Planning Commission
Regular MeetingTumwater, WA · November 28, 2023
Minutes
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 1
CONVENE: 7:01 p.m.
PRESENT: Chair Elizabeth Robbins and Commissioners Grace Edwards, Terry
Kirkpatrick, Brandon Staff, Michael Tobias, and Kelly Von Holtz.
Absent: Commissioners Brian Schumacher and Anthony Varela.
Staff: Assistant Director of Transportation and Engineering Mary
Heather Ames, Planning Manager Brad Medrud, Land Use and Housing
Planner Erika Smith-Erickson.
CHANGES TO THE Manager Medrud advised of rescheduling the public hearing for the
AGENDA: Development Code Housekeeping Amendments to December 12, 2023
after the joint meeting with the City Council.
COMMISSIONER’S There were no reports.
REPORTS:
MANAGER’S Manager Medrud reported the joint session with the City Council has
REPORT: been scheduled at 6 p.m. on December 12, 2023. The Commission will
receive two meeting notices for attending in person or remotely. The
Commission is scheduled to meet following the conclusion of the joint
meeting.
PUBLIC COMMENT: There were no public comments.
ORDINANCE NO. Planner Smith-Erickson recapped the series of briefings and questions
O2023-002, FINAL about the Old Highway 99 Corridor Plan. She introduced Mary Heather
DOCKET FOR 2023 Ames, Assistant Director of Transportation and Engineering.
COMPREHENSIVE
PLAN Commissioner Kirkpatrick noted that the corridor plan appears to apply
AMENDMENTS: to the corridor beginning at 79th Avenue. The plan calls for expanding
the highway to four lanes from 79th Avenue to 88th Avenue. He asked
about the segment north from 79th Avenue to Tumwater Boulevard.
Assistant Director Ames advised that the corridor plan is from 73rd
Avenue to 93rd Avenue. The plan continues recent improvements
completed from the recent Capitol Boulevard project. The plan
recommends four lanes between 73rd Avenue and 88th Avenue and two
lanes from 88th Avenue to 93rd Avenue. Tumwater Boulevard is located
north of 73rd Avenue. A project completed approximately two years
ago widened the highway to four lanes to the south of Tumwater
Boulevard. The corridor study focused on the area south of those recent
improvements.
Chair Robbins asked about the planning horizon for project
improvements to serve additional growth in the area. Assistant Director
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 2
Ames explained that the traffic analysis forecasted a planning horizon of
2040 for peak hour traffic (worst-case scenario).
Commissioner Tobias referred to the presence of endangered species in
Tumwater. He asked about potential impacts to the Mazama pocket
gopher, which inhabits the airport area. Manager Medrud replied that
the Olympia subspecies pocket gopher and the Streaked Horned Lark
have primary habitat in the area of the Olympia Regional Airport.
Commissioner Tobias asked about any anticipated impact to both
species because of the project. Manager Medrud replied that overall,
the impacts would be minor; however, any construction project requires
a gopher study. If gophers are present, the project requires a series of
federal permits, or if the City’s Habitat Conservation Plan has been
completed, the plan provides for a federal incidental take permit.
Commissioner Staff asked about planned lighting along the corridor and
potential impacts to airport operations. Assistant Director Ames replied
that the plan did not address illumination in detail. The City would
follow street standards for illumination as the corridor is improved. The
Federal Aviation Administration (FAA) has specific requirements for
illumination, which would be considered as the plan is implemented.
Assistant Director Ames referred to a question concerning bike lanes.
For the majority of the corridor, the plan calls for a dedicated bike lane
on the southbound (airport side) with a multi-use path located on the
northbound side of the corridor comprised of a 10-foot wide combined
walking and bicycling path for northbound traffic. The southbound side
of the corridor has limited opportunities for stopping with the lane used
primarily by bicyclists commuting whereas the northbound side of the
corridor has many opportunities to stop and visit local businesses. The
northbound bicycle lane would be bi-directional.
Planner Smith-Erickson requested the Commission schedule a public
hearing on the two proposed amendments on December 12, 2023.
MOTION: Commissioner Von Holtz moved, seconded by Commissioner
Tobias, to schedule a public hearing on December 12, 2023 for
Ordinance No. O2023-002, Final Docket for 2023 Comprehensive
Plan Amendments. A voice vote approved the motion unanimously.
2025 Planner Smith-Erickson briefed Commissioners on two elements of the
COMPREHENSIVE Comprehensive Plan Periodic Update - Lands for Public Purposes
PLAN PERIODIC Element and the Utilities Element. The Commission is asked to review
UPDATE – LANDS existing elements and consider specific issues and topics to address.
FOR PUBLIC Staff will review recent legislation on new requirements to incorporate
PURPOSES & diversity, equity, and inclusion within the update and the guidance
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 3
UTILITIES: materials for updating the elements.
The State Growth Management Act (GMA) requires cities to
demonstrate each element in the Comprehensive Plan meets the relevant
15 planning goals in the GMA. For both elements, the update focuses
on urban growth goals to encourage development in urban areas where
adequate public facilities and services exist or can be provided in an
efficient manner, and ensuring public facilities and services necessary to
support development are adequate for the next 20 years.
The Lands for Public Purposes Element includes: (1) Inventory of
existing capital facilities owned by public entities; (2) Forecast of the
future needs for such capital facilities; (3) Proposed locations and
capacities of expanded or new capital facilities; (4) Lands for Public
Facilities Element Maps showing the locations of the existing capital
facilities owned by public entities; and (5) Essential Public Facilities
and siting.
Capital facilities include:
Transportation Systems
Solid Waste Management (Landfill and Hazardous Waste)
Sewage Treatment Facilities and Sanitary Sewer Systems
Stormwater Systems and Facilities
Water Systems and Facilities
Parks, Recreation, and Open Space
Fire Protection and Emergency Medical Services
Police Protection
School Facilities (Tumwater School District and Olympia
School District)
Library Services
City Facilities
Chair Robbins inquired as to whether school facilities only include
grade school rather than a community college. Manager Medrud
explained that the policies are intended to create the opportunity for
siting schools. Schools, such as a university would fall under the
category of “essential public facilities.” The City needs to allow for and
accommodate for those types of land uses.
Commissioner Kirkpatrick asked whether the inventory of parks and
recreation facilities within the element would be updated. Manager
Medrud advised that the category of capital facilities apply to the Parks
and Recreation Plan. Staff is considering options to accommodate an
update, but it is unlikely to be accomplished as part of the Periodic
Update process. Staff and City Administration are discussing options
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 4
for updating the Parks and Recreation Plan.
2016 Capital Facilities maps in the element include:
Sewage Treatment Facilities and Sanitary Sewer System
Stormwater Systems and Facilities
Water Systems and Facilities
School Facilities, Library Services, City Facilities
The Lands for Public Purposes Element includes Essential Public
Facilities that are difficult to site such as:
Airports
State Education Facilities
Large Scale State or Regional Transportation Facilities
Correctional Facilities
Solid Waste Handling Facilities
Inpatient Facilities
Mental Health Facilities
Sewage Treatment Facilities
Emergency Communication Towers and Antennas
Manager Medrud added that in 2022, the Commission considered
potential amendments to the section to address substance abuse facilities
in the City and where the use could be located. Some facilities were
approved by the Thurston County, which have since been annexed to
the City. Some of those facilities wish to expand and the City needs to
consider the possibility given current regulations that prohibit
expansion. Language in the Comprehensive Plan for Essential Public
Facilities is similar to the language in the regulations, which requires an
amendment to the Comprehensive Plan when changes are implemented
in the code. Part of the update process is intended to minimize
including the code within the Comprehensive Plan.
Chair Robbins asked whether the City currently has all nine uses.
Manager Medrud advised that the City does not have state education
facilities other than the education facilities located at the Brewing and
Distilling Center as part of South Puget Sound Community College, as
well as any solid waste handling facilities. The LOTT Clean Water
Alliance owns property within the City for future development of a
satellite plant connected to the main plant. However, LOTT has since
moved away from that particular model and the future use of the
property is uncertain at this time.
Planner Smith-Erickson reported the City is required to establish a
process or amend its existing process for identifying essential public
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 5
facilities and the sites for those facilities. The current code includes the
uses and zoning codes. The City must identify and site the expansion of
essential public facilities.
The Utilities Element addresses the general location, proposed location,
and capacity of all existing and proposed private utilities, such as
natural gas, electricity, telephone, utility pipelines, cable television,
cellular, and broadband internet. A utilities map of existing facilities is
included in the element.
Some of the 2025 topics to address as part of the update for Lands for
Public Purposes Element include:
Address Organics Management Facility Siting (ESSHB 1799).
Update inventory and projected needs for public buildings,
facilities, and services over the 20-year planning period.
Use the updated City and urban growth area 20-year population
forecasts.
Update provisions for protection of the quality and quantity of
groundwater used for public water supplies.
Allow expansion of the area in the City that would allow for
essential public facilities such as inpatient facilities as part of
Planning Commission’s 2022 Comprehensive Plan amendment
cycle recommendations.
Group A water system plans must include climate resilience
element if initiated after June 30, 2024.
Chair Robbins asked whether Organics Management Facilities mostly
pertains to timber harvesting. Manager Medrud said the category
applies to household waste rather than agricultural waste. Some
commercial operations could be included as well as multifamily
complexes.
2025 topics to address during the update of Update Utilities Element
include:
Include all electrical, telecommunication, and natural gas
systems and make a good faith effort to gather information from
them (E2SHB 1181)
Update general location, proposed location and capacity of all
existing and proposed gas, electric, cable television, and
telecommunications to year 2045.
Update wireless telecommunication facilities information as
needed.
Update the general location, proposed location, and capacity of
all existing and proposed utilities.
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 6
Incorporate provisions of the updated 2023 Hazard Mitigation
Plan as appropriate
Update Maps.
Planner Smith-Erickson reported the public comment period for the
Hazard Mitigation Plan closed on November 17, 2023. Thurston
Regional Planning Council (TRPC) submitted the core plan and some
draft annexes to the Washington Emergency Management Department
for a 30-day review. After receipt of the plan with comments, the plan
will be submitted to the Federal Emergency Management Agency
(FEMA) for a 45-day review.
Manager Medrud reported one comment from a Tumwater resident was
included in the plan addressing how the community will understand the
elements of the plan.
Planner Smith-Erickson reported some new requirements include
special consideration for environmental justice in goals and policies
(E2SHB 1181) in all elements and addressing Organics Management
Facility Siting (ESSHB 1799).
Planner Smith-Erickson shared an illustration of the format for the
Conservation and Utilities Elements. Staff is utilizing Department of
Commerce Guidance Materials to assist in the update:
Periodic Update Checklist for Fully Planning Cities (Commerce,
March 2023)
A Guide to the Periodic Update Process Under the Growth
Management Act – Fully-Planning Counties & Cities
(Commerce, 2022)
○ Commerce Periodic Update Materials, including:
Capital Facilities Planning
Capital Facilities Planning Guidebook
(Commerce, October 2014)
Stormwater
Building Cities in the Rain: Watershed
Prioritization for Stormwater Retrofits
(September 2016)
Next steps include completion of the gap analysis by November 2023, a
briefing to the General Government Committee on December 13, 2023,
and to the Public Works Committee on January 18, 2024
Manager Medrud noted the Periodic Update survey is available on the
City’s website. A postcard will be mailed to all City residents on
December 4, 2023. The City has received 160 survey responses to date.
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 7
Commissioner Tobias commented on recent changes in technology with
fewer people using landline telephones or subscribing to cable opting
instead to livestream broadcasts. He asked about the plan’s ability to
account for required infrastructure to support an increase in various
types of new uses such as cellular and streaming services. Manager
Medrud said the plan is a high-level review of utility uses that could be
sited in the City. The telecommunications chapter is very
comprehensive. Overall, the review is at a higher level but accounts for
future technology changes.
2024 LONG RANGE Manager Medrud reported the briefing and discussion would help guide
PLANNING WORK staff in preparation of the joint work session with the City Council on
PROGRAM: December 12, 2023 to review the 2024 Long Range Planning Work
Program.
The work program is prepared annually to guide the Community
Development Department’s work. It also serves as a way of prioritizing
work items based on staffing capacity. The work program includes a
section on many other projects (below the line) that lack the necessary
resources to pursue. The process for establishing the work program
enables the Commission to recommend projects to consider. The
development of the work program is outlined in Section 18.60 of the
Tumwater Municipal Code.
The proposed 2024 Long Range Work Program includes four main
categories and associated projects:
1. Comprehensive Plan Amendment Docket - Approximately
33% of all budgeted staff time. 2025 Comprehensive Plan
Periodic Update (continued from 2022-23)
2. Development Regulation Amendment Docket - 2025
Development Code Periodic Update, Urban Forestry
Management Plan Amendments – Landscaping, Street Tree
Standards, and Tree and Vegetation Preservation, and other
Amendments (The urban forestry amendments are carried over
from May 2023 when staff learned of the state’s Wildland-Urban
Interface Code. Efforts on the amendments ceased until staff
reviewed how the new requirements might affect the City. It is
likely efforts will restart on the three ordinances in March
2024.), 2024 Development Code Housekeeping Amendments and
Thurston County Code Title 22 – Tumwater Urban Growth Area
Zoning
3. Other Planning Projects - Approximately 25% of all budgeted
staff time. The Habitat Conservation Plan (HCP) is
approximately 11% of all budgeted staff time. Work items
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 8
include Bush Prairie Habitat Conservation Plan (continued from
2016); Equity Toolbox (continued from 2022-23); Food System
Plan (new in 2024); Hazard Mitigation Plan Update (continued
from 2022-23); Managing Multifamily Tax Exemption Program
(ongoing); Code Enforcement (ongoing); and Permit Review
Support, Public Inquiries, and other items.
4. General Management and Coordination - Approximately 20%
of all budgeted staff time. Regional Housing Council is
approximately 10% of all budgeted staff time.
a. General Coordination with Other Departments – Code
Compliance Team, Traffic Team, Green Team,
Stormwater Team, GIS Team, and other items (ongoing)
b. General Coordination with Other Jurisdictions
1) Regional Housing Council (minimum 0.25 FTE per
Memorandum of Understanding) (ongoing)
2) Work with the Port of Olympia, other cities, County,
State, Tribes, Thurston Regional Planning Council,
and Intercity Transit among others (ongoing)
3) Department Management (ongoing)
4) Training (ongoing)
Staff hours are estimated at 1,800 hours equating to one-third of all
dedicated staff capacity. Within in each category, individual projects
are identified with an estimate of staff time needed to complete, who
proposed the project, how they address City Council strategic priorities,
and detail on the work required. The work program also accounts for an
additional planner position in Long Range Planning.
Commissioner Kirkpatrick inquired about the remaining elements of the
HCP that require such a high level of work. Manager Medrud replied
that comments on the plan received from the U.S. Fish and Wildlife
Service require a substantial revision to the draft HCP to address those
particular concerns. As part of the process, staff is identifying specific
sources of funding in addition to development fees that may help
support funding of the program, as well as reviewing different parcels
for acquisition. The goal is to update the HCP by first quarter 2024 for
resubmission to the U.S. Fish and Wildlife Service.
Some elements of the following projects listed “below the line” may be
addressed to include Aquifer Protection Standards Amendments,
Autonomous Vehicle, and Electric Vehicle Infrastructure as part of the
Development Code Update process.
Manager Medrud invited feedback and suggestions on the work
program.
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 9
Commissioner Staff commented on the lack of electric vehicle charging
stations in the City of Tumwater. More electric vehicle charging
stations along the I-5 corridor within the City might attract more tourism
to the City. He would prefer moving the item above the line or seeking
federal funding or tax reductions. Manager Medrud agreed the demand
is increasing. Internally within City facilities, the City is installing
charging stations with three stations located at City Hall. State
legislation requires jurisdictions along the I-5 corridor to identify and
allow for the development of electric vehicle charging stations in
particular areas. The City currently meets state requirements; however,
discussions are worthy of pursuing to determine if code or policy
changes are necessary to support the infrastructure. Charging stations
are likely a coordination project with the City’s climate position.
Commissioner Staff offered that the Tumwater Craft District would be
an ideal location for rapid charging stations because of its close
proximity to the interstate. Manager Medrud added that new state
requirements for charging stations include multifamily and other large
uses of a specific percentage.
Chair Robbins inquired as to the possibility of securing some grant
funds to move charging stations above the line. Manager Medrud said
any grant funds would be part of the process; however, any charging
project would need to be clarified to justify any requests for grant
funding. Staff is currently managing up to seven grants, which requires
time and capacity.
Commissioner Staff asked whether staff has approached any of the
major retailers about the possibility of installing charging stations.
Manager Medrud offered to follow up with staff.
Discussion ensued on existing charging stations at the Tumwater
Safeway and the difference between slow and rapid charging stations.
Most motorists prefer rapid charging stations.
Commissioner Kirkpatrick asked whether mitigation land would also
serve to satisfy the state requirement for more open space. Manager
Medrud said the City is working on a legislative funding request for
funds the state has allocated for carbon sequestration to include prairies,
which would serve to support conservation of prairie lands for gophers
and other species as well as for carbon sequestration.
Chair Robbins asked about the possibility of promoting more
opportunities for events or the possibility of design competitions for
architects or engineers involving students and businesses competing for
design or engineering awards to assist the City in pursuing goals for
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 10
sustainability and type of development envisioned for the City. She
cited the University of Washington’s Sustainable Engineering Group
and The Evergreen State College Center for Sustainability and
Environment as a source of students, faculty, and potential professional
contacts to assist the City in projecting the desired image the City
envisions. Manager Medrud responded that the suggestion speaks to the
efforts Sustainability Coordinator Jones Wood is pursuing. The issue
also supports the development of the Climate Element in terms of how
the City could support those types of activities.
Manager Medrud referred to the upcoming joint work session with the
Council as an opportunity for the City Council and Planning
Commission to discuss the draft 2024 work program as well as general
topics related to their roles on a range of community development
issues. A list of discussion topics to consider during the joint work
session include:
1. What went well with the 2023 long range work program and
what could be improved?
2. If adjustments to the 2024 long range work program are needed,
what projects have less priority?
3. How well was coordination between the City Council and
Planning Commission in 2023 and what could be improved in
2024?
4. Are there additional projects in 2024 to consider? If so, what
projects currently proposed could be delayed?
Commissioner Kirkpatrick suggested that many of “below the line”
items would likely be included as part of the Comprehensive Plan
Periodic Update while acknowledging that the review might not be at
the desired level of detail. Some dedicated staff hours for “below the
line” items could be reduced if some are captured as part of the Periodic
Update.
Chair Robbins cited her interest in the first topic of what has gone well
and how the City can build on those successes.
In response to questions about the source of documents, Manager
Medrud described how to access the City’s website and the pages to
visit to obtain desired information. Staff established a webpage for the
Periodic Update to house all materials.
Discussion ensued on the goal of avoiding surprises for both the City
Council and the Planning Commission and the importance of
maintaining coordination and collaboration with the Council.
Manager Medrud advised of the possibility of canceling the December
26, 2023 meeting. Commissioner Von Holtz advised that she would be
TUMWATER PLANNING COMMISSION
MINUTES OF MEETING
November 28, 2023 Page 11
unable to attend the joint meeting with the Council on December 12,
2023.
NEXT MEETING The next meeting is scheduled on December 12, 2023 at 6:00 p.m. with
DATE: the City Council followed by a separate Commission meeting at
approximately 7:00 p.m.
ADJOURNMENT: Commissioner Tobias moved, seconded by Commissioner
Kirkpatrick, to adjourn the meeting at 8:19 p.m. A voice vote
approved the motion unanimously.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PLANNING COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Tuesday, November 28, 2023
7:00 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Approval of Minutes
5. Commissioner's Reports
6. Manager's Report
7. Public Comment
8. Ordinance No. O2023-002, Final Docket for 2023 Comprehensive Plan Amendments
9. 2025 Comprehensive Plan Periodic Update – Lands for Public Purposes & Utilities
10. 2024 Long Range Planning Work Program
11. Next Meeting Date - Joint City Council and Planning Commission Meeting on 12/12/2023 at 6:00
PM, Planning Commission Meeting to follow
12. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/webinar/register/WN_gei2GZHuQEGShcaqsCZR5A
Listen by Telephone
Call (253) 215-8782, listen for the prompts, and enter the Webinar ID 840 4491 8564 and Passcode
418432.
Public Comment
The public is invited to attend the meeting and offer comment. The public may register in advance for
this webinar to provide comment:
https://us02web.zoom.us/webinar/register/WN_gei2GZHuQEGShcaqsCZR5A
After registering, you will receive a confirmation email containing information about joining the webinar.
The public may also submit comments prior to the meeting by sending an email to:
cdd@ci.tumwater.wa.us. Please send the comments by 1:00 p.m. on the date of the meeting.
Comments are submitted directly to the Commission Members and will not be read individually into the
record of the meeting.
If you have any questions, please contact Planning Manager, Brad Medrud at (360) 754-4180 or
bmedrud@ci.tumwater.wa.us.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
What is the Planning Commission?
The Tumwater Planning Commission is a citizen advisory commission that is appointed by and
advisory to the City Council on the preparation and amendment of land use plans and implementing
ordinances such as zoning. Actions by the Planning Commission are not final decisions; they are
Commission recommendations to the City Council who must ultimately make the final decision. If
you have any questions or suggestions on ways the Commission can serve you better, please
contact the Community Development Department at (360) 754-4180.
Decorum Statement
Welcome to the Planning Commission meeting. We thank you for attending.
The City Council encourages community engagement in local government and provides a variety of
ways to participate.
The Chair of the Planning Commission will be responsible for conducting orderly and efficient meetings
within the scheduled time. To accomplish that, the Chair will maintain order and decorum and can
regulate inappropriate debate, repetitious discussion, and disruptive behavior when needed.
The Chair will recognize those that wish to speak and may limit the time allowed for individual
comments. City staff will record questions and comments during the meeting. If an issue or question
cannot be addressed during the meeting, City staff will address the issue or respond to the question by
following up with the individual.
We respectfully request that attendees refrain from disruptions during the meeting and comply with
decorum rules.
Thank you for participating.
Get email alerts for Tumwater
A daily email when new agendas and minutes are posted.