TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OF HYBRID MEETING
September 21, 2023 Page 1
CONVENE: 6:41 p.m.
PRESENT: Chair David Shipley and Commissioners Dave Nicandri, Alex Rossiter,
Renee Radcliff Sinclair, Marnie Slakey, and Don Trosper.
Staff: Parks and Recreation Director Chuck Denney, Communications
Manager Ann Cook, and Parks and Facilities Manager Stan Osborn.
CHANGES TO There were no changes to the agenda.
AGENDA:
APPROVAL OF Consideration of the minutes of July 20, 2023 was deferred.
MINUTES OF JULY
20, 2023:
PUBLIC There were no public comments.
COMMENT:
OLD BREWHOUSE Manager Cook introduced Jim Cary, Cardinal Architecture. Mr. Cary
TOWER PHASE 2 presented the final plan for seismic improvements to the old brewhouse.
SEISMIC
IMPROVEMENTS: Mr. Cary reported that since the last update in February, the
geotechnical engineer and the structural engineer have been developing
the construction drawings, which will be submitted to the City for Phase
2 of the project.
Mr. Cary displayed historic images of the old brewhouse and the
original construction drawings produced in Milwaukee, Wisconsin used
by the team throughout the project. The building sections reflect how
brewery equipment was placed in the building. The team was able to
develop a 3D model of the gravity brewing system used in the tower.
Foundation drawings assisted the team in recreating building details and
how the building was used. Additional photos were of construction
workers building the original roof of the brewery tower.
During Phase 1 of the project, masonry was repaired and installed and
new roofs were installed. Phase 2 of the project is only for seismic
improvements. The phase includes geotech exploration and input,
installation of micropiles, and the addition of concrete and steel to
preserve the structure during future earthquakes and seismic events.
Phase 2 efforts began with the foundation. The team worked from an
historic foundation plan; however, the version was not developed in
Milwaukee because it had been revised and developed onsite to
accommodate the addition of 494 timber piles underneath the structure.
Mr. Cary shared photographs of the crawl space. The water table is
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OF HYBRID MEETING
September 21, 2023 Page 2
located four feet below grade. The foundation of the tower is
approximately 14 feet below the main floor of the structure. Since
initial construction of the building, the crawl space has been flooded
with water. To assist the team in inspecting the foundation, the City
pumped all water from the crawl space. The geotech engineer,
structural engineer, and several members of the team were able to access
the crawl space. They discovered approximately 18 inches of mud and
an understanding of how the concrete was designed and installed. The
original plan called for concrete footings that spread to distribute the
load to the soil. However, after initial digging discovered groundwater,
the water table prohibited further digging to reach basalt bedrock At 14
feet, the maximum digging capacity was reached in 1905 necessitating a
new foundation drawing to add a new piling plate comprised of 494
timber piles driven through the ground to bedrock with the piles topped
with steel caps. The Milwaukee-designed concrete foundation was then
poured on top of the timber pile to serve as the base for the old
brewhouse.
Since the site inspection, the geotech engineer identified ways for
ground forces imparted during an earthquake to be determined and
measured on the building with the structural engineer using those
measurements to design the amount of concrete and steel to be added to
the building to mitigate seismic forces.
Mr. Cary displayed the structural engineer drawings. The construction
drawings will be available within the next week for submittal to the City
and to the Commission. The seismic improvements essentially build up
through the foundation plan by adding new concrete structure within the
crawl space, additional vertical and diagonal micropiles of steel casings
filled with concrete to provide compression and tension structural
support, infilling of some openings previously housing equipment, and
adding an internal steel frame attached to the masonry.
Mr. Cary displayed a series of interior elevations and building section
drawings reflecting the existing building and blue-colored
improvements of concrete, supports in the crawl space, and new steel
supports above the main floor. The addition of reinforced concrete
extends up through the first floor, commonly referred to as “shock treat”
to help protect the height of the first floor during seismic activity.
Mr. Cary displayed a model completed by the structural engineer during
modeling to identify earthquake forces on the building. The ground
remains stationary in the model with the tall first floor experiencing
much movement with movement of the upper floors in unison but not to
the same degree as the first floor. During masonry repairs, the team
identified many areas that experienced stress during earthquake forces at
the top of the building but less so in the lower elevation of the building.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OF HYBRID MEETING
September 21, 2023 Page 3
Commissioner Slakey asked whether the team identified any projections
in the size of seismic activity based on the Richter scale. Mr. Cary
advised that engineer calculations rarely recognize the Richter scale;
however, the building would be protected from earthquakes measuring
in the 7.0 range. The building would remain standing based on a
projected earthquake per the building code and civil engineering codes.
Commissioner Nicandri asked about the exchange of the water within
the crawl space and whether the field adaptation of the foundation
achieved the original Milwaukee structural desirability for the building
design. Mr. Cary advised that the field design was a solution
engineered with a specific number of timber piles within a specific
design that were laterally connected to create a cap beneath the
foundation. The design solved the gravity issue but not the translation
of the wet earth to the building. The failure of the earth around the
building would be solved by the design incorporating new diagonal
piles. The original timber piles are assumed to hold the heavy masonry
building during a seismic event. Water in the crawl space was not
brackish; however, the mud was old and not fresh. He believes the
foundation lacks openings to allow for tidal actions in the crawl
space/basement. The water table under the building is higher than the
river.
Manager Osborn inquired as to whether the shot crete within the
building would cover existing wall tiles. Mr. Cary said the treatment
would cover portions of the east and west walls on the first level.
Installation includes the attachment of rebar to the masonry wall to
create a connection to enable the transference of engineering forces with
concrete sprayed onto the wall until a specific thickness is attained with
final finish to follow. The treatment would cover tiles on the west wall.
Chair Shipley asked whether that specific solution has been used for
other buildings. Mr. Cary responded that the options are standard
seismic mitigation solutions. For masonry buildings, lateral steel is
used above ground with additional reinforcement of the foundation to
distribute energy forces. Chair Shipley asked whether the concrete on
the first floor is intended to stabilize the wall on the first level. Mr.
Cary said the intent is to stabilize the walls on the first floor and provide
a transition from the steel above to the concrete below.
Commissioner Trosper conveyed disappointment for not preserving the
decorative tiles on the walls because the tiles were historically important
for sanitation and the brewery process. Mr. Cory advised that the
documents would include salvaging and preserving the tiles to the
extent possible.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OF HYBRID MEETING
September 21, 2023 Page 4
Mr. Cary shared drawings for Phase 3 of the project. Future
programming explored for the building was based on an analysis of the
building code in terms of how much of the building could be occupied
using all floors. He displayed a diagram depicting floor plans for floors
1 through 5. Usable space is highlighted along with required
circulation, restrooms, and an elevator. Most of the building’s space is
consumed by stairs, elevator, and restrooms. A second version for
building space reflects the existing brewery tower, an addition of a
connecting pavilion served by terraced steps for access to the first level
of the brewery tower, and connection to the concrete warehouse
structure located to the east of the brewery tower. All components
consuming space in the brewery tower were relocated with one staircase
remaining in the brewery tower with the elevator and another staircase
relocated to the outside of the building with access from the connection
pavilion. The brewery tower could serve as a site for a museum. The
concrete warehouse would be restored for programming space.
Commissioner Sinclair asked whether the City has ownership of the
warehouse facility. Director Denney advised that the City controls only
the brewery tower. However, the warehouse owner has indicated a
willingness to work with the City on a joint project.
Mr. Cary confirmed that the proposed seismic improvements to the
brewery tower would preserve the option of adding the connecting
pavilion at some point in the future.
Manager Cook reported on next steps. The Commission is requested to
forward the proposed structural design drawings to the Department of
Archaeology and Historic Preservation (DAHP). If approved, the
drawings would be forwarded to DAHP during the week of October 2,
2023. At the Commission’s October 19, 2023 meeting, staff will
request approval of a Certificate of Appropriateness based on no other
changes recommended by DAHP. It is anticipated DAHP will issue a
letter affirming the drawings meet the standards of the Secretary of
Interior. During the week of October 23, 2023, the Certificate of
Appropriateness would be submitted with the building permit
application.
Staff requests the Commission forward the structural design drawings to
the DAHP for its review.
MOTION: Commissioner Nicandri moved, seconded by Commissioner
Rossiter, to forward the proposed Structural Design Drawings for
the Old Brewhouse Tower Phase 2 Seismic Improvements to the
Department of Archaeology and Historic Preservation for review
and approval. The motion carried unanimously.
TUMWATER HISTORIC PRESERVATION COMMISSION
MINUTES OF HYBRID MEETING
September 21, 2023 Page 5
Manager Osborn asked whether the addition of the connecting pavilion
located between the brewery tower and the warehouse facility would
help to stabilize the structure of the brewery tower and lessen the need
for some of the structural seismic improvements. Mr. Cary said the
addition of the pavilion structure would be placed in a manner that does
not directly connect to the brewery tower. It would be important to
protect the brewery tower to avoid damaging or destroying the new
structure.
Manager Cook reported on ongoing conversations with the owner of the
warehouse facility and surrounding property. The owner is supportive
of the proposed pavilion and repurposing the warehouse facility. The
conversations included the potential of transfer of property. The owner
presented a preliminary proposal for redevelopment of the site
representing the most authentic and serious proposal the City has
received to date for the historic property.
Commissioner Trosper asked about the timeline for completion of the
project. Manager Cook advised that the completion timeline is based on
the availability of funding and financing. The Council is scheduled to
consider a proposal in early 2024.
OTHER BUSINESS: Commissioner Slakey requested an update on the status of the wallpaper
selections for the Brewmaster’s House. Manager Osborn said he
recently met with the vendor. The vendor offered some
recommendations based on logic. As a result, three of the ceilings will
be wallpapered with the remaining ceilings to be textured. Following
approval of the contract by the City’s legal department, the contract will
be forwarded to the City Council for approval.
NEXT MEETING The next meeting is scheduled on Thursday, October 19, 2023.
DATE:
ADJOURNMENT: Commissioner Slakey moved, seconded by Commissioner Sinclair,
to adjourn the meeting at 7:33 p.m. The motion carried
unanimously.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
HISTORIC PRESERVATION COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Thursday, September 21, 2023
6:30 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Approval of Minutes 7/20/2023 - Delayed
5. Public Comment
6. Old Brewhouse Tower Phase 2 Seismic Improvements
7. Next Meeting Date - 10/19/2023
8. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/j/89525541461?pwd=VDFnTlIwYXFvY2lqdzNUQUR5cWxqQT09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 895 2554 1461 and Passcode
983125.
Public Comment
The public may submit comments by sending an email to sklein@ci.tumwater.wa.us, no later than 4:00
p.m. the day of the meeting. Comments are submitted directly to the Commission members and will
not be read individually into the record of the meeting.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA