Planning Commission
Regular MeetingTumwater, WA · October 8, 2024
Minutes
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 1
CONVENE: 7:00 p.m.
PRESENT: Chair Elizabeth Robbins and Commissioners Terry Kirkpatrick, Gina
Kotek, Malissa Paulsen, Brandon Staff, Michael Tobias, and Anthony
Varela.
Absent: Commissioners Grace Edwards and Cody Perez.
Staff: Planning Manager Brad Medrud and Housing and Land Use
Planner Erica Smith-Erickson.
Others: Rob LaFontaine, Emily Bergkamp, Nick Demerice, and Senior
Planner Matt Kenney with Intercity Transit.
CHANGES TO AGENDA: There were no changes to the agenda.
COMMISSIONER’S Commissioner Tobias reported that his term on the Commission expires
REPORTS: in November, and he does not plan to reapply because of a recent change
in job and a possible move to Lacey. He thanked the Commission and
staff for their efforts and for their support to the community.
MANAGER’S REPORT: Manager Medrud reported on changes to the schedule on the update of
the Comprehensive Plan. An updated schedule will be forwarded to the
Commission. The first meeting in December is scheduled as a joint
work session with the Council to review the work plan for 2025 and
housing, land use, and development code updates.
With no pending agenda topics and the Christmas holiday, Manager
Medrud recommended cancelling the December 24, 2024 Commission
meeting. The Commission acknowledged the recommendation.
PUBLIC COMMENT: There were no public comments.
TRANSIT 101: Rob LaFontaine, Planning Deputy Director, Intercity Transit, introduced
General Manager Emily Bergkamp, Development Director Peter
Stackpole, Chief Communications Officer Nick Demerice, and Senior
Planner Matt Kenney. Mr. LaFontaine briefed members on Transit 101
covering the agency’s service area, source of tax revenue, modes of
service, infrastructure, and equity efforts.
Current services provided by Intercity Transit include fixed route
service, commuter service to Pierce County, Dial-A-Lift (door-to-door
ADA Paratransit) to qualified customers living within the service
boundary and with ¾ mile of a fixed route, and Vanpool service. Under
study is On-Demand (micro transit) service. Bus Rapid Transit (BRT) is
currently offered as a pilot program operating along the Martin Way
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 2
corridor. Intercity Transit does not provide rail service. Sound Transit
and Washington State Department of Transportation (WSDOT) are the
two predominant rail providers within the county.
Intercity Transit is governed by a Public Transportation Benefit Area
(PTBA) as a special taxing district and a municipal corporation as part
of the region’s local government structure. PTBAs were authorized by
state legislation. Intercity Transit levies a 1.2% local sales tax within
the PTBA boundary.
Initially, Intercity Transit offered service countywide. In 2002, the
boundary was reduced following the approval of Initiative 695, which
reduced transit revenues. The boundaries were reduced to the urban
areas and the urban growth areas of the cities of Lacey, Olympia, and
Tumwater with an extension of service provided to the City of Yelm.
Intercity Transit has 961 active bus stops across the service area. The
public’s investment in transit is significant and should be considered
permanent. Changes in service resulting in abandonment of stops are
unusual and often inadvisable. Demographic estimates from sources of
specific data identified approximately 610 residents living within the
proximity of bus stops at Linwood Avenue and G Street. Decisions to
change bus stop location or remove frequency of service are impactful.
Intercity Transit is purposeful in its decisions to add and remove transit
service.
The Intercity Transit Authority recently updated the agency’s Title VI
Program. The document is transmitted to the federal government
declaring the agency’s compliance with the U.S. Civil Rights Act of
1964. The 2020 census was significant as the urban area of the county
surpassed 200,000 in resident population. The number is a meaningful
threshold for transit as it added more stringent requirements for equity
analyses. All major service changes are required to identify any adverse
impact resulting in significant disparity to populations that are a racial
minority or low-income. Disparity is present if the proportion of
adversely affected population impacts more minority or low-income
residents by 3% or more or the proportion of benefitting population
favors fewer minority or low-income residents by 3% or less. The
analyses are approved through a public process coordinated by the
agency.
