TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 1
CONVENE: 6:00 p.m.
CASE NUMBER: Yorkshire Apartments TUM-22-1743 Preliminary Binding Site
Plan & Conditional Use Permit
DESCRIPTION OF The project proponent is requesting approval of a Phased Preliminary
PROPOSAL: Binding Site Plan (TUM-22-1743), and a Conditional Use Permit
(TUM-22-1742) to construct 1150 apartment units in a mix of high-
rise structures and mixed-use buildings, including 9,000 square feet of
commercial space, and mini-storage units on parcels located in the
General Commercial Zone District (GC).
PROJECT NAME: Yorkshire Apartments.
APPLICANT: Owner:
Grandviews Yorkshire, LLC
127 N Olympic Avenue
Arlington, WA 98223
Representative:
Tyrell Bradley LDC Corp.
1411 Slate Ave NE, Suite 200
Olympia, WA 98506
PUBLIC HEARING: Hearing Examiner Mark Scheibmeir convened the public hearing at
6:00 p.m. to consider the Applicant’s request for approval of a Phased
Preliminary Binding Site Plan (TUM-22-1743), and a Conditional Use
Permit (TUM-22-1742) to construct 1,150 apartment units in a mix of
high-rise structures and mixed-use buildings, including 9,000 square
feet of commercial space, and mini-storage units on parcels located in
the GC zone district. The applicant is represented by Tyrell Bradley
with LDC Corp. The City is represented by Permit Manager Tami
Merriman. Prior to the hearing, he reviewed the Staff Report prepared
by City staff. He was recently advised of some additional public
comments received by the City prior to the hearing. One comment is
from Bonnie Blessing along with photos and other documents. The
second comment is from Sherry Buckner.
Examiner Scheibmeir reported that prior to the public hearing he
received and reviewed the following 14 exhibits:
Exhibits:
Exhibit 1. Staff Report 12-22-2023
Exhibit 2. Binding Site Plan and Application Materials
Exhibit 3. Vicinity Map
Exhibit 4. Zoning Map
Exhibit 5. Public Notice Certification 12-22-2023
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 2
Exhibit 6. Mitigated Determination of Nonsignificance 10-19-2023
Exhibit 7 Public Hearing Notice 12-22-2023
Exhibit 8. Notice of Application Public Comments
Exhibit 9. SEPA Public Comments
Exhibit 10. Concurrency Determination 10-05-2023
Exhibit 11. Draft Drainage Report 12-05-2022
Exhibit 12 Water Sewer Availability 12-30-2022
Exhibit 13 Traffic Impact Analysis 8-22-2023
Exhibit 14 Power Undergrounding Letter 12-05-2022
Examiner Scheibmeir added the public comment from Sherry Buckner
as Exhibit 15. The public comment from Bonnie Blessing was entered
as Exhibit 16. Examiner Scheibmeir noted that Ms. Blessing
submitted two public comments and that Exhibit 16 includes both
versions of her comments.
Examiner Scheibmeir reported the purpose of the hearing is to provide
City staff with an opportunity to explain its Staff Report and
recommendations and any proposed conditions followed by an
opportunity for the Applicant to respond to the City’s presentation and
either add to or subtract from the City’s suggestions. Public testimony
will follow. Both the City and the Applicant will have an opportunity
to respond to any testimony. All testimony will be under oath or
affirmation.
CITY TESTIMONY: Examiner Scheibmeir administered the oath to Tumwater Permit
Manager Tami Merriman.
Manager Merriman reported the Applicant is requesting approval of a
Phased Preliminary Binding Site Plan and a Conditional Use Permit to
construct 1,150 apartment units with a mix of high-rise structures and
mixed-use buildings, including 9,000 square feet of commercial space,
and mini-storage units on parcels located in the GC zone district. The
parcels are located between Israel Road and Tumwater Boulevard.
Examiner Scheibmeir asked whether the southerly and last parcel of
the old public right-of-way is included within the project. Manager
Merriman said the area is public right-of-way and is not included
within the project. Examiner Scheibmeir said that the basis of the
question pertained to one of the schematics that references a land swap
with the City for that parcel. Manager Merriman explained that at the
beginning of the project review, there was some discussion about a
potential land swap for the parcel. However, staff could not include
the right-of-way as part of the development without first processing a
vacation of right-of-way request. At that time, the Applicant withdrew
the request and did not include the proposal in subsequent project
application materials.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 3
Staff reviewed the project for consistency with the Tumwater
Comprehensive Plan and other City documents. The Staff Report
provides analysis for the different plans that apply to the proposed
project. The Comprehensive Plan identifies the area as part of the new
commercial core and that mixed-use development should be
considered as well as promoting affordable housing. The site is
included in the Littlerock Road Subarea Plan, which identifies
residential development anticipated for the area. The plan identifies
75% of any anticipated residential growth to be multifamily units. The
proposal along with other findings is consistent with the
Comprehensive Plan.
