Historic Preservation Commission
Regular MeetingTumwater, WA · February 16, 2023
Minutes
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page1
CONVENE: 6:31p.m.
PRESENT: ChairDavidShipley andCommissioners DonTrosper, Alex Rossiter,
ReneeRadcliffSinclair, andMarnieSlakey.
Absent: Commissioner DaveNicandri.
Staff: Parks andRecreation Director Chuck Denney, Parks and
Facilities Manager StanOsborn,andAnnCook.
CHANGES TO Election ofofficers wasaddedtotheagenda.
AGENDA:
Director Denney advised oftheresignation ofCommissioner Jeremy
Barclay.
APPROVAL OF
MINUTES OF
OCTOBER 20,2022
MINUTES:
MOTION: Councilmember Rossiter moved, seconded byCommissioner
Slakey, toapprove theminutes ofOctober 20,2022 aspresented.
Avoicevoteapproved themotion unanimously.
PUBLIC COMMENT: Therewerenopubliccomments.
ELECTION OFCHAIR Commissioner Rossiter nominated David Shipley toserveas2023
VICE CHAIR: Chair. Commissioner Slakeyseconded thenomination.
Noothernominations wereoffered.
MOTION: Avoicevote ofmembers unanimously elected David Shipley to
serveas2023Chair oftheHistoric Preservation Commission.
Commissioner Slakey nominated Alex Rossiter toserveas2023
ViceChair. Commissioner Sinclair seconded thenomination.
Noothernominations wereoffered.
MOTION: Avoicevoteofmembers unanimously elected AlexRossiter to
serveas2023Vice ChairoftheHistoric Preservation Commission.
BREWMASTER’ S Director Denney reported onSaturday, January 21,2023, the
HOUSE ARSON: Brewmaster’sHouse/Museum wasthetargetofarsonatapproximately
6a.m. Thefirewasreported byamotorist driving along Deschutes
Parkway. Tumwater policeofficers andfirefighters responded quickly
closing Deschutes Parkway tothepublic andcontrolling thefire. The
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page2
Tumwater FireDepartment wasabletoextinguish thefirequickly
limiting damage primarily tothreerooms andfourdoors.
Director Denney shared photographs ofthehouse. Damage occurred at
therearofthehouse tothree rooms. Thefirstwasabasement room
containing event supplies andcomputer/electronic equipment. Directly
above thebasement roomisthebackporch. Thethird storyincludes a
roomserving asanoffice forvolunteers who worked onarchiving
materials andinformation. Thebackporch roomwasthemainarea
affected bythefiredestroying mostoftheroom. Theupstairs room
sustained damage tofurniture andtowallsafterfirefighters removed
interior siding tocheck onthepotential spread offirewithinthewall
cavity. Thelower storage room withsupplies, equipment, and
materials wasdamaged byfireandwater. Staffisevaluating other
rooms inthehouse toassess damage tothestructure andexisting
furniture andstored materials.
Thefirewasstarted byamanlivingacross thestreetnearthefreeway
wall. TheCity hasvideo oftheman walking acrossDeschutes
Parkway withatorch, lighting thetorch, andsetting thefireattherear
ofthehouse. Themanwasarrested andadmitted tothearson.
Facilities staffvisited thesite, completed somecleanup ofthesite, and
secured thehouse withplywood, aswellassecuring alldoors. The
building issecure atthistime.
Director Denney shared aseriesofphotos ofareas damaged bythefire
andwater. AnOlympia FireDepartment Inspector spenttimeatthe
property andwasabletodocument howthefirestarted andspread to
thehouse.
ADeclaration ofEmergency wassigned bytheMayor onJanuary 31,
2023, andratified bytheCityCouncil onTuesday, February 7,2023.
Thedeclaration enables stafftoimmediately contract forthenecessary
repair andrestoration services. TheEmergency Declaration and
Waiver ofCompetitive Bidding Requirements enabled stafftoact
quickly. Director Denney reported hemetwithrepresentatives from
theWashington CitiesInsurance Authority ontwodifferent occasions
atthehouse. Thehouse isinsured upto $1million forboththe
structure andcontents. TheCitycontracted withHeritage Restoration
from Chehalis. Staffandrepresentatives ofthecompany metand
reviewed thetimeline andscopeofwork. Thehouse haspartialpower
restored withfullpower restored assoon aspossible toenable the
operation ofboththefirealarm system andsecurity cameras. All
rooms inthehouse wereaffected bysmoke fromthefiredamaging
contents, floors, carpets, andsomeclothing storedwithin thehouse.
Staffplans toevaluate allcontents. TheCitywasinstructed to
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page3
complete testborings inwallstoascertain theextent ofsmoke damage
andsmelldamage toinsulation. Manyofthephoto archives havebeen
moved toCityHalltoascertain anyfiredamage andlingering smoke.
Therepairs willtakeapproximately ninemonths tocomplete.
Director Denney reported hemetwithstafffromtheStateDepartment
ofArcheology andHistorical Preservation toexplore thepossibility of
applying forgrantfunding fromtheNational ParkService should the
repairs exceedinsured costs. TheDepartment isoverseeing thework
asthehouse islistedontheTumwater Register ofHistoric Places and
theNational Register aspartoftheTumwater Historic District.
StaffhasalsometwithJohnFreedman fromtheOlympia Tumwater
Foundation whooffered tostorethephotoarchives.
Commissioner Slakey askedabout thestatus ofthearsonist. Director
Denney saidtheindividual wascharged with second-degree arson.
Theindividual lacksanyresources toreimburse theCityfordamages
butwilllikelyservesome timeinjail.
Commissioner Slakey asked about anyadditional security measures
thatmight benecessary toprotect thestructure. Director Denney
replied thattheBrewmaster’sHouse andtheCrosby House are
equipped withcameras that aremonitored bystaff. Thecamera
identified asuspect duringthearson.
Commissioner Rossiter asked aboutthepurpose oftheemergency
declaration. Director Denney explained thatanyCityproject requires a
bidding process thatrequires ascope ofworkandadvertising the
project totheconstruction industry, which canrequire approximately
onemonth. Dependent upon thetiming ofCouncil meetings,
contracting canbedelayed foranother twoweeks. Another month is
usually necessary todevelop acontract withtheselected lowbidder
resulting inatimelapseofnearly threemonths sincetheprocess was
initiated. Following finalization ofthecontract, thecontractor requires
timetomobilize fortheproject. The typical process tohirea
contractor canrequire nearly 4months. Declaration oftheemergency
enabled theCitytoselectacontractor following thedevelopment ofthe
scopeofwork.
CERTIFICATE OF JohnFreedman, Executive Director, Olympia Tumwater Foundation,
APPROPRIATENESS – commented onthearsonattheBrewmaster’sHouse. Oneofhisfears
BREWERY PARK AT issomething similar occurring attheSchmidt House. TheSchmidt
TUMWATER FALLS: House hasexperienced several break-insinthelastseveral months.
Thehouse isclosely monitored withacamera system. Transient
activity hasincreased recently intheareawiththecamera system
documenting manytransients walking throughout theproperty. The
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page4
system hasproved tobebeneficial andtheTumwater Police
Department hasbeenveryresponsive whenincidents occur.
Mr.Freedman reported ontherecent departure ofAssistant Director
Megan Ockerman toacceptanother position. TheFoundation hiredEd
Echtle, alocalhistorian withasocialmediabackground. Hereceived
hisMaster’sfromCentralWashington University.
Mr.Freedman presented theproposal fora10'x10'prefab gazebo to
houseinterpretive panelsandadonation kioskintheBrewery Parkat
Tumwater Falls. Hedisplayed anillustration ofthekiosk, a
prefabricated gazebo atacostofapproximately $30,000toinstall. The
facility willenable thebroadcasting ofvideos orslideshows on
Tumwater history. Thepurpose ofthekioskistogenerate fundsfor
theFoundation. Thestructure iscedar withacedar shake roofto
mimictheshingle milllocated nearthesite. Heshared aphoto ofthe
areaintheearly1900s oftheshingle mill. Contributions received for
thestructure include $10,000fromtheOlympia Brewing Company,
10,000fromtheDepartment ofFishandWildlife, withtheremaining
fundsfromtheFoundation.
Commissioner Slakey askedaboutprotection oftheelectronics within
thekioskfrom weather. Mr.Freedman explained thatthekiosk isa
weatherproof system withallelectrical wiring underground withaccess
forcreditordebit cards only. Typically, thepark attracts
approximately 250,000visitors annually. If5%ofthevisitors donate
3,theFoundation would raiseapproximately $13,000annually. The
kiosk willdisplay different historical exhibits ofTumwater and is
capable ofdisplaying slide showsorbroadcasting videos, aswellas
including announcements onupcoming events. Thedisplaywithin the
kioskalsoincludes apaystation. Thelocation ofthekioskwillbeat
theendofthelargerparking lot fromCStreet. Dependent uponthe
success ofthekiosk, theFoundation mayinstall another kioskata
futuredate. The location isdesigned toattract visitorstothekioskas
theyenterthepark priortovisiting thehatchery orotherareasofthe
park.
MOTION: Commissioner Slakey moved, seconded byCommissioner Trosper,
toapprove theCertificate OfAppropriateness – Brewery Park at
Tumwater Fallsaspresented.
Commissioner Rossiter requested moreinformation ontheproposed
kiosk intermsofdimensions orthestylereminiscent ofthelate1800s
toearly 1900s. Mr.Freedman explained thatthestructure isa
prefabricated structure ascustom-built systems aremuch more
expensive. Thestructure isconstructed ofcedarwithcedar shingles
withawestern motifroofline.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page5
Commissioners conveyed interest inensuring the roof features cedar
shingles.
Commissioner Rossiter askedaboutthetypeoffoundation housing the
structure. Mr.Freedman saidthestructure would sitona12’ x12’
concrete pad.
MOTION: Themotion carried unanimously.
Mr.Freedman responded toquestions about theproject timeline.
Shipment ofthestructure requires three months withinstallation
scheduled forsummer 2023.
Mr.Freedman offeredassistance tostaffwiththeBrewmaster’sHouse.
TheFoundation isrenovating theSchmidt House andimproving the
archive roomsfromagrant fromtheWashington Historical Heritage
Fund. Therooms willbeclimate controlled withfire prevention
installed throughout theentirehouse. Theproject should becompleted
byJune2023.
Mr.Freedman advised thatthedesign rendering ofthevisitor center is
notthefinaldesign. Afinalwillbepresented totheCommission.
OLDBREWHOUSE Manager Cookintroduced JimCary withCardinal Architecture PSto
TOWER PHASE 2 provide theupdate onseismic improvements totheoldbrewhouse
SEISMIC tower. Phase2oftheproject focuses onlyonseismic improvements.
IMPROVEMENTS: Phase 1involved brickrestoration, masonry, androof replacements.
TheintentofPhase 1wasprotecting thestructure. ByJune30, 2023,
staffexpects tohaveanestimate forcosts forseismic improvements for
theCouncil’sconsideration astowhether tomoveforward withnext
stepsforrenovating theoldbrewhouse tower. Following ameeting
withMr.CaryandCityAdministrator Doan, staffdetermined thatthe
estimate of $2.5 million forseismic improvements completed in
2014/2015might beinsufficient.
Mr.Carybriefed members onworkcompleted todateandthescope of
theseismic project. Hedisplayed historic elevationaldrawings ofthe
towerusedtoassist theproject teamindeveloping somepreliminary
costestimates. Theproject teamisworking withdocumentation
comprised ofconstruction drawings from1905/1906completed in
Milwaukee. Itisuncertain whether thearchitect evervisited thesiteat
thattimebecause itwascommon forarchitects toworkwiththe
brewery team withbuilders responsible forinterpreting the
construction drawings tobuildthestructure. Thefoundation ofthe
building waslikelydesigned inMilwaukee forasitethatwould house
aheavy masonry building. Thetypeoffoundation wascommon for
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page6
displacing theweight ofabuildingon compacted soils. However, that
soiltypewaslacking inTumwater.
Mr.Carysharedbefore andafterphotosofthetoweraftercompletion
ofthefirstphaseof masonry androofworktoprotect thestructure.
Thebuilding’swindows anddoors havenotbeenreplaced. All
masonry replaced wasproduced in2018/2019tomatch existing bricks.
Newcornices protect themasonry alongwitharestored copper roof
andothertemporary roofs.
Toassess thecondition ofthefoundation, itwaspossible toaccessthe
foundation through acrawlspacehatchonthesouthandnorthsideof
thebuilding enabling theconveyance ofcamera totakepictures ofthe
foundation which revealed severalfeetofconcrete onabedofwater.
Itwasnotpossible toascertain whatwasbelow thewater. Because of
theimportance ofidentifying thebase, theCitypumped waterfromthe
crawlspacetoenable thestructural engineer andothers toassess the
foundation. Thecrawlspacewasactually 14feetinheight. Theteam
believes theoriginal architects anticipated hitting eithersuitable soils
orbedrock (basalt) asasuitable basefortheheavymasonry building.
During theoriginal digtocreate spaceforthebuilding, workers likely
usedsteam shovels and dugtoadepth ofapproximately eightfeet
whentheyencountered groundwater. Afterdigging toagreater depth,
theworkers encountered morewaterandbelieved theyhadreached
basalt butcould notcontend with thelargevolume ofwater.
Subsequently, anew foundation planwascompleted inMilwaukee
withapproximately 490pilesconstructed ofDouglas firtreesdriven
intotheground untiltheyhitbasalt rock. Based ongeotechnical
borings, thepilesareonly10’ to12’ feetlong. Following the
installation ofthepilings, workers poured theconcrete foundation on
topofthepilesandcontinued with completing thebuilding. That
information represents significant consequences forseismic mitigation
fortheproject.
Mr.Carydescribed theproposed seismic improvements usingaseries
ofbuilding elevation illustrations from thenorth, east, west, andsouth.
Thestructural changes necessary tomake thebuilding safeinclude
adding vertical anddiagonal micropiles or smalldiameter steeldrilled
andfilledwithrebarandconcrete thatarecapped andtiedtonew
concrete added inthe crawlspace along thewallstocreate shear
resistance andtiedtonewconcrete wallsonthelowerfloors. Aseries
ofsteelbracings willbeplaced oneachfloorofthestructure tothetop
ofthetower. Themitigation design isintended toreflect theshear
forces ofthebasetiedtotheground belowusingsteelbracestoabsorb
anddisseminate theforcesthatcontinue uptothetopofthestructure.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page7
Mr.Caryshared 3Ddrawings prepared fortheproject representing the
north elevation ofthetower facing Capitol Lake. Thedrawings
identify themultiple levelsofthetowerbeginning fromthebasalt layer
below, timber piers (footings), ground level,andeachstoryofthe
structure. Thedrawings reflect thenewstructure imposed uponthe
existing masonry structure. Thenewmicropiles servetobracethebase
ofthebuilding tothebasalt belowwithnewconcrete inthecrawlspace
andtwo newconcrete walls onthewestandeast sideofthestructure,
followed bytheframework ofsteel thatcontinues uptothetopofthe
structure.
Mr.Caryreported theproposed mitigation isarelatively standard
practice forseismic mitigation byusinga combination ofreinforced
concrete andsteelstructures toabsorb theseismic loadsasthey
accelerate tothetopofastructure. Someofthediagonal steelbracings
willcrosswindows; however, thereare waystolimit theamount of
steelcrossing windows, which tendstoincrease theamount thesteel
necessary thereby increasing thecostoftheproject. Theteam’s
proposal isdeemed themostefficient pathforseismic mitigation ofthe
building. Thebuilding willinclude newconcrete shearwalls atthe
mainlevelofthebuilding aspartofthestructural reinforcement ofthe
building.
Currently, thearchitects areattheendofschematic designwith the
structural engineering delving further intheworktoreachthepoint of
schematic design because ofthenecessity ofanalyzing theforces to
develop adesign thatmeetscurrent building codes. Some designwork
wasundertaken toidentify potential placeholders forfuture usesofthe
building.
ChairShipley asked foradescription oftheinterior building afterthe
improvements. Mr.Carysaid aperson would viewanexisting
masonry building behind thenewsteelstructure withthestructure
limited tothenorthandsouthwallswith newconcrete wallsonthe
westandeastsideoftheground floor. Thenew structure isdesigned
toprevent thebuilding fromcollapsing from seismic activity. Shear
concrete wallswillalsobeadded tothecrawlspaceagainst theexisting
foundation.
Commissioner Trosper inquired about theextent ofthehistorical
research completed insupport oftheproposed design. Theareahas
beenprone topriorearthquakes sincethebuilding wasconstructed. He
askediftheteam wasabletoreview anyofthearchives foranynews
reports aboutanydamage tothebuilding frompriorearthquakes. Mr.
Cary saidtheteamdidnotresearch anymaterials on thehistory of
earthquakes; however, duringtheworktorestore masonry onthe
building, theteamdiscovered significant damage atthetopofthetower
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page8
causedbyearthquakes manifested intheformofmajor cracks leading
tosomeseparation oftheroofstructure from themasonry wall. The
cracks wererepaired when theroofwasreplaced, whichwastiedtothe
masonry usingdragstrut connectors. Considering thestrength ofprior
earthquakes, itwasimpressive thedamage wasonlyevident fromthe
fourthfloortothetop.
Commissioner Slakey asked whether theteamhasidentified the
maximum earthquake thebuilding couldwithstand withnewseismic
improvements. Mr.Caryadvised thatstructural engineering does not
usetheRichter magnitudeas itisbased onthebehavior ofaspecific
typeofinstrument atsomespecific distance. Structural engineering
consider moment magnitude, which ismoredirectly related toenergy
thebuilding couldsustain. Additionally, thetypeofcriteria fordesign
isbasedonhuman safety. Thebuilding codeincludes energy forces to
assistengineers inanalyzing seismic forces. Nationally, energy forces
have increased, especially inthePacific Northwest. Anewbuilding
codeupdate isscheduled foradoption in2023. Thecriteria for
evaluating buildings willincrease inthenewcode.
Chair Shipley saiditisinteresting thattheconcrete shearwalls are
located ontheeastandwestsidesofthebuilding whilethestructure
faces northandsouth. Mr.Carysaidthelocation wasbased onthe
capacity toaccess thetopofthebuilding anditwas important notto
placeconcrete shearwallsalong wallswithmanywindows.
Commissioner Trosper inquired astowhether thefirstfloorcontaining
ceramic tilesinthefloorandonthewallswould bereplaced asthe
building isremodeled.
Director Denney asked whether themicropiles wouldbeanchored from
thefirstfloororfromthecrawlspace.
Mr.Carysaidthemicropiles willbedrilled fromthecrawlspace. In
terms ofthetiles, theteamhasreviewed ways toretain thetiles;
however, theconcrete wallswillprovide ashearbackbone forthesteel
structure. Theteamplanstodevelop aplanfortileworktomaintain a
senseofthehistorical nature.
ChairShipley referred tothestate capitol inCalifornia withatilefloor
incorporating adesign. Hehadaskedabouttheprocess thestate used
topreserve thefloor andlearned howeach tile hadbeenremoved,
numbered, andreattached.
Mr.Carydisplayed twoversions ofconceptual designs reflecting ways
thebuilding couldbeoccupied. Tooccupy thebuilding safely, two
setsofstairs fromeachfloor willbenecessary, aswellasanelevator.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page9
Theoriginal design ofthebuilding reflected abuilding predisposed to
vertical gravity brewing butnotforregular occupation formodern
uses. After adding stairs andanelevator, thefloorplan was
significantly reduced leaving insufficient programmingspace. The
upperfloorsessentially limitusesonlytoaccess. Asecond conceptual
design reflects oneinternal staircase uptothegrainroom andan
external elevator andstaircasewith thewarehouse structure totheeast
connected bytheaddition ofanentrance pavilion connected to the
towermaximizing moreprogram space inthetower.
Commissioner Sinclair questioned whether theCityowns the
warehouse building. Director Denney advised thatthewarehouse
building isnotownedbytheCity.
Chair Shipley acknowledged otherinherent issues ofownership and
limited access tothebuilding, aswellasvirtually noparking.
Mr.Caryexplained thatthedrawings wereintended toidentify afuture
project withprogramming options insupport ofseismic mitigation of
thetower.
Commissioner Rossiter thanked Mr.Caryforthepresentation asthe
proposal makes muchmoresense. Hecansupport theplacement of
steelbeams inthewindows; however, healsosupports preservation of
theexisting tilestotheextent possible. Thespaceinthetower along
theconcrete wallscould serve asaplace toproject videos orthe
concrete couldbestamped inapattern thatisreflective ofthehistoric
design. Heasked about anyupdate ontheprojected cost ofthe
mitigation project.
Mr.Caryexplained thatthenextstepiscompleting thecostestimate as
theintentwaspresenting theinformation totheCommission toreceive
feedback. Acostestimator isontracktostarttheestimating process.
Manager Cookreported sheasked Mr.Caryandtheteamtodevelop a
future usethatincluded anewbuilding toconnect theexisting
buildings. Shealsorecently metwith thenewowner ofthehistoric
properties andpresented theproposal. Conversations arecontinuing on
ownership issues andpotential waystoconstruct theconnecting
building.
Commissioner Slakeysuggested consideration offundraising similar to
howtheAmtrak Station wasconstructed usingfunds donated by
private individuals andcompanies through thesaleofengraved bricks
andtiles.
OTHER BUSINESS: Commissioner Trosper commented onapresentation byCommissioner
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OFHYBRID MEETING
February 16,2023Page10
Nicandri totheCityCouncil toadvocate forthedesignation ofthe
Cowlitz Trail segment oftheOregon Trail alongOldHighway 99. The
Council adopted theresolution, which willmove forward tothe
Thurston County legislative delegation toadvocate andraisetheprofile
oftherequest totheU.S.Congress.
NEXT MEETING Thenextmeeting isscheduled onMarch16,2023.
DATE:
ADJOURNMENT: Commissioner Slakey moved, seconded byCommissioner Trosper,
toadjourn themeeting at8:14p.m. Avoicevoteapproved the
motion unanimously.
Prepared byValerie L.Gow, Recording Secretary/President
PugetSound Meeting Services, psmsoly@earthlink.net
Agenda
HISTORIC PRESERVATION COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Thursday, February 16, 2023
6:30 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Approval of Minutes
a. 10/20/2022 Meeting
5. Public Comment
6. Brewmaster’s House Arson
7. Certificate of Appropriateness – Brewery Park at Tumwater Falls
8. Old Brewhouse Tower Phase 2 Seismic Improvements
9. Next Meeting Date - 03/16/2023
10. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/83146050271?pwd=NEsydVVhT1BTZ3gwbFhWWnQ3bTlsZz09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 831 4605 0271 and Passcode
364201.
Public Comment
The public may submit comments by sending an email to sklein@ci.tumwater.wa.us, no later than 4:00
p.m. the day of the meeting. Comments are submitted directly to the Commission members and will
not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.