TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 1
CONVENE: 4:05 p.m.
CASE NUMBER: New Market Landing TUM-23-0909, Preliminary Binding Site Plan
DESCRIPTION OF The Applicant requests approval to construct 416 apartments with over
PROPOSAL: 19,000 square feet of commercial space in a phased development.
PROJECT NAME: New Market Apartments/Landing.
APPLICANT: Grandviews New Market, LLC
PO Box 159
Arlington, WA 98223
PROJECT Glenn Wells Architect, PS
PROPONENT/ Tyrell Bradley, LDC Corporation
REPRESENTATIVE: 324 West Bay Drive Ste 214
Olympia WA, 98502
PUBLIC HEARING: Hearing Examiner Mark Scheibmeir convened the public hearing at
4:05 p.m. to consider the applicant’s request for approval of a Phased
Preliminary Binding Site Plan (TUM-23-0909). The Applicant is
Grandviews New Market, LLC represented by Tyrell Bradley. The City
of Tumwater is represented by Alex Baruch, Senior Planner. Prior to
the hearing, he reviewed the Staff Report prepared by Planner Baruch.
Examiner Scheibmeir reported he reviewed other materials posted on
the City’s website relating to the project to include all public comments.
Examiner Scheibmeir reported the purpose of the hearing is to enable
City staff an opportunity to explain its Staff Report and
recommendations and any proposed conditions followed by an
opportunity for the Applicant to respond to the City’s presentation and
either add to or subtract from the City’s suggestions. Public testimony
will follow. Both the City and the Applicant will have an opportunity
to respond to any testimony. All testimony will be under oath or
affirmation.
CITY TESTIMONY: Examiner Scheibmeir administered the oath to Tumwater Senior
Planner Alex Baruch.
Planner Baruch reported the Applicant is requesting approval of a
Preliminary Binding Site Plan (TUM-23-0909) to subdivide one parcel
totaling approximately eight acres into three lots for phased commercial
and residential development with associated infrastructure, parking, and
open space. The property is located at the corner of New Market Street
SW and 73rd Avenue SW, south of Tumwater City Hall within the
Town Center zone district. The topography of the property is mostly
flat with vegetation and trees. Surrounding properties are zoned Town
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 2
Center. The Aquifer Protection Overlay District applies to the property.
The overlay district restricts hazardous uses to protect aquifer recharge
areas. Proposed uses include apartments and commercial uses, such as
daycare, gym, and office space. Those uses are not restricted in the
Aquifer Protection Overlay District. Proposed improvements are
reflected on the preliminary binding site plan and include connection for
the surrounding road network, grading, infrastructure, and open space.
All new utilities on site will be undergrounded pursuant to the Tumwater
Municipal Code.
The preliminary binding site plan application was submitted and a
Notice of Application was published on July 14, 2023. During the
notice of application comment period, the Nisqually Indian Tribe,
Squaxin Island Tribe, Port of Olympia, Thurston County, and several
community members commented on the project. The Nisqually Indian
Tribe requested completion of a cultural resources study prior to
issuance of permits for any grading. Condition 12 is included in
response to the tribe’s comment.
Community comments pertained to an existing tree on the property.
Many of the comments requested retention of the tree. The Forester’s
Report stated that the tree was diseased and is proposed for removal due
to site infrastructure and location of elements integral to the site.
The project was reviewed by the City’s Transportation Manager who
provided a transportation concurrency ruling stating that trips proposed
to be sent through the Tumwater Boulevard /I-5 interchange require
payment of mitigation fees or construction of required interchange
improvements. The City reviewed a SEPA Environmental Checklist
and other information submitted by the Applicant. A Mitigated
Determination of Non-Significance (MDNS) was issued on March 29,
2024. No appeals of the MDNS were filed.
During the SEPA comment period, the Washington Department of
Ecology commented on the application with specific comments related
to elements of construction activities. No immediate concerns were
addressed about the land use application. A public notice was sent on
August 8, 2024 and no comments were received to date. Notices for all
three notifications were mailed to property owners living within 300 feet
of the proposed project. Public notice concerning the project was posted
on the site and published in The Olympian.
Staff finds that the Preliminary Binding Site Plan as conditioned
conforms to the Comprehensive Plan, Tumwater Municipal Code,
planning standards, development standards, and policies of the City of
Tumwater. Staff recommends approval of the Preliminary Binding Site
Plan with the attached conditions.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 3
Examiner Scheibmeir asked about the status of the landscaping plan as
it was not in the materials. Planner Baruch explained that a landscaping
plan would be prepared for each phase of development with the site
grading plans. The plan is required to meet landscaping requirements
in the Tumwater Municipal Code. He added that he believes
preliminary civil plans included a landscaping sheet for Phase 1.
Examiner Scheibmeir advised that he did not recall any information
pertaining to landscaping. He asked to receive a copy to complete the
information with respect to the proposal for Phase 1. Planner Baruch
confirmed the request.
Examiner Scheibmeir referenced approximately 10 comments from the
public about the remorse over the loss of a very large maple tree located
along the boundary of the project site. Although staff noted the tree is
diseased, he suggested a more detailed discussion surrounding the tree
as it is a concern to many community members.
Planner Baruch responded that based on the Forester’s Report, the tree
is located within the bounds of right-of-way of 73rd Avenue, which is
reflected as a connection on the Town Center Street Plan connecting
several streets for the buildout of the network of streets within the area.
The tree is diseased and dying. The tree was not designated as a tree to
be retained as part of the Forester’s Report.
Examiner Scheibmeir recommended designating some common street
identifiers as the information changes between each plan. One set of
plans describe the north/south connector on the eastside of the project
as Terminal Street while a map describes the street as 73rd. Other
information describes the street at 71st. He asked about the preferred
identifier for that specific street.
Planner Baruch advised that Terminal Street would be the preferred
identity of the street.
Examiner Scheibmeir clarified that the tree is located along the south
boundary of property or along the extension of 73rd Street.
Examiner Scheibmeir noted that the intersection from the east from 71st
sometimes appear to be a straight line in some plans and sometimes
appears to be from a point further south than the proposed extension of
71st Street in other plans. He asked for information on the final
alignment planned for 71st Street. Planner Baruch identified the
anticipated alignment as 71st Street, which curves toward Terminal
Street with no connection further east. The area currently serves as a
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 4
fire lane with no plan for a public road north or south extending to
Terminal Street.
Examiner Scheibmeir asked about the plan connecting Terminal Street
to the east. Planner Baruch replied that Terminal Street would connect
to 73rd Avenue continuing south to Tumwater Boulevard after the
development of adjacent Port of Olympia property. There is no planned
easterly connection to 71st Avenue.
Examiner Scheibmeir referred to the Port of Olympia's concerns
regarding agreements to the Avigation Easement. The Port of Olympia
expressed concerns in earlier responses to the notice that the property is
near or in close proximity to the Olympia Regional Airport. Although
the property does not fall within any zones of impact, it has some
potential for some impacts. The Port is recommending the Applicant as
well as each resident sign some form of agreement acknowledging the
avigation easement and the risk associated with living in that area. He
asked how staff intends to respond to the Port of Olympia’s concerns.
Planner Baruch responded that since the area is not within the Airport
Overlay zone, no conditions are included in the City’s ordinance to
impose any requirements. The City proposes that the Port and the
Applicant coordinate those details about avigation easements or
agreements with property owners rather than involving the City.
Examiner Scheibmeir asked about the Port’s concerns about residential
development in the neighborhood as dictated in the City’s
Comprehensive Plan for that area. He asked whether staff is aware of
any concerns conveyed by the Port of Olympia at the time when the
Town Center was established which encourages residential
development in the area of concern by the Port of Olympia.
Planner Baruch said the process for developing the Town Center zone
district involved a lengthy process involving stakeholder discussions.
The Port of Olympia was a participant in the process as the Town Center
intersected with many Port properties to the east, west, and south of the
subject property. The Port of Olympia was a participant in the planning
process. As different individuals assume various Port positions over
time, Warren Hendrickson was not a member of the Town Center
planning committee and addressed concerns based on his personal job
experience.
Examiner Scheibmeir questioned the provision of open space, as the
Staff Report indicates the project meets the requirements for total square
footage of open space given the size of the project. The plan
acknowledges some areas of open space of three internal courtyards, a
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 5
play area, a pond, and a second story courtyard. He asked for a
description of how open space is achieved for the project.
Planner Baruch said open space is a combination of different
mechanisms of internal clubhouses for recreation areas as reflected in
Phase 1 and courtyards in Phases 1, 2 and 3. The intent is that all open
space uses would be available to any resident within the area.
Additionally, other amenities could be proposed within Building 2 and
Building 3 that are not specifically reflected on the plan but identified
during the building permit review and overall site grading review for
each individual lot.
Examiner Scheibmeir asked whether the proposed clubhouse at the
southwest location at the end of Phase 1 is considered open space or
commercial space.
Planner Baruch advised that the clubhouse is considered open space as
it was specifically separated from commercial space. The 4,300 square-
foot clubhouse is for the residential component of the project.
Examiner Scheibmeir questioned a thin perimeter designation on the
plan surrounding the entirety of the project.
Planner Baruch explained that the path is a sidewalk surrounding the
entire development, as well as a five-foot wide landscape buffer
between the sidewalk and parking area. Certain applications of
screening are required as part of the landscape plan for the project.
Examiner Scheibmeir commented on the extensive massing of parking
along the outer edges of the site. He asked about the type of landscaping
to buffer and soften impacts of the mass parking area.
Planner Baruch replied that in this circumstance, it likely would include
a three-foot high architectural wall along the edge of the parking with
landscaping adjacent to the sidewalk.
Examiner Scheibmeir asked about any concerns for ensuring students
can safely walk to the high school and New Market Skills Center.
Planner Baruch advised that the City is completing a sidewalk project
along Israel Road that will widen existing sidewalks and improve ADA
accessibility along Israel Road. The project connects north through
New Market Street. The project will improve sidewalks and
intersections to enable easier accessibility to the library, City Hall, and
Tumwater High School. Middle and grade school students would be
bused to schools.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 6
Examiner Scheibmeir asked about any housing affordability
requirements for the project of this particular size and whether the City
has any requirements in the Comprehensive Plan or development
regulations that impose some consideration for affordability.
Planner Baruch advised that the City does not require any affordability
component associated with the project.
Examiner Scheibmeir asked the road status assigned to the four streets
proposed for improvement.
Planner Baruch deferred the question to the Applicant.
Examiner Scheibmeir added that he believes the City’s code determines
the type of street frontage improvements required based on the type of
street status.
Planner Baruch said each road status is identified in the New Market
Street Plan for each road through the Town Center.
Examiner Scheibmeir asked whether parking along the improved streets
would be allowed.
Planner Baruch said he believes parking would be allowed along New
Market Street but is unsure if parking would be allowed along 73rd, 71st,
or Terminal Street although there are bulb outs for some parking along
73rd Avenue and 71st Street towards New Market Street.
Examiner Scheibmeir asked about any other recreational facilities for
residents other than those previously mentioned.
Planner Baruch said the proposal calls for the courtyard and outdoor
seating areas in different areas of the site. Some concepts were reviewed
during the site plan review for other possibilities, but those details would
be included on the building plans and the site development grading plans
if other playgrounds or other structures are proposed for the areas.
Examiner Scheibmeir commented on the chicken and egg quality of
projects that include commercial uses and the uncertainty by the
applicant as to future commercial uses; however, from a planning
perspective, some estimating is necessary to account for accurate traffic
counts. For purposes of traffic counting, he asked about the City’s
vision for the types of commercial uses on the site.
Planner Baruch explained that as part of the Preliminary Binding Site
Plan, the Applicant proposes a 24-hour fitness area, a daycare, and some
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 7
office spaces along with deli as part of the commercial uses within the
development.
Examiner Scheibmeir asked whether those commercial uses would be
consistent with the City’s comprehensive planning for the Town Center
zone.
Planner Baruch affirmed the commercial uses would be consistent with
Town Center zone district requirements.
Examiner Scheibmeir said that in addition to concerns about the older
maple, some public comments spoke fondly of the area for walking. He
asked whether the project plans to retain any pathways for walking
through the site.
Planner Baruch said sidewalks will be constructed throughout the site
as well as connections throughout the development for residents and
commercial uses. He acknowledged that the area is often used for
walking routes.
APPLICANT Examiner Scheibmeir administered the oath to Tyrell Bradley.
TESTIMONY:
Tyrell Bradley said he has no additional comments to add to the City’s
presentation. However, in terms of roadway classifications, the
classification is listed as local access for the four streets. Town Center
guidelines expand on the classification because each adjacent street has
on-street parking on all four sides of the project.
Examiner Scheibmeir cited the Town Center guidelines and local access
standards and requested information on the expected streetscape and
street frontage improvements.
Mr. Bradley said all four streets have a minimum lane width of 11 feet
and a six-foot wide bike lane on New Market Street and a five-foot wide
bike lane on the remaining three streets. All streets will have a seven-
foot parking lane. Three streets will have a 12-foot wide sidewalk with
a 10-foot wide sidewalk on New Market Street. The 12-foot wide
sidewalks include cutouts for street trees.
Examiner Scheibmeir asked about any public pathway through the
project site in addition to internal sidewalks.
Mr. Bradley said the site includes only internal sidewalks. The project
will complete four new street sections with major completion of the
New Market Street connection from Tumwater Boulevard to Israel Road
near City Hall and the Tumwater Library.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 8
Examiner Scheibmeir asked whether the Applicant has any objections
to the proposed conditions for the project.
Mr. Bradley advised that the Applicant has no objections to any of the
conditions.
PUBLIC Examiner Scheibmeir invited members of the public to provide
TESTIMONY: testimony.
Permit Manager Tami Merriman affirmed that no member of the public
attended the public hearing in person; however, virtual attendance
would require activation of the microphone to enable public testimony.
Planner Baruch advised of one person attending virtually.
Examiner Scheibmeir administered the oath to Betsy Norton.
Betsy Norton said she has several questions.
Examiner Scheibmeir reviewed the typical process for addressing
questions from the public. However, as only one member of the public
is present, he invited Ms. Norton to ask her questions directly to receive
a response.
Ms. Norton asked about the percentage of trees retained on the site.
Examiner Scheibmeir noted that the Staff Report outlines the specific
tree counts. Planner Baruch added that the site includes 23 trees along
the perimeter of the site that could potentially be retained. The number
of trees retained/required on the site is identified as the project proceeds
through civil engineering plans.
Ms. Norton said her review of the drawing did not reflect any trees. She
asked about the percentage of impervious surface on the lot.
Planner Baruch reported that 75% of the site would be impervious
surface with the maximum impervious surface within the Town Center
zone district of 85%.
Ms. Norton said she also curious about the 4,300 square foot recreation
center. She asked whether the recreation center is a private enclosed
building that could be classified as open space.
Planner Baruch advised that the enclosed building would be used to
satisfy part of the open space and recreational uses for residents of the
site. Ms. Norton asked whether that is how the City defines open space.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 9
Planner Baruch replied that there are multiple options as part of the
definition of open space. A recreational building is one of the options.
Ms. Norton said her concerns are about stormwater management and
run-off, as she views development proposals from a wildlife perspective
and it appears a very limited amount of habitat would remain. The
Applicant’s report states that no gophers were present; however, the area
houses prime gopher soils. She is concerned about the analysis and is
hopeful the stormwater management system as designed is fully scaled
and filters effectively to avoid any damage to wildlife.
Examiner Scheibmeir asked Mr. Bradley to describe the proposed
stormwater system.
Mr. Bradley said that currently, the project meets City of Tumwater’s
2022 Stormwater Design requirements, which requires enhanced
treatment for the site. The project meets the specification in two ways.
The first is through bio-retention soils engineered to remove pollutants
comprised of 18-inch thick composted and amended soil that will
process a portion of the stormwater and infiltrate the discharge to a sand
layer below. The second treatment is through a mechanical treatment
system providing enhanced water quality treatment and filtration system
and infiltrated in underground rock galleries. All stormwater systems
have been sized to handle and infiltrate 100% of the 100-year storm
event. Outlined in detail in the stormwater manual are requirements if
the facilities fail for rerouting stormwater. The manual requires that
development cannot impact downstream systems or neighboring
properties. All those factors have been accounted for in the design of
the system.
Ms. Norton asked about the location of stormwater if it overflows. Mr.
Bradley said the flow would travel south on New Market to Tumwater
Boulevard.
No other members of the public were present.
Examiner Scheibmeir asked Planner Baruch if had any response to Ms.
Norton’s questions.
Planner Baruch said the gopher report completed by the applicant did
not reflect the presence of any Mazama pocket gophers or endangered
species on the property, which is a requirement of the Mazama Pocket
Gopher Administration Determination for the proposal to move
forward. The development does not pose any impact to any endangered
species.
TUMWATER HEARING EXAMINER PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
August 28, 2024 Page 10
Mr. Bradley advised of no further comments at the invitation of
Examiner Scheibmeir.
Examiner Scheibmeir concluded the public hearing. He advised of
approval of the application for Preliminary Binding Site Plan subject to
the conditions outlined in the Staff Report. The list of conditions is
lengthy and it is unlikely he could improve the list as 70 conditions are
imposed. City staff did an excellent job of reviewing the application
and considering all potential impacts. Despite its complexities, he does
not find anything problematic about the proposal and the proposed
phasing. He plans to submit his written decision promptly to the City.
He thanked everyone for attending and participating in the meeting.
ADJOURNMENT: With there being no further business, Examiner Scheibmeir
adjourned the public hearing at 4:52 p.m.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
HEARING EXAMINER
MEETING AGENDA
Online via Zoom and In Person at
Tumwater City Hall, Sunset Room, 555
Israel Rd. SW, Tumwater, WA 98501
Wednesday, August 28, 2024
4:00 PM
The Tumwater Hearing Examiner is an appointed official of the City, and rules upon land use and zoning
matters. Within 10 business days of the conclusion of the hearing, the Examiner shall render a decision,
including findings and conclusions. Questions on the operation and procedures of the Hearing Examiner
may be directed to the Community Development Department at 360-754-4180.
1. Call to Order
2. Public Hearing
a. New Market Landing TUM-23-0909, Preliminary Binding Site Plan
3. Adjourn
Meeting Information
Staff may be attending remotely. The public is welcome to attend in person, by telephone or online via
Zoom.
Watch Online
Go to http://www.zoom.us/join and enter the Webinar ID 819 7469 0394 and Passcode 997528
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 819 7469 0394 and Passcode
997528.
The City of Tumwater Hearing Examiner will hear testimony from interested parties in person, via
computer audio or by telephone by registering in advance to provide comment.
Public Comment – Register in advance for this webinar:
https://us02web.zoom.us/webinar/register/WN_3A6N6qK4RU6LMldCgZHHrw
After registering, you will receive a confirmation email containing information about joining the webinar.
Written comments may be submitted to City of Tumwater, Community Development Department, 555
Israel Road SW, Tumwater, WA 98501, or by email at abaruch@ci.tumwater.wa.us or by fax at (360)
754-4138, and must be received by 12:00 p.m. on August 28, 2024.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4129 or email ADACoordinator@ci.tumwater.wa.us.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.