As part of transportation concurrency, the Applicant submitted a
Transportation Impact Analysis. The detail for transportation
mitigation is described in the SEPA Conditions. The concurrency
determination was based on frontage improvements and any
transportation mitigation would align with the Transportation System
Plan. The project also aligns with the Sustainable Development Plan
for the Thurston Region providing affordable housing and varied
housing. Apartments are considered a varied housing type, which
provides different types of living and affordability as opposed to
single-family homes.
The Thurston Region Trail Plan does not apply to the proposed
development as no trail plans would be impacted by the development.
Within the City’s municipal code, the Hearing Examiner has authority
to review Conditional Use Permits and Phased Preliminary Binding
Site Plans.
Chapter 14 of Tumwater Municipal Code (TMC) requires the City to
provide public notice of the proposal. The notice of application was
originally submitted in December 2022. Following submittal of the
application, staff identified the need for additional information within
the Transportation Impact Analysis and the Phasing Plan. Further
analysis was requested of the Applicant. The Applicant resubmitted
documentation and a revised binding site plan in June 2023. Due to
changes in the application, the City reissued an amended notice of
application. The notice was posted on the site, mailed to property
owners located within 300 feet of the subject property and to various
agencies, and published in The Olympian. The City received
comments on the notice of application from the Nisqually Indian Tribe
requesting a cultural survey. A cultural survey was completed and
provided to the tribe. The tribe concurred with the conclusions and
recommendations of the cultural survey. The tribe requested the City
require adding an inadvertent discovery plan to civil construction
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 4
plans. The request is also codified in the TMC as a requirement.
Thurston County did not provide comments on the Transportation
Impact Analysis. Tumwater School District requested the Applicant
provide bus stops on the extension of Tyee Drive. The Applicant
added the request to the revised site plans.
Several citizen comments were received and are included in Exhibit 8.
Many comments spoke in support of apartments and providing
affordable housing. Some comments expressed concerns about traffic
impacts, impacts to the schools, and the need for transit stops, tree
retention, and impacts to emergency services. The concerns are
addressed within the City’s development standards and critical areas
codes.
Staff issued a SEPA Mitigated Determination of Non-Significance on
October 19, 2023. The notice was posted on-site, mailed to property
owners located within 300 feet of the site, mailed to affected agencies,
and posted on the City’s website. Comments were received on the
SEPA determination. The Squaxin Island Tribe conveyed no concerns
regarding cultural issues. The Nisqually Tribe reviewed the cultural
survey and offered no additional comments. The Department of
Ecology submitted comments surrounding solid waste and toxic clean-
up regulations. The Black Hills Audubon Society expressed concerns
about groundwater contaminants. Some citizens expressed concerns
about tree retention, traffic impacts, high groundwater, building
heights, and gopher protection. The concerns from the public were
similar concerns by the City. The City’s critical areas ordinance
provides for the protection of habitat species, critical areas, and trees.
Traffic impacts and mitigation were reviewed by staff. The Mitigated
Determination of Non-significance outlines traffic impacts and
required mitigation. Schools are also affected. The Tumwater School
District will receive transportation impact fees. Groundwater
protection is addressed by the City’s Drainage Design and Erosion
Control Manual. Designs for site planning, building design, and
building heights are reviewed under TMC 18 and Citywide Design
Guidelines. A qualified biologist completed a survey on the Mazama
Pocket gopher and determined there was no presence of mounds or
formations that exhibited gopher activity or gopher habitat.
Public notification for the January 3, 2024 public hearing was mailed
to property owners located within 300 feet of the subject property and
to various agencies, posted on-site, and published in The Olympian in
conformance with TMC 14.06.
The transportation concurrency ruling identified specific mitigation
measures to achieve concurrency that include frontage improvements,
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 5
payment of transportation impact fees, extension of Tyee Drive from
Israel Road to Tumwater Boulevard, and a roundabout at the
intersection of Tyee Drive and Tumwater Boulevard. Tyee Drive
begins at the north end of the property off Israel Road and would be
extended through the binding site plan connecting to Tumwater
Boulevard.
