proposes a separate chapter for goals, policies and actions,
responsible entities, and an implementation timeline.
Chair Althauser mentioned the passage of the requirement to include
climate change as an element and the previous discussion by staff
and the Council to include climate change within existing elements
as opposed to producing a stand-alone element. Manager Medrud
said staff plans two courses of action as the new requirement requires
a separate element on Climate, which will build on the work the City
has completed with TRPC and other jurisdictions, as well as
incorporating climate within the other elements.
The City’s website includes a link to all documents related to the
update. Staff is working with Communications staff to launch the
Comprehensive Plan Update website. The website will include a list
of all documents supporting the update, meeting minutes, and
guidance materials.
New legislation requires more information on how the Capital
Facilities Plan works in conjunction with the Comprehensive Plan.
Staff anticipates that the next update will be a different format than
in the past.
Lands for Public Purposes pertain to all City public services of solid
waste, sanitary sewer, water, and fire, etc. All private utilities are
addressed within the Utilities Element.
The Department of Commerce provided the City with a substantial
amount of guidance materials for the periodic update comprised of
over 1,000 pages. Of the most important materials, the Guide to the
Periodic Update Process helps readers to understand the general
process and steps the City follows under state law to update the
Comprehensive Plan. The City has been encouraged to prepare and
submit a checklist to the state of completed actions. The checklist
includes all issues to be addressed in the Comprehensive Plan and in
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 13
the City’s development regulations. The checklist does not address
new legislation adopted during the 2023 legislative session. Staff
plans to incorporate all new requirements within the City’s checklist.
The Department of Ecology provided a critical areas checklist to use
for updating the development code and critical areas. Because the
City has updated critical areas as changes occurred, the update will
be minimal for that update process.
Other state guidance materials will be introduced during the update
process and as specific elements are presented for review and
discussion beginning in the fall.
Community outreach actions include scheduling some open houses
and other events during the fall. Staff is working on completing a
gap analysis for review by the committee in October. Staff submitted
an application for a Department of Commerce grant to cover the cost
of work on the Transportation Element and some technical
information for the Economic Development Plan. Staff recently
learned of the opportunity to apply for a Missing Middle grant of
$75,000 to fund updates to the development code.
Staff is currently in the mode of data collection and updating the
format. The gap analysis covers all elements and all regulations
subject to the update.
Manager Medrud outlined the review schedule for each element by
the committee. He invited feedback on the process for presenting the
information to the Council.
Councilmember Dahl recommended including a Council work
session during a briefing on the Equity Toolbox to receive direction
from the Council.
Manager Medrud reported Phase 2 beginning in 2024 is comprised
of reviewing the amendments to the elements and amendments to the
development code. Planning Commission reviews are occurring
concurrently with the General Government Committee briefings.
The legislative process will begin in fall 2024 to meet the June 2025
deadline.
Councilmember Dahlhoff recommended incorporating more joint
meeting opportunities between the Commission and the Council to
enable an exchange of information and direction. Manager Medrud
TUMWATER GENERAL GOVERNMENT COMMITTEE
MINUTES OF VIRTUAL MEETING
August 9, 2023 Page 14
explained that the process begins with the Commission receiving an
introduction of the elements followed by the General Government
Committee receiving a review a month following the Commission’s
review. A joint meeting of the Commission and the Council is
scheduled in December to discuss and approve the 2024 Work
Program and the Comprehensive Plan Periodic Update. Other joint
meetings can be scheduled on specific topics as needed.
ADJOURNMENT: With there being no further business, Chair Althauser
adjourned the meeting at 8:23 a.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
GENERAL GOVERNMENT COMMITTEE
MEETING AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Council Conference
Room, 555 Israel Rd. SW, Tumwater, WA
98501
Wednesday, August 09, 2023
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes: General Government Committee, July 12, 2023
4. Enterprise Resource Planning System Update (Troy Niemeyer)
5. Hazards Mitigation Plan for the Thurston Region Update (Erika Smith-Erickson)
6. Preliminary Docket for 2023 Annual Housekeeping Amendments (Erika Smith-Erickson and Brad
Medrud)
7. 2025 Comprehensive Plan Periodic Update – Work Program and Schedule (Brad Medrud)
8. Additional Items
9. Adjourn
Meeting Information
All committee members will be attending remotely. The public are welcome to attend in person, by
telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/82280736315?pwd=V2hFM2t4WlNVRVQxNmpXelowZ1NJZz09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 822 8073 6315 and Passcode
496653.
Public Comment
The public may submit comments by sending an email to council@ci.tumwater.wa.us, no later than
5:00 p.m. the day before the meeting. Comments are submitted directly to the Committee members
and will not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request. Please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA