Hearing Examiner - Vista Views at Black Lake
Regular MeetingTumwater, WA · January 29, 2025
Minutes
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 1
CONVENE: 6:00 p.m.
CASE NUMBER: TUM-24-1446 Vista Views at Black Lake Phased Preliminary Plat and
Infrastructure Exception
DESCRIPTION OF The Applicant requests approval to construct a 184 single family plat in a phased
PROPOSAL: development. An infrastructure exception is required due to utilities proposed to
be constructed adjacent to critical areas and critical area buffers.
PROJECT NAME: Vista Views at Black Lake
OWNER/ Allen and Virginia Bodenhamer Trustees
APPLICANT: 22 S Barracks Lane
Salmon, ID 83467
APPLICANT: Rob Rice
Rob Rice Homes
1868 State Ave NE
Olympia, WA 98506
PROJECT Jeff Pantier
PROPONENT/ Hatton Godat Pantier
REPRESENTATIVE: 3910 Martin Way E, Suite B
Olympia, WA 98506
PUBLIC HEARING: Hearing Examiner Mark Scheibmeir convened the public hearing at 6:00 p.m.
to consider the Applicant’s request for approval to construct a 184 single family
plat in a phased development. An infrastructure exception is required due to
utilities proposed to be constructed adjacent to critical areas and critical area
buffers. The City’s case number is TUM-24-1446. The Applicant is requesting
approval to construct 184 single family homes in two phases on parcels located
in the Single-Family Low Density (SFL) zone district. The SFL zone allows
single family homes as a permitted use. The proponent wishes to develop the
project in phases through the phased preliminary plat process, which allows
developments over 100 lots to be constructed up to 4 phases. The project is also
requesting an infrastructure exception to construct utilities adjacent to critical
areas and critical area buffers. Prior to the hearing, he reviewed the Staff Report
and Exhibits prepared by staff, as well as other materials relevant to the
proposal.
Examiner Scheibmeir reported the purpose of the hearing is to provide City staff
with an opportunity to present the Staff Report and recommendations and any
proposed conditions followed by an opportunity for the Applicant to respond to
the City’s presentation and either add to or subtract from the City’s
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 2
recommendations. Public testimony will follow. He imposed a five-minute
timeline for those testifying. Both the City and the Applicant will have an
opportunity to respond to any testimony. All testimony will be under oath or
affirmation. Examiner Scheibmeir explained that the hearing is for fact-finding
and is regulated by the facts received through testimony or other sources of
information. Once all testimony and other information is received and
thoroughly reviewed, he will render a decision on the proposal consistent with
Tumwater development regulations and the Tumwater Comprehensive Plan.
Examiner Scheibmeir cited the following exhibits:
Exhibit 1 Staff Report January 22, 2025
Exhibit 2 Preliminary Plat 11-18-2024
Exhibit 3 Vicinity Map
Exhibit 4 Zoning Map
Exhibit 5 Public Notice Certification 01-21-2025
Exhibit 6 Notice of Application 10-18-2024
Exhibit 7 Mitigated Determination of Non-significance with SEPA Checklist
12-20-2024
Exhibit 8 Public Hearing Notice 08-16-2024
Exhibit 9 Notice of Application Public Comments (Exhibits 9A-9S) Exhibit 10
SEPA Public Comments (Exhibits 10A-10W)
Exhibit 11 Public Hearing Public Comments (Exhibits 11A-11B) Exhibit 12
Critical Area and Wetland Mitigation Plan 08-08-2024 Exhibit 13 Critical
Area Advanced Studies Stand Alone 06-14-2023 Exhibit 14 Critical Area
Pump Station Mitigation Plan 09-20-2024 Exhibit 15 Preliminary Drainage
Report 10-01-2024
Exhibit 16 Gopher Report 10-30-2022
Exhibit 17 Gopher Report 08-18-2023
Exhibit 18 Gopher Report 07-30-2024
Exhibit 19 Transportation Impact Analysis 11-22-2024
Exhibit 20 Concurrency Ruling 12-02-2024
Exhibit 21 Safe Walks to School Analysis 10-01-2024
Exhibit 22 Tree Retention and Replacement Plan 10-01-2024
Exhibit 23 Water Sewer Availability Letter 10-01-2024
Exhibit 24 Project Narrative 10-01-2024
Exhibit 25 Plat Name Certificate 10-01-2024
Exhibit 26 Pearsall Recorded Graded Easement 10-01-2024
Exhibit 27 Pearsall Recorded Waterline Easement 10-01-2024
Exhibit 28 Easement Agreement 10-01-2024
Exhibit 29 Preliminary Civil Plans 10-01-2024
Exhibit 30 Chapter 18.10 Single Family Low Density Residential Zone
District
Exhibit 31 Maps from General Sewer Plan
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 3
Examiner Scheibmeir reviewed corrections he received from City. The Staff
Report was corrected to reflect three phases rather than two phases as referenced
on page 1 of the Staff Report. The City in conjunction with the Applicant
recommends a modification to proposed Condition 45 relating to a left-turn lane
into the project from 49th.
CITY TESTIMONY: Examiner Scheibmeir administered the oath to Tumwater Senior Planner Alex
Baruch.
Planner Baruch reported the request is to subdivide two properties totaling 54.36
acres into 184 single family lots through the phased preliminary plat process.
The Applicant is also requesting an infrastructure exception to construct utilities
adjacent to critical areas and critical area buffers. Both the preliminary plat and
infrastructure exception require Hearing Examiner review and approval.
The property is located at 3717 49th Ave and 3825 58th Lane and is zoned Single
Family Low Density residential. The properties are mostly flat with a decrease
in elevation to Wetland A to the northwest and an increase in elevation to the
east. The property historically has been used to raise cattle and has several
outbuildings and a home on the property.
Surrounding properties are zoned Single Family Low Density with parcels
zoned Multi-family Medium, Single Family medium and Neighborhood
Commercial to the west and northwest.
The subdivision is proposed to be developed in three phases with 103 lots in the
first phase, 47 lots in the second phase and 34 lots in the third phase. Frontage
improvements, infrastructure extension, traffic improvements, safe routes to
school path, stormwater, open space and wetland mitigation would be completed
during the first phase of construction. Phases 2 and 3 will include the
surrounding streets and infrastructure associated with those portions of the
development internal to the subdivision.
The preliminary plat application was submitted and subsequently a Notice of
Application was issued on October 18, 2024. During the Notice of Application
comment period, the Nisqually Indian Tribe, Squaxin Island Tribe, Department
of Archaeology and Historic Preservation, Thurston County, and several
community members commented on the project. The tribes and DAHP
requested a cultural resource study be completed prior to issuance of any grading
work on the property. Condition 8 was included in response to their comments.
Community comments related to school pedestrian connections, pickup and
drop-off at the school, density, open space, stormwater drainage, utility
connections, transportation impacts, emergency service impacts, best planning
practices, and wetland impacts. The City responded to the different concerns
included in response letters within Exhibit 9.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 4
The project was reviewed by the City of Tumwater Transportation Manager who
provided a transportation concurrency ruling which stated that trips proposed to
be sent through the Tumwater Boulevard/I-5 Interchange will require payment
of mitigation fees or construction of the required interchange improvements.
Additionally, improvements to the intersection of Black Lake Belmore Road
and Black Lake Boulevard SW were identified as the project created failing
movements at that intersection.
The City reviewed a SEPA Environmental Checklist and other information
submitted by the Applicant. A Mitigated Determination of Non-Significance
(MDNS) was issued on December 20, 2024 and no appeals of the SEPA
threshold determination were filed.
During the SEPA comment period, the Olympia Regional Clean Air Agency
submitted comments on the requirements for construction dust and demolition
permits as it relates to the need for asbestos surveys. The Washington State
Department of Ecology commented on the application with some specific
comments related to elements of construction activities and critical area review.
The Applicant and the Applicant’s consultant have responded to the Department
of Ecology’s concerns in a series of emails and response letters. The Department
of Ecology also responded to the Applicant’s responses. No formal resolution
to the comments has been achieved at this time. Several community members
also sent comments to the City about the SEPA determination. The comments
included concerns about the transportation network, schools, critical area
impacts, and water availability. The City responded to the different concerns
which are included in the response letters within Exhibit 10.
A Public Hearing notice was sent out on January 17, 2025. Comments have
been received by various members of the public and have been included as
updated Exhibit 11. Staff recently received an additional public comment earlier
in the day, which will be forwarded following the hearing to both the Applicant
and the Hearing Examiner. Notices for all three processes were mailed to
property owners located within 300 feet of the subject property and various
agencies, posted on-site, and published in The Olympian.
Various studies were provided by the Applicant regarding environmental
elements to the site.
Staff reviewed the critical area reports which included an evaluation of the
wetland regulations, impacts to wetlands, and a wetland infrastructure
exception. Three wetlands were identified on-site. Wetland A is a large Category
II wetland in the northwest portion of the property that has a 150-foot buffer that
can be reduced to 110 feet by meeting specific criteria. Wetlands B and C are
located in the middle of the site and were classified as category four wetlands
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 5
with 50-foot buffers that can be reduced to 40 feet by meeting required criteria.
This development proposes to remove the two small wetlands which can be
allowed when following Tumwater Municipal Code (TMC) requirements in
16.28.095. The wetland report for the project details the small wetland standards
and the wetland biologist’s responses to each of the required criteria under
Exhibit 12 section 4.2 of the report along with Exhibits 10S and 10T. After
review of the wetland reports and additional documentation provided by the
Applicant, staff agrees with the findings and the proposed mitigation.
Additionally, a wetland infrastructure exception is proposed to install frontage
improvements and infrastructure along the frontage of 49th Avenue and a sewer
pump station adjacent to Black Lake Belmore Road SW. The infrastructure
would impact Wetland A on the north and west side of the wetland. The
infrastructure aligns with the City’s Transportation Comprehensive Plan and
Sewer and Water Plans for that area of the City. With the proposed mitigation
plans listed in the Wetland and Pump Station reports. Staff recommends
approval of the infrastructure exception.
The geographic area of the subject property includes soils preferred by the
Mazama Pocket Gopher, a listed protected species. Mazama Pocket Gopher
reports dated October 2022, August 2023, and July 2024 conclude that no
gopher mounds were observed on the subject property. Additionally, no Oregon
Spotted Frog critical habitat is mapped on the subject property and while
potential Oregon spotted frog habitat occurs in Wetland A, no preferred habitat
occurs in Wetland A according to the critical area reports.
A professional forester’s report including a tree inventory and tree protection
plan were submitted for review for the project. The inventory reflects 275
existing trees on the site. The TMC requires retention of 20% of trees on-site or
12 trees per acre, whichever is greater. Retention of 12 trees per acre would
require retaining 653 trees on-site. Since the proposed development does not
have the required amount of trees in a pre-developed state, the development
would need to add trees to equal the required amount post-development. A total
of 378 additional trees need to be planted to meet the tree ordinance standards.
This will be provided as a part of the landscape plan for the subdivision. A
preliminary landscape plan was provided in Exhibit 29 on sheet 10.
The property is zoned Single-Family Low Density (SFL). Single-family
detached dwelling units are an allowed use. The Single Family Low Density
zoning district requires a minimum density of 4 dwelling units per acre and a
maximum of 7 dwelling units per acre with a transfer of development rights
from Thurston County. The applicant is proposing 5.92 dwelling units per acre
which is under the maximum 6 dwelling units per acre without the transfer of
development rights.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 6
The minimum lot size in the single family low density zone district is 3,200
square feet with 4,000 square feet proposed for the smallest sized lot. The
minimum lot width is 50 feet, except for alley loaded lots, which reduces the lot
width to 40 feet. Some of the lots within the subdivision are proposed to be alley
loaded which allows the lots to be 40 feet wide. Maximum building height is 35
feet. Front yard setbacks are 10 feet, side yard setbacks are 5 feet, and rear yard
setbacks are 20 feet. The proposed homes must meet design guidelines for single
family homes at the time of building permit submittal. Those requirements will
be reviewed during the building permit process for the homes.
The minimum open space requirement is 10 percent of total land area. Based on
a review of the preliminary plat, it appears that the zoning criteria are met or
will be reviewed during building permit applications.
The Aquifer Protection Overlay district applies to the property, which restricts
hazardous uses to protect aquifer recharge areas. Residential subdivisions are
not a restricted land use in the Aquifer Protection Overlay.
Staff finds that the phased preliminary plat and infrastructure exception as
conditioned conform to the Tumwater Comprehensive Plan, TMC, planning
standards, development standards, and policies of the City of Tumwater. Staff
recommends approval of the phased preliminary plat and infrastructure
exception with the attached conditions.
Examiner Scheibmeir said the site mapping included in the exhibits appears to
be an earlier version when the project was intended to be a two-phased project.
The map reflects Division 1 and Division 2 but lacks Division 3. He asked for
identification of the location for all three phases.
Planner Baruch responded that Exhibit 2, Preliminary Plat, reflects Division 1
encompassing lots 1-103, Division 2 located to the right encompasses lots 104-
150, and Division 3 to the left encompasses lots 151-184.
Examiner Scheibmeir said it appears Division 1 is located within the entire
north/south area of the project. Planner Baruch explained that the outline of
Division 2 is located within the dotted line on the map and is located to the right.
A public street and homes are part of Division 1. A new road, 58th Lane, will
be constructed as part of Division 1. Division 3 is located to the southwest.
Examiner Scheibmeir referred to no SEPA appeals received by the City. He
asked about the expiration of the SEPA appeal period. Planner Baruch advised
that the appeal period expired on January 10, 2025. Planner Baruch verified that
no changes were made to the MDNS as a result of any public or agency
comments.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 7
Examiner Scheibmeir requested additional information on how the City counts
existing trees. The Critical Areas Mitigation Plan proposes planting
approximately 900 cedars around Wetland A and the farm pond. As noted, the
tree plan requires, according to the standard calculations, an additional 378 trees.
He asked whether the figures were added together or whether any part of the
900 trees for wetland mitigation are counted toward the 378 trees required for
tree protection.
Planner Baruch said he understands that the tree protection and tree planting
associated with the replanting is a separate action from the mitigation planting.
Examiner Scheibmeir cited mitigation plans for the preliminary plat and impacts
along 49th as well as the proposed elimination of Wetlands B & C, and the
mitigation plan for the proposed pump station. He wants to ensure that any
mitigation is not double counted. The mitigation plan for the pump station notes
that it will impact 5,000 square feet of buffer to Wetland A with the mitigation
proposal of 15,800 square feet of enhanced buffer elsewhere around Wetland A.
However, the mitigation plan for other impacts reflects square footage of 15,800
in the plan. It is important to ensure mitigation measures are not applied twice
by claiming mitigation for the pump station and mitigation for impacts to 49th
or in the elimination of Wetlands B & C.
Planner Baruch recommended deferring the response to the inquiry to the
Applicant’s consultant.
Examiner Scheibmeir recommended preparing a checklist of questions to defer
to the Applicant for a response.
Examiner Scheibmeir cited the mitigation plan for impacts to the primary site
and the numerous mitigations of an expansion of the wetland, expanded buffer,
and restoration of wetland and buffer. It is unclear however, what mitigation
measures are proposed for the utility impacts along 49th as opposed to the
elimination of Wetlands B & C. He asked about any source of information that
differentiates the mitigation for each area.
Planner Baruch advised that the mitigation for Wetlands B & C is well defined
in the report; however, the impacts to the wetland along 49th is a tentative
question as the intent is to reduce the level of impacts to the extent possible
during construction. Although the location and necessary right-of-way and
improvements along 49th have been tentatively identified, staff wants to ensure
that those improvements tie appropriately on the back of the sidewalks affording
an opportunity to evaluate the impacts and propose mitigation appropriately
during the review of the impact. The report includes mitigation for the impacts
along 49th Avenue; however, there is variable right-of-way in that area requiring
some project shifting to enable completion of the improvement.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 8
Examiner Scheibmeir asked whether all wetland mitigation would be completed
during Phase 1. Planner Baruch affirmed wetland mitigation would be
completed during Phase 1.
Examiner Scheibmeir cited a written comment from Franklin Polk dated
November 1, 2024, citing his opposition of the proposed development as the site
is located within a high groundwater hazard area and would violate Thurston
County’s Critical Areas Ordinance. Staff provided a lengthy response to Mr.
Polk’s many comments; however, a response to that specific question was not
included in the response. He asked whether the lack of a response is because
the City believes Thurston County’s ordinance does not apply or whether there
are other reasons.
Planner Baruch responded that the property is located within the City of
Tumwater and City regulations apply to development on property. Thurston
County’s regulations are not applicable to the property. The project is required
to complete a drainage report as required by the City’s Drainage Design and
Erosion Control Manual. The drainage report is required to address all
stormwater including runoff collection, conveyance, storage, treatment,
infiltration, and release. Because of concerns with high groundwater in the
vicinity, the reports and further studies must be completed prior to approval of
the proposed plan. A preliminary drainage report has been completed; however,
staff is confident the project could move forward after additional documentation
is provided during site development grading.
Examiner Scheibmeir said his review deserves some thought as to the basis for
eliminating Wetlands B & C based on economic impacts. In other jurisdictions,
he has been reluctant to grant variances or special use exemptions simply based
on the economics of a project. The proposal is different and he recognizes that
there are many components regarding the issue. Approval of variances has
created some nervousness based on economic impacts as opposed to the viability
of development. He asked for additional elaboration on the City’s perspective
on the proposed project and how the City has addressed similar projects where
wetlands have been removed.
Planner Baruch advised that he could not speak to other instances where small
wetlands were eliminated as other projects in the City that have proposed a
similar request. For this project, staff examined the entirety of the development,
the amount of infrastructure, and potential public benefit to the surrounding area
for an opportunity to connect to City sewer, which would increase
environmental benefits by reducing the number of septic systems in the Black
Lake basin and surrounding area. The proposal aligns with the City’s Sewer
Comprehensive Plan and the Transportation Plan for street improvements. The
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 9
development is responsible for extending utilities to the project. Staff agreed
the project aligned with the City’s criteria within the Critical Areas Ordinance.
Examiner Scheibmeir requested an additional explanation of both passive and
active open spaces required for the project, as well as the public benefit open
spaces would provide.
Planner Baruch reported the project includes a proposed storm pond that meets
a six-month requirement of a dry pond. One of the conditions includes a
requirement to include an accessible path to the bottom of the open space and a
sign at the intersection of the sidewalk advising the public of available open
space for recreational use. A trail is proposed surrounding the storm pond and
extends to a portion of an enhanced wetland buffer area. The ordinance includes
an allowance for pathways through wetland buffers that counts toward the
required open space. A park with an open lawn and play area is denoted as
Track C to provide additional amenities and open space area for the community.
The amount of sidewalk throughout the subdivision and connection to an
existing asphalt path on Black Lake Belmore Road connects the subdivision to
the school.
Examiner Scheibmeir questioned whether some conflict exists between the
goals of protecting the large wetland (Tract A) with the goal of using Tract B as
open space and providing walking paths as Tract A would be fenced to
discourage public access. Because both features are close in proximity, it
appears the City is marrying two disparate purposes with the protection of one
and public use of the other. He asked staff whether the proposal would achieve
the goal.
Planner Baruch affirmed that the uses are allowed within the Open Space
Ordinance. The ordinance speaks to allowing walking paths through wetland
buffers as an amenity, which meets a portion of the open space requirements.
Planner Baruch responded to questions as to the visual appearance of frontage
improvements. Along 49th Avenue, the improvements include curb, gutter,
planter strip with street trees, and sidewalk along the portion abutting the
property. Additionally, 58th Lane is a private street and would be converted to
a public street and improved to City street standards connecting to Blake Lake-
Belmore Road. Along Blake Lake Belmore Road to the south, a four-foot wide
asphalt path will lead to the school.
Examiner Scheibmeir asked whether the City requires any frontage
improvements in the area of the pump station.
Planner Baruch said that other than the extension of water, no other frontage
improvements are required for the parcel.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 10
Examiner Scheibmeir commented on the extensive exchange between the
Applicant’s wetland’s expert and the Department of Ecology with eight reports
completed discussing the adequacy of the wetland examinations. As noted in
the Staff Report, the outcome appears to be inconclusive; however, testimony
by staff indicated that notwithstanding the uncertainty, it is the position of staff
that the studies are adequate and mitigation is sufficient. He asked Planner
Baruch whether he would like to add more information to his summary.
Planner Baruch advised that the Staff Report covers all those issues for wetland
reports. The Applicant likely will address those conversations as well.
Examiner Scheibmeir cited some concerns by members of the public regarding
the protection of Oregon spotted frogs. Some discussion about the frogs
occurred between the Applicant and the Department of Ecology, as well as the
Applicant and some environmental groups about protecting the frogs. He asked
whether staff has any concerns that the recommended condition would
adequately protect Oregon spotted frogs.
Planner Baruch confirmed that protections are in place to protect the Oregon
Spotted frog and its potential habitat.
Examiner Scheibmeir commented on the Department of Ecology’s positions.
Based on hundreds of pages of material, it appears the Department of Ecology
is suggesting another study in the early part of the growing season to satisfy the
Department’s position that the species would be protected. He asked for a
response from staff on the Department of Ecology’s suggestion.
Planner Baruch said the report aligns with other similar reports the City has
received and approved for other projects from different project consultants.
Studies and observations occurred on the property and additional data sheets
were provided in additional reports. Staff does not believe the City has any
concerns with the existing critical area report and the findings.
Examiner Scheibmeir referred to the site plan and questioned why 58th Lane
would not be extended and stubbed at the easterly boundary of the site instead
of construction of a cul-de-sac to the west. He questioned the reason for not
extending the road to the boundary of the site to meet the City’s street
connectivity goals.
Planner Baruch explained that instead of extending a partially existing cul-de-
sac at the end of 58th Lane, another east-west road has a stub out for connectivity
to the adjacent parcel, which aligns with the transportation goals for connectivity
to adjacent parcels that would develop in the future. He described current
conditions of the area and existing structures and adjacent parcels. The overall
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 11
transportation network identifies potential connections to Trosper Road in the
future with the current proposal for internal connectivity through the parcel to
the east that would meet with a road that eventually connects to Trosper Road.
APPLICANT Examiner Scheibmeir administered the oath to Jeff Pantier, Chris Carlson, Rob
TESTIMONY: Rice, Curtis Wambach, and Chloe McIntyre.
Jeff Pantier, Hatton Godat Pantier, 3910 Martin Way E, Suite B,
Olympia, WA 98506, reported he is a professional land surveyor and is
responsible for the preliminary plat layout under consideration (Exhibit 2).
Mr. Pantier thanked Planner Baruch for his precise and thorough presentation.
Vista Views at Black Lake is a proposed subdivision in process for the last three
years. The planning process included several site specific technical evaluations
that culminated in a project that will achieve the Applicant’s objectives while
also serving the public interest in providing needed housing, supplies, and
infrasture to support the southwest region of the City of Tumwater. Technical
studies include wetlands, wildlife, groundwater, soil and geotechnical,
transportation, stormwater, sanitary sewer routing, and potable water
distribution. The process included some unique situations. For a successful
project, a number of off-site easements and right-of-ways were required and
acquired by the Applicant to achieve the goals of the Comprehensive Sewer
Plan.
The project includes 184 single family lots on a 54-acre site. The lots are
carefully planned to provide some diversity in the housing types built on the site
comprised of different lot sizes and front-load and rear-loaded lots for an
improved streetscape versus a conventional subdivision. Rob Rice has
developed many of the same types of communities both in Tumwater and
throughout the region.
In response to the Examiner’s inquiry concerning Tracts B & C, the total area
of two tracts to be used for passive and active recreation is over 4 ½ acres. Other
open spaces will be provided in addition to the two tracts including the critical
area tract A. Each lot will be served by City of Tumwater sanitary sewer
connecting to the existing system located one mile north of the site in the
Mottman Industrial Park. Water will be extended from the existing system
located along 49th Avenue SW and Black Lake Belmore Road SW. The
completed system will provide for multiple system loops and connections to
provide redundancy and fire flow for the completed complex. Each lot will be
accessed by public streets and alleys and constructed to City’s standards. The
streets are designed with a focus on interconnectivity with careful consideration
of existing topography. The subdivision is considered to be a walkable
community based on its current design.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 12
As part of Phase 1, the north/south through road from 49th Avenue SW on the
north to 58th Avenue on the south will be constructed.
Sidewalks will be provided along each side of public streets throughout the
subdivision for safe walking routes to the Black Lake Elementary School and
bus waiting areas. The safe walking route to the school includes construction of
a pathway from the southwest corner of the site to the existing pathway located
near the school.
Stormwater will be managed with water quality treatment and infiltration
systems located in the northwest area of the site. The systems will be designed
in accordance with the Tumwater Drainage Manual. Chloe McIntyre will
provide more details on the stormwater design.
Sanitary sewer construction for the project is significant both cost wise and
because of the magnitude of the system. The gravity sewer extension will extend
three quarters of a mile on 49th Avenue and Black Lake Belmore Road SW. A
force main will extend approximately one mile north to Mottman Industrial
Park. A new sanitary pump station will be constructed serving the region as
well as the east and northeast sides of Black Lake.
Mr. Rice has acquired several easements to construct the improvements at a total
cost of over $4 million. The project will provide a public benefit as it will serve
a larger region along the Black Lake area and supports the City’s Sewer
Comprehensive Plan.
Examiner Scheibmeir administered the oath to Aaron Van Akin, with Health &
Associates.
Mr. Van Aken said he is a principal engineer at Heath & Associates as well as a
licensed civil engineer specializing in traffic engineering with over 10 years of
experience. He authored the November 2024 Traffic Impact Analysis (TIA)
report for the project. The traffic impact analysis evaluates anticipated traffic
generated by the project and its impact on the surrounding network. At the time
of the report, the project was proposed as 186 single-family dwelling units;
however, the proposal is currently for 184 single-family dwelling units. The
project is located on approximately 54 acres and the site will have access to 49th
Avenue SW via a new public road extending south connecting to 58th Lane SW.
The traffic study identifies the scope of the impacts by working in conjunction
with the City of Tumwater, Thurston County, the City of Olympia, and the
Washington State Department of Transportation (WSDOT). All agencies with
the exception of the City of Olympia provided requirements and comments. The
process resulted in the evaluation of 10 nearby intersections. The 10
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 13
intersections are depicted in Figure 3 of the Traffic Impact Analysis. The
analysis determined that the existing level of service standard by all agencies is
LOS D or better. All identified intersections meet the current LOS. The 186
single family dwelling units were estimated to generate 1,786 daily trips and
178 PM peak hour trips. The team evaluated a seven-year horizon of 231
assuming full build-out and occupancy of the development along with several
others in-process developments and future growth in the City. All study
intersections maintained LOS C or better conditions with the exception of Black
Lake Boulevard SW and Black Lake Belmore Road SW. This intersection was
projected to operate at LOS F or failing conditions both with and without the
project. Mitigation measures were recommended to offset the project’s impact.
The measures include construction of a separate northbound left and right turn
lane (currently a single lane) to increase capacity for turning. Additionally, the
construction of a westbound acceleration lane on Black Lake Boulevard would
allow a two-staged entry onto the roadway. The combined improvements were
projected to reduce the LOS from F to C bringing the intersection into acceptable
standards. Another component of the proposed mitigation is increased
pedestrian connectivity off-site by constructing an approximately 280 foot
walking path along the east side of Black Lake Belmore Road to provide a
continuous walking route to the elementary school. The last mitigation measure
is payment of traffic impact fees and SEPA mitigation fees totaling
approximately $850,000. The fees would provide funding for future projects
listed on the City’s Six-Year Transportation Improvement Plan.
The TIA was reviewed, updated, and approved by all 3 agencies. The proposed
mitigation was determined to offset the impacts of the project.
Examiner Scheibmeir questioned whether the proposal by the Applicant to
eliminate the condition requiring a left turn lane into the development from 49th
was based on information he received earlier from the City.
Mr. Van Aken replied that he could not speak to the timing or how the action
was requested so late in the process.
Examiner Scheibmeir advised that he would follow up with City staff.
However, the analysis concludes that a left turn lane was not needed at 49th. He
asked for feedback on that analysis.
Mr. Van Aken said the left turn lane was based on the WSDOT Design Manual
for left turn guidelines for storage of two-lane controlled facilities. As the City
and other jurisdictions do not identify any criteria, most jurisdictions default to
the WSDOT Design Manual. It is essentially a function of advancing opposing
and left turning vehicles and speed limits. The analysis revealed that the site
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 14
fell below the warrant threshold criteria, which resulted in a recommendation
that the left turn lane was not necessary.
Examiner Scheibmeir noted several public comments expressing concerns about
traffic impacts. He believes 58th will be less traveled than 49th because of the
layout of the subdivision. He asked Mr. Van Aken to provide a response to his
belief.
Mr. Van Aken replied that the distribution of traffic is essentially balanced based
on modeling provided by the Thurston Regional Planning Council (TRPC).
TRPC models traffic distribution for the region. Based on the modeling, usage
is essentially a 50/50 split between the two access points.
Examiner Scheibmeir asked about the specific numbers for existing traffic.
Mr. Van Aken advised that approximately 55% of the traffic was assigned on to
49th Street access.
Examiner Scheibmeir asked whether the project’s dynamics, geography, and
points of interest would lead to some doubts about the division of traffic.
Mr. Van Aken responded that the team reviewed the modeling and analysis and
agreed it was based on the origin, destination, and location of the home on the
plat. Generally, with outlined distributions, it is an appropriate estimation.
Examiner Scheibmeir invited Mr. Van Aken to respond to some of the
comments relating to traffic or the analysis.
Mr. Van Aken cited comments from Rick Guthrie’s concerns about safety at
intersections at 49th Avenue SW and Black Lake Belmore Road and 54th Avenue
and Trosper Road. The intersections were examined through a capacity
evaluation and a review of five-year collision histories. Intersection 4 had three
incidents in the last five years while intersection 6 experienced one incident.
Incident history did not reveal any patterns or other issues that would warrant
further investigation. Both intersections were determined to have adequate
capacity for additional traffic loads.
Another comment from Becky Riley concerned the methodology or the data
collected in the traffic study related to COVID impacts. The team collected
traffic counts in April 2024. At that time, all agencies were accepting new count
data as time had sufficiently elapsed since the pandemic. Another concern
surrounded safe walking routes. The team responded by including a mitigation
measure of construction of 280 feet of off-site walking path to provide a
continuous walking route.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 15
Examiner Scheibmeir thanked Mr. Van Aken for his testimony.
Mr. Pantier requested confirmation that all supplemental submittals pertaining
to wetlands and responses to neighborhood comments were assigned as exhibits
to ensure the record includes all comments and responses.
Planner Baruch advised that some public comments recently received by staff
prior to the public hearing are not included in Exhibit 11. Otherwise, Exhibit
A-E includes all public comments received previously by staff.
Planner Baruch responded to questions about inclusion of other comments. He
identified the information included in several of the exhibits. The additional
comment from Bonnie Blessing and will be included in Exhibit 11 as item F.
He confirmed he would send the comment to the Examiner and attorney Health
Burgess.
Examiner Scheibmeir commented that the attachments/exhibits embedded in
Exhibits 9, 10, and 11 appear to be comments received before and after the
SEPA appeal date.
Mr. Pantier addressed street connectivity and traffic issues. In terms of the
extension of 58th to the east, the property immediately east of the subject
property and the property immediately south east of the subject property are
owned by the same group. The stub road to be provided on the south side of lot
122 provides access to that ownership. During the traffic study, Mr. Van Aken
examined left turn warrants along 49th into the project site. As he stated, based
on WSDOT criteria, the data did not meet the warrants for a left turn pocket at
that location. The City’s default is improvement to frontage along an existing
street that meets City street standards. However, in that specific location, the
width available would preclude sufficient space to add a turn lane.
Planner Baruch said City staff agreed with the analysis during a discussion
earlier in the day and realized the error in the condition and that it should be
removed.
Mr. Pantier referred to the conversation about the distribution of traffic. The
team received data on traffic distribution from TRPC, which reviewed the data
several times. However, after TRPC provided the distribution information,
TRPC considered the City of Tumwater’s capital improvement at the
interchange of Trosper Road and Interstate 5. That project is significant as
roundabouts were constructed resulting in free-flowing traffic and reduced
congestion.
Chris Carlson, Planning Manager, Godat Pantier, agreed with the thoroughness
of the staff report and presentation. He has served as a professional planner for
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 16
34 years and previously worked at the City of Tumwater in various capacities
leaving as the City’s Permit Manager approximately four years ago.
Mr. Carlson reviewed the prior use of the property. Up to 30 heads of cattle
grazed on the property for many years with unfettered access to Wetland A,
which is considered a Category 2 wetland as identified in the Critical Areas
Report. Grazing activity in the area and in the buffer of the wetland has
degraded its condition severely over the years. The consulting biologist
identified B and C wetlands. A year-long study by the biologist identified those
areas as wetlands by utilizing extra methodology in the wetland guidance. One
indicator was the hydrology using data measuring devices over the course of the
year-long study. The wetlands are small at approximately 2,100 square feet and
1,600 square feet in area. Three sections in the City’s wetland code pertinent to
wetlands are 16.28.095 for small wetland standards that allow for the
elimination of wetlands that are less than 4,000 square feet if specific criteria
are satisfied. The code requires mitigation of compensation when wetlands are
less than 4,000 square feet. As the wetlands are classified as Category 4, the
lowest rating for a wetland, mitigation is required at specific ratios. Mitigation
of impacts will be at a ratio of 30:1 well above the City’s requirements.
As the City’s code lacks a separate mitigation sequencing section, the City’s
requirements in 16.28.180 include specific criteria that apply to the two wetlands
for avoiding wetland impacts that enable for the elimination of the wetlands.
Section 16.28.180 D requires the Applicant to demonstrate that the impacts are
necessary and unavoidable based on a reasonable alternative, which will
accomplish the applicant’s objective. Avoidance criterion was achieved by
submission of an alternate project site layout with 50-foot buffers on Wetlands
B & C, which eliminated 17 lots. The option did not meet the Applicant’s
objective for the property. Additionally, the City’s objectives speak to
increasing housing stock and housing affordability. The option eliminates lots
within the subdivision, contrary to the City’s policy to increase housing stock in
the City as well as complete streets and connectivity. The alternate layout
requires several dead-end cul-de-sacs that would prevent connectivity through
the neighborhood and inhibits emergency service response. Another issue with
cul-de-sacs within the alternate layout would result in the dead ending of the
City’s water mains in that portion of the subdivision, which would prevent
looping of the system promoted by the City for numerous reasons including
preventing stagnant water at the end of the water main. The project is likely the
only project that could assume the cost of construction of a sewer pump station
consistent with the Tumwater Sewer Comprehensive Plan. The site offers a
significant environmental benefit by providing connectivity to sanitary services
to improve groundwater and surface water quality. Black Lake to the west of
the site is listed on the Clean Water Act 303 D list for phosphorus. Septic
systems are a main source of phosphorus polluting surface water bodies.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 17
Proposed wetland mitigation would be increased and exceed the requirements
of the code. The project team believes the project design proposed by the
Applicant is a reasonable alternative that accomplishes the Applicant’s objective
and many of the City’s objectives.
The Applicant is also requesting an infrastructure exception because of the
location of the wetland adjacent to the north boundary of the property off 49th
as part of the City’s development guide. The Applicant is required to construct
urban street improvements of curb, gutter, sidewalk, landscape strip, separated
sidewalk, and street lights. Because the project encroaches further into the small
buffer on 49th Avenue, the Applicant included a section in the critical areas
report that describes the criteria for infrastructure exception. The Applicant
believes the proposal meets the requirements for the Examiner to consider
granting the infrastructure exception.
Mr. Carlson addressed the Examiner’s prior questions regarding the tree count.
The Applicant’s proposed mitigation for the enhancement of the wetland and
wetland buffer include additional trees that are not part of the 378 trees that are
required by TMC 16.08 for tree protection and replacement. The trees replaced
to meet the requirements of the ordinance require a different tree standard.
In terms of concerns of double counting of wetland mitigation, all mitigation
around Wetland A is not part of any mitigation for other requirements.
With respect to high groundwater concerns, Thurston County regulates high
groundwater hazard areas through its critical areas ordinance with restrictions
and setbacks that do not apply to the project. The project site is under the
jurisdiction of the City of Tumwater, which regulates high groundwater hazard
areas through implementation of the City’s Stormwater Drainage Manual.
Mr. Pantier introduced Curtis Wambach, M.S. Senior Biologist and Principal
with EnviroVector, to provide a presentation of a summary of most of the
information that has been reviewed.
Examiner Scheibmeir requested a copy of the presentation following the public
hearing. He entered the presentation material as Exhibit 32.
Mr. Wambach reviewed his education and professional experience. Following
completion of his Master of Science degree in biology, he managed a non-profit
organization rehabilitating wetlands and streams for two years prior to assuming
a consultant position at Talasaea Consultants in 1999. He gained extensive
knowledge and experience preparing wetland determinations, delineating
wetlands, and applying advanced methods, including hydrology monitoring,
chemical analysis of soils, and redox testing of soils. Since 1999, he prepared
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 18
numerous advanced study reports approved by local, state, and federal agencies,
including the US Army Corps of Engineers (USACE).
Mr. Wambach’s presentation identified and reviewed 11 reports/documents
prepared for the project. Seventeen site visits occurred during the two-year
study. First steps for evaluating a wetland involved reviewing aerial
photographs and agency databases. Historical aerial photographs and agency
databases supported the evaluation and delineation as analyzed and described in
two of the reports. The USACE (2010) Regional Supplement states that
transitory flooding following heavy storm events and flooding during years of
high precipitation can frequently occur in non wetlands. Low resolution aerial
photographs should be reviewed but are not reliable if they are only the solitary
indicator of wetland hydrology. Care must be used in applying this indicator
(flooding and aerial photographs) because surface water may be present in non
wetland areas immediately after a rainfall event or during periods of unusually
high precipitation, runoff, tides, or river stages. Some non wetlands flood
frequently for a brief period based on information in the Regional Supplement.
Mr. Wambach described the routine on-site determination method, which is
considered a rapid assessment method. Wetland A was delineated using this
method. The method was applied on the southern portion of the property. No
wetland indicators were identified in the areas mapped as hydric soils in the
southern portion of the property. However, disturbances were identified
associated with long-term agricultural practices that occurred on the southern
portion of the property that could have masked or altered wetland indicators.
Mr. Wambach reviewed procedures applied during the assessment. The
Advanced Study Report identifies the procedural steps to identify the best
methods to use in the study. The study followed the procedural steps to
determine the appropriate method and provided a step by step procedural
process. The procedures contained in Chapters 2 to 4 resulted in Chapter 5 for
difficult situations. Following the procedural steps in Chapter 5, three
appropriate methods were determined practical to perform on the property. The
methods were shallow groundwater monitoring during the wettest part of the
growing season, chemically testing soils using alpha, alpha-dipyridyl, and
Redox Test evaluating Oxidation Reduction Potential (Eh).
Seventeen groundwater monitoring wells were installed in the area mapped as
hydric soils in addition to three deeper wells to determine whether there was
hydrostatic pressure. Table 7 in the advanced studies report speaks to
specifications of the monitoring wells. The specifications are from a manual
that provides instruction on how to perform the procedures. Testing included
using water level data loggers to record water levels every hour.
Mr. Wambach explained how all data was interpreted utilizing guidance in the
Regional Supplement. Data was segmented into three parts of (1) the water level
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 19
must be within 14 or more consecutive days of flooding, ponding, or a water
table twelve inches (30 cm) or less below the soil surface, (2) must occur during
the growing season, and (3), must be at a minimum frequency of five (5) years
in ten (10) fifty percent or higher probability.
Mr. Wambach shared data generated at the Olympia Regional Airport reflecting
the average precipitation for each month, a range of average of 30% less than or
30% more than the average, and the average precipitation per month. The
average precipitation per month is 40.17 inches, a normal precipitation. During
the study period, precipitation was normal.
The second condition is the growing season. Field methods for deterring the
growing season include measuring soil temperatures or observance of above
ground growth of plants. Either procedure can be used. Testing was performed
using the soil temperature method as measuring plant growth is variable and not
practical. A soil temperature data logger was installed on February 8, 2023
collecting hourly soil temperatures 12 inches below the surface until May. The
high volume of data calculated the growing season to the hour it began. Mr.
Wambach shared a graph of the soil temperature data. Data reflected that the
growing season began on March 17, 2023 at 1 p.m.
Mr. Wambach summarized the hydrology study results. Wells 2, 15, and 16
were positive for wetland hydrology. All wells were negative for alpha, alpha-
dipyridyl. Wetlands B & C were delineated because the hydrology was positive
and Redox was positive. All remaining sample tests were negative. Mr.
Wambach displayed aerial photographs taken in February of Wetlands B & C
reflecting no water or habitat.
The mitigation plan provides a 30:1 ratio for rehabilitation. The required
rehabilitation is 3:1. Mr. Wambach reviewed mitigation measures proposed for
the project. High-quality wetlands will be created at a 1:1 replacement to loss
ratio to form one large contiguous wetland habitat. The created wetland will
replace low quality Category IV wetlands within the livestock pasture in favor
of a high quality, forested Category II wetland system. Existing disturbed soils
and non-native plants would be excavated to form a shallow depression. A clay
layer would be installed to maintain wetland hydrology if the hydrology
criterion is not satisfied. Invasive weeds will be eliminated. Native plant species
would be installed throughout the created wetland system to provide the
maximum habitat diversity.
Mr. Pantier explained that the reasoning for the enhanced mitigation ratio of
30:1 versus the standards was because of the degraded nature of the sites.
Planting and replanting of the buffers as well as other enhancements will provide
benefits to the development.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 20
Mr. Wambach reported some adjustments have been made to mitigation, with
the created wetland much larger and an increase in plant density at the pump
station to restore the cattle pasture into a forested condition.
Mitigation will improve habitat for the Oregon spotted frog as well as for
stormwater as the stormwater pond will serve as the infiltration facility to
prevent flash flooding downstream. No discharge of stormwater from the pond
will occur to Wetland A. No Mazama pocket gopher mounds were identified
on the property after three years of studies.
Examiner Scheibmeir asked about the process for calculating the perimeters of
Wetlands B and C. Mr. Wambach said the calculation was through the
observation of soft brush growing within the area that did not exist outside the
boundary.
Examiner Scheibmeir noted that one of the issues addressed by the Department
of Ecology spoke to the numerous sources of aerial photographs and multiple
agency databases and the collective and universal belief that wetlands are
present across a portion of the site. The agency pointed out that with so much
universal belief that wetlands exist, the agency questioned why it would not be
possible for another examination of the site to ensure other locations do not exist
outside the area of the two wetlands.
Mr. Wambach responded that as previously mentioned, the agency databases
are the first step review followed by site visits as aerial photographs are only
snapshots in time. The Regional Supplement addresses those conditions and
cautions against using only aerial photographs because they are a snapshot in
time. Frequent flooding can occur outside of the growing season without
producing wetland conditions. On-site studying is necessary. Additionally, two
years were spent extensively studying the site during 17 site visits. The study
collected thousands of data points in those areas.
Examiner Scheibmeir requested feedback on his previous question as to whether
mitigation measures were counted twice. Mr. Wambach reviewed mitigation
measures proposed for the created wetland, wetland rehabilitation, restoration
of forest within the graded buffer, buffer enhancement, and the new wetland
buffer. He corrected a graph indicating the ratio for Wetlands B and C.
Mitigation is a ratio of 1:15 rather than a 1:5 ratio as depicted on the graph. For
infrastructure impacts, mitigation is at a ratio of 1:25.
Examiner Scheibmeir said the figures represent a double allocation of mitigation
for Wetlands A, B & C which has also been allocated as mitigation for the pump
station. It appears there is a double allocation of new wetland buffer.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 21
Mr. Wambach explained that the allocation is extra and was allocated to the
buffer as the mitigation is beyond the required ratio.
Mr. Pantier introduced Chloe McIntyre to address questions on stormwater.
Examiner Scheibmeir questioned whether the stormwater facilities as designed
would impact the hydrology of Wetland A by denying stormwater.
Ms. McIntyre explained that the design for stormwater is to convey a majority
of all stormwater to an on-site infiltration pond with water infiltrating to the
groundwater aquifer beneath the pond. The aquifer is hydraulically tied to the
wetland with water entering the wetland naturally through the substrate rather
than directly or through flash flooding surface flow directly to the wetland. She
affirmed his interpretation as there would be sufficient connectivity between the
stormwater system and the wetland to ensure its hydrology.
PUBLIC Examiner Scheibmeir invited members of the public to provide testimony.
TESTIMONY:
Tumwater Permit Manager Tami Merriman advised of several individuals who
were unable to remain to testify because of physical reasons and timing for
medication. They asked her to share their message. She identified the couple as
James Giovannini and Pamela Callaway. The live on property located
between the wetland and the entrance to the project site on 49th. They are very
concerned and were not aware of all the documents as reviewed during the
presentations. They are concerned as to how the development will impact their
home and their property specifically. They reached out to the City in the past
and were unsuccessful and would like to speak to someone who can explain the
project.
Manager Merriman identified members of the public that were no longer present
but had intended to testify:
• Don Wakefield
• Melinda & Chris Gordon
• Lance Brender
Examiner Scheibmeir individually administered the oath to each speaker.
Ramona Fultz said she is registering a complaint with the City of Tumwater
after learning that the project has been underway for three years with multiple
processes at great expense while the public only learned about the development
at the end of October 2024. She feels that taxpaying citizens are an afterthought
and that testifying is only a formality and the public is irrelevant. She is unhappy
as there should be a community connection with development proposals of this
type. She is incensed and has a list of questions.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 22
Examiner Scheibmeir asked Ms. Fultz to provide her questions to enable him to
identify the appropriate individual to respond.
Ms. Fultz said the general issue is that she and other community members are
taxpayers who pay the bills, yet they only learned about the proposal very late
in the process. She would like some kind of change in the procedures to ensure
residents can be advised of development proposals earlier in the process rather
than three years later when it appears decisions have been pre-determined and
decided. Another objection is the location as the project proposal relates to the
definition of urban sprawl, which is the spreading of urban development, such
as houses and shopping centers on undeveloped land near a City. The entire
area is rural. The state’s Growth Management Act is supposed to alleviate urban
sprawl. The development actually expands urban sprawl into a rural farmland
area. She could support the proposal if it was closer to the City center or if there
were more than just two-lane roads. Today, they must travel miles to find a
four-lane road. The proposal would likely add 400 to 500 more cars. Another
concern is the wildfire danger and evacuations. She is doubtful that she could
survive today because of the difficulty of evacuating on two-lane roads. Another
concern is the school and congestion. Parents park on her easement. Her home
is served by two entrances and exits with no line of sight around parked cars.
The issue has been documented with the school district and the City of
Tumwater. Adding more traffic on 58th Lane will only increase congestion and
worsen visibility issues. Visibility is an important issue as she lost a brother
who was only 21 years of age caused by a visibility problem on a highway
involving a logging truck driver crossing the center lane because of a car parked
alongside the road. She has multiple concerns about the project. The exit and
entrance to 58th Lane should not be allowed. She recommended reconsidering
extending another access point from 58th Lane if the proposal is approved,
although she opposes the project.
Gary Flutz said that Black Lake Belmore Road and 49th Street is served by a 3
way stop sign with the southbound Black Lake Belmore Road traffic having
unencumbered access. He asked about any plans to mitigate that stop sign
configuration. On 49th where the proposed entrance/exit is planned, he asked
about any improvement to the railroad crossing and whether the speed limit will
remain 40 mile miles an hour since there will be no (left turn lane accessing the
development.
Carol Webster said her concerns surround stormwater runoff. Within the area
of Black Lake Belmore Road and south of 49th the area experiences constant
flooding during rainy seasons. She has experienced flooding in the last couple
of months with water across the road requiring the City to install temporary signs
advising motorists of water over the roadway. The fields at the bottom located
to the west turn into a lake with ducks swimming on the property during rain
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 23
events. With the proposed amount of impervious surface that will be constructed
on the hill, she questioned the amount of additional water that will travel to the
area and block the road. It continues to be a reoccurring issue during rainy
seasons. It appears the traffic studies were not conducted during the rain events.
Guy Bogdanovich, 3827 58th Lane, said he owns a 2.45 acre parcel at the
corner of 58th Lane and Black Lake Belmore Road. His question and concern
regards the increase in traffic on 58th Lane SW. He appreciated the Examiner’s
observation of the logistics of the proposal and the anticipated amount of traffic
accessing 49th as opposed to 58th. During the last 4 years since his retirement, he
has observed the substantial amount of traffic generated by four existing homes.
He asked whether any provisions are included for mitigation other than a stop
sign for traffic at the end of 58th Lane because waiting time at the stop sign will
be substantial due to the increase in traffic. During the summer, traffic increases
to access a popular county park, Kennydale Park, located south of Black Lake
Elementary. His experience with traffic off 58th Lane onto Black Lake Belmore
for the last 33 years leads him to question whether there was any consideration
for anything other than a stop sign or a provision for a turn lane either on Black
Lake Belmore or 58th Lane SW.
Lois Greisen said she lives off 58th Lane SW. The proposal will impact her as
well as all neighborhoods Neighbors are concerned about the school as the
school houses many portable buildings to accommodate students. She
questioned how the school anticipates supporting more students and whether
that issue was studied. The pasture is a wetland based on her pictures of the
area. Wildlife frequent the property when wet. Golden eagles, bald eagles, blue
herons, vultures, and geese and ducks are present on the site. Another concern
is the intersection at 49th and Black Lake Belmore Road. According to the
information shared, only three collisions were documented in three years;
however, many members of public chuckled when that information was shared
as the area is often covered with broken glass from fender bender accidents quite
frequently as the three-way stop is confusing for motorists. Adding a turn lane
would not resolve the issue.
Pat Greisen added that traffic on the southbound lane of Black Lake Belmore
Road during school hours often experiences a backup past 58th Lane for more
than an hour or more during morning and afternoon school hours.
Ms. Greisen reported that a neighbor spoke to a staff member at the City and
was informed that residents of the development would be allowed to park along
58th Lane. Examiner Scheibmeir confirmed the design of the roads enables
parking on all proposed streets.
Examiner Scheibmeir agreed with a request from Heather Burgess, Attorney for
the Applicant, to provide an extended opportunity until Monday, February 3,
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 24
2025 at 5 p.m. for the Applicant and City to provide comprehensive written
responses to issues raised during public testimony.
Examiner Scheibmeir invited members of the public participating via zoom to
provide testimony.
Bonnie Blessing commented on the interesting presentation on the hydrologic
studies and wetland mitigation towards the north of the property. Her concern
is the needed separation between surface water and groundwater as Planner
Baruch indicated more studies would be completed to ensure there is separation.
Additionally, she questioned whether the stormwater manual includes
appropriate guidance as she understands that the manual allows improvement of
downstream conveyances. She asked about the potential of any relationship
concerning groundwater pumping options or draining of adjacent marshes as her
concern is ensure the water table is sufficiently below ground. She discovered
spotted frogs in the marsh and the frogs lay eggs in shallow water, which could
be lost. Wetlands are located approximately 600 feet or more to the southeast
of the subject parcel. The stormwater manual allows improvement of off-site
conveyances and she would like that issue addressed because of potential
changes to the hydrology to marshes located off-site to the southeast. The marsh
provides habitat for listed species.
David Stauffer said he lives at the end of 58th Lane at the cul-de-sac. He cited
the Examiner’s discussion about the possibility of extending the road to the
property to the east. There is insufficient room between his house and the
centerline of 58th Lane to enable extension of the road. Between Littlerock Road
and Black Lake Belmore and the 49th intersection, approximately six major
developments have added hundreds of home to the community. He is okay with
growth, but there are many choke points along the roads on 70th Avenue, Kirsop
Road, 66th Avenue, Belmore, 49th and Black Lake Boulevard that will never be
improved. There are many areas along those routes that have a swamp on both
sides of the road. Property owners are not going to fund widening the roads
sufficiently for a walking path or bicycle lane let alone expanding the number
of lanes. Today, Black Lake Belmore is barely wide enough to accommodate
two cars. Many people walk along the road and often fall into the ditch. Adding
another 400 cars speaks to when the City plans to address all the choke points
along the roads between Littlerock Road and Black Lake Boulevard. There is
too much traffic and the City is not mitigating traffic flow along those
chokepoints. Property owners pay taxes for infrastructure, transit, police and
fire services within the limits of the City with none of those services afforded to
the area where he lives. The City has no plans to increase the road width of
Black Lake Belmore Road, which is unacceptable.
Esther Kronenberg said she is speaking on behalf of the Clean Black Lake
Alliance, a citizen’s non-profit organization to preserve the health of the Black
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 25
Lake basin. The organization has several concerns about the project related to
water quality, wildlife habitat, and the drastic change in character within the
rural area. The addition of 184 houses and nearly 1,800 daily vehicle trips will
add a significant burden of stormwater pollution to existing degraded water
bodies and tributaries which provide habitat to federally endangered species.
The Department of Ecology has twice raised concerns about the methodology
and dating used to delineate wetlands on the property. The agency questioned
why the impacts of the two wetlands could not have been avoided. The response
from the consultant was that the Applicant’s objective would not be
accomplished, which reflects that the consultant was hired to achieve those
desired results and is not an impartial biologist. As the Department of Ecology
stated, the desire to develop a certain number of units is not a demonstration of
need. The Applicant’s response was that project engineers would address the
issue. SEPA law includes several provisions requiring the lead agency to
consider impacts on endangered/threatened species, habitat, adverse impacts on
other locations, and the cumulative impacts of the proposal. The submittal does
not include any analysis on whether the change in water levels will impact
Oregon spotted frogs. There is no analysis by Tumwater of the entire basin area
at full build-out instead of a piece-mealing development proposals. There was
no analysis of the impact from the loss of trees and mitigation for damage to
pavement caused by downstream conveyance. The application indicates the
development would not release additional stormwater to downstream
conveyance systems and raised a similar question to the Department of Ecology
about whether the wetlands are significantly more expensive than the proposal
claims. Earlier, neighbors testified about marsh and swamp land and water over
the road. There is also a hazardous waste site close to a culvert. Frank’s place
was listed by the Department of Ecology as a contaminated site with
groundwater possibly contaminated by lead, metals, and many other unknown
substances. The wetland on the site was graded and filled with solid waste and
debris. She asked whether the City considered the hazardous site in any
assessment of cumulative impacts to the Black Lake basin. It appears the City
has not considered the impacts within the assessments on the entire watershed
and endangered species that live in the urban growth area or other ongoing
projects in the same rural area. At the very least, an assessment of the impacts
on groundwater withdrawal and seasonal flooding is necessary for threatened
species, for wildlife habitat, and the possibility of more runoff to Black Lake.
The Department of Ecology recommended another site visit. The Clean Black
Lake Alliance believes it is time the City of Tumwater exert its legal and ethical
responsibility to protect natural resources and wildlife under its jurisdiction.
The project should have an Environmental Impact Statement (EIS) review. It is
not possible to continue building on top of the watershed that supplies the City’s
drinking water without serious consequences in the future.
Examiner Scheibmeir responded that most of the requests are not under his
authority, such as reconsidering the SEPA Determination or to impose an EIS.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 26
The SEPA Determination included an appeal period. No appeals were
submitted. That portion of the process is fixed for purposes of his consideration
and legally, he is unable to change the SEPA Determination.
Betsy Norton commented that her concerns surround biodiversity, habitat loss,
and the failure of water resources management to maintain quantity and quality
to support ecosystems, wildlife, and humans. In the application packet, the City
states that after the exchange between the Applicant’s environmental consultant
and the Washington Department of Ecology, no formal resolution was achieved.
It is concerning that the Hearing Examiner would render decision and staff
would provide a recommendation without a final resolution from the
Department of Ecology. She urged the Examiner to resolve the issue prior to
issuing a decision. Secondly, the proposal removes the ecosystem function of
the underground aquifer recharge levels 1 and 2. She asked whether Tumwater
has reviewed the cumulative long-term impacts on groundwater levels and
drinking water availability for City residents as a result of incrementally
reducing the recharge function each time a development request is approved.
The application states that 55% of the development site will be impervious
surface, a calculation that must include the area under Wetland A. Wetland A
comprises a significant part of the total area in the northwest corner. She asked
whether the remaining non-Wetland A area of the developed parcel meets the
60% impervious surface calculation limit. She believes it is possible to meet the
letter of the law but not the intent. The City should have analyzed the
development in terms of the likely cumulative impact of all similar
developments in the area on stormwater volume in the neighborhood and the
likely impacts downstream including the cumulative effect of all new
impervious surface, the cumulative loss of stormwater absorption ability as
prairie and grasslands are paved, and the cumulative loss of wetlands and
wildlife habitat. Finally, the cumulative impacts of those actions combined with
more extreme rain events from global warming will affect all development
concurrently. She is hopeful the City will consider the cumulative impacts of
the incremental decisions and reconsider whether the intent is to weaken
environmental protections and wetlands at this time.
Planner Baruch advised that Betsy Norton also forwarded comments via email
as she was unsure if she would be able to rejoin the meeting. He will forward
the comments to all parties after the meeting as Exhibit 11G.
Examiner Scheibmeir advised that rather than afford an opportunity for the City
or the Applicant to respond to the comments, he will adjourn the meeting to
enable the parties to submit written responses to public comments as previously
discussed no later than Monday, February 3, 2025 by 5 p.m.
Examiner Scheibmeir thanked everyone for attending and participating in the
hearing.
TUMWATER HEARING EXAMINER
PUBLIC HEARING
MINUTES OF VIRTUAL MEETING
January 29, 2025 Page 27
ADJOURNMENT: With there being no further business, Examiner Scheibmeir adjourned the
public hearing at 9:36 p.m.
Prepared by Valerie L. Gow, Recording Secretary/President