Examiner Scheibmeir commented that the schematics reflect that the
project would only construct a portion of Tyee Drive and the northerly
section would be reserved for construction by an adjoining property
owner located to the east. He asked whether the schematic was an
earlier iteration of the concept. Manager Merriman explained that the
Tyee Drive extension begins at Israel Road and extends to the south
connecting to Tumwater Boulevard. The City received an application
for an apartment complex on the east side of the new extension of
Tyee Drive. The developer plans to construct a portion of Tyee Drive.
Frontage improvements for the Yorkshire Apartments include a
sidewalk, pathway, and landscape strip on a portion of Tyee Drive.
The phasing plan speaks to different transportation improvements and
phasing. Phase 1 of the development is the apartment complex of 240
units, which requires frontage improvements and access on Israel
Road, as well as fire access extending to Tumwater Boulevard.
Examiner Scheibmeir referred to Phase 2, which speaks to
constructing the entire length of Tyee Drive from Israel Road to
Tumwater Boulevard. He asked how the two projects marry in terms
of completing the extension of Tyee Drive. Manager Merriman
responded that Phase 2 of the transportation improvements require
construction of the full extension of Tyee Drive either by the Applicant
or the adjoining property owner in order for the project to receive a
Certificate of Occupancy on any phase of development after Phase 1.
Any Certificate of Occupancy after completion of Phase 1 requires the
completion of the Tyee Drive extension and the roundabout at
Tumwater Boulevard.
Tree protection was reviewed as part of the environmental review.
The City’s critical areas ordinance in TMC 16 requires protection of
trees at the time of development. A minimum requirement requires
retention of 20% of existing trees or a minimum of 12 trees per acre.
A forester’s report was submitted. To construct the development, the
project was unable to retain the minimum number of trees. The
ordinance allows mitigation for replacement of trees at a ratio of 3:1.
The development proposes to retain approximately 91 trees resulting in
a shortfall of 215 trees. With 3:1 mitigation, 655 additional trees will
be planted. The development includes several tree tracts throughout
the site.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 6
TMC 17 requires minimum standards for the binding site plan. The
Staff Report documents 18 minimum standards. Manager Merriman
reviewed several of the required standards. The binding site plan is
also subject to other TMC 17 subdivision regulations. The project
requires the appropriate provisions for public health, welfare, open
space, drainage, transportation, water, and sewer. The Staff Report
includes findings for each requirement. However, one error in the
Staff Report is located on page 14 addressing Land Division (L). The
language should reflect that the analysis complies with City of
Tumwater’s 2022 Drainage Design and Erosion Control Manual rather
than the 2021 manual.
The phased binding site plan requires a subdivision of more than 10
residential dwelling units and that at least two but not more than four
phases. Phase 1 includes 240 residential apartments in a five-story
structure that includes parking, short-term and long-term bicycle stalls,
tree tracts, open space, recreation, and a portion of the Tyee Drive
frontage completed. Phase 2 proposes to complete two five-story
structures with 333 residential units, parking, short- and long-term
bicycle stalls, and completion of Tyee Drive. Phase 3 includes two
five-story apartment buildings containing 320 residential apartment
units, a mixed-use four-story structure with 9,000 square feet of
commercial floor space, and a self-storage unit. Phase 4 includes two
five-story structures with apartments and parking stalls. Phasing
begins after approval of the Preliminary Binding Site Plan for a period
of five years. Applications for final Binding Site Plan for each
successive phase must be submitted within three years of the submittal
of the Final Plat for the first phase.
The Conditional Use Permit would allow high-rise apartments, as well
as the mini-storage units. Specific criteria are outlined in TMC 18.56
that must be achieved to receive a Conditional Use Permit. The
analysis is included in the Staff Report. No minimum standards are
included in TMC 18.56 for high-rise apartment buildings. Staff finds
that following the City’s design standards, environmental
determinations and review, as well as mitigation measures would
enable approval of the Conditional Use Permit for the high-rise
apartments. Mini-storage units are subject to minimum conditions,
such as off-street parking not located in any required yard areas and
that screening is installed along all property lines to lessen visual
impacts, and that minimum side areas are adequate to provide for the
required parking in the yards. The proposed layout meets the
requirements.
The City of Tumwater conducts preliminary and formal site plan
review meetings. The meetings are to ensure the application and
materials meet all design standards of the zoning code, critical areas
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 7
ordinance, Citywide Design Guidelines, and assurance that the plan
moving forward would meet all minimum standards. The Applicant
completed both preliminary and formal site plan reviews prior to the
issuance of the Notice of Application. The Staff Report includes 79
conditions. Manager Merriman reviewed conditions that are specific
to mitigation required for the project. Staff recommends approval of
the Preliminary Binding Site Plan and the Conditional Use Permit.
Examiner Scheibmeir asked a series of questions. During Phase 1, the
property will exit to the north of Israel Road requiring a right-in and
right-out onto Israel Road. He asked whether the turning direction is
permanent or remains for some time as phases are completed.
Manager Merriman said the turning direction is intended to be
permanent as exiting from Tyee Drive onto Israel Road is through a
roundabout. Another roundabout not reflected in the Staff Report is
located on Littlerock Road.
Examiner Scheibmeir said the diagram identifies the leave tree areas
throughout the site. He asked how the City addresses leave tree areas
in terms of accountability and the future of the areas. Manager
Merriman explained that the critical areas code requires a specific
percentage of the land be allocated (5%) for tree tracts. The tracts are
separate and owned by the homeowners or an association. The tracts
must be maintained and protected. The tracts can be used for open
space as well if the areas include pathways or benches. The tracts are
required to remain for the protection of trees in the future.
Examiner Scheibmeir noted that the Tree Protection Plan does not
identify the location of leave trees. He asked whether those trees are
located within tree protection tracts. Manager Merriman said the
forester’s plan was completed earlier in the process. The specific
location of tree tracts has changed from the original proposal. The
number of trees has not changed in terms of retention and replacement
trees. Examiner Scheibmeir asked whether the tree tract located near
Building 1 consists of existing older trees. Manager Merriman
deferred to the Applicant to respond to the question.
Examiner Scheibmeir commented on the lack of any elevations within
the materials other than schematics of the plans rather than from a side
elevation. He asked whether staff has a sense of the proposed
development in terms of views of the proposed development from
adjoining properties from Littlerock Road, Tumwater Boulevard,
Interstate 5, and other adjoining properties. Manager Merriman
responded that staff did not include elevations that were submitted for
the project, as staff understood the Applicant would include the
elevations as part of the full application package. Examiner
Scheibmeir said the question is prompted because the proposed project
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 8
is a large-scale tall project that will be built within an area of existing
forested land with surrounding properties of limited development. The
proposal will be large and new to that specific area of the City, which
has also been noted in public comment. His intent is to obtain a sense
of the development and its visual impact for those driving by or for
residents who reside along Littlerock Road in terms of the visual
impact of the proposed development.
Further discussion ensued with Examiner Scheibmeir agreeing to defer
to the Applicant to obtain a better understanding of the project scope
and visual impact.
Examiner Scheibmeir pointed out that many storage facilities are
required to screen its aesthetics through either extended setbacks or
additional screening requirements to enable the use to coexist within a
surrounding area. He cited the minimum requirements by the City and
asked whether any additional requirements were considered for mini-
storage facilities to minimize the impact of the use.
Manager Merriman responded that the City has Citywide Design
Guidelines that require building modulation and limiting blank walls.
The zoning is commercial and the use will be reviewed under the
Commercial Citywide Design Guidelines, which require aesthetic
measures to avoid large blank walls and requires building modulation
and articulation.
Examiner Scheibmeir asked about any potential implications caused
by the project to the Thurston Region Trail Plan. Manager Merriman
advised that the regional trail plan oversees the regional trail system.
In Tumwater those trails are located along the Deschutes River and the
golf course. The City coordinates new development to ensure no
impacts occur to the regional trail system. The proposed project does
not affect the regional trail system other than for continuation of an
existing trail system that will be extended throughout the development.
Examiner Scheibmeir referred to public comments that speak to
concerns about high groundwater existing in the location of the
proposed project and the potential of flooding occurring in the area.
The City’s response has cited the City’s stormwater manual to meet all
requirements for building in an area experiencing high groundwater.
He asked for additional clarification for the benefit of the public in
terms of how stormwater is managed for the project site.
Examiner Scheibmeir administered the oath to City of Tumwater
Design Engineer Jared Crews.
Engineer Crews described the process the City utilizes using the
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 9
Drainage Design and Erosion Control Manual based on the
Department of Ecology’s 2019 Stormwater Manual. The manual
provides specific criteria for projects meeting specific thresholds,
sizes, and impervious surface, etc. Requirements are based on
appropriate best management practices for stormwater infiltration
basins, permeable pavement, and other recommendations based on
feasibility. Additionally, the City is guided by the 2005 high
groundwater ordinance that established an additional area of review for
sites within the City that require an additional level of in-depth
analysis for development projects. Although the project site is not
located within the area that has experienced groundwater flooding, the
site is located in a high groundwater control area that was established
by the ordinance. That area requires additional screening and draining
requirements as included in the formal site plan review approval letter.
The improvements will be implemented and reviewed during the site
development grading project.
The City requires a project to collect both on-site and off-site
stormwater and convey it on-site and construct private stormwater
facilities to store, treat, and infiltrate all stormwater generated by the
project.
Examiner Scheibmeir referred to references to a roof courtyard as part
of one of the buildings. He asked whether the courtyard is a
requirement or an addition proposed by the Applicant.
Manager Merriman said the courtyard is not a requirement by the City;
however, the City can consider those types of courtyards to be used as
open space. She believes the project meets the requirement for open
space at the ground level. The Applicant is providing a clubhouse and
a pool providing different forms of open space components.
Examiner Scheibmeir asked whether the project’s approval is based on
the maps presented or whether the maps are only for informational
purposes with details to be determined during the time of final
approval. If the maps reflect the presence of a clubhouse or a sport
court or courtyard, he questioned whether those components are now
requirements or simply added by the Applicant. Manager Merriman
advised that the components are requirements as the Applicant is
proposing the options to meet the open space requirements for passive
and active open space. Through the Binding Site Plan Review, staff
considers the overall development. The plan reflects the proposed
location of the buildings and the type of development on the site.
Amendments are possible. However, staff is not in receipt of the exact
building plans or the elevations for each building on the site as those
plans would be reviewed individually. The Binding Site Plan serves as
a preapproval for the site planning.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 10
Examiner Scheibmeir commented that it appears the distinction that
speaks to the roof courtyard may fall outside of the mandatory
obligations and may be added based on the decision by the developer
rather than as a requirement by the City. Manager Merriman affirmed
the observation.
Examiner Scheibmeir referred to the traffic impact study. He asked
for confirmation that the study considered a number of public
comments received following the initial notice of application and was
updated accordingly. Manager Merriman advised that the
interpretation is correct.
Examiner Scheibmeir referred to the Mazama Pocket gopher study and
its findings of evidence of pocket gophers on a number of properties
located near the project site. He asked whether that situation would
trigger a heightened review of the study, such as a third-party review
given that nearby properties have had some evidence of pocket
gophers. Manager Merriman replied that following completion of the
gopher survey, the biologist must check the priority habitat species
maps produced by the U.S. Fish and Wildlife Service to document
whether the species have been discovered or identified on the property
and/or the surrounding properties. The biologist follows the protocol
of the City and the U.S. Fish and Wildlife Service to complete a
standard survey of two visits between June and October. Generally,
the City does not require a third party review and in this case, staff was
satisfied with the results of the study.
Examiner Scheibmeir remarked that although not mentioned, it is
assumed that phasing is sequential and that there is no right to pursue
Phase 1 and then move to construct Phase 4 bypassing Phases 2 and 3.
Manager Merriman said the observation points out the lack of
guidance in the City’s code. The intent by staff is to ensure that any
development sequence of the phases completes any mitigation
measures required for the entire project. Essentially, the Applicant
would not be allowed to complete Phase 1 and proceed to construct
Phase 4 without completing the extension of Tyee Drive.
Examiner Scheibmeir referred to existing high voltage lines. The
aerial maps reflect that they are located along the eastern boundary of
the site. He asked whether the City has considered any measures that
might warrant consideration for aesthetics, access to the lines, or
potential public risks of lines falling.
Manager Merriman said staff reviewed the power lines to prevent
public access. The power lines are subject to easement requirements
between the company and the Applicant. No other additional
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 11
development requirements were required for the power lines.
Examiner Scheibmeir asked about the buffer requirements between the
property site and the properties to the west along Littlerock Road.
Manager Merriman said the parcel requires a Type II 8-foot landscape
buffer. Examiner Scheibmeir asked whether the buffer includes
fencing. Manager Merriman replied not necessarily but that it could
be included. Fencing is not a requirement. Examiner Scheibmeir
asked whether the City’s policy includes a requirement for fencing
where appropriate to screen properties.
Manager Merriman said the requirement is not in the code; however, if
fencing is provided along the landscaping area, the landscape plants
must be located outside the perimeter of the fence.
Examiner Scheibmeir asked about staff’s position if he were to require
a fence along the westerly boundary. Manager Merriman said the
City’s code does not require fencing; however, the Examiner could
rule that a fence is necessary to protect privacy or improve aesthetics.
Examiner Scheibmeir conceded that the question is likely unfair for
such a quick response. His goal is to be transparent when considering
all options and that all parties are aware of his concerns with some
issues. This particular application is a large development relative to
surrounding developed uses that tilts the scale of development of all
nearby properties. If completed with aesthetics considered then the
development would likely be acceptable. However, if the development
is a monstrosity, the community would likely wonder how the
development was approved. His goal is to obtain a sense of how the
development might interact with nearby properties.
Manager Merriman advised that because high-rise apartments are
allowed through the Conditional Use Permit process, the Examiner has
the right to provide additional mitigation measures to prevent impacts
to adjoining property owners.
APPLICANT Examiner Scheibmeir administered the oath to Glenn Wells.
TESTIMONY:
Mr. Wells reported the site is eligible for a 12-year property tax
exemption as long as 20% of the housing units are designated for
median income households. The Applicant applied for the exemption.
The company has completed other projects in Tumwater and has
received approval of the exemption for those projects. The company’s
business model is housing in the medium range of pricing. The
company has constructed other affordable housing projects, such as a
large 82-unit affordable housing project at 60% to 80% median income
in Olympia, Washington. The company is very familiar with the
requirements for verification for the exemption program. The project
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 12
in Olympia is located on Martin Way near Lilly Road.
Mr. Wells responded to a list of questions from the Examiner. The
power lines require a 50-foot easement by Puget Sound Energy to
access poles and lines. The proposal does not intrude on any
requirements of the easement.
Typically, the company provides fencing for properties but opposes a
fence along the curb line. Any fencing would require landscaping on
the adjoining neighbor side and the fence construction would need to
be unique as placement of a fence along parking stalls would not be a
preferable option.
The project is providing a generous amount of open space with more
than the required open space. If the rooftop courtyard is not included,
the project would need to accommodate some space at ground level.
Some of the rooftop courtyard is applicable to open space
requirements. Other approved projects have utilized rooftop
courtyards as open space. Typically, the space is active recreation
with pickleball courts and other types of recreational uses. The
rooftop courtyards serve as a great amenity for tenants and are
considered as valuable as clubhouses.
The properties reside within a forested area. Habitat for pocket
gophers is located in fields with soft soils. Some fields are located
next to the property with no trees. That area is occupied with gophers
but it does not mean the forested area would be affected by the gophers
because they tend to remain within the fields.
The development of Tyee Drive to Israel Road during Phase 2 is
required. Mr. Wells explained that based on his understanding, when
the project initiates Phase 2, the project is obligated to extend the
connection. The construction entails building half of the frontage plus
a lane of travel. Frontage improvements on the opposite side of the
road would not be completed. The improvements would not entail a
full road but only half plus a lane of travel.
The tree tract is fenced during construction activity. Following
completion of the building, temporary fencing would be removed. The
tree tract assists in mitigating the height of the building, which is why
the Applicant prefers to retain mature trees near the buildings. It is
possible as the courtyards are large enough to accommodate the trees
Mr. Wells advised that the Applicant submitted full building plans for
Building 1 to include all elevations, and complete building plans in
June. He offered to forward 3D plans to the Examiner to provide
views of the project.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 13
Based on the company’s experience, the provision of storage units
typically enables 15% to 20% of the tenants to lease storage space.
The company is estimating that 75% of the storage units would serve
tenants living in the buildings. The company does not envision renting
a majority of the storage units to the public as they are typically leased
by tenants. At this time, he has not reviewed the design of the storage
facility as the proposal is a for a seven-year build out as Building 1
will take two years to complete.
The company plans to provide solar power on each building.
The apartment buildings contain a wide range of apartment sizes and
unit types. The goal is to attract a variety of different types of
apartment dwellers. Many of the units will be three-bedroom
apartments with the site containing many play areas for children, as
well as many studio apartments. The Applicant believes the project
will provide a mix of apartment types.
Mr. Wells advised that he served on the City’s ad hoc committee
approximately 20 years ago that studied the likelihood that New
Market would become the downtown center for the City. However, it
is not likely to occur because the downtown has shifted near the
project. The Applicant is in negotiations with Costco and other
commercial uses. Placement of residential uses next to commercial
uses would likely encourage more live, work, and play opportunities in
close proximity.
Mr. Wells offered to address questions from Examiner Scheibmeir.
Examiner Scheibmeir suggested there might be a minor impasse in
terms of the status of extending Tyee Drive as the statement by Mr.
Wells declared an expectation that the road extension would be a half-
built roadway on the northerly portion, which is not reflected in the
City’s report or the City’s requirements. Based on the information
contained in the Staff Report, the requirement would impose more than
a half-built roadway within the westerly half of Tyee Drive north of
the midway point. The requirement actually requires the full
construction of Tyee Drive but not necessarily the full improvements
along the opposite side of the roadway. He asked about any potential
misunderstanding of the requirement.
Mr. Wells said he does not believe there are any misunderstandings as
his comments reflected that the project would construct the project’s
half of the road plus a lane. The road would be constructed to be
operational to Israel Road; however, the project is not constructing
frontage improvements on the east side of the road.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 14
Examiner Scheibmeir said his questions regarding mini-storage were
not suggestive that the use would be a third-party use. He fully
envisions that the mini-storage facility would be a primary component
of the proposed development. His concern surrounded the aesthetics
of the use especially along Tumwater Boulevard to ensure the use is
aesthetically pleasing as a condition of the project moving forward.
He asked for a response to that concern rather than to the tenants of
future storage units.
Mr. Wells advised that the mini-storage facility is not of importance at
this time. He offered to re-present the storage facility proposal to the
Examiner after it has been designed to ensure the aesthetic concerns
are mitigated. He has no problem deferring the proposal until the
project is initiated. At this time, he is not prepared to design the
facility. His main concern is obtaining a permit to construct Building
1. Deferral of the mini-storage facility to a later date because it
requires a Conditional Use Permit is understandable as it would be
important for the Examiner to have access to the design of the facility,
which he is not prepared to present at this time.
Examiner Scheibmeir asked Manager Merriman whether the
construction of the commercial/retail area in Phase 3 is required prior
to initiating Phase 4. In multiple cities, he is considering village
concepts in which commercial portions have not been constructed and
the village development is failing as a result. He asked whether
commercial uses are requirements or could be adjusted to enable
moving forward with other planned phases.
Manager Merriman advised that for this particular project, the
commercial component is not a required portion of the development;
however, to satisfy requirements for a mixed-use building with
residential, commercial/retail uses must be a component of the mixed-
use structure, which is why a majority of the buildings are five stories.
Mr. Wells said he understands that because the Applicant elected not
to pursue a five-story building at the site of the corner building, the
commercial use component would be required, which the Applicant
believes is an appropriate location for mixed-use, which is why the
building is only four stories high and not five stories because the intent
was to locate commercial on that particular corner. If the Applicant
elected to construct a five-story building on the corner, a commercial
component is not required as mixed-use is included on the first floor of
the five-story building.
Examiner Scheibmeir administered the oath to Tyrell Bradley with
LDC Corp.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 15
Mr. Bradley offered some comments to assist in clarifying several of
the Examiner’s questions.
The triangular property located in the southeast corner labeled as
unopen Robinson Road and a small triangle by City Center Land
Company are both heavily forested land with mature trees and
understory. Unless the City approves vacation of the parcels or the
property owner clears the land and the City vacates the properties,
those properties would provide a heavily vegetated buffer between
Tumwater Boulevard and the future five-story building and three-story
mini-storage building.
Additionally, in addition to the testimony by Manager Crews regarding
stormwater on the site, the development proposes adding up to six feet
of fill on much of the southern portion of the property in Phase 3 and
Phase 4 to increase the distance between the high groundwater hazard
area and the stormwater facilities, which is required by the stormwater
manual. The developer is pursuing great care to increase the
separation to maintain water quality in the area.
In terms of a fence along the western property line, the Housing
Authority of Thurston County owns two parcels located to the
southwest, which are multifamily apartments. Between the two
properties, three parcels are located of which two parcels are forested
with the third comprised of a vacant field. The uses located in that
area would not necessarily drive the need for a fence in most city
codes as the visual disparity concerns of adjacent single-family uses
does not currently exist.
Mr. Wells added that he was unaware of the requirement for a
landscaping barrier placed on the outside of a fence. He questioned
the requirement as it could create a 16-foot wide area of landscaping if
buffers are required on both sides of the fence.
Examiner Scheibmeir said that in some jurisdictions, such as
Lakewood, a 16-foot wide landscaping buffer is often required.
PUBLIC Examiner Scheibmeir invited members of the public to provide
TESTIMONY: testimony.
Planner Alex Baruch advised of one individual wishing to testify.
Examiner Scheibmeir administered the oath to Craig Chance.
Craig Chance, Director, Housing Authority of Thurston County,
said the organization owns several properties adjacent to the subject
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 16
site. Although the phases of developing the properties located near the
organization’s properties are several years in the future, he would
appreciate a conversation with the Applicant about some type of
appropriate landscaping or fencing along the property lines. The
Housing Authority currently has a 40-unit apartment complex in the
most southern area of the property built over a decade ago. North of
that site, is an undeveloped parcel. The Housing Authority is engaged
in preliminary discussions for planning for senior housing on the site,
which raises the issues of seniors living near properties that generate
noise and traffic, which speaks to an interest of pursuing conversations
about some type of reasonable barrier without complicating the
project. He is appreciative of the comments by Mr. Wells as he has
been generous with the development of affordable housing. He is
appreciative that the applicant is providing a number of affordable
units for people of modest income.
Examiner Scheibmeir closed the public hearing.
Examiner Scheibmeir invited Manager Merriman to address his
concerns regarding aesthetics and compatibility and the applicant’s
responses, as well as comments from an adjoining landowner.
Manager Merriman responded that a City code section speaks to
fencing and landscaping in relationship to fencing. She plans to follow
up on the code because there are likely some options. However, the
regulation might only apply for frontage fencing between streets,
which she wants to confirm if the Examiner contemplates adding it
another condition. Additionally, the elevations were included with the
building permit. She apologized for not including them within the
Staff Report. The elevations can be provided following the meeting
and added as an exhibit.
Additionally, because the mini-storage facility is located within the
commercial zone, the use is subject to the City’s commercial citywide
design guidelines. The guidelines include stringent requirements for
the aesthetics of developments especially larger buildings.
Manager Merriman added that she would like to ensure the completion
of Tyee Drive is clear in terms of the expectation for completion of
Tyee Drive.
Design Manager Crews advised that Mr. Wells and Manager
Merriman are correct with respect to Tyee Drive. In instances of
phased developments or along an existing corridor that straddles
different properties, the intent is to create a new road network that can
handle two-way traffic. Mr. Wells is correct in that the proposal
includes construction of his half of the improvements plus a 12-foot
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 3, 2024 Page 17
vehicle lane to accommodate traffic in both directions. The proposal
accommodates the City’s request that the vehicular connection of Tyee
Drive between Israel Road and Tumwater Boulevard would be
completed with any additional phase other than Phase 1 of the
development and that additional improvements such as a bike lane,
shoulder, curb and gutter, and sidewalk on the opposite side of the
developing property would be completed by the development
occurring on that side of the roadway at a later time when the property
develops.
Examiner Scheibmeir conveyed appreciation for the explanation and
agreed that it was his interpretation from both presentations by the
parties. However, the additional information helped clarify the
requirement.
Examiner Scheibmeir advised that he would not be rendering a
decision based on additional public comment received prior to the
hearing that he did not have an opportunity to review. He most likely
will approve the requested Binding and Conditional Use Permit with
some uncertainty surrounding the sufficiency of the buffering under
the requirements of the Conditional Use Permit. He asked staff to
forward the building design elevations. By close of business on
Friday, January 5, 2024, he would like to receive any final comments
or recommendations by staff or the applicant relative to buffering.
Although appreciative of Mr. Wells offer to defer the request for the
Conditional Use Permit, he agrees with Manager Merriman that given
the City’s design requirements, deferral is an unnecessary burden on
the development and should be addressed at this time. He recognizes
that the final design of the mini storage facility is pending a
determination by the City that is well equipped to address through its
other design requirements. He asked that City staff and the Applicant
engage in a final conversation prior to the end of the week to agree to
any adjustments to the recommended conditions.
Examiner Scheibmeir thanked everyone for their time and efforts.
ADJOURNMENT: With there being no further business, Examiner Scheibmeir
adjourned the public hearing at 7:46 p.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
HEARING EXAMINER
MEETING AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Sunset Room, 555
Israel Rd. SW, Tumwater, WA 98501
Wednesday, January 03, 2024
6:00 PM
The Tumwater Hearing Examiner is an appointed official of the City, and rules upon land use and zoning
matters. Within 10 business days of the conclusion of the hearing, the Examiner shall render a decision,
including findings and conclusions. Questions on the operation and procedures of the Hearing Examiner
may be directed to the Community Development Department at 360-754-4180.
1. Call to Order
2. Public Hearing
a. Yorkshire Apartments TUM-22-1743 Preliminary Binding Site Plan & Conditional Use Permit
3. Adjourn
Meeting Information
All committee members will be attending remotely. The public is welcome to attend in person, by
telephone or online via Zoom.
Watch Online
Go to http://www.zoom.us/join, and enter the Webinar ID 891 4853 3747 and Passcode 254307.
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 891 4853 3747 and Passcode
254307.
The City of Tumwater Hearing Examiner will hear testimony from interested parties in person, via
computer audio or by telephone by registering in advance to provide comment.
Public Comment – Register in advance for this webinar:
https://us02web.zoom.us/webinar/register/WN_T7mzUq0sRrmHkpl5-iXzQA
After registering, you will receive a confirmation email containing information about joining the webinar.
Written comments may be submitted to City of Tumwater, Community Development Department, 555
Israel Road SW, Tumwater, WA 98501, or by email at tmerriman@ci.tumwater.wa.us, and must be
received by 6:00 p.m. on January 3, 2024.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.