Planning Commission
Regular MeetingTumwater, WA · August 8, 2023
Minutes
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 1
CONVENE: 7:00 p.m.
PRESENT: Chair Elizabeth Robbins and Commissioners Grace Edwards, Terry
Kirkpatrick, Meghan Sullivan, Michael Tobias, Anthony Varela, and Kelly
Von Holtz.
Excused: Commissioner Brian Schumacher.
Staff: Water Resources and Sustainability Director Dan Smith, Planning
Manager Brad Medrud, Housing and Land Use Planner Erika Smith-
Erickson, and Department Assistant Brittaney McClanahan.
CHANGES TO THE There were no changes to the agenda.
AGENDA:
APPROVAL OF
MINUTES:
FEBRUARY 28, 2023
MAY 23, 2023
JUNE 27, 2023
MOTION: Commissioner Kirkpatrick moved, seconded by Commissioner Tobias,
to approve the minutes of February 28, 2023, May 23, 2023, and June
27, 2023, as published. A voice vote approved the motion unanimously.
COMMISSIONER’S There were no reports.
REPORTS:
MANAGER’S REPORT: Planner Smith-Erickson reported on a survey for the Hazard Mitigation
Plan. A link was forwarded previously to the Commission inviting
Commissioners to vote on the initiatives the City of Tumwater is
considering for the City’s Annex to the Plan. The survey is open until
August 25, 2023. Public comments will be accepted until September 25,
2023.
PUBLIC COMMENT: There were no public comments.
FINAL DOCKET FOR Director Smith reviewed projects included in Water, Sanitary Sewer, and
2023 COMPREHENSIVE Storm Drain Elements of the Comprehensive Plan.
PLAN AMENDMENTS –
CAPITAL FACILITIES Commissioner Sullivan joined the meeting at 7:05 p.m.
PLAN:
Director Smith reported many of the utility projects are identified through
various planning processes to include the Comprehensive Water System
Plan, Sewer Plan, and the Stormwater Plan. The Comprehensive Water
System Plan is updated every ten years with the last update completed in
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 2
2021. The last Sewer Plan was updated in 2015 followed by an update of
the Stormwater Plan in 2018.
The combined projects represent $123 million with most of the projects
included in the Water Utility and Stormwater Utility as required under the
City’s National Pollutant Discharge Elimination System (NPDES) Phase 2
permit. The Sewer Plan includes projects supporting proposed planning for
growth and to meet ongoing maintenance and operations needs of the
system.
Within the Water Utility, projects support the system and include security
improvements, water quality enhancements, source water development and
mitigation (new water rights), infrastructure improvements, and programs
and planning projects.
Funding for the Water Utility is from customer rates, connection fees from
new development, state and federal grants, bonds, loans, and other types of
debt.
The Water Utility has 14 projects with two new projects added. The Israel
Road/Linderson Way Water Main Upsizing and Replacement project is
anticipated to be completed by the end of the year. The Capitol
Boulevard/Trosper Road/Sixth Avenue Water Main Replacement project
includes upgrading some existing facilities and infrastructure as part of the
transportation project underway at Capitol Boulevard and Trosper Road.
Well 15 is a new project at Palmero Wellfield, which is the second largest
water producer for the City. The facility will be upgraded at a cost of
approximately $950,000 to improve the well site and upgrade to the City’s
current security standards. The project includes some corrosion treatments
to control pH to protect drinking water.
Commissioner Tobias asked about the status of a perpetual easement on
property owned by the Port of Olympia. Director Smith explained that the
Port of Olympia owns a larger parcel that houses Well 15. The City
obtained an easement to maintain the well. Upgrades to the well were
delayed due to uncertainties associated with the Port’s plan for the property.
As the second largest producing well in the City, the flexibility to replace
Well 15 with another well is very limited. The City will continue to
maintain the site and work with the Port to ensure the perpetual easement
remains intact and provides access to enable the City to maintain the well.
Commissioner Von Holtz joined the meeting at 7:16 p.m.
Director Smith reported the City is also adding components of seismic
resiliency into the system in some locations. The water main on Israel Road
was upgraded to include some mechanical features to help mitigate impacts
from a large seismic event. Significant planning is scheduled to evaluate
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 3
the entirety of the City to protect the City’s source of drinking water and
areas used as gathering points and emergency centers. The plan will be
developed in coordination with the Sanitary Sewer Utility to ensure both
systems are protected. The plan will identify needed upgrades throughout
the City to protect the City to the extent possible.
The remaining 12 projects are either ongoing or nearing completion.
Source development is a multi-year process. The brewery wellfield has
been a pending project for some time. Staff recently restarted conversations
with the City’s consultant for design and permitting of the brewery
wellfield infrastructure, as well as ongoing conversations with partners,
City of Olympia and the City of Lacey, about water rights to ensure the
rights are utilized to the maximum extent possible. Staff identified some
deficits on the long-term planning horizon for water rights and plans to
ensure continued efforts to secure water rights. Water rights are difficult to
attain especially since the City’s water source is from the Deschutes basin
that is considered a closed basin. Staff plans to examine several
opportunities in detail to create some pathways to acquire additional water
rights over time.
The wellfield abandonment of existing wells is another project in
conjunction with the brewery well project. The wells are located on and
near the golf course.
Within programs and planning, several projects include the ERP project to
replace the City’s planning and permitting software system. Funds have
been allocated for water main replacement and extensions to accommodate
growth. One project is the Southeast Reservoir and System Extension
along 93rd Avenue to meet the needs of new development. The reservoir
will also address some deficiencies of fire flow and water pressure.
Commissioner Kirkpatrick commented that the Southeast Reservoir project
is the largest financial project in the next several years. The financial data
indicates no expenditures in future years. It appears the City plans to
borrow $18 million. He asked whether the loan would be repaid within the
six-year plan. Director Smith advised that the expenditures would be
incorporated following receipt of debt service details. Debt service is
generally included in the planning to demonstrate to both the City and the
Department of Health that the City has the capacity to pay for the
improvements over time. The Southeast Reservoir project was included in
the last Water System Plan update. Some projects have increased in price
because of market conditions, difficulty in hiring personnel, and equipment
delivery delays.
Director Smith reviewed Sanitary Sewer Utility projects. The projects are
similar to the Water Utility and include infrastructure and expansion
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 4
projects and programs. Rates, connections fees, grants, and debt provide
necessary funds for the utility.
Several completed projects are part of the Capitol Boulevard/Trosper
Road/I-5 Improvement project to replace and evaluate sustainability
throughout the system by identifying appropriate locations for solar power
to enable the City to reduce its carbon footprint. The new Seismic
Resiliency Plan includes a sewer system component. The large discrepancy
between the Sanitary Sewer and Water Fund is due to initial planning
completed for the Water Utility as part of the Water System Plan Update.
Most of the funding for the Sanitary Sewer Utility will address sewer
elements of the plan. The plan considers growth and current capacity of
the system to ensure handling of flows and conveyance of wastewater to
the LOTT Wastewater Treatment Plant.
Kimmie Street was identified as a deficiency in the last Sewer Plan update.
The project will evaluate the entire area, and consider ways to provide
resiliency, add a generator to address emergency conditions, and update the
technology controlling the lift station. Two new projects include the
Infrastructure Replacement Program, a methodical evaluation of annual
design and construction in future years to update and replace infrastructure.
The Oversizing Program addresses new development. During new
development projects, the City often participates financially with a
developer to install the correct sized pipe to meet City needs. The Sewer
Extension Program is in conjunction with the Community Development
Department and other City stakeholders to evaluate funding and
construction capacity for extending sewer into neighborhoods that are
predominately served by septic systems and might be at higher risk for
groundwater contamination or other environmental or health impacts
caused by septic systems. In 2015, the City of Tumwater participated in
the Regional Septic Summit with Thurston County, City of Olympia, City
of Lacey, and the LOTT Clean Water Alliance. The summit identified a
number of areas throughout the City that were of higher risk than other
areas. Those areas were identified as priority areas of focus to extend sewer
services. The plan is based on the availability of funding for conversions.
The Comprehensive Business Plan Update is in process this year and will
extend over the next several years. The last update was completed in 2018.
The ERP System project is also another project.
Director Smith responded to several questions involving lift station
projects. Lift stations are typically located at the lowest point in a basin
and operate on a gravity draining basis from homes. The lift station collects
all wastewater from wet wells located at the lift station, which pumps
wastewater through the system. The plan also includes a placeholder for
the expansion of a regional pump station. The City has reserved funds to
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 5
develop a pump station in a location that has not been forecasted
specifically at this time.
The plan also includes infrastructure and maintenance projects. The I-5
Sanitary Sewer Main Crossings Report will be a major undertaking because
of the significant sanitary sewer line crossing Interstate 5. The project
involves running cameras through the lines to assist in completion of
engineering evaluations of the pipe system.
Director Smith reviewed Stormwater projects, which includes some similar
elements as water and sanitary sewer with fewer mechanical elements.
Stormwater facilities are typically gravity operated with main pipes and
collection facilities of ponds and water treatment facilities requiring
maintenance and replacement over time. The Stormwater Utility includes
programs to mitigate floods threatening development or roads. Water
quality and habitat conservation are also a component in terms of receiving
waters such as creeks, rivers, or wetlands to ensure water discharged is
treated at some level. Habitat conservation limits impacts and includes
actions to preserve green spaces for wildlife and habitat.
Significant planning efforts concentrate on development in terms of the
application of the City’s drainage manual to help align for growth. The
Storm Drain Capital Facilities Plan supports permit requirements from the
Environmental Protection Agency (EPA) and the Department of Ecology
for the City’s NPDES permit for stormwater. Funding sources for the
utility are somewhat different with no funds from connection fees. New
development is responsible for stormwater conveyance and necessary
stormwater facilities. New systems installed by developers eventually
become part of the City’s stormwater system for future maintenance. The
utility relies heavily on grants to fund projects. The City has no acquired
debt, loans, or bonds but anticipates acquiring debt in the near term to pay
for the new Maintenance and Operations Facility.
Two completed projects in the previous CFP are the Lee Street Bioretention
Retrofit project with most of the improvements a part of the Capitol
Boulevard/Trosper Road/I-5 Improvement project. The second project is
the Deschutes River Flood Reduction and Erosion Study. The City
acquired a grant enabling an evaluation of the Tumwater Brewery valley
and the Deschutes River valley to identify conditions creating flooding
events at those properties and identifying appropriate mitigation measures
to prevent future flooding. The outcome of the study will provide
information to share with private development on anticipated costs the
developer might incur and the level of risk for development occurring in
those areas in the future.
Director Smith reviewed new projects. The City reserved funds for habitat
acquisition that was upgraded to focus on conserving lands and other
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 6
properties that might be required for mitigation. Previously, the project was
focused only on mitigation for projects; however, based on City needs, the
project was upgraded to include a significant amount of additional funding
from $300,000 in previous CFPs to $3.3 million for potential opportunities
that might exist in the near term near the brewery properties. Funds were
allocated for the Kirsop area wetlands (largest wetland complex in the City)
and for potential wetlands for the WIRA 13 Watershed. Another new
project is the Comprehensive Stormwater Management Plan Update. The
plan combines all basin plans to assist the City in focusing on the totality
of the Stormwater Management Program to ensure compliance with permit
requirements. The project encompasses a 10-year update as staff aligns
plans with the Water and Sanitary Sewer System Plans 10-year update
cycles.
Another new project is the East Dennis Outfall Retrofit. The City has a
number of smaller tributaries that do not provide stormwater treatment or
do not currently meet standards if the area was developed. The project
addresses one of the outfalls. The project is funded significantly by grants.
Previous and ongoing projects are categorized as water quality, habitat,
fish, flooding mitigation, infrastructure maintenance, and planning
projects. A number of outfall retrofit projects are included to improve
habitat and water quality. One project is the Tumwater Valley Regional
Facility and the Deschutes Habitat Restoration project identified through
various reports over the last 15 years. The projects include working with
the golf course and other surrounding private landowners throughout the
Deschutes River valley corridor for restoration improvements. The East
Linwood Basin Outfall Retrofit is in alignment with the Tumwater Valley
Regional Facility if the projects can be funded and completed concurrently.
Both projects have experienced some design and permitting challenges.
Staff is aligning the projects to complete them collaboratively.
The Sapp Road Culvert Replacement project is the first major culvert
replacement in the City. The culvert was identified as a fish passage barrier.
The project is currently in design with construction funding received by the
City. A similar project designated in future years is the 66th Avenue culvert
located upstream from a major fish passage project Thurston County
completed. The project will open Kirsop wetlands for fish migration.
Flooding mitigation projects were identified in the 2012 annexation report
after the City annexed lands on the west side of the City. The projects are
conveyance and water quality treatment projects to help mitigate flooding.
A stormwater pond located in the Crites and Mottman Industrial area is in
need of significant upgrades as well.
Commissioner Kirkpatrick commented that at the beginning of the planning
period, the City has a healthy fund balance that reduces to approximately
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 7
$1 million at the end of six years. The plan reflects a substantial amount of
spending with limited funds remaining to service debt obligations in the
future. He asked whether that scenario presents any problems or concerns
by the City. Director Smith said the figures include debt service. He plans
to recheck the figures especially for the Water Utility to ensure any debt
service is captured in the figures. All utility plans include reserves as
required by the state and City policies. The City has experienced increases
in the cost of all projects because of market factors with some projects
increasing in cost by 110%. Market conditions might change in the future
and assist in balancing some of the costs. Product costs are affecting all
utilities. Staff is exploring all revenue tools from rate increases, connection
fee increases, and evaluating cost of service for the Water Utility to ensure
rates and connection fees are covering operational costs and growth
requirements.
2025 COMPREHENSIVE Manager Medrud provided some background on the current Land Use
PLAN PERIODIC Element of the Comprehensive Plan to assist the Commission in
UPDATE – LAND USE: understanding the general structure and general requirements for the
update. The Commission is scheduled to review the Land Use Element at
its first meeting in September. During the review, he encouraged
Commissioners to forward questions or other issues to address during the
next meeting.
The Growth Management Act (GMA) Goals serve as the foundation of the
Comprehensive Plan Periodic Update. Discussions will focus on ways to
incorporate diversity, equity, and inclusion throughout the Comprehensive
Plan beginning with the Land Use Element. The discussion will address
specific issues the Land Use Element must address and a discussion on the
proposed amendments and state guidance materials. The briefing includes
an update on the public engagement process and website.
Fifteen goals are included in the GMA. Some significant changes have
been made to a number of the goals over the last several years. The update
requires the City to address any potential conflicts with GMA goals and
reflect how the plan addresses those goals. Several new requirements do
not currently exist in the Land Use Element; however, the City is largely in
compliance because of work recently completed by the City.
The goals encourage growth in urban areas where existing public facilities
and services are located to provide services in an efficient manner. It is
important to focus any new population growth within the cities and in urban
growth areas that are more efficient to serve new growth. Staff completed
some check-ins to measure progress on the goals and since 1990 when the
Act was implemented, very little progress occurred until many projects in
the pipeline were finally constructed. The City has since experienced a
change with more growth occurring in the City than in the county.
However, the Sustainable Thurston Plan indicates cities are not achieving
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 8
the goals within that plan. Reducing sprawl is related to the conversion of
undeveloped land into low density sprawling development, which increases
costs for transportation and services.
Several new requirements pertaining to transportation include multimodal
transportation covering all forms of transportation. Additional
requirements include using the transportation system to reduce greenhouse
gas emissions and per capita vehicle miles traveled. The focus is to develop
near services and employment centers to reduce travel. The update will
address both greenhouse gas emissions and vehicle miles traveled. The
Thurston Climate Mitigation Plan was the first step with some actions
identified that could be incorporated within the Land Use Element.
Another goal is to plan to accommodate housing affordable to all economic
segments of the population through a variety of housing densities and types,
as well as preservation of existing housing stock. Major changes in 2022
included adding, “affordable to all economic segments of the population.”
Some minor changes were made to economic development recognizing that
everyone in the City should have the ability to have economic
opportunities. The change does not specifically address what those
economic opportunities would entail.
No changes to property rights have occurred since the initial adoption. The
provision is important as it emphasizes both the State Constitution and
Federal Constitution that private property cannot be taken for public use
without just compensation. Property rights of landowners shall be
protected from arbitrary and discriminatory actions, which inform the
City’s development regulations.
Goal 7 speaks to the timing of permit processing in a timely and fair manner
to ensure predictability. A state bill passed during the legislative session
supports the construction of more affordable housing in the state. As part
of that process, jurisdictions are required to make some changes. For
Tumwater, the changes would occur to Tumwater Municipal Code Chapter
14 on the permitting process to shorten the deadlines.
Natural resource industries do not pertain to most of the City other than the
City has several identified forestlands as part of the previous update. The
City also has some mineral lands that fall within the category.
Another GMA goal is retention of open and green space and enhancing
recreational opportunities and fish and wildlife habitat. The goal was
amended to add, “retain green space” as a new requirement in 2023.
The GMA goal to protect and enhance environment and enhance the state’s
high quality life includes air and water quality and the availability of water.
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 9
A new change in 2023 was adding “and enhance.” In the past, the City’s
critical areas ordinances protected areas by identifying those areas and
defining the buffer. The change now requires the City to enhance those
areas.
The goal for citizen participation and coordination encourages the
involvement of citizens in the planning process including participation of
vulnerable populations, over-burdened communities, and ensuring
coordination within communities and jurisdictions to reconcile conflicts.
The change in 2023 added participation of all vulnerable populations and
over-burdened communities in the process. During the Commission’s
discussion on the Housing Element, more information will be shared on
recent staff efforts.
Manager Medrud reported climate change and resiliency are two new GMA
goals. The goals are extensive and cover much information. The goals
range from reducing greenhouse gas emissions and per capita vehicle miles
traveled to climate impact scenarios, resiliency, and environmental justice.
The goals will be reviewed during a Commission worksession. The City is
fortunate in gaining a head start by the adoption of the Thurston Climate
Mitigation Plan and completion of the adaptation plans, and Sustainable
Thurston.
The last GMA goal is on shorelines of the state. The goals were amended
to reflect changes in state law to tie the Shoreline Management Act to the
GMA. The City has several shorelines (Deschutes River, several lakes, and
Black Lake Drainage Ditch). The City is not required to update this goal
until 2030.
Manager Medrud reviewed several state requirements. In addition to
meeting the 15 GMA Goals, the City must address seven items as part of
the Land Use Element. The City is required to designate the proposed
general distribution and general location of uses of land for agriculture,
timber production, housing, commerce, industry, and recreation, etc. The
Land Use Map will identify those uses, how they relate, and the size. The
next step is allocating population in those areas for both growth and jobs.
The requirement also requires the City to allocate population density and
the appropriateness of development in specific areas of the City. The City
must also address protection of quality and quantity of groundwater.
An additional requirement as part of the recent update is special
consideration in achieving environmental justice, which includes avoiding
the creation or worsening of environmental health inequities. The City has
pursued some work through Thurston Thrives planning efforts. The City is
also tasked with addressing drainage, flooding, and stormwater run-off both
within the City and how it affects other jurisdictions outside the City to
avoid both flooding and polluting Puget Sound. A new requirement is
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 10
reducing and mitigating the risk of wildfires by using land use planning
tools.
Manager Medrud reviewed the structure of the current Land Use Element.
The Land Use Element contains goals, policies, and designations for
current and future land use throughout the City.
1. Introduction
Purpose and Scope, including Table of Foundational Plans and
Documents
Vision and Mission Statements
Strategic Plan Goals
Growth Management Act Goals Compliance
County-Wide Planning Policy Compliance
Sustainable Thurston Goals
Purpose and Scope, including Table of Foundational Plans and
Documents
Vision and Mission Statements
Strategic Plan Goals
Growth Management Act Goals Compliance
County-Wide Planning Policy Compliance Sustainable Thurston
Goals
2. Designations and Definitions
Introduction, including Citywide Future Land Use Map
Use Categories
Design Review
Maximum and Minimum Densities
Clustering
Modular and Manufactured Housing
Innovative Housing and Urban Planning Approaches Promoting
Physical Activity
3. Land Use Goals, Policies, and Actions
Introduction
Goals, Policies, and Actions
Implementation Policies
4. Land Supply Analysis
Introduction
Partially Used and Under Utilized Land Supply Analysis
Developable or Re-developable Land Supply Analysis
Analysis of Population Accommodation
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 11
Commissioner Kirkpatrick asked about the possibility of the City
eliminating specific residential zoning districts similar to actions recently
taken by the cities of Lacey and Olympia other than designating the use as
residential. Manager Medrud said he suggested at the onset of the planning
process to adopt a similar practice because at the state level, single family
zoning no longer exists. Zoning today addresses level of intensity rather
than specific types of housing. The City will likely move to the residential
intensity model as part of the periodic update.
Chair Robbins stressed the importance of ensuring all sections reflect what
the City is trying to achieve through tailored strategies.
Other parts of the Land Use Element include:
● Appendices
A. Neighborhoods
B. County-Wide Planning Policies
C. Sustainable Thurston Goals and Actions
D. Land Use and Housing Survey Results
E. List of Foundational Plans and Documents
F. Glossary
G. Ordinance No. O2016-012
H. 2016 Tumwater Soil Report
● Land Use Maps
o City-Wide Future Land Use Map
o Neighborhood Maps
● Subarea Plans
o Brewery District Plan
o Capitol Boulevard Corridor Plan
o Littlerock Road Subarea Plan
Manager Medrud reported all the documents and all related Comprehensive
Plan documents are published on the City’s website at
https://www.ci.tumwater.wa.us/departments/communitydevelopment-
department/tumwater-comprehensive-plan. Staff is meeting with
communications staff to update the 2025 Comprehensive Plan webpage to
serve as one location for the material and information.
Three important Commerce Land Use Guidance Materials to review
include:
Urban Growth Area Guidebook published in 2016
Periodic Update Checklist for Fully-Planning Cities (published in
March 2023 but does not include new state laws and WACs)
Urban Growth Area Swaps Fact Sheet
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
August 8, 2023 Page 12
Manager Medrud updated members on the status of the process to date.
Staff is working with communications staff to identify particular] actions
and timing with more information to follow. Staff is also working on the
gap analysis with data collection in progress. The City contracted with
Thurston Regional Planning Council (TRPC) to assist in the housing
allocation figures. Five meetings are planned over September and October.
Staff is working on the general format of the updated plan. At the
September 12, 2023 meeting, the agenda will focus on policies, goals, and
actions and any questions pertaining to the process. Phase 2 of the periodic
update will begin next year followed by Phase 3.
Manager Medrud invited Commissioners to submit any questions or
inquiries by the last week in August for the September 12, 2023 meeting.
NEXT MEETING DATE: The next meeting is scheduled on August 22, 2023. The focus of the
meeting will be on the Housing Element and all new requirements.
OTHER BUSINESS: Manager Medrud updated members on the status of the City’s Equity
Toolbox project. Interviews have been completed with the City
management team. The project was reviewed with new City Administrator
Lisa Parks concerning her involvement in the project and her specific
views. At this time, the initial project is moving forward as envisioned.
Staff is identifying and reviewing information from other jurisdictions with
respect to similar programs or that have developed similar toolboxes.
Examples will be provided by the cities of Kirkland and Auburn. However,
staff was asked to contact other jurisdictions of similar size to obtain
examples. Staff plans to present information to the management team in
early September.
ADJOURNMENT: Commissioner Tobias moved, seconded by Commissioner Von Holtz,
to adjourn the meeting at 8:53 p.m. A voice vote approved the motion
unanimously.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PLANNING COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Tuesday, August 08, 2023
7:00 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Approval of Minutes
a. Planning Commission Minutes February 28, 2023
b. Planning Commission Minutes May 23, 2023
c. Planning Commission Minutes June 27, 2023
5. Commissioner's Reports
6. Manager's Report
7. Public Comment
8. Final Docket for 2023 Comprehensive Plan Amendments – Capital Facilities Plan
9. 2025 Comprehensive Plan Periodic Update – Land Use
10. Next Meeting Date - 08/22/2023
11. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/webinar/register/WN_DdZ5OxgJSkmqqAvRsBiITg
Listen by Telephone
Call (253) 215-8782, listen for the prompts, and enter the Webinar ID 832 4857 7595 and Passcode
078267.
Public Comment
The public is invited to attend the meeting and offer comment. The public may register in advance for
this webinar to provide comment:
https://us02web.zoom.us/webinar/register/WN_DdZ5OxgJSkmqqAvRsBiITg
After registering, you will receive a confirmation email containing information about joining the webinar.
The public may also submit comments prior to the meeting by sending an email to:
cdd@ci.tumwater.wa.us. Please send the comments by 1:00 p.m. on the date of the
meeting. Comments are submitted directly to the Commission Members and will not be read
individually into the record of the meeting.
If you have any questions, please contact Planning Manager, Brad Medrud at (360) 754-4180 or
bmedrud@ci.tumwater.wa.us.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
What is the Planning Commission?
The Tumwater Planning Commission is a citizen advisory commission that is appointed by and
advisory to the City Council on the preparation and amendment of land use plans and implementing
ordinances such as zoning. Actions by the Planning Commission are not final decisions; they are
Commission recommendations to the City Council who must ultimately make the final decision. If
you have any questions or suggestions on ways the Commission can serve you better, please
contact the Community Development Department at (360) 754-4180.
Decorum Statement
Welcome to the Planning Commission meeting. We thank you for attending.
The City Council encourages community engagement in local government and provides a variety of
ways to participate.
The Chair of the Planning Commission will be responsible for conducting orderly and efficient meetings
within the scheduled time. To accomplish that, the Chair will maintain order and decorum and can
regulate inappropriate debate, repetitious discussion, and disruptive behavior when needed.
The Chair will recognize those that wish to speak and may limit the time allowed for individual
comments. City staff will record questions and comments during the meeting. If an issue or question
cannot be addressed during the meeting, City staff will address the issue or respond to the question by
following up with the individual.
We respectfully request that attendees refrain from disruptions during the meeting and comply with
decorum rules.
Thank you for participating.