Public Works Committee
Regular MeetingTumwater, WA · April 7, 2022
Minutes
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 1
CONVENE: 8:00 a.m.
PRESENT: Chair Eileen Swarthout and Councilmembers Michael Althauser and Charlie
Schneider.
Staff: City Administrator John Doan, Transportation and Engineering
Director Brandon Hicks, Water Resources and Sustainability Director Dan
Smith, Communications Manager Ann Cook, Capital Projects Manager Don
Carney, Engineering Services Manager Bill Lindauer, Water Resources
Specialist Carrie Gillum, and Administrative Assistant Cathy Nielsen.
APPROVAL OF
MINUTES: PUBLIC
WORKS COMMITTEE,
MARCH 3, 2022 &
MARCH 17, 2022:
MOTION: Councilmember Schneider moved, seconded by Councilmember
Althauser, to approve the minutes of March 3, 2022 and March 17, 2022
as published. A voice vote unanimously approved the motion.
FOURTH Manager Carney reported the City, through Cardinal Architecture P.C.,
AMENDMENT TO completed the Historic Brewery Tower Protection & Renovation Report. The
SERVICE PROVIDER report included a phased strategy and project design for maintaining,
AGREEMENT FOR preserving, and renovating the City’s historic brewery tower. The first phase
HISTORIC BREWERY of work has been completed with the removal of a temporary roof over the
TOWER fourth and fifth floors, addition of new roof gutters and temporary
RENOVATION downspouts, replacement of damaged and missing brick, and masonry repairs.
The current phase of work is seismic upgrades to enable the use of the building
for different purposes. The proposal is the fourth amendment to the service
provider agreement.
In 2017, the City selected Cardinal Architecture P.C. to complete the design
work with the contract totaling $117,570 with several amendments for change
in terms. The third amendment recently executed extended the timeline of the
contract. The proposed fourth amendment is for a fee increase of the Historic
Brewery Tower Renovation Phase II Seismic Improvements. The increase is
due to an hourly rate increase, as well as changes to the updated International
Building Code requirements for seismic analysis that will increase staff time
to complete the analysis. The fourth amendment totals $11,025 bringing the
total project agreement to $323,315.
Councilmember Schneider asked for clarification for the purpose of the
additional $11,025 and whether it would complete that stage of the project.
Manager Carney confirmed the request is for an additional $11,025 to
complete the design for seismic upgrades.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 2
Councilmember Schneider said his concerns surround flooding issues
associated with the area. Although he has been assured flooding does not pose
a threat to the brewhouse, the City continues to experience several flooding
events in that area. He asked about the flooding concerns for the property at
some point in time based on historical flooding events. Manager Carney said
he would follow up to identify whether staff has addressed potential flooding
of the property.
Councilmember Schneider added that another major concern is the investment
of funds into the project. When the project was initiated, there were
assurances the City would receive private funds and grant funds; however, it
appears each time the project moves forward, the City is asked for additional
funding. Director Hicks explained that the current phase of work is protecting
investments the City has invested in the building. The previous phase of work
to protect the shell and roofs of the building required substantial funds. The
seismic upgrades will protect the building from collapsing in the event of an
earthquake. It is likely the last stage of work would be funded by the City
without the benefit of private donations or grants. Staff has been successful
in obtaining grant funding from the state. Staff intends to make up the
difference through private contributions or from other funding sources. More
details on the status of funding are scheduled to be shared with the Council at
a worksession.
City Administrator Doan added that the worksession will include a financial
summary on the status of the project. The project was phased with the initial
emergency improvements completed primarily through donations followed by
the roof and brick work. The first two phases were intended to preserve the
asset. The next phases are dependent upon the type of access, parking, utility
connections, and flooding risks requiring additional conversations. The intent
at this time is to complete the Phase 2 design to provide adequate information
to identify what is necessary and the cost for moving forward. At that time,
the Council can make a decision as to whether to move forward on Phase 2 or
defer the work. It is difficult to make a decision on whether to proceed with
construction of Phase 2 without having all the necessary information for next
steps and costs.
Councilmember Schneider expressed appreciation for the clarification.