Tumwater has 113 active bus stops within the City. The agency has
been active in pursuing bus stop enhancements. Over 150 bus stops are
scheduled for improvements in 2025 with 17 of the stops located in the
City of Tumwater. Bus stop improvements include expanding the bus
stop footprint to accommodate both front door and rear door activity.
Not all bus stops include a shelter as many stops lack the ridership, or a
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 3
shelter is unnecessary dependent upon the location. Mr. LaFontaine
reviewed a checklist utilized to identify improvements to existing bus
stops.
Mr. LaFontaine addressed questions surrounding the decision to
eliminate bus fares. The assessment of fares resulted in a net revenue
gain; however, the amount was nominal. Ms. Bergkamp added that
fares contributed approximately 2% of the agency’s revenues. Another
element of the decision was attributed to the antiquated fare boxes as the
equipment lacked readers for other transit systems. The cost to replace
the system with a technologically advanced system outweighed financial
benefits. A new system would also cost approximately $1 million to $2
million to maintain each year, which contributed to the decision to
eliminate fares during a pilot demonstration project scheduled to end in
January 2028.
Chair Robbins asked whether the removal of the fare contributed to an
increase in ridership. Ms. Bergkamp commented on the issues created
by the COVID pandemic. During the first two months of zero fares in
2020, the agency experienced a 20% increase in ridership in January
2020 followed by a 40% increase in February. Today, the ridership
level is similar to 2019 ridership levels. One of the main issues of lost
ridership is the loss of state government employees who typically
worked on the campus and in Olympia who no longer use transit.
Mr. LaFontaine reported on the agency’s November 2018 ballot
measure for a sales tax increase of 4/10ths of one percent within the
PTBA. The ballot measure passed. The measure enabled the agency to
preserve the level of service at that time and expand service within the
PTBA. Following the ballot measure, the agency adopted a short- and
long-range plan to extend the span of service (hours of operation),
improve frequency, expand to new areas, improve capital facilities,
enhance corridor service (BRT), expand late night service, enhance
commuter service between Thurston County and locations to the north,
and engage in discussions on moving to zero fare. Many actions were
pending implementation when the nation experienced a pandemic
causing an unprecedented historic change for the agency to focus on
reducing service and the public’s use of the service. It was never the
mission of the agency to discourage riders from using transit. That
journey over the course of four years prompted efforts beginning in June
2020 to begin restoring service. The September 2024 service schedule
is indicative of full restoration of service following the pandemic
reductions.
The state requires transit agencies to develop and submit annually an
update to the agency’s six-year plan. The plan includes planned
operating changes. In 2025, the agency is planning for a 10% to 15%
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 4
increase in annual service hours, returning service to the State Capitol
Campus, improve span and frequency in accordance with the long-range
plan, evolve the BRT demonstration project (The One) into an anchored
corridor line consistent with Thurston Regional Planning Council’s
(TRPC) Corridor Study work and the City of Olympia’s Capital Mall
Triangle Study, restructure the fixed route network, introduce new
service segments, and pending a state grant, initiate commuter service
with access to Joint Base Lewis McChord through a connection with
Pierce Transit for bus service on base.
Potential new service segments in Tumwater include Henderson
Boulevard, Old Highway 99 between Tumwater Boulevard and River
Road, Tyee Drive and 73rd Avenue, Old Highway 99 and 93rd Avenue,
Capitol Boulevard Craft District, and the E Street connector.
Density plays an important role in extending service. Transit supportive
land use is in areas of high density residential, business districts,
medical districts, shopping centers, high schools, universities, colleges,
and employers of significance. Intercity Transit relies on many of the
zoning districts in each jurisdiction to help guide the agency’s allocation
of transit service. The agency supportive infrastructure supports
integration with bike and pedestrian amenities and avoids local access
roadways or neighborhoods to the extent possible. The agency pursues
directness and reliability in service routing and avoids circuitous
deviations and large one-way loops.
Mr. LaFontaine addressed the lack of transit service to Black Hills High
School. Using a map, he identified the attendance boundaries of the
high school, as well as Tumwater High School. Many families are
interested in transit service serving the high schools to enable students to
have the ability to travel to and from school. Intercity Transit bus stops
are distant from Black Hills School because of operational constraints
and not because of the lack of awareness of the need. The operational
complications affecting Black Hills High School include no practical
location to terminate southbound service and return north on Littlerock
Road. Some suggestions for service included terminating service within
high school roadways. However, the use of school roadways encumber
significant limitations including congestion, pedestrians, uncontrolled
traffic blockages, and complications with respondents adhering to
protective orders (individuals not allowed on school ground per state
law). Another suggestion was termination of service in some of the
adjacent subdivisions. However, neighborhoods and local access
roadways are also risky for many of the same reasons as schools.
Residents are often intolerant of fixed route transit operating within their
neighborhood.
Transit service beyond 77th Way is not justified at this time. Any
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 5
decision for service would be at a very high operational cost and would
force consideration of other service dilution in the system to
accommodate for the addition of a route serving Littlerock Road.
Chair Robbins remarked about the possibility of Tumwater offsetting or
assisting in funding the service through a partnership. Mr. LaFontaine
said such a partnership would not be unprecedented.
Ms. Bergkamp advised of the agency’s relationship with The Evergreen
State College to provide a safe option for students to travel within the
area by executing a contract with the college providing some funds to
offset the cost of transit service for students and faculty. It is an option
that could be considered for Tumwater as well.
Discussion ensued on potential existing route service extending to Black
Hills School for limited service in the morning and early afternoon. Mr.
LaFontaine commented on some school activity scheduling
requirements and conflicts that would entail some difficulty in
scheduling afternoon service.
Mr. LaFontaine reviewed operational variances of bus stop design and
placements, street tree and vegetation blocking signage, pedestrian
access facilities, and sites where Dial-A-Lift service is difficult to
access. Areas have been examined to determine if there is service
inoperability because of some type of complication. Many factors
contributing to operational challenges include frequency of bus turns,
uncontrolled intersections, intersection geometry, roundabouts, private
roads, and on-street parking. Operability is the most significant
influence on fixed route design. Bus stop design and locations are based
on equity, density, eligibility, and operability. Transit service is the
result of the harmony of considerations of both quantitative and
qualification factors.
Commissioner Kirkpatrick commented on the time the Commission has
expended on ways to encourage the development of more affordable
housing in Tumwater. Those discussions included ways to reduce
parking to encourage transit usage. Both those efforts have become
difficult because of the lack of transit opportunities.
Mr. LaFontaine advised that the agency’s long-range plan is aspirational
in the sense of span of service operating later in the evening to support
the majority of mobility needs within the community, as well as
providing frequency of service. The agency does not have the ability to
offer a robust volume of service other major metropolitan areas offer.
At this time, that volume of service is not within the agency’s capacity
to attain.
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 6
It was noted that the Department of Commerce efforts on transit
redevelopment focuses on encouraging and incentivizing the
development of affordable housing along corridors that have existing
transit service within the communities to help bolster populations
around those areas and help focus on equity and those that need the
service.
Commissioner Kirkpatrick noted that the City of Tumwater has only two
main transit routes and that most of the corridor will need to be
developed. The focus has been on placement of multifamily housing,
which is the only type of housing that is affordable at this time. That
development will likely be in areas where no transit service is available,
which speaks to the need for a conversation between the development
community of affordable housing and the agencies providing
transportation. It is difficult to attract developers to construct low-
income housing for residents who lack cars when no public
transportation exists.
Manager Medrud said the City must plan for over 6,000 new housing
units that are affordable for households with incomes of 80% or less of
the area median income over the next 20 years. The concern is justified,
as the City’s corridors are narrow because of topography and other
reasons.
Ms. Bergkamp stressed the importance of the agency participating
earlier in conversations with the City.
The Commission discussed the difficulties associated in both time and
frequency of transit service in Tumwater connecting to destinations in
Lacey or Olympia. Mr. LaFontaine replied that the agency plans to
restructure the fixed route network for a variety of reasons to include
more cross-city connections.
Discussion ensued by the Commission and Intercity Transit staff on the
possibilities associated with on-demand service in terms of the cost-
effectiveness of the service and the lack of other transit agencies
successfully offering the service.
DEVELOPMENT CODE Manager Medrud reviewed highlights of the proposed changes to the
ADMINISTRATION: Development Code in preparation of reviewing the ordinance at the next
meeting. Senate Bill 5290 changed the way municipalities review
development applications as established in RCW 36.70 B outlining the
steps and the timelines associated with each step. When changes in state
law occur, the City is required to update its processes and code to meet
the new regulations. The City has not updated Title 14 Development
Administration Chapter for many years. Consequently, the update
includes changes to other provisions in addition to new changes in state
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 7
law.
Manager Medrud outlined the current development review process
comprised of five steps:
1. Preapplication Process
A. Feasibility Review (optional)
B. Preliminary Preapplication Conference
C. Final Preapplication Conference
2. Application Submittal
A. Determine Application Type (I-IV) (New step)
B. Determine the Procedural Application Materials Required
C. Application Submittal
D. Determination of Completeness (Types II-III) starts the
official clock for City review (some issues may arise
during the review of application completeness that stops
the clock)
3. Application Review
A. Notice of Application (Types II – III). Under state law,
the City can issue a notice of application for projects
requiring SEPA review or for projects requiring a hearing
examiner decision.
B. Distribution of Application for Review
C. SEPA Review (Types II-III). Most projects do not require
SEPA review as the City’s codes cover all SEPA
requirements that were established in 1971. However,
SEPA review incorporates an automatic public notice
process.
• Review and Approval Times for internal and
external agency reviews: Type I – 65 Days, Type II
– 100 Days, and Type III – 170 Days
D. Recommendation for Decision
4. Application Decision
A. Administrative Decision (Types I-II)
B. Hearing (Type III)
C. Decision Notice (Type I)
D. Notice of Decision (Types II-III)
5. Application Appeal
A. SEPA Recommendation or Appeal
B. Land Use Permit Decision Appeal to Hearing
Examiner (Type I-II) or Superior Court (Type III)
Manager Medrud said staff proposes to rewrite Title 14. The first
section of the draft includes general provisions that apply throughout the
code. Chapters 14.04, 14.06, and other chapters define the development
review process. Chapter 14.04 includes provisions for Land Use
Permits and associated types and requirements. Chapter 14.06 addresses
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 8
the preapplication process and submittal process. The determination of
completeness process is within Chapter 14.08. The review of
applications is within Chapter 14.10 and the decision and review process
outlined in Chapter 14.12.
Manager Medrud described the importance of the Comprehensive Plan,
as it is incorporated within the determination. The Comprehensive Plan
serves as a backstop to the City’s development regulations serving as an
essential part of a permit review process if there are gaps within the
development regulations.
City development definitions for the most part are from RCWs. One
important change in the recent legislation within the definition section of
TMC 36.70 B indicates that a project permit definition is defined as a
land use, an environmental permit, or a license required from the local
government. However, recent legislation removed building permits.
The legislation is important as it represents a sea change in how
jurisdictions process development applications. Title 14 no longer needs
to address issues with building code review in terms of length of process
and coordination. Title 15 on buildings and construction is based on
another section of the RCW leading to less confusion. However, recent
legislation narrows the scope of Title 14 to actions rendered under Title
16 (Environment Code, SEPA, trees, land clearing, and critical areas,
etc. Title 17 covers a new process for land divisions for subdivision of
short plats, larger preliminary plats, binding site plans, or changes to a
boundary line. Title 18 covers all zoning requirements.
Commissioner Kirkpatrick referred to language that speaks to the City
Council determining the amount of permit fees to cover costs incurred
by the City for development review and processing. Manager Medrud
responded that permit application fees at this time do not cover the
City’s costs. Any adjustment that would cover City costs 100% would
likely eliminate development activity in the City to include affordable
housing development the City wants to expand. The City must be
reasonable when establishing fees.
Planner Smith-Erickson added that another reason for revising Title 14
is to ensure that permit types are identified during a preapplication
meeting to ensure the applicant understands submittal requirements and
required documents to submit a complete application to enable a timely
review of the application by staff. The City is also implementing a new
permitting system.
Manager Medrud added that another new state requirement is a reporting
requirement. The City must submit an annual report on all permitting
and actual timelines. The City’s current computer system does not
enable reporting, which may require another system to satisfy the new
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 9
state reporting requirement.
Chair Robbins inquired as to whether the City’s fee schedule is included
within Title 14. Manager Medrud replied that the City Council adopts a
resolution approving a fee schedule of all fees charged by the City for all
City services and programs.
Commissioner Kirkpatrick commented on the lack of opportunities for
the public to comment on development proposals. Manager Medrud
shared that he recently engaged in conversations with other jurisdictional
staff surrounding public outreach and noticing concerns. Additionally,
the Commission’s work highlights public outreach in terms of reviewing
and recommending changes to the Development Code and the
Comprehensive Plan as those regulations guide permit review. During
updates of regulations, community input is important.
Chair Robbins suggested the possibility of providing additional
information at the next meeting to help emphasize the shift in public
noticing requirements.
Manager Medrud reported that another new section pertains to
substantially different proposals to account for situations after an
application is submitted and the scope changes to such a degree that it is
not the same project. The project could have more impacts, different
impacts, or other project changes. The section establishes a process for
administering those types of project applications. The section identifies
what constitutes a new application or deviation from the original
application.
Other changes include a section on land use expirations. Once a permit
is issued a timeline is initiated for specific actions. For example, an
applicant receives a preliminary plat approval for the division of land for
a period of five years. Conditional Use Permits have an 18-month
timeline to complete a project.
Manager Medrud reviewed the four application types:
• Type I applications do not require SEPA review. Examples
include boundary line adjustments, critical area requests for
determination of applicability, final plats, home occupation
permits, land clearing permits, lot consolidations, plat time
extensions, preliminary short plats, preliminary SEPA threshold
determinations (if Environmental Impact Statement (EIS)
required), reasonable use exemptions, shoreline exemptions, sign
permits, temporary use permits, tree permits, and variances
(administrative)
• Type II are Type I permits requiring some level of environmental
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 10
review.
• Type III permits require a hearing examiner decision. Examples
include binding site plans (phased), conditional use permits,
planned unit developments, plat alternations with hearing, plat
vacations, preliminary plats, replats, shoreline conditional use
permits, shoreline substantial development permits, shoreline
variances, site-specific rezones not requiring a comprehensive
plan amendment, and variances (zoning).
• Type IV permits are development code amendments,
comprehensive plan map and text amendments, development
agreements, rezones requiring comprehensive plan amendments,
and shoreline master program amendments.
Chair Robbins asked about the type assigned to planned actions.
Manager Medrud advised that planned actions require a SEPA process
with review and approval by the City Council. Planned actions are
covered within Title 14 as a separate project type.
Manager Medrud reviewed Table 14.04.020(A) Decision and Appeal
Authority describing the final decision and appeal authorities for each
land use permit application type. He reviewed public noticing
requirements based on the type of permit.
Table 14.04.030 Land Use Permit Application Review Times for each
permit type include:
• Type I - 65 days
o Final Plat: 30 days (TMC 17.24.050)
• Type II - 100 days
• Type III – 170 days
o Preliminary Plat: 90 days (RCW 58.17.140)
Manager Medrud reviewed the application review process, which
reflects many changes based on new state law. One change effective in
1996 was the consolidation of SEPA and Land Use reviews to occur
concurrently. Should an applicant require multiple permits to construct
a project, all applications are combined under one review with the
timeline at the higher level. A section was added covering that
provision.
Additional revisions not involving Title 14 include the City’s hearing
examiner code. Some changes are proposed for the type of cases the
hearing examiner considers. Another change is to the City’s
multifamily tax exemption section. Under state law, a contract is
approved as part of the multifamily tax exemption approved either by
the City Council or administratively. Currently, a multifamily tax
exemption is approved by the Community Development Director except
TUMWATER PLANNING COMMISSION
MINUTES OF HYBRID MEETING
October 8, 2024 Page 11
for the contract which is approved by the City Council.
Staff has initiated SEPA review of the proposed ordinance. The
Commission will receive the ordinance at the next meeting with an
updated staff report. Manager Medrud encouraged Commissioners to
submit questions. The intent is to schedule a public hearing for the first
meeting in November to adhere to the adoption timeline because new
state requirements are effective January 1, 2025.
Chair Robbins requested additional information on the extent of public
outreach for the proposed changes. Manager Medrud advised of the
difficulty of pursuing public outreach because of the constrained
timeline for the changes, which may necessitate some adjustments after
adoption of the ordinance.
NEXT MEETING DATE: The next meeting is scheduled on October 22, 2024.
ADJOURNMENT: Commissioner Tobias moved, seconded by Commissioner Staff, to
adjourn the meeting at 9:01 p.m. A voice vote approved the motion
unanimously.
Prepared by Valerie L. Gow, Recording Secretary/President
Puget Sound Meeting Services @ psmsoly@earthlink.net
Agenda
PLANNING COMMISSION
MEETING AGENDA
Online via Zoom and In Person at
Tumwater Fire Department
Headquarters, Training Room, 311 Israel
Rd. SW, Tumwater, WA 98501
Tuesday, October 08, 2024
7:00 PM
1. Call to Order
2. Roll Call
3. Changes to Agenda
4. Commissioner's Reports
5. Manager's Report
6. Public Comment
7. Transit 101
8. Development Code Administration
9. Next Meeting Date - 10/22/2024
10. Adjourn
Meeting Information
The public are welcome to attend in person, by telephone or online via Zoom.
Watch Online
https://us02web.zoom.us/webinar/register/WN_HuNtizGkR8aELzD9XjRP0A
Listen by Telephone
Call (253) 215-8782, listen for the prompts, and enter the Webinar ID 867 9051 9875 and Passcode
904123.
Public Comment
The public is invited to attend the meeting and offer comment. The public may register in advance for
this webinar to provide comment:
https://us02web.zoom.us/webinar/register/WN_HuNtizGkR8aELzD9XjRP0A
After registering, you will receive a confirmation email containing information about joining the webinar.
The public may also submit comments prior to the meeting by sending an email to:
cdd@ci.tumwater.wa.us. Please send the comments by 1:00 p.m. on the date of the meeting.
Comments are submitted directly to the Commission Members and will not be read individually into the
record of the meeting.
If you have any questions, please contact Planning Manager, Brad Medrud at (360) 754-4180 or
bmedrud@ci.tumwater.wa.us.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us.
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.
What is the Planning Commission?
The Tumwater Planning Commission is a citizen advisory commission that is appointed by and
advisory to the City Council on the preparation and amendment of land use plans and implementing
ordinances such as zoning. Actions by the Planning Commission are not final decisions; they are
Commission recommendations to the City Council who must ultimately make the final decision. If
you have any questions or suggestions on ways the Commission can serve you better, please
contact the Community Development Department at (360) 754-4180.
Decorum Statement
Welcome to the Planning Commission meeting. We thank you for attending.
The City Council encourages community engagement in local government and provides a variety of
ways to participate.
The Chair of the Planning Commission will be responsible for conducting orderly and efficient meetings
within the scheduled time. To accomplish that, the Chair will maintain order and decorum and can
regulate inappropriate debate, repetitious discussion, and disruptive behavior when needed.
The Chair will recognize those that wish to speak and may limit the time allowed for individual
comments. City staff will record questions and comments during the meeting. If an issue or question
cannot be addressed during the meeting, City staff will address the issue or respond to the question by
following up with the individual.
We respectfully request that attendees refrain from disruptions during the meeting and comply with
decorum rules.
Thank you for participating.