Chair Swarthout requested clarification as to the intent of the design. Manager
Carney said the design is a seismic frame to attach externally or internally to
keep the building from collapsing in the event of an earthquake. Chair
Swarthout asked whether the exploration of the depth of the area had been
identified. Manager Carney reported City maintenance personnel pumped
water from the foundation and the architect and the structural engineer were
able to access the foundation. They were able to verify the depth, which was
much deeper than the original plans depicted. The foundation is actually 14
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 3
feet deep. No one is sure as to why the depth is so much different from the
plan specifications.
MOTION: Councilmember Althauser moved, seconded by Councilmember
Schneider, to recommend the City Council approve and make a motion
authorizing the Mayor to sign the Fourth Amendment to Service Provider
Agreement for Historic Brewery Tower Renovation with Cardinal
Architecture P.C., increasing the not-to-exceed amount to $323,315.00 for
the term ending December 31, 2023. A unanimous voice vote approved
the motion.
WATER Water Resources Specialist Carrie Gillum provided an overview of the City’s
CONSERVATION Water Conservation Program and future steps over the next several years. The
PROGRAM UPDATE: Water Conservation Program is comprised of 11 programs promoting different
measures for water conservation. The City collaborates with the LOTT Clean
Water Alliance, the region’s wastewater treatment provider. Different
categories include customer-based conservation efforts and City conservation
efforts for operations and maintenance.
The customer-based program is a conservation-pricing model with higher
rates for higher usage of water. A single-family home uses an average of 600
gallons of water per month and is priced in the first tier at approximately $2.75
per 100 cubic feet of water. During the summer, homes often increase water
consumption to 1,100 cubic feet per month because of irrigation resulting in
an increased cost of $3.04 per 100 cubic feet. The customer-based program
includes education and outreach in many different forms ranging from the
water quality report published every year, bill inserts containing messaging,
Tumwater on Tap, an e-newsletter, and the Facebook page. Additional paper
materials are often provided to customers during different City events to
provide information to residents on ways to conserve water. Education
opportunities are also available to irrigation account users. Account holders
can receive a personalized audit of their landscape and water usage to assist
them in identifying the correct amount of water or whether it is possible to
decrease usage.
All water customers are eligible to receive flow meters, spray nozzles, and rain
gauges (useful for irrigation). Customer rebates are also available for rain
barrels (up to six rebates per address). The City processes approximately two
applications each year. Smart irrigation equipment rebates affords a discount
up to 50% of $200 for the purchase and installation of an irrigation controller.
The City has received approximately two applications each year since 2017.
The pandemic has impacted many of the rebate programs. A program
emphasizing water indoor savings provides kits to customers from LOTT to
reduce water flow to the sewer system. The kits include showerheads, kitchen
and bath faucet aerators, leak detection dye tabs, and installation instructions.
The City also provides kits for septic users in the City. Rebates are offered
for water-saving toilets, water smart rebates, and washing machine rebates
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 4
(last two are provided by LOTT). The Cities of Lacey and Olympia participate
in the water smart rebate program through LOTT. Washing machine rebates
offered by LOTT has been taken advantage by 200 customers annually with
30 of the customers from Tumwater.
The City’s control of water loss within the system is through audit tracking
and calibration. American Water Works (AWA) offers different auditing
tools. The City has taken advantage of many of the software programs. The
software enables a comparison of consumed versus produced water and
through reporting it enables staff to determine where improvements may be
needed. Staff also tracks unmetered water usage to determine consumption
compared to well production, which identifies breaks, leaks, emergency use,
flushing, or maintenance. Meter calibrations are performed on wells twice a
year. Customer meter calibrations are performed as needed based on a specific
issue. Staff completes leak detection and theft deference. Staff uses sonic
detection methods through sound to identify leaks within the distribution
system. Staff completes detection monitoring for 25% of the system each
summer to provide a complete mapping of the system every four years.
Another form of detection is through the AMR-based leak detection whereby
meters document instances where a customer is experiencing continuous flows
over an extended period. The customer’s account is flagged to conduct further
investigation and contact with the customer to determine whether a leak exists.
In the past, the City has also experienced water theft from the City’s fire
hydrants. In areas where thefts have occurred, the City has installed locking
hydrants to prevent theft of water.
Goals in the Water Conservation Plan through 2028 include:
Goal 1: Maintain a 3% annual reduction in the single family equivalent
residential unit (ERU). Since 2007, ERUs have decreased; however
ERUs are beginning to increase as more people are at home during
the pandemic.
Goal 2: Maintain a peaking factor of 2. The peaking factor is the ratio between
the maximum daily demand to the average daily demand in the water
system.
Goal 3: Reduce 3-year average distribution system leakage (DSL) to 5%. The
City achieved a leakage rate below 5% last year. The state
requirement through the Department of Health is 10%.
Councilmember Althauser asked whether the leakage rate is
reflective of leaks customers may experience between the customer’s
pipe and the distribution pipe. Specialist Gillum explained that the
leakage rate does not account for those instances; however the rate
does include loss of water through thefts (hydrants) or other
unauthorized uses as well as during maintenance of hydrants and for
fire fighting. The City recently converted to the AMR customer
meters and some of the leakage could be attributed to accounting.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 5
Goal 4: Decrease commercial water use through participation in Watersmart
Program. Forty projects have been completed since 2011 with most
occurring at the beginning of the program. A future goal is to target
specific businesses, such as hotels and commercial kitchens that
could benefit from the program.
The biggest challenge to overcome is public engagement and finding new
ways to inform and inspire customers about water conservation. Some options
staff plans to explore is increasing public involvement with simple, catchy
messaging, promoting outdoor rebate programs, educate customers on
different landscaping alternatives, and review City codes and policies to
promote conservation practices.
Councilmember Schneider asked about the availability of materials that can
be provided to the public during community and neighborhood events, such
as National Night Out. Specialist Gillum said some materials are available
and the City could obtain other publications from other sources promoting
water conservation. Councilmember Schneider asked about the process for
customers to take advantage of the rebate program and other programs
sponsored by the City. Specialist Gillum said customers can obtain
information through the City’s website. Rebate forms are published and can
be submitted electronically.
Councilmember Althauser recommended including conservation materials
during the Arbor Day tree giveaway. He asked whether the City’s design
guidelines include examples of water-saving landscaping techniques or
landscaping materials that reduce water consumption. Director Hicks said the
design guidelines are geared for public improvements within the right-of-way.
Although the design guidelines have been amended, the majority of the
guidelines were developed in 1995. The City’s development guide is
scheduled for an update. However, the guide is not geared towards mandating
water-saving landscaping.
Director Smith added that the review of City codes and policies is intended to
include reviews of irrigation guidelines for new development, which could be
aligned with a stronger focus on water conservation. Another example is
hiring a certified designer to design irrigation systems for residential
development versus designs by a party that may not have that level of
expertise.
Chair Swarthout said she was aware of the indoor products but was unaware
of the outdoor options, such as rain barrels. She recommended promoting the
availability of both indoor and outdoor products during the Arbor Day event
or even featuring water barrels and other conservation equipment. She asked
about the qualifications to receive a City-funded irrigation audit. Specialist
Gillum said the program is geared to customers with a dedicated irrigation
account or larger commercial uses.
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 6
Chair Swarthout inquired about the possibility of requiring the use of artificial
turf as an alternative to grass for landscaping in open areas of residential
neighborhoods. Director Smith said staff often works with developers;
however, at this time the City does not provide a sewer credit or other form of
credit for reduced ERUs for utilizing different types of landscaping.
I-5/TROSPER ROAD/ Manager Lindauer reported the briefing is an update on the I-5/Trosper
CAPITOL Road/Capitol Boulevard Reconfiguration Project, a request for authority to
BOULEVARD solicit bids, and a request to award a contract.
RECONFIGURATION
PROJECT: Manager Lindauer displayed an aerial vicinity map of the project site. The
extensive transportation project includes primary work on Trosper Road and
Capitol Boulevard and new construction of 6th Avenue and ramp construction
along I-5. All work is located east of I-5 and centered at the intersection of
Trosper Road and Capitol Boulevard.
The project has been in the design and planning stages for many years and is
based on the Capitol Boulevard Corridor Plan adopted in 2014. The plan’s
goal is to transform the old state highway (Capitol Boulevard) into an
economically vibrant community-oriented corridor. The proposed project is
one of the first improvements projects contained in the plan and aligns with
another project currently in design for the Israel Road to M Street Corridor
project.
The project design is geared to reduce traffic delays within the heavily used
intersection of Capitol Boulevard and Trosper Road, improve overall safety,
and enhance multi-modal use. The project meets the City’s strategic goals of
pursuing targeted community development opportunities and creating and
maintaining a transportation system that is safe for all modes of travel.
The project components include:
• Three roundabouts (Trosper Road/Capitol Boulevard, Trosper
Road/6th Avenue/Northbound On Ramps, 6th Avenue serving the
northbound on and off ramps to I-5)
• New roadway extension of Trosper Road to the east behind the Burger
King restaurant and connecting to Linda Street with reconstruction of
approximately 400 feet of Linda Street
• Addition of a new 6th Avenue road
• Rebuilding I-5 northbound on and off ramps to align with new
roundabout
• Storm drainage improvements
• Upgrade sanitary sewer and water mains and systems
• Utility undergrounding
• Street lighting and crosswalk beacon systems
• Landscaping and irrigation
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 7
The initial construction cost of the project was forecasted as $8.3 million in
2020 during the planning and preliminary design stage. The current estimate
is $10.5 million. The project is funded through the Capital Facilities Plan’s
(CFP) Transportation, Sewer, Water, and Storm CFPs. The largest component
of $8.3 million is from the Transportation CFP comprised of different funding
sources of grants, impact fees, Transportation Benefit District funds, and the
Transportation CFP fund balance.
The project increase is reflective of the lapse of time between the original
planning estimates and the current engineering estimates with one of the
largest drivers attributed to the overall significant cost increase in the
construction industry. Nationally, over the last 12 months the construction
industry has experienced an increase of 21.5% with an increase of 26.1% in
the Seattle area. The increase is driven by inflation, supply chain issues,
material cost increases, and oil price increases (asphalt). The bid includes an
adjustment in the cost estimate for asphalt as a way to control increased prices
for asphalt during the project. Other additional components added to the
project have been scheduled in the Utility Comprehensive Plan. One is a water
and storm project on Lee Street. Other contributing factors to the project cost
increase are changes in the City’s design guidelines.
Councilmember Schneider recommended consideration of installing water-
efficient plants and/or artificial grass to increase water conservation and to set
an example to the community. Manager Lindauer advised that most of the
landscaping completed by the City includes water-efficient plants. The
irrigation system is a function of ensuring the plants remain viable for the first
several years until the plants become established.
Councilmember Althauser asked about the timeline for project
groundbreaking. Manager Lindauer replied that staff anticipates beginning
construction this year if the bid is released soon. The first phase of the project
is underground work with a majority completed this year and through the
winter. Road construction would likely begin next year. The project will take
approximately 18 months to complete.
MOTION: Councilmember Althauser moved, seconded by Councilmember
Schneider, to authorize staff to solicit bids for the I-5/Trosper
Road/Capitol Boulevard Reconfiguration Project and recommend City
Council make a motion to award and authorize the Mayor to sign a public
works contract with the lowest responsible bidder. A voice vote approved
the motion unanimously.
PRESERVE PARK Manager Carney briefed the committee on proposed equipment to purchase
PLAYGROUND for the Preserve Park.
EQUIPMENT:
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 8
The Preserve Park is located within the Preserve residential subdivision north
of 93rd Avenue and east of Old Highway 99. The park was included in the
CFP when the City purchased the property for the park in 2020. Funding for
the park is from park impact fees.
Manager Carney identified the placement of various park equipment within
the park. He shared photographs of the equipment selected. All equipment
has been competitively bid and is the same type of equipment installed in other
City parks. The proposal is to move forward with the purchase in early May
as all equipment has been identified and the City has received price quotes.
The intent is to complete the park in late November.
Manager Carney shared an illustration of the park layout with the equipment
and play structure. The equipment price range is $250,000 to $325,000
pending an updated quote. Cascade Recreation has provided periodic updates
on pricing; however, prices continue to increase. The last estimate was
midpoint between the low and high estimate. Cascade Recreation will also
install the equipment to maintain manufacturer warranties.
Councilmember Althauser commented on the popularity of ziplines in the
community.
Councilmember Schneider commented on the number of contacts he has
received regarding the status of the park. He lives in the Preserve and many
of the residents have asked about the delay in completing the park. He
conveyed appreciation for the clarification on the timing and for the work on
the project.
Discussion ensued on the potential of a weight limit for the zipline. Manager
Carney advised that he would follow up to identify whether the equipment has
any weight limitations.
Chair Swarthout asked whether the grass areas serve as swales for overflow
areas for stormwater. Manager Carney said the development uses part of the
park area as an infiltration area receiving both winter and irrigation water.
Councilmember Schneider noted that the community has conveyed some
concerns about the area filling with water during the winter as it can be as deep
as two to three feet. He questioned whether flooding could affect the zipline
equipment. Manager Carney explained that the zipline is elevated above the
pond with a seawall installed around the zipline area, in addition to elevating
the equipment to protect against flooding events. It might entail closing the
zipline at times during the winter when water is present and reopening the
feature in the spring.
MOTION: Councilmember Schneider moved, seconded by Councilmember
Althauser, to recommend the City Council approve and authorize the
TUMWATER PUBLIC WORKS COMMITTEE
MINUTES OF VIRTUAL MEETING
April 7, 2022 Page 9
Mayor to sign a public works contract with Cascade Recreation, Inc. for
supply and installation of playground equipment at Preserve Park. A
voice vote approved the motion unanimously.
2022-2035 BARNES Director Smith requested the committee to schedule the date for a public
LAKE ASSESSMENT hearing on May 5, 2022 to receive public testimony on the proposed 2022-
INCREASE - PUBLIC 2034 Barnes Lake 5% annual assessment increase.
HEARING REQUEST:
MOTION: Councilmember Althauser moved, seconded by Councilmember
Schneider, to approve scheduling a public hearing on May 5, 2022 to
receive testimony and forward a recommendation to the City Council
regarding a proposed 5% annual increase to LMD Roll of Rates and
Charges. A voice vote approved the motion unanimously.
ADJOURNMENT: With there being no further business, Chair Swarthout adjourned the
meeting at 9:13 a.m.
Prepared by Puget Sound Meeting Services, psmsoly@earthlink.net
Agenda
PUBLIC WORKS COMMITTEE
AGENDA
Online via Zoom
Thursday, April 07, 2022
8:00 AM
1. Call to Order
2. Roll Call
3. Approval of Minutes: Public Works Committee, March 3, 2022 & March 17, 2022
4. Fourth Amendment to Service Provider Agreement for Historic Brewery Tower Renovation (Don
Carney)
5. Water Conservation Program Update (Carrie Gillum)
6. I-5 / Trosper Road / Capitol Boulevard Reconfiguration Project (Bill Lindauer)
7. Preserve Park Playground Equipment (Don Carney)
8. 2022-2035 Barnes Lake Assessment Increase - Public Hearing Request (Dan Smith)
9. Additional Items
10. Adjourn
Remote Meeting Information
To comply with Governor Inslee's Proclamation 20-28, the City of Tumwater meetings will be conducted
remotely, not in-person, using a web-based platform. The public will have telephone and online access
to all meetings.
Watch Online
https://us02web.zoom.us/j/84058768043?pwd=dVFzeXI3OStvSHlwNmdsZ3VjWXdYUT09
Listen by Telephone
Call (253) 215-8782, listen for the prompts and enter the Webinar ID 840 5876 8043 and Passcode
909713.
Post Meeting
Audio of the meeting will be recorded and later available by request, please email
CityClerk@ci.tumwater.wa.us
Accommodations
The City of Tumwater takes pride in ensuring that people with disabilities are able to take part in, and
benefit from, the range of public programs, services, and activities offered by the City. To request an
accommodation or alternate format of communication, please contact the City Clerk by calling (360)
252-5488 or email CityClerk@ci.tumwater.wa.us. For vision or hearing impaired services, please
contact the Washington State Relay Services at 7-1-1 or 1-(800)-833-6384. To contact the City’s ADA
Coordinator directly, call (360) 754-4128 or email ADACoordinator@ci.tumwater.wa